CN115375413B - ERP purchase calculation method and system - Google Patents

ERP purchase calculation method and system Download PDF

Info

Publication number
CN115375413B
CN115375413B CN202211300734.2A CN202211300734A CN115375413B CN 115375413 B CN115375413 B CN 115375413B CN 202211300734 A CN202211300734 A CN 202211300734A CN 115375413 B CN115375413 B CN 115375413B
Authority
CN
China
Prior art keywords
calculating
supplier
supply
progress
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202211300734.2A
Other languages
Chinese (zh)
Other versions
CN115375413A (en
Inventor
胡志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi University of Technology
Original Assignee
Jiangxi University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi University of Technology filed Critical Jiangxi University of Technology
Priority to CN202211300734.2A priority Critical patent/CN115375413B/en
Publication of CN115375413A publication Critical patent/CN115375413A/en
Application granted granted Critical
Publication of CN115375413B publication Critical patent/CN115375413B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0633Lists, e.g. purchase orders, compilation or processing
    • G06Q30/0635Processing of requisition or of purchase orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0605Supply or demand aggregation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0611Request for offers or quotes

Abstract

The invention is suitable for the technical field of purchasing systems, and particularly relates to an ERP purchasing calculation method and system, wherein the method comprises the following steps: acquiring basic information of project progress, material demand information and historical order information; calculating and judging whether the project progress has delay or not according to the basic information of the project progress, and calculating the expiration time; inquiring historical order information, calculating a supply period and a material price of each provider, and calculating material cost corresponding to supply of each provider; calculating overdue penalties corresponding to the supplier supplies of all the suppliers, calculating corresponding total costs, selecting the corresponding supplier with the lowest total cost, and generating the purchase order. The invention analyzes the historical supply data of the supplier, and brings the supply period and the overdue default penalty of the supplier into the calculation range, thereby ensuring the lowest total cost when calculating the purchasing cost.

Description

ERP purchase calculation method and system
Technical Field
The invention belongs to the technical field of purchasing systems, and particularly relates to an ERP purchasing calculation method and system.
Background
ERP is a management idea of supply chain. The enterprise resource plan is a management platform which is established on the basis of information technology and provides decision operation means for an enterprise decision layer and employees by using a systematic management idea. The ERP system supports mixed manufacturing environments of discrete type, flow type and the like, the application range is expanded from the manufacturing industry to the public service departments of retail industry, service industry, banking industry, telecommunication industry, government organs, schools and the like, and enterprise resources are effectively integrated by fusing database technology, a graphical user interface, a fourth generation query language, a client server structure, a computer-aided development tool, a portable open system and the like.
The ERP is not separated from the high development of computer technology, and users have greater initiative on the system, and the functions involved in computer-aided management far exceed the scope of MRP II. The functions of the ERP include multi-factory management, quality management, laboratory management, equipment maintenance management, warehouse management, transportation management, process control interfaces, data collection interfaces, electronic communications, e-mail, regulations and standards, project management, financial investment management, and market information management, among others.
However, in the current ERP purchasing system, the suppliers in the system are directly purchased, and some systems still cannot select different suppliers according to different material requirements.
Disclosure of Invention
The embodiment of the invention aims to provide an ERP purchasing calculation method, and aims to solve the problem that in a current ERP purchasing system, different suppliers cannot be selected according to different material requirements because purchasing is directly performed on the suppliers in the system.
The embodiment of the invention is realized in such a way that an ERP purchasing calculation method comprises the following steps:
acquiring basic information of a project progress, material demand information and historical order information, wherein the basic information of the project progress comprises a project progress proportion and available time;
calculating and judging whether the project progress has delay or not according to the basic information of the project progress, and calculating the expiration time;
inquiring historical order information, calculating a supply period and a material price of each provider, and calculating material cost corresponding to supply of each provider;
calculating overdue penalty corresponding to each supplier supply, calculating corresponding total cost, selecting the corresponding supplier with the lowest total cost, and generating a purchase order.
Preferably, the step of calculating and judging whether the project progress has a delay or not according to the basic information of the project progress and calculating the expiration time specifically includes:
acquiring a progress plan, and determining a plan progress value corresponding to the current moment;
judging whether a delay exists according to a project progress proportion and a plan progress value in the project progress basic information;
and calculating the current average progress value, and calculating the timeout period according to the average progress value.
Preferably, the steps of querying the historical order information, calculating a supply period and a material price of each provider, and calculating a material cost corresponding to supply of each provider include:
inquiring historical order information, and calculating the average supply time of a provider to obtain a supply period;
inquiring the price of the materials provided by each supplier at the current time;
and calculating the supply cost corresponding to each supplier according to the material demand information to obtain the material cost.
Preferably, the step of calculating the average supply time of the supplier to obtain the supply period is carried out by inquiring the historical order informationIn the middle, secondiA supplier suppliesjThe calculation formula of the supply period corresponding to the seed material is expressed as follows:
Figure 883846DEST_PATH_IMAGE001
wherein the content of the first and second substances,
Figure 332145DEST_PATH_IMAGE002
is shown asiA supplier suppliesjThe corresponding supply period of the seed material,
Figure 643041DEST_PATH_IMAGE003
is shown asiThe basic supply period corresponding to the supply of one material by each supplier,
Figure 569409DEST_PATH_IMAGE004
is shown asiA supplier suppliesjThe current supply quantity corresponding to the seed material,
Figure 413475DEST_PATH_IMAGE005
is shown asiThe corresponding basic supply quantity when one material is supplied by each supplier,
Figure 767095DEST_PATH_IMAGE006
is shown asiThe supplier is on the first of the collectionjCorrecting factors of the corresponding supply difficulty degree when the materials are planted,
Figure 565287DEST_PATH_IMAGE007
Mindicates the total number of suppliers,
Figure 295346DEST_PATH_IMAGE008
Figure 495383DEST_PATH_IMAGE009
representing the maximum amount of the total variety of material required by the requesting party.
Preferably, in the step of calculating the supply cost corresponding to each supplier according to the material demand information to obtain the material cost, the following formula exists:
Figure 19905DEST_PATH_IMAGE010
wherein the content of the first and second substances,
Figure 305393DEST_PATH_IMAGE011
indicating procurement ofiA supplier
Figure 573563DEST_PATH_IMAGE004
Supply quantity ofjThe material cost corresponding to the material to be planted,
Figure 831369DEST_PATH_IMAGE012
denotes the firstiA supplier suppliesjThe material unit price corresponding to the seed material.
Preferably, the step of calculating the overdue penalty corresponding to each supplier supply, calculating the corresponding total cost, selecting the supplier corresponding to the lowest total cost, and generating the purchase order specifically includes:
determining corresponding overdue time according to the supply period corresponding to each provider;
determining corresponding overdue penalty according to a preset overdue penalty calculation formula;
and calculating the total cost according to the overdue penalty and the material cost corresponding to each supplier, and selecting the supplier corresponding to the lowest total cost to generate the purchase order.
Preferably, in the step of determining the corresponding overdue time according to the supply period corresponding to each supplier, there is the following formula:
Figure 90575DEST_PATH_IMAGE013
wherein the content of the first and second substances,
Figure 66621DEST_PATH_IMAGE014
denotes the firstiA supplier suppliesjThe overdue time corresponding to the seed material,
Figure 669641DEST_PATH_IMAGE015
represents demander toiA supplier suppliesjThe waiting time corresponding to the seed material.
Preferably, in the step of determining the corresponding overdue penalty according to a preset overdue penalty calculation formula, there is the following formula:
Figure 844270DEST_PATH_IMAGE016
wherein, the first and the second end of the pipe are connected with each other,
Figure 710595DEST_PATH_IMAGE017
denotes the firstiA supplier suppliesjThe overdue penalty corresponding to the seed material,
Figure 173937DEST_PATH_IMAGE018
a first threshold value representing the time-out,
Figure 783910DEST_PATH_IMAGE019
denotes the firstiA supplier suppliesjUnit penalty value per unit time when seeding.
Preferably, in the step of calculating the total cost according to the overdue penalty and the material cost corresponding to each supplier, selecting the supplier corresponding to the lowest total cost, and generating the purchase order, the following formula exists:
Figure 813046DEST_PATH_IMAGE020
wherein the content of the first and second substances,
Figure 416983DEST_PATH_IMAGE021
indicating the demander procurement ofiA supplier suppliesjThe cost corresponding to the seed material;
Figure 898780DEST_PATH_IMAGE022
wherein, the first and the second end of the pipe are connected with each other,
Figure 515707DEST_PATH_IMAGE023
indicating the demander procurement ofiThe total cost for all kinds of materials supplied by an individual supplier,
Figure 399349DEST_PATH_IMAGE009
representing the maximum amount of the total variety of material required by the requesting party.
Another object of an embodiment of the present invention is to provide an ERP procurement calculation system, including:
the system comprises an information acquisition module, a data processing module and a data processing module, wherein the information acquisition module is used for acquiring basic information of project progress, material demand information and historical order information, and the basic information of the project progress comprises project progress proportion and available time;
the time calculation module is used for calculating and judging whether the project progress has delay or not according to the basic information of the project progress and calculating the time of overdue;
the cost calculation module is used for inquiring historical order information, calculating the supply period and the material price of each supplier and calculating the material cost corresponding to the supply of each supplier;
the supplier selection module is used for calculating overdue penalties corresponding to the supply of each supplier, calculating corresponding total cost, selecting the corresponding supplier with the lowest total cost and generating a purchase order;
preferably, the time calculation module includes:
the progress value calculating unit is used for acquiring a progress plan and determining a plan progress value corresponding to the current moment;
the progress analysis unit is used for judging whether a delay exists according to the project progress proportion and the plan progress value in the project progress basic information;
the average progress calculation unit is used for calculating the current average progress value and calculating the time-out according to the average progress value;
preferably, the cost calculation module includes:
the supply period calculating unit is used for inquiring the historical order information and calculating the average supply time of the provider to obtain a supply period;
the material price inquiry unit is used for inquiring the material price provided by each supplier at the current moment;
the material cost calculating unit is used for calculating the supply cost corresponding to each supplier according to the material demand information to obtain the material cost;
preferably, the supplier selection module includes:
the total overdue time calculation unit is used for determining total overdue time according to the supply periods corresponding to the suppliers;
the penalty calculation unit is used for inquiring a preset overdue penalty calculation formula and determining corresponding overdue penalty;
and the order generating unit is used for calculating the total cost according to the overdue penalty and the material cost corresponding to each supplier, selecting the supplier corresponding to the lowest total cost and generating the purchase order.
According to the ERP procurement calculation method provided by the embodiment of the invention, through analyzing the historical supply data of the supplier, the supply period and overdue default penalties of the supplier are included in the calculation range, so that the lowest total cost is ensured when the procurement cost is calculated.
Drawings
Fig. 1 is a flowchart of an ERP procurement calculation method according to an embodiment of the present invention;
FIG. 2 is a flowchart illustrating steps of calculating and determining whether there is a delay in the project schedule and calculating an expiration time according to basic information of the project schedule according to an embodiment of the present invention;
fig. 3 is a flowchart illustrating steps of querying historical order information, calculating a supply period and a material price of each provider, and calculating a material cost corresponding to supply of each provider according to an embodiment of the present invention;
FIG. 4 is a flowchart illustrating steps provided by an embodiment of the present invention for calculating overdue penalties corresponding to supplier supplies of various suppliers, calculating corresponding total costs, selecting a supplier with the lowest total cost, and generating a purchase order;
FIG. 5 is an architecture diagram of an ERP procurement computing system according to an embodiment of the invention;
FIG. 6 is an architecture diagram of a time calculation module according to an embodiment of the present invention;
FIG. 7 is an architecture diagram of a cost calculation module according to an embodiment of the present invention;
fig. 8 is an architecture diagram of a vendor selection module according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
It will be understood that, as used herein, the terms "first," "second," and the like may be used herein to describe various elements, but these elements are not limited by these terms unless otherwise specified. These terms are only used to distinguish one element from another. For example, a first xx script may be referred to as a second xx script, and similarly, a second xx script may be referred to as a first xx script, without departing from the scope of the present application.
The ERP is not separated from the high development of computer technology, and users have greater initiative on the system, and the functions involved in computer-aided management far exceed the scope of MRP II. ERP functions include multi-factory management, quality management, laboratory management, equipment maintenance management, warehouse management, transportation management, process control interfaces, data collection interfaces, electronic communications, e-mail, regulations and standards, project management, financial investment management, and market information management, among others. In the current ERP purchasing system, purchasing is directly carried out on suppliers in the system, and part of ERP purchasing systems still cannot select different suppliers according to different material requirements.
The invention analyzes the historical supply data of the supplier, and brings the supply period and the overdue default penalty of the supplier into the calculation range, thereby ensuring the lowest total cost when calculating the purchasing cost.
As shown in fig. 1, a flowchart of an ERP procurement calculation method according to an embodiment of the present invention is provided, where the method includes:
s100, acquiring basic information of project progress, material demand information and historical order information, wherein the basic information of the project progress comprises project progress proportion and available time.
In the step, basic information of project progress, material demand information and historical order information are obtained, wherein the basic information of project progress comprises the total planning period of the current project and the daily planning progress. For example, the total time of the project is 100 days, in the total planning period, 1% of tasks are planned to be completed each day, so that the progress is recorded each day to obtain the project progress proportion, the actual completion amount of the progress is determined, and the project progress proportion is used as an index for measuring the progress of the project.
The material demand information refers to the material to be purchased in the current project and includes the type, model and quantity of the material, and the historical order information is the material information purchased in the history and includes a supplier code, a historical supply time, a historical supply price and the like.
And S200, calculating and judging whether the project progress has delay or not according to the basic information of the project progress, and calculating the expiration time.
In this step, whether or not there is a delay in the project progress is calculated and determined based on the basic information of the project progress. The actual progress of the current project is recorded in the basic information of the project progress, and the daily progress amount is arranged in the total progress plan, so that the actual progress can be counted every day, the actual progress is compared with the plan progress, whether the current project progress has delay or not is determined, and the corresponding expiry time is calculated. The term "time out" refers to the time length that the original scheduled time will be exceeded according to the current project schedule. For example, if the project is planned to be completed in 10 days and the project is completed in 11 days according to the actual schedule, the expiration time is 1 day, and if there is no delay, the expiration time is 0 or a negative number.
S300, historical order information is inquired, the supply period and the material price of each provider are calculated, and the material cost corresponding to supply of each provider is calculated.
In this step, the historical order information is queried, and in the historical order, the time consumed by each supplier in the supply process is recorded, for example, in the supply process of the supplier A, the supply quantity is
Figure 873056DEST_PATH_IMAGE024
The supply time is
Figure 842149DEST_PATH_IMAGE025
In another supply process, the supply quantity is
Figure 793924DEST_PATH_IMAGE026
The supply time is
Figure 797652DEST_PATH_IMAGE027
And determining the supply periods required by different supply quantities according to the relationship between the supply quantities and the supply time, and then determining the price of the material.
S400, calculating overdue penalties corresponding to the supplier supplies of all the providers, calculating corresponding total costs, selecting the corresponding provider with the lowest total cost, and generating a purchase order.
In the step, the overdue penalties corresponding to the material supply of each provider are calculated, the time required for completing the current project is calculated according to the current project schedule, the influence of the material supply periods corresponding to different providers on the project completion time is determined, the overdue penalties to be generated are calculated according to the overdue time, the total costs corresponding to the different providers are obtained, the provider corresponding to the lowest total cost is selected, and the purchase order is generated.
As shown in fig. 2, as a preferred embodiment of the present invention, the step of calculating and judging whether there is a delay in the project progress according to the project progress basic information and calculating the expiration time specifically includes:
s201, obtaining a progress plan, and determining a plan progress value corresponding to the current time.
In this step, a schedule is obtained, the time for implementing the project is determined according to the project starting time and the date corresponding to the current time, and then the task schedule which should be completed by the project at the current time is obtained through query. For example, for a ten day project, the project schedule on the fifth day should be 50%, i.e., the projected schedule value is 50%.
And S202, judging whether a delay exists according to the project progress proportion and the planning progress value in the project progress basic information.
In this step, a project progress ratio in the project progress basic information is called, the project progress ratio is a progress of actually completing the project, for example, the completion progress on the fifth day is 48%, and then the project progress ratio is compared with a planning progress value to determine whether there is a delay in the current project, the completion progress on the fifth day is 48%, and the planning progress value is 50%, which indicates the project delay.
S203, calculating the current average progress value, and calculating the time-out according to the average progress value.
In this step, the current average progress value is calculated, and if 48% of tasks are completed on the fifth day, it indicates that the daily progress of the current project is 9.6%, the time required for the remaining tasks is calculated according to the remaining task amount, that is, the time required for completing the remaining 50% of task amount is calculated with the daily progress of 9.6%, and the expiration time is determined.
As shown in fig. 3, as a preferred embodiment of the present invention, the steps of querying the historical order information, calculating a supply period and a material price of each provider, and calculating a material cost corresponding to supply of each provider specifically include:
s301, historical order information is inquired, and the average supply time of the provider is calculated to obtain the supply period.
In this step, historical order information is queried, historical order information corresponding to one supplier is queried each time, and the relationship between the quantity corresponding to each material and the supply time is queried, so that the supply cycle of different quantities of goods corresponding to each material of each supplier is determined.
In this step, theiA supplier suppliesjThe calculation formula of the supply period corresponding to the seed material is expressed as follows:
Figure 943725DEST_PATH_IMAGE001
wherein the content of the first and second substances,
Figure 400114DEST_PATH_IMAGE002
denotes the firstiA supplier suppliesjThe corresponding supply period of the seed material,
Figure 155581DEST_PATH_IMAGE003
denotes the firstiThe basic supply period corresponding to the supply of one material by each supplier,
Figure 748236DEST_PATH_IMAGE004
is shown asiA supplier suppliesjThe current supply quantity corresponding to the seed material,
Figure 563745DEST_PATH_IMAGE005
denotes the firstiThe basic supply quantity corresponding to one material supplied by each supplier,
Figure 507430DEST_PATH_IMAGE006
is shown asiThe supplier is on the first of the collectionjCorrecting factors of corresponding material supply difficulty degree when planting materials,
Figure 66588DEST_PATH_IMAGE007
Mpresentation provisioningThe total number of the quotients,
Figure 779329DEST_PATH_IMAGE008
Figure 998695DEST_PATH_IMAGE009
representing the maximum amount of the total kind of material required by the demand side.
As a supplementary explanation, it is possible to,
Figure 429677DEST_PATH_IMAGE007
indicating that the total number of suppliers in the supplier database isM. In addition, in the case of the present invention,
Figure 792525DEST_PATH_IMAGE008
the type of material being specific to the requesting party, i.e. the maximum amount of the total type of material required by the requesting party isJAnd (4) seed preparation.
S302, inquiring the material prices provided by each supplier at the current time.
In this step, theiA supplier suppliesjThe unit price of the material corresponding to the seed material is expressed as
Figure 625352DEST_PATH_IMAGE012
. It should be noted here that
Figure 517084DEST_PATH_IMAGE012
The unit price is indicated, and the corresponding supply quantity is required to be combined when the total price is calculated.
And S303, calculating supply costs corresponding to each supplier according to the material demand information to obtain the material costs.
In this step, the prices of the materials provided by the suppliers at the current time are inquired, the prices of the materials are provided by the suppliers, the supply period required by each material can be determined according to the material demand information, and the material cost corresponding to the same material provided by each supplier can be calculated and obtained if the prices of the materials are obtained.
As described above, the first timeiSupply by a supplierFirst, thejThe current supply quantity corresponding to the seed material
Figure 435362DEST_PATH_IMAGE004
And a firstiA supplier suppliesjMaterial unit price corresponding to the kind of material
Figure 336322DEST_PATH_IMAGE012
Then, the purchasing number can be calculatediA supplier
Figure 758076DEST_PATH_IMAGE004
Supply quantity ofjMaterial cost corresponding to the kind of material
Figure 289551DEST_PATH_IMAGE011
Specifically, it is represented as:
Figure 931010DEST_PATH_IMAGE010
as shown in fig. 4, as a preferred embodiment of the present invention, the steps of calculating overdue penalties corresponding to goods suppliers of various providers, calculating corresponding total costs, selecting a provider corresponding to the lowest total cost, and generating a purchase order specifically include:
s401, determining corresponding overdue time according to the supply period corresponding to each supplier.
In this embodiment, since the prices of materials of the suppliers are different, the demander comprehensively considers the price of the material of each supplier when purchasing the material, and comprehensively sets the waiting time corresponding to a certain material for each supplier. Specifically, the formula for determining the corresponding expiration time according to the supply period corresponding to each provider is as follows:
Figure 635661DEST_PATH_IMAGE013
wherein the content of the first and second substances,
Figure 177501DEST_PATH_IMAGE014
denotes the firstiA supplier suppliesjThe overdue time corresponding to the seed material,
Figure 676615DEST_PATH_IMAGE015
represents demander toiA supplier suppliesjThe waiting time corresponding to the seed material. It can be understood that when the demander is rightiA supplier suppliesjWaiting time corresponding to variety of materials
Figure 569485DEST_PATH_IMAGE015
Is greater than that ofiA supplier suppliesjSupply period corresponding to the material
Figure 812248DEST_PATH_IMAGE002
If so, the overdue time is 0, otherwise, the overdue time is the absolute value of the difference between the two. And S402, determining the corresponding overdue penalty according to a preset overdue penalty calculation formula.
In the step, according to a preset overdue penalty calculation formula, when a project is agreed in a project contract and is delayed, the overdue penalty is calculated in a mode, so that the overdue penalty can be directly determined, and different suppliers can have different supply periods, and different overdue penalties can be caused.
It should be noted that, when purchasing, the demand side often considers two factors, namely price and supply period. If the supplier is considered to be less expensive by the demander and the demander allows for overdue offerings within acceptable limits, a combination of two factors is often considered. On the contrary, some suppliers with strong timeliness do not have overdue, but the unit price of the given materials is often higher, and the demand side is not necessarily favored.
In this embodiment, the demander purchasesiOf a supplierjThe formula of overdue penalty corresponding to the seed material is shown as follows:
Figure 411856DEST_PATH_IMAGE016
wherein the content of the first and second substances,
Figure 81872DEST_PATH_IMAGE017
is shown asiA supplier suppliesjThe overdue penalty corresponding to the seed material,
Figure 196458DEST_PATH_IMAGE018
a first threshold value representing the time-out,
Figure 493446DEST_PATH_IMAGE019
is shown asiA supplier suppliesjUnit penalty value per unit time when seeding. And S403, calculating the total cost according to the overdue penalty and the material cost corresponding to each supplier, selecting the supplier corresponding to the lowest total cost, and generating the purchase order.
In this step, the demander purchasesiOf a supplierjThe cost calculation formula corresponding to the material is expressed as follows:
Figure 9878DEST_PATH_IMAGE020
wherein the content of the first and second substances,
Figure 116374DEST_PATH_IMAGE021
indicating the demander procurement ofiA supplier suppliesjThe cost corresponding to the material.
Further, the demander procuresiThe formula for calculating the total cost for all kinds of materials supplied by an individual supplier is expressed as:
Figure 718257DEST_PATH_IMAGE022
wherein the content of the first and second substances,
Figure 302822DEST_PATH_IMAGE023
indicating the demander procurement ofiSupply by one supplierThe total cost corresponding to all kinds of materials,
Figure 877023DEST_PATH_IMAGE009
representing the maximum amount of the total variety of material required by the requesting party. It will be appreciated that in this embodiment, the total number of suppliers isMThe demanders can pass the comparisonMAnd finally determining a proper purchasing scheme according to the level of the total purchasing cost corresponding to any one of the suppliers, and further generating a purchasing order.
In the step, the total cost is calculated according to the overdue penalty and the material costs corresponding to each supplier, the overdue penalty and the material costs are superposed to obtain the total cost, then the total cost corresponding to the supply of goods by adopting different suppliers is compared, and one supplier with the lowest total cost is selected, because the supply periods of the different suppliers are different, the given prices of the different suppliers have corresponding differences, for example, the supply period of the supplier A is 10 days, the price is B, the supply period of the supplier A is 5 days, and the price is 1.5B, so that the supply period is long, the project is overdue, but the total cost is reduced, and the project cost can be ensured to be lower by comparison; the purchase order comprises the material quantity and the latest supply time; and if the total overdue time exceeds the preset value, determining the supplier with the lowest cost by taking the total overdue time as a limit.
As shown in fig. 5, an ERP procurement computing system provided for an embodiment of the present invention includes:
the information obtaining module 100 is configured to obtain basic information of a project progress, material demand information, and historical order information, where the basic information of the project progress includes a project progress proportion and available time.
In the system, an information acquisition module 100 acquires basic project schedule information, material demand information and historical order information, wherein the basic project schedule information includes a total planning period of a current project and a daily planning schedule, and if the total project time is 100 days, 1% of task amount is planned to be completed every day in the total planning period, so that the progress is recorded every day to obtain a project schedule proportion, an actual completion amount of the progress is determined, and the project schedule proportion is used as an index for measuring the progress of the project.
The material demand information refers to the material to be purchased in the current project and includes the type, model and quantity of the material, and the historical order information is the material information purchased in history and includes a supplier code, historical supply time, historical supply price and the like.
And the time calculating module 200 is used for calculating and judging whether the project progress has a delay according to the project progress basic information and calculating the expiration time.
In the present system, the time calculation module 200 calculates and determines whether there is a delay in the progress of the project based on the basic information of the progress of the project. The actual progress of the current project is recorded in the basic information of the project progress, and the daily progress amount is arranged in the total progress plan, so that the actual progress can be counted every day, the actual progress is compared with the plan progress, whether the current project progress has delay or not is determined, and the corresponding expiry time is calculated. The term "time out" refers to the time length that the original scheduled time will be exceeded according to the current project schedule. For example, if the project is completed in 10 days as originally planned and the project needs to be completed in 11 days according to the actual schedule, the timeout period is 1 day, and if there is no delay, the timeout period is 0 or negative.
The cost calculating module 300 is configured to query historical order information, calculate a supply period and a material price of each provider, and calculate a material cost corresponding to supply of each provider.
In the system, the cost calculating module 300 queries the historical order information, and records the time consumed by each supplier in the supply process in the historical order, for example, the supply quantity of the supplier A in the supply process is
Figure 888841DEST_PATH_IMAGE024
The supply time is
Figure 712441DEST_PATH_IMAGE025
In another supply process, the supply quantity is
Figure 366276DEST_PATH_IMAGE026
The supply time is
Figure 93186DEST_PATH_IMAGE027
And determining the supply periods required by different supply quantities according to the relationship between the supply quantities and the supply time, and then determining the price of the material.
The supplier selection module 400 is used for calculating overdue penalties corresponding to the supplier supplies of the various suppliers, calculating corresponding total costs, and selecting the corresponding supplier with the lowest total cost to generate the purchase order.
In the system, the supplier selection module 400 calculates overdue penalties corresponding to the supply of each supplier, calculates the time required for completing the current project according to the current project schedule, determines the influence of the supply periods corresponding to different suppliers on the project completion time so as to determine the overdue time, calculates the overdue penalties to be generated according to the overdue time so as to obtain the total costs corresponding to different suppliers, and selects the corresponding supplier with the lowest total cost to generate the purchase order.
As shown in fig. 6, as a preferred embodiment of the present invention, the time calculation module 200 includes:
and a progress value calculation unit 201, configured to acquire the progress plan and determine a planned progress value corresponding to the current time.
In this module, the progress value calculating unit 201 obtains a progress plan, determines the time for implementing the project according to the project starting time and the date corresponding to the current time, and further queries the task progress to be completed in the project at the current time. For example, for a ten day project, the project schedule for the fifth day should be 50%, i.e., a schedule progress value of 50%.
A progress analysis unit 202, configured to determine whether there is a delay according to the project progress proportion and the planning progress value in the project progress basic information.
In this block, the progress analysis unit 202 retrieves a project progress ratio in the project progress basic information, where the project progress ratio is the progress of the actual project completion, for example, the completion progress on the fifth day is 48%, and then compares it with the planned progress value to determine whether there is a delay in the current project, the completion progress on the fifth day is 48%, and the planned progress value is 50%, indicating the project delay.
The average progress calculating unit 203 is configured to calculate a current average progress value, and calculate an expiration time according to the average progress value.
In this module, the average progress calculation unit 203 calculates the current average progress value, and if 48% of the tasks are completed on the fifth day, it indicates that the daily progress of the current project is 9.6%, calculates the time required for the remaining tasks according to the remaining task amount, i.e., calculates the time required for completing the remaining 50% of the task amount with the daily progress of 9.6%, and determines the expiration time.
As shown in fig. 7, as a preferred embodiment of the present invention, the cost calculating module 300 includes:
the supply period calculating unit 301 is configured to query the historical order information, calculate an average supply time of the provider, and obtain a supply period.
In this module, the supply cycle calculating unit 301 queries historical order information, queries historical order information corresponding to one supplier each time, and queries a relationship between a quantity corresponding to each material and supply time, thereby determining a supply cycle of different quantities of goods corresponding to each material of each supplier.
The material price query unit 302 is configured to query the material prices provided by the suppliers at the current time.
The material cost calculating unit 303 is configured to calculate supply costs corresponding to each provider according to the material demand information, so as to obtain material costs.
In the module, the price of the material provided by each supplier at the current moment is inquired, the price of the material is provided by the supplier, the supply period required by each material can be determined according to the material demand information, and the material cost corresponding to the same material provided by each supplier can be calculated and obtained if the price of the material is obtained.
As shown in fig. 8, as a preferred embodiment of the present invention, the vendor selection module 400 includes:
the total overdue time calculation unit 401 is configured to determine corresponding overdue time according to the supply period corresponding to each provider.
And the penalty calculation unit 402 is configured to query a preset overdue penalty calculation formula and determine a corresponding overdue penalty.
In this module, the penalty calculation unit 402 calculates the overdue penalty according to a preset overdue penalty calculation formula when a project is agreed in a project contract and a delay occurs, so that the overdue penalty can be directly determined, and different suppliers have different supply periods, which results in different overdue penalties.
The order generating unit 403 is configured to calculate a total cost according to the overdue penalty and the material costs corresponding to the suppliers, select the supplier with the lowest total cost, and generate the purchase order.
In this module, the order generating unit 403 calculates the total cost according to the overdue penalty and the material costs corresponding to each provider, superimposes the overdue penalty and the material costs to obtain the total cost, and then selects a provider with the lowest total cost by comparing the total costs corresponding to the supply by different providers, because the supply periods of the different providers are different, and the given prices are also different, for example, the supply period of the provider a is 10 days, the price is B, the supply period of the provider a is 5 days, and the price is 1.5B, so that the supply period is long, the project is overdue, but the total cost is reduced, and the project cost can be guaranteed to be lower by comparing the total costs; the purchase order comprises the material quantity and the latest supply time; and if the total overdue time exceeds the preset value, determining the supplier with the lowest cost by taking the total overdue time as a limit.
It should be understood that, although the steps in the flowcharts of the embodiments of the present invention are shown in sequence as indicated by the arrows, the steps are not necessarily performed in sequence as indicated by the arrows. The steps are not performed in the exact order shown and described, and may be performed in other orders, unless explicitly stated otherwise. Moreover, at least a portion of the steps in various embodiments may include multiple sub-steps or multiple stages that are not necessarily performed at the same time, but may be performed at different times, and the order of performance of the sub-steps or stages is not necessarily sequential, but may be performed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by a computer program, which can be stored in a non-volatile computer-readable storage medium, and can include the processes of the embodiments of the methods described above when the program is executed. Any reference to memory, storage, database, or other medium used in the embodiments provided herein may include non-volatile and/or volatile memory, among others. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically Programmable ROM (EPROM), electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double Data Rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous Link DRAM (SLDRAM), rambus (Rambus) direct RAM (RDRAM), direct Rambus Dynamic RAM (DRDRAM), and Rambus Dynamic RAM (RDRAM), among others.
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the present invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (6)

1. An ERP procurement calculation method is characterized by comprising the following steps:
acquiring basic information of a project progress, material demand information and historical order information, wherein the basic information of the project progress comprises a project progress proportion and available time;
calculating and judging whether the project progress has delay or not according to the basic information of the project progress, and calculating the time-out;
inquiring historical order information, calculating a supply period and a material price of each provider, and calculating material cost corresponding to supply of each provider;
calculating overdue penalty corresponding to the goods supply of each provider, calculating corresponding total cost, selecting the provider corresponding to the lowest total cost, and generating a purchase order;
the step of calculating and judging whether the project progress has a delay or not according to the project progress basic information and calculating the expiration time specifically comprises the following steps:
acquiring a progress plan, and determining a plan progress value corresponding to the current moment;
judging whether a delay exists according to a project progress proportion and a plan progress value in the project progress basic information;
calculating the current average progress value, and calculating the overtime time according to the average progress value;
the steps of inquiring the historical order information, calculating the supply period and the material price of each provider and calculating the material cost corresponding to the supply of each provider specifically comprise:
inquiring historical order information, and calculating the average supply time of a provider to obtain a supply period;
inquiring the price of the materials provided by each supplier at the current time;
calculating supply cost corresponding to each supplier according to the material demand information to obtain material cost;
in the step of inquiring the historical order information, calculating the average supply time of the supplier and obtaining the supply period, the second stepiA supplier suppliesjThe calculation formula of the supply period corresponding to the seed material is expressed as follows:
Figure 910863DEST_PATH_IMAGE001
wherein the content of the first and second substances,
Figure 654828DEST_PATH_IMAGE002
is shown asiA supplier suppliesjThe corresponding supply period of the seed material,
Figure 829457DEST_PATH_IMAGE003
is shown asiThe basic supply period corresponding to the supply of one material by each supplier,
Figure 571149DEST_PATH_IMAGE004
denotes the firstiA supplier suppliesjThe current supply quantity corresponding to the seed material,
Figure 831229DEST_PATH_IMAGE005
is shown asiThe basic supply quantity corresponding to one material supplied by each supplier,
Figure 316568DEST_PATH_IMAGE006
is shown asiIndividual supplier is in the collectionFirst, thejCorrecting factors of the corresponding supply difficulty degree when the materials are planted,
Figure 345704DEST_PATH_IMAGE007
Mindicates the total number of suppliers,
Figure 258296DEST_PATH_IMAGE008
Figure 5672DEST_PATH_IMAGE009
a maximum quantity representing a total variety of materials required by the demander;
in the step of calculating the supply cost corresponding to each supplier according to the material demand information to obtain the material cost, the following formula exists:
Figure 29123DEST_PATH_IMAGE010
wherein the content of the first and second substances,
Figure 178344DEST_PATH_IMAGE011
indicating procurement ofiA supplier
Figure 261838DEST_PATH_IMAGE004
Supply quantity ofjThe material cost corresponding to the material of the seed,
Figure 496510DEST_PATH_IMAGE012
is shown asiA supplier suppliesjThe material unit price corresponding to the seed material.
2. The ERP procurement calculation method according to claim 1, wherein the step of calculating the overdue penalty corresponding to each supplier supply, calculating the corresponding total cost, selecting the supplier corresponding to the lowest total cost, and generating the procurement order specifically comprises:
determining corresponding overdue time according to the supply period corresponding to each provider;
determining corresponding overdue penalty according to a preset overdue penalty calculation formula;
and calculating the total cost according to the overdue penalty and the material cost corresponding to each supplier, and selecting the supplier corresponding to the lowest total cost to generate the purchase order.
3. The ERP procurement calculation method according to claim 2, wherein in the step of determining the corresponding expiration time according to the supply period corresponding to each supplier, the following formula exists:
Figure 55143DEST_PATH_IMAGE013
wherein the content of the first and second substances,
Figure 58871DEST_PATH_IMAGE014
is shown asiA supplier suppliesjThe overdue time corresponding to the seed material,
Figure 313266DEST_PATH_IMAGE015
represents demander toiA supplier suppliesjThe waiting time corresponding to the seed material.
4. The ERP procurement calculation method according to claim 3, wherein in the step of determining the corresponding overdue penalty according to a preset overdue penalty calculation formula, the following formula exists:
Figure 769655DEST_PATH_IMAGE016
wherein the content of the first and second substances,
Figure 400488DEST_PATH_IMAGE017
is shown asiA supplier suppliesjThe overdue penalty corresponding to the seed material,
Figure 930826DEST_PATH_IMAGE018
a first threshold value representing the time-out,
Figure 949598DEST_PATH_IMAGE019
is shown asiA supplier suppliesjUnit penalty value per unit time when seeding.
5. The ERP purchasing calculation method according to claim 4, wherein in the step of calculating the total cost according to the overdue penalty and the material cost corresponding to each supplier, selecting the supplier with the lowest total cost, and generating the purchasing order, there is the following formula:
Figure 565387DEST_PATH_IMAGE020
wherein, the first and the second end of the pipe are connected with each other,
Figure 62227DEST_PATH_IMAGE021
indicating the demander procurement ofiA supplier suppliesjThe cost corresponding to the seed material;
Figure 447072DEST_PATH_IMAGE022
wherein the content of the first and second substances,
Figure 433483DEST_PATH_IMAGE023
indicating the demander procurement ofiThe total cost for all kinds of materials supplied by a single supplier,
Figure 739831DEST_PATH_IMAGE009
representing the maximum amount of the total variety of material required by the requesting party.
6. An ERP procurement computing system applying the ERP procurement computing method of any one of claims 1 to 5, the system comprising:
the system comprises an information acquisition module, a data processing module and a data processing module, wherein the information acquisition module is used for acquiring basic information of project progress, material demand information and historical order information, and the basic information of the project progress comprises project progress proportion and available time;
the time calculation module is used for calculating and judging whether the project progress has delay or not according to the basic information of the project progress and calculating the overdue time;
the cost calculation module is used for inquiring the historical order information, calculating the supply period and the material price of each provider and calculating the material cost corresponding to the supply of each provider;
the supplier selection module is used for calculating overdue penalties corresponding to the supply of each supplier, calculating corresponding total cost, selecting the corresponding supplier with the lowest total cost and generating a purchase order;
the time calculation module includes:
the progress value calculation unit is used for acquiring a progress plan and determining a plan progress value corresponding to the current moment;
the progress analysis unit is used for judging whether a delay exists according to the project progress proportion and the plan progress value in the project progress basic information;
the average progress calculation unit is used for calculating the current average progress value and calculating the time-out according to the average progress value; the cost calculation module includes:
the supply period calculating unit is used for inquiring the historical order information and calculating the average supply time of the provider to obtain a supply period;
the material price inquiry unit is used for inquiring the material price provided by each supplier at the current moment;
the material cost calculating unit is used for calculating the supply cost corresponding to each supplier according to the material demand information to obtain the material cost;
the vendor selection module comprises:
the total overdue time calculation unit is used for determining total overdue time according to the supply periods corresponding to the suppliers;
the penalty calculation unit is used for inquiring a preset overdue penalty calculation formula and determining corresponding overdue penalty;
and the order generating unit is used for calculating the total cost according to the overdue penalty and the material cost corresponding to each supplier, selecting the supplier corresponding to the lowest total cost and generating the purchase order.
CN202211300734.2A 2022-10-24 2022-10-24 ERP purchase calculation method and system Active CN115375413B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211300734.2A CN115375413B (en) 2022-10-24 2022-10-24 ERP purchase calculation method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211300734.2A CN115375413B (en) 2022-10-24 2022-10-24 ERP purchase calculation method and system

Publications (2)

Publication Number Publication Date
CN115375413A CN115375413A (en) 2022-11-22
CN115375413B true CN115375413B (en) 2023-01-20

Family

ID=84073688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211300734.2A Active CN115375413B (en) 2022-10-24 2022-10-24 ERP purchase calculation method and system

Country Status (1)

Country Link
CN (1) CN115375413B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110400114A (en) * 2019-08-30 2019-11-01 珠海格力电器股份有限公司 A kind of method and system of couple of purchase order distribution supplier

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8306862B2 (en) * 2009-07-31 2012-11-06 Sap Ag Creating purchase orders with mobile devices
CN102799966A (en) * 2012-06-29 2012-11-28 厦门易用软件技术有限公司 Monitoring and early-warning system of enterprise project executing schedule
CN106709646A (en) * 2016-12-23 2017-05-24 国网山东省电力公司 Project progress dynamic regulating method considering resource constraint
CN109948936A (en) * 2019-03-24 2019-06-28 长沙曙通信息科技有限公司 A kind of buying total management system design method based on ERP
CN111292070A (en) * 2020-03-10 2020-06-16 大汉软件股份有限公司 Automatic project monitoring and calculating method based on progress deviation control
CN111898962B (en) * 2020-06-04 2022-09-02 哈尔滨宇龙自动化有限公司 Automatic engineering project management system
CN111667184A (en) * 2020-06-09 2020-09-15 河南工程学院 ERP management control method for electronic commerce enterprises
CN112561293A (en) * 2020-12-08 2021-03-26 爱信诺征信有限公司 System and electronic equipment for evaluating suppliers by buyers
CN113469579A (en) * 2021-07-30 2021-10-01 苏州清研精准汽车科技有限公司 Production and assembly project progress quality control system
CN113837730B (en) * 2021-10-12 2023-09-19 国网福建省电力有限公司 Three-rate-in-one-based multidimensional collaborative management and control system for project of main grid of power grid infrastructure
CN114596020A (en) * 2021-10-19 2022-06-07 杭州新中大科技股份有限公司 Project MRP design method and system for large-scale customized production
CN114548906A (en) * 2022-01-18 2022-05-27 山东恒诺信工程咨询有限公司 Engineering supervision and supervision method, system and device and storage medium
CN114663130A (en) * 2022-02-22 2022-06-24 大唐互联科技(武汉)有限公司 Decision tree-based supplier purchase management method and system
CN114781795A (en) * 2022-03-16 2022-07-22 上海有间建筑科技有限公司 Enterprise Resource Planning (ERP) -based comprehensive purchasing management system and management method
CN115063063A (en) * 2022-04-28 2022-09-16 佛山市海天调味食品股份有限公司 Distribution method, device, equipment and storage medium of purchase order

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110400114A (en) * 2019-08-30 2019-11-01 珠海格力电器股份有限公司 A kind of method and system of couple of purchase order distribution supplier

Also Published As

Publication number Publication date
CN115375413A (en) 2022-11-22

Similar Documents

Publication Publication Date Title
Van Landeghem et al. Robust planning: a new paradigm for demand chain planning
Jayaraman et al. Supplier selection and order quantity allocation: a comprehensive model
US7801753B2 (en) Purchase planning and optimization
AU2009217349B2 (en) Automatically prescribing total budget for marketing and sales resources and allocation across spending categories
US11593722B2 (en) Method and structure for risk-based resource planning for configurable products
US8180691B2 (en) System and method for generating optimal bill/payment schedule
US20030187773A1 (en) Virtual marketplace agent technology
US20090222297A1 (en) System and method for composite pricing of services to provide optimal bill schedule
US20050278227A1 (en) Systems and methods of managing price modeling data through closed-loop analytics
WO2010019897A1 (en) Automatically prescribing total budget for marketing and sales resources and allocation across spending categories
Xu et al. Integrated optimisation for production capacity, raw material ordering and production planning under time and quantity uncertainties based on two case studies
Chaharsooghi et al. Developing a two stage stochastic programming model of the price and lead-time decision problem in the multi-class make-to-order firm
Zhang et al. Production and distribution planning in Danone waters China division
US20040236591A1 (en) System and method for optimizing sourcing opportunity utilization policies
US20100280969A1 (en) Method and system for managing pension portfolios
CN115375413B (en) ERP purchase calculation method and system
JP2004046454A (en) Stock investment rating evaluation method and system, program for making computer execute the method, and storage medium with the program stored therein
US8180694B2 (en) System and method for incorporating qualitative inputs into econometric models
US20090299806A1 (en) Method and apparatus for demand and/or skill hedging
Dang et al. Dynamic importance allocated nested simulation for variable annuity risk measurement
Spangardt et al. Applications for stochastic optimization in the power industry
US20050097065A1 (en) System and method for analyzing relationships between sourcing variables
US7877311B1 (en) System and method for analyzing transactions at an electronic exchange
US20130054302A1 (en) Enablement of exposure management to handle priced exposure
US7890360B1 (en) System and method for automated analysis of sourcing agreements and performance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant