CN115392767A - Intelligent building site field management system based on BIM and 5G technologies - Google Patents
Intelligent building site field management system based on BIM and 5G technologies Download PDFInfo
- Publication number
- CN115392767A CN115392767A CN202211110926.7A CN202211110926A CN115392767A CN 115392767 A CN115392767 A CN 115392767A CN 202211110926 A CN202211110926 A CN 202211110926A CN 115392767 A CN115392767 A CN 115392767A
- Authority
- CN
- China
- Prior art keywords
- module
- bim
- construction
- unit
- staff
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005516 engineering process Methods 0.000 title claims abstract description 16
- 238000010276 construction Methods 0.000 claims abstract description 81
- 238000001514 detection method Methods 0.000 claims abstract description 24
- 238000000034 method Methods 0.000 claims abstract description 17
- 238000000691 measurement method Methods 0.000 claims description 6
- 230000036541 health Effects 0.000 claims description 4
- 238000012544 monitoring process Methods 0.000 claims description 3
- 238000012937 correction Methods 0.000 abstract description 6
- 230000008676 import Effects 0.000 abstract description 5
- 230000009897 systematic effect Effects 0.000 abstract description 3
- 238000007726 management method Methods 0.000 description 43
- 238000010586 diagram Methods 0.000 description 7
- 230000009471 action Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000012550 audit Methods 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 238000013475 authorization Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009795 derivation Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Geometry (AREA)
- Development Economics (AREA)
- Computer Hardware Design (AREA)
- Educational Administration (AREA)
- Mathematical Analysis (AREA)
- Evolutionary Computation (AREA)
- Architecture (AREA)
- Data Mining & Analysis (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Game Theory and Decision Science (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a BIM and 5G technology-based intelligent construction site field management system, which comprises a BIM system and a central management platform, wherein the BIM system comprises model establishment, data import, model detection, model correction and data export, the output end of the model establishment is electrically connected with the input end of the data import through a wire, the output end of the data import is electrically connected with the input end of the model detection through a wire, the output end of the model detection is electrically connected with the input end of the model correction through a wire, and the output end of the model correction is electrically connected with the input end of the data export through a wire. This wisdom building site field management system based on BIM and 5G technique has solved the job site management system of current stage wisdom building site and has only considered certain aspect such as personnel or material, does not realize the problem of the comprehensive systematic management in job site.
Description
Technical Field
The invention relates to the technical field of construction management systems, in particular to an intelligent construction site field management system based on BIM and 5G technologies.
Background
At present, the building industry of China is urgently awaiting transformation and upgrading, the state and governments at all levels greatly promote the construction of intelligent construction sites, the management system and the management mode of the traditional construction site are difficult to continue, and the construction site management system of the intelligent construction site at the present stage only considers a certain aspect of personnel or materials and the like, and does not realize the comprehensive systematic management of the construction site.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides an intelligent construction site management system based on BIM and 5G technologies, and solves the problem that the construction site management system of the intelligent construction site only considers a certain aspect of personnel or materials and the like at the present stage and does not realize the comprehensive systematic management of the construction site.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides a wisdom building site field management system based on BIM and 5G technique, includes BIM system and central management platform, the BIM system includes that the model is established, data import, the model detects, the model is revised and the data is derived, realize electric connection through the wire between the output that the model was established and the leading-in input of data, realize electric connection through the wire between the leading-in output of data and the model detection input, realize electric connection through the wire between the output that the model detected and the model correction input, realize electric connection through the wire between the output that the model was revised and the data derivation input.
The central management platform comprises a worker unit, a material unit, a mechanical equipment unit, a construction environment unit, a measurement method unit and a construction scheme unit which are connected with the central management platform, wherein the worker unit comprises a worker identification module, a worker detection module, a worker positioning module, a worker post module and a construction progress module, the material unit comprises a material classification module, a material purchasing module, a placing module and a use management module, the mechanical equipment unit comprises a road detection module and a mechanical equipment management module, and the construction scheme unit comprises a related file module and an auditing module.
Preferably, the staff identification module is used for identifying the identity of staff, and the staff positioning module is used for wearing the positioner to position the position of the staff.
Preferably, the personnel post module is used for determining the work type of the staff, and the construction progress module is used for recording construction progress data of the staff each time.
Preferably, the staff detection module detects the health of staff through detection equipment, and the detected data can be uploaded.
Preferably, the material classifying module is used for classifying materials in construction and marking codes, and the use management module is used for recording warehousing quantity and ex-warehouse quantity of the materials and automatically calculating the residual quantity.
Preferably, the material purchasing module is used for recording bills when the material materials are purchased and uploading the bills, and the placing module is used for recording placing conditions and positions of various material materials.
Preferably, the road detection module is used for collecting the conditions of roads by arranging cameras in the roads, and the mechanical equipment management module is used for reasonably arranging the entry and exit, the mounting and dismounting and the placement of mechanical equipment.
Preferably, the related document module is used for submitting the construction related documents to a central management platform for sharing, and the auditing module is used for auditing the construction scheme, the contract and other documents by personnel of each party.
Preferably, the construction environment unit is used for monitoring the construction environment of a construction site.
Preferably, the measuring method unit is used for measuring and detecting each construction condition.
(III) advantageous effects
The invention provides an intelligent construction site field management system based on BIM and 5G technologies. Compared with the prior art, the method has the following beneficial effects: this wisdom building site field management system based on BIM and 5G technique through changing traditional job site management's interactive mode and working method, perfects the management mode of wisdom building site job site, introduces wisdom building site field management with BIM technique and 5G technique, can realize the all-round visual intelligent management to "man-machine material method environmental survey".
Drawings
FIG. 1 is a system diagram of the present invention;
FIG. 2 is a BIM system diagram of the present invention;
FIG. 3 is a system diagram of the central management platform of the present invention;
FIG. 4 is a system diagram of a worker unit according to the present invention;
FIG. 5 is a system diagram of an asset material unit of the present invention;
FIG. 6 is a system diagram of a mechanical device unit of the present invention;
FIG. 7 is a system diagram of a construction scenario unit of the present invention;
FIG. 8 is a flow chart of the present invention.
In the figure: 1. a BIM system; 11. establishing a model; 12. importing data; 13. detecting a model; 14. correcting the model; 15. exporting data; 2. a central management platform; 21. a worker unit; 211. a staff identification module; 212. a staff detection module; 213. a personnel positioning module; 214. a personnel position module; 215. a construction progress module; 22. a material unit; 221. a material classification module; 222. a material purchasing module; 223. a placement module; 224. a usage management module; 23. a mechanical equipment unit; 231. a road detection module; 232. a mechanical equipment management module; 24. a construction environment unit; 25. a measurement method unit; 26. a construction scheme unit; 261. a related file module; 262. and an auditing module.
Detailed Description
The technical solutions in the embodiments of the present invention are clearly and completely described, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, an embodiment of the present invention provides a technical solution: an intelligent construction site field management system based on BIM and 5G technologies comprises a BIM system 1 and a central management platform 2.
Referring to fig. 2, the bim system 1 includes a model building 11, a data importing 12, a model detecting 13, a model correcting 14, and a data exporting 15, where an output end of the model building 11 is electrically connected to an input end of the data importing 12 through a wire, an output end of the data importing 12 is electrically connected to an input end of the model detecting 13 through a wire, an output end of the model detecting 13 is electrically connected to an input end of the model correcting 14 through a wire, and an output end of the model correcting 14 is electrically connected to an input end of the data exporting 15 through a wire.
Referring to fig. 3, the central management platform 2 includes a staff unit 21, an asset material unit 22, a mechanical equipment unit 23, a construction environment unit 24, a measurement method unit 25 and a construction plan unit 26 connected thereto, the construction environment unit 24 is used for monitoring the construction environment of the construction site, and the measurement method unit 25 is used for measuring and detecting each construction condition.
Referring to fig. 4, the staff unit 21 includes a staff identification module 211, a staff detection module 212, a staff positioning module 213, a staff position module 214 and a construction progress module 215, the staff identification module 211 is used for identifying the identity of the staff, the staff positioning module 213 is used for wearing a positioner to position the position of the staff, the staff position module 214 is used for determining the work type of the staff, the construction progress module 215 is used for recording the construction progress data of the staff at each time, the staff detection module 212 detects the physical health of the staff through a detection device, and the detected data can be uploaded.
Referring to fig. 5, the material unit 22 includes a material classifying module 221, a material purchasing module 222, a placing module 223 and a use managing module 224, the material classifying module 221 is used for classifying materials in construction and marking codes, the use managing module 224 is used for recording warehousing quantity and ex-warehouse quantity of the materials and automatically calculating the remaining quantity, the material purchasing module 222 is used for recording bills when the materials are purchased and uploading, and the placing module 223 is used for recording placing conditions and positions of various materials.
Referring to fig. 6, the mechanical device unit 23 includes a road detection module 231 and a mechanical device management module 232, the road detection module 231 collects the conditions of the roads by arranging cameras in the roads, and the mechanical device management module 232 is used for reasonably arranging the entry and exit, the installation and the removal and the placement of the mechanical devices.
Referring to fig. 7, the construction scheme unit 26 includes a related document module 261 and an auditing module 262, where the related document module 261 is used to submit the construction related documents to the central management platform 2 for sharing, and the auditing module 262 is used to audit the construction scheme, the contract and other documents by the personnel.
When the system is used, firstly, modeling of a construction site is carried out through model building 11 in a BIM system 1, modeling is carried out through PhotoSacan three-dimensional software, required data are imported into a model through data import 12 after modeling, model and data are detected through model detection 13, whether errors exist is observed, then, correction is carried out through model correction 14, all data and the models are correspondingly matched, finally, the data are imported into a central management platform 2 through data export 15, then, a worker unit 21, a material unit 22, a mechanical equipment unit 23, a construction environment unit 24, a measurement method unit 25 and a construction scheme unit 26 are in data connection with the central management platform 2, and the central management platform 2 is enabled to carry out data display, search and data change.
Then through staff identification module 211 and staff detection module 212 in staff unit 21, discern the personnel that get into the scene and monitor staff's health condition, and carry out the position through personnel position module 214 and confirm, and personnel positioning module 213 fixes a position all kinds of constructors through wearing the locator, and construction progress module 215 carries out accurate analysis and upload all data that produce to central management platform 2 to staff's behavior, construction progress etc. wherein personnel positioning module 213 can show the region that the staff is located in BIM system 1.
In addition, the material classifying module 221 in the material classifying unit 22 classifies and marks materials in the construction site, the material purchasing module 222 can record purchasing conditions of various materials and materials in the construction site, the placing module 223 realizes stacking conditions of the materials, the management module 224 is used for managing the materials, the warehousing quantity and the ex-warehouse quantity of the materials are recorded, and the residual quantity is automatically calculated.
Road detection module 231 judges each inside road in building site in mechanical equipment unit 23 through the camera in the condition of use to and mechanical equipment management module 232 rationally arranges mechanical equipment's business turn over, ann tears open and put, improves the management and control efficiency in building site.
The related document module 261 in the construction scheme unit 26 is used for submitting the construction related documents to the central management platform 2 for sharing, and the auditing module 262 audits the construction scheme, the contract and other documents through personnel of each party, so that the office efficiency is improved.
The construction environment unit 24 monitors the construction environment of the construction site, prevents the construction environment of the project from being abnormal, reduces construction pollution, and improves the safety of the construction operation of workers.
The measuring method unit 25 is used to measure and detect the respective construction situation.
Referring to fig. 8, the construction process is as follows;
firstly, a worker logs in the central management platform 2, secondly, the construction scheme, the data, the contract files, the construction site data, the video and the like are uploaded respectively, then, the worker checks and verifies the construction scheme, the data, the contract files, the construction site data, the video and the like, the construction scheme, the data, the contract files, the construction site data, the video and the like are discussed and fed back with the worker after the verification is passed, the final file is determined, the signature authorization of the responsible person is carried out, and the file and the related information are filed.
And those not described in detail in this specification are well within the skill of those in the art.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (10)
1. The utility model provides an wisdom building site field management system based on BIM and 5G technique, includes BIM system (1) and central management platform (2), its characterized in that: the BIM system (1) comprises a model building (11), a data importing (12), a model detecting (13), a model correcting (14) and a data exporting (15), wherein the output end of the model building (11) is electrically connected with the input end of the data importing (12) through a wire, the output end of the data importing (12) is electrically connected with the input end of the model detecting (13) through a wire, the output end of the model detecting (13) is electrically connected with the input end of the model correcting (14) through a wire, and the output end of the model correcting (14) is electrically connected with the input end of the data exporting (15) through a wire;
the central management platform (2) comprises a worker unit (21), a material unit (22), a mechanical equipment unit (23), a construction environment unit (24), a measurement method unit (25) and a construction scheme unit (26) which are connected with the central management platform;
the staff unit (21) comprises a staff identification module (211), a staff detection module (212), a staff positioning module (213), a staff position module (214) and a construction progress module (215);
the material purchasing unit (22) comprises a material classifying module (221), a material purchasing module (222), a placing module (223) and a use management module (224);
the mechanical equipment unit (23) comprises a road detection module (231) and a mechanical equipment management module (232);
the construction scheme unit (26) comprises a related file module (261) and an auditing module (262).
2. The intelligent building site management system based on BIM and 5G technology of claim 1, wherein: the staff identification module (211) is used for identifying the identity of staff, and the staff positioning module (213) is used for wearing a positioner to position the position of the staff.
3. The intelligent building site management system based on BIM and 5G technology of claim 1, wherein: the personnel position module (214) is used for determining the work type of workers, and the construction progress module (215) is used for recording construction progress data of the workers each time.
4. The intelligent building site management system based on BIM and 5G technology as claimed in claim 1, wherein: the staff detection module (212) detects the health of staff through detection equipment, and detected data can be uploaded.
5. The intelligent building site management system based on BIM and 5G technology of claim 1, wherein: the material classifying module (221) is used for classifying materials in construction and marking codes, and the use management module (224) is used for recording the warehousing quantity and the ex-warehouse quantity of the materials and automatically calculating the residual quantity.
6. The intelligent building site management system based on BIM and 5G technology of claim 1, wherein: the material purchasing module (222) is used for recording bills when the material materials are purchased and uploading the bills, and the placing module (223) is used for recording placing conditions and positions of various material materials.
7. The intelligent building site management system based on BIM and 5G technology of claim 1, wherein: the road detection module (231) is used for collecting the conditions of roads by arranging cameras in the roads, and the mechanical equipment management module (232) is used for reasonably arranging the entry and exit, the mounting and dismounting and the placement of mechanical equipment.
8. The intelligent building site management system based on BIM and 5G technology of claim 1, wherein: the related file module (261) is used for submitting the construction related files to the central management platform (2) for sharing, and the auditing module (262) is used for auditing the construction scheme, the contract and other files by personnel.
9. The intelligent building site management system based on BIM and 5G technology of claim 1, wherein: the construction environment unit (24) is used for monitoring the construction environment of a construction site.
10. The intelligent building site management system based on BIM and 5G technology of claim 1, wherein: the measuring method unit (25) is used for measuring and detecting various construction conditions.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211110926.7A CN115392767A (en) | 2022-09-13 | 2022-09-13 | Intelligent building site field management system based on BIM and 5G technologies |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211110926.7A CN115392767A (en) | 2022-09-13 | 2022-09-13 | Intelligent building site field management system based on BIM and 5G technologies |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115392767A true CN115392767A (en) | 2022-11-25 |
Family
ID=84125738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211110926.7A Pending CN115392767A (en) | 2022-09-13 | 2022-09-13 | Intelligent building site field management system based on BIM and 5G technologies |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115392767A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116739516A (en) * | 2023-06-10 | 2023-09-12 | 达蒙数字科技(南通)有限公司 | Intelligent building site management system, intelligent building site management method and electronic equipment |
-
2022
- 2022-09-13 CN CN202211110926.7A patent/CN115392767A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116739516A (en) * | 2023-06-10 | 2023-09-12 | 达蒙数字科技(南通)有限公司 | Intelligent building site management system, intelligent building site management method and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105182935B (en) | A kind of production management system and its control method | |
US7313759B2 (en) | System and method for mobile data collection | |
CN113780990A (en) | Cloud intelligence manufacturing platform based on artificial intelligence production management mode and processing method | |
CN107203838A (en) | Equipment management system | |
US8248269B1 (en) | Advanced metering infrastructure installation auditing | |
CN109242145B (en) | Batch alternate field operation method, device and system for electric energy meters | |
CN114443923A (en) | Electronic archiving method and system for power grid operation and inspection project archives | |
CN106127398A (en) | A kind of construction costs being applicable to project of transmitting and converting electricity calculates system | |
CN113503912A (en) | Urban rail transit civil engineering facility health status real-time monitoring system | |
CN106095462A (en) | A kind of embedded distribution system program configuration version management method | |
CN115392767A (en) | Intelligent building site field management system based on BIM and 5G technologies | |
CN108961085A (en) | A kind of vehicle insurance intelligence loss assessment system and method | |
CN107693997A (en) | A kind of fire-fighting equipment detection and maintaining management system and management method | |
CN118171811A (en) | Engineering supervision method and system based on blockchain and BIM | |
CN112163813B (en) | Transaction list accounting method for online purchasing | |
CN113807797A (en) | Underground engineering construction management and monitoring system integrated with BIM and intelligent algorithm | |
CN117196853A (en) | Asset management digital system | |
CN112085523A (en) | BIM engineering information management method and system | |
CN115907615A (en) | Power test equipment storehouse management system | |
EP4211522A1 (en) | A method directed to interaction in a digital maintenance log system | |
CN117474531B (en) | Renewable resource industry service system based on block chain | |
US20240310345A1 (en) | Systems and methods for calculating carbon emission reductions | |
CN114333180B (en) | Financial self-service equipment maintenance method based on blockchain technology | |
CN118673943A (en) | Segment NFC chip card identification method, server, medium and program product | |
KR20240076885A (en) | Integrated management system for pavement quality data and method therefor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |