CN115369921B - Easily buried electric power inspection well - Google Patents

Easily buried electric power inspection well Download PDF

Info

Publication number
CN115369921B
CN115369921B CN202211196093.0A CN202211196093A CN115369921B CN 115369921 B CN115369921 B CN 115369921B CN 202211196093 A CN202211196093 A CN 202211196093A CN 115369921 B CN115369921 B CN 115369921B
Authority
CN
China
Prior art keywords
plate
well
vertical plate
well body
adjusting vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202211196093.0A
Other languages
Chinese (zh)
Other versions
CN115369921A (en
Inventor
屈应良
周孝杰
杨硕
赵进朝
黄怡
王琼
申博文
成云翔
程浩航
秦鑫
孙玮皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Henan Electric Power Co Yiyang County Power Supply Co
State Grid Corp of China SGCC
Original Assignee
State Grid Henan Electric Power Co Yiyang County Power Supply Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Henan Electric Power Co Yiyang County Power Supply Co, State Grid Corp of China SGCC filed Critical State Grid Henan Electric Power Co Yiyang County Power Supply Co
Priority to CN202211196093.0A priority Critical patent/CN115369921B/en
Publication of CN115369921A publication Critical patent/CN115369921A/en
Application granted granted Critical
Publication of CN115369921B publication Critical patent/CN115369921B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

An easy-to-landfill electric inspection well relates to an inspection well, wherein a cable port (15) is arranged on the side wall of a well body plate (14), and a convex insertion ring (8) is arranged at the upper end of the well body plate; an inner bulge loop (3) is arranged at the upper part of the inner wall (4) of the wellhead annular adjusting vertical plate (5), and a lower diameter expanding inclined plane (19) is arranged at the lower part of the inner bulge loop of the inner wall of the wellhead annular adjusting vertical plate; the lower surface of the inner bulge loop of the annular wellhead adjusting vertical plate is pressed on the upper end surface of the bulge inserting loop, an adjusting slit (16) is arranged between the lower surface of the inner bulge loop and the upper end surface of the bulge inserting loop, the adjusting slit is used for adjusting the height of any surface of the upper end surface of the annular wellhead adjusting vertical plate, and a filler is arranged in the gap after the height adjustment; the well cover (1) is placed on the upper surface of a protruding ring in the annular adjusting vertical plate of the well mouth; according to the invention, after the annular adjusting vertical plate of the well mouth is adjusted, the filling material is added, so that the damage to the road surface is effectively reduced.

Description

Easily buried electric power inspection well
Technical Field
The invention relates to an inspection well, in particular to an easy-to-fill electric inspection well.
Background
As is known, most of the previous cables supply power to residents, enterprises and public institutions, factories, markets and the like of cities through telegraph poles and high-voltage iron towers arranged at roadsides, and along with the large-scale expansion of the cities, advices of making the ground of the cables beautiful are also proposed; some economical places adopt a comprehensive pipe gallery mode to enable the cable to enter the ground; more, the cables are put into the ground through the buried cables, cable trenches, calandria and cable tunnels; whether the cable is put into the ground by any method, whether the temperature and the humidity of the cable are reasonable or not needs to be monitored, parameters such as the tensile force, the clamping force, the lateral pressure, the running state of equipment and the like, which are born by the cable when the cable is laid, are monitored in real time, the laying condition of the cable is judged in an auxiliary mode, and the laying quality of the cable is guaranteed; thus, the electric inspection well needs to be arranged at a certain distance; the electric inspection well is mostly arranged on a pavement, a green belt or a pavement; in order to ensure the running safety of vehicles, the well cover part of the electric inspection well must be consistent with the level of the road surface, the existing mode is to fill the electric inspection well in advance, then cover the cover plate on the well head, dig the road surface around the well head again after the construction is finished, break the original well head part, make a new well head to install, then pave the road surface again, cover the well cover and finish, this mode is labor-and time-consuming and funds-consuming, and also brings delay problems to road completion.
Disclosure of Invention
In order to overcome the defects in the background technology, the invention discloses an easy-to-land-fill electric inspection well, which can be completed by adding fillers after adjusting an installed well head annular adjusting vertical plate, thereby effectively reducing the damage to the road surface.
The technical scheme for realizing the invention is as follows:
the utility model provides an easy landfill electric power inspection shaft, includes well body board, protruding inserted ring, well head annular regulation riser and well lid, and the lateral wall of well body board is equipped with the cable conductor mouth, and the upper end of well body board is equipped with protruding inserted ring; an inner bulge loop is arranged at the upper part of the inner wall of the wellhead annular adjusting vertical plate, and a lower diameter expanding inclined plane is arranged at the lower part of the inner wall of the inner bulge loop of the inner wall of the wellhead annular adjusting vertical plate; the lower surface of the inner bulge loop of the annular wellhead adjusting vertical plate is pressed on the upper end surface of the bulge inserting loop, an adjusting slit is arranged between the lower surface of the inner bulge loop and the upper end surface of the bulge inserting loop, the adjusting slit is used for adjusting the height of any surface of the upper end surface of the annular wellhead adjusting vertical plate, and a filler is arranged in the heightened slit; the well lid is placed on the upper portion face of protruding ring in the annular regulation riser of well head.
The utility model provides an easy landfill electric power inspection shaft, be equipped with the picture peg of reducing in the upper portion of well body board, the lower mouth of well body upper portion board overlaps on the picture peg upper mouth of well body board, the lower mouth of well body upper portion board and the outer fringe face clearance fit of picture peg, the lower mouth of well body upper portion board is pressed on the step in the picture peg outside, is equipped with the upper end plate in the upper end of well body upper portion board, protruding inserted ring setting is in the middle part of upper end plate.
The electric inspection well easy to fill is characterized in that a bottom plate is arranged at the lower end of the well body plate.
The electric inspection well easy to fill is characterized in that cable openings are respectively arranged on two sides of the well body plate.
The electric inspection well easy to fill is characterized in that an iron plate A is arranged on the lower surface of an inner convex ring of the annular adjusting vertical plate of the well head.
And an iron plate B is arranged on the upper end surface of the convex insertion ring.
The filling material is stone and cement mortar.
The electric inspection well easy to fill is characterized in that the protruding insertion ring, the wellhead annular adjusting vertical plate and the well cover can be synchronously arranged to be in a round or square structure.
Through the above disclosure, the beneficial effects of the invention are:
according to the easy-to-land-fill electric inspection well, the annular adjusting vertical plate of the well mouth is connected with the convex inserting ring of the upper end face of the upper plate of the well body in a sleeved mode, after the well head is installed, a road surface is not required to be excavated again, and after the well head annular adjusting vertical plate is installed, filler is added, so that the well head annular adjusting vertical plate can be corrected, and damage to the road surface is effectively reduced; the invention has reasonable structure, has the advantage of once installation without secondary excavation, and realizes the aim of the invention of easy landfill.
Drawings
FIG. 1 is a schematic view of a three-dimensional assembly structure of the present invention;
FIG. 2 is a schematic diagram of the structure of the present invention;
FIG. 3 is a schematic view of a three-dimensional structure of a supporting stick of the present invention;
in the figure: 1. a well cover; 2. an iron plate A; 3. an inner raised ring; 4. the inner wall of the wellhead; 5. a wellhead annular adjusting vertical plate; 6. a concave surface; 7. an iron plate B; 8. a convex insert ring; 9. an upper end plate; 10. a well upper plate; 11. a well bore; 12. inserting plate; 13. a step; 14. a well plate; 15. a cable port; 16. adjusting the seam; 17. clearance fit; 18. a bottom plate; 19. a lower diameter-expanding inclined plane; 20. an adjusting plate; 21. a handle.
Detailed Description
The invention is further illustrated below with reference to examples; the following examples are not intended to limit the invention, but merely as a means for supporting the practice of the invention, and any equivalent structural substitutions within the technical framework of the invention disclosed herein are intended to be within the scope of the invention;
the easy-to-landfill electric inspection well comprises a well body plate 14, a protruding insert ring 8, a well mouth annular adjusting vertical plate 5 and a well cover 1, wherein the protruding insert ring 8, the well mouth annular adjusting vertical plate 5 and the well cover 1 can be synchronously arranged into a round or square structure, cable ports 15 are respectively arranged on two sides of the well body plate 14, and the protruding insert ring 8 is arranged at the upper end of the well body plate 14; an inner bulge loop 3 is arranged on the upper part of the wellhead inner wall 4 of the wellhead annular adjusting vertical plate 5, a lower diameter expanding inclined plane 19 is arranged on the lower part of the inner bulge loop 3 of the wellhead inner wall 4 of the wellhead annular adjusting vertical plate 5, and an iron plate A2 is arranged on the lower surface of the inner bulge loop 3 of the wellhead annular adjusting vertical plate 5; the lower surface of the inner convex ring 3 of the wellhead annular adjusting vertical plate 5 is pressed on the upper end surface of the convex insert ring 8, an adjusting slit 16 is arranged between the lower surface of the inner convex ring 3 and the upper end surface of the convex insert ring 8, the adjusting slit 16 adjusts the height of any surface of the upper end surface of the wellhead annular adjusting vertical plate 5, and a filler formed by stone and cement mortar is arranged in the adjusted gap; the well lid 1 is placed on the upper face of the protruding ring 3 in the well mouth annular adjusting vertical plate 5.
Referring to fig. 1 or 2, a bottom plate 18 is arranged at the lower end of a well body plate 14, a plugboard 12 with a reduced diameter is arranged at the upper part of the well body plate 14, the lower opening of a well body upper plate 10 is sleeved on the upper opening of the plugboard 12 of the well body plate 14, the lower opening of the well body upper plate 10 is in clearance fit with the outer edge surface 17 of the plugboard 12, the lower opening of the well body upper plate 10 is pressed on a step 13 at the outer side of the plugboard 12, an upper end plate 9 is arranged at the upper end of the well body upper plate 10, a convex plugring 8 is arranged in the middle of the upper end plate 9, and an iron plate B7 is arranged at the upper end surface of the convex plugring 8.
In order to facilitate the height adjustment of the inner convex ring 3 of the wellhead annular adjusting vertical plate 5, an elliptical adjusting plate 20 is made of iron, and a handle 21 is welded at one end of the elliptical adjusting plate 20 by combining with figures 1, 2 or 3; the well lid 1 is manufactured by using an iron net, and then concrete pouring is carried out on the inner skeleton in a mould to obtain the well lid; welding and connecting an iron plate A2 with a reinforcement cage matched with the wellhead annular adjusting vertical plate 5 in shape, then placing the steel bar cage into a die of the annular adjusting vertical plate 5, and performing concrete pouring and maintenance on the reinforcement cage in the die; an iron plate B7 at the upper end of the convex insert ring 8 is welded with the convex insert ring 8, the upper end plate 9 and a reinforcement cage of the upper plate 10 of the well body, and then the steel plate B is put into a mould and concreted and maintained on the reinforcement cage in the mould; the well plate 14 and the bottom plate 18 at the lower end in the well cavity 11 are of an integrated structure, matched reinforcement cages are manufactured according to the shapes of the well plate 14 and the bottom plate 18, and then the well plate 14 and the bottom plate 18 are placed into a die, concrete pouring is carried out on the reinforcement cages in the die, and maintenance is carried out.
During the use, excavate cable pit on the road surface, tamp the place foundation of installation well body board 14 foundation ditch, then install well body board 14 and well body upper portion board 10, buckle well head annular regulation riser 5 behind the cable laying and buckle well lid 1 at protruding inserted ring 8, then cover the rubber slab that one deck thickness is more than one centimeter at the outer fringe face of well head annular regulation riser 5, open well lid 1 after waiting that the road surface is done, personnel can stand in road surface or well cavity 11, use regulating plate 20 to insert in the regulation slit 16 that forms between the iron plate B7 of protruding inserted ring 8 upper end and the interior protruding ring 3 lower part face iron plate A2, make the upper mouth of well head annular regulation riser 5 and road surface high-uniformity through prying, then insert the stone and use concrete to fill the seam in regulating slit 16, finally cover well lid 1 can.
The invention is not described in detail in the prior art.

Claims (8)

1. The utility model provides an easy landfill electric power inspection shaft, includes well body board (14), protruding inserted ring (8), well head annular regulation riser (5) and well lid (1), characterized by: the side wall of the well body plate (14) is provided with a cable port (15), and the upper end of the well body plate (14) is provided with a convex insertion ring (8); an inner bulge loop (3) is arranged at the upper part of the inner wall (4) of the wellhead annular adjusting vertical plate (5), and an under-expanding inclined plane (19) is arranged at the lower part of the inner bulge loop (3) of the inner wall (4) of the wellhead annular adjusting vertical plate (5); the lower surface of an inner bulge loop (3) of the wellhead annular adjusting vertical plate (5) is pressed on the upper end surface of the bulge inserting loop (8), an adjusting slit (16) is arranged between the lower surface of the inner bulge loop (3) and the upper end surface of the bulge inserting loop (8), the adjusting slit (16) is used for adjusting the height of any surface of the upper end surface of the wellhead annular adjusting vertical plate (5), and a filler is arranged in the adjusted slit; the well lid (1) is placed on the upper surface of the protruding ring (3) in the well mouth annular adjusting vertical plate (5).
2. The landfill power manhole as claimed in claim 1, wherein: the upper part of the well body plate (14) is provided with a plugboard (12) with a reduced diameter, the lower opening of the well body upper plate (10) is sleeved on the upper opening of the plugboard (12) of the well body plate (14), the lower opening of the well body upper plate (10) is in clearance fit with the outer edge surface (17) of the plugboard (12), the lower opening of the well body upper plate (10) is pressed on a step (13) at the outer side of the plugboard (12), the upper end of the well body upper plate (10) is provided with an upper end plate (9), and the convex inserting ring (8) is arranged at the middle part of the upper end plate (9).
3. The landfill power manhole as claimed in claim 1, wherein: a bottom plate (18) is arranged at the lower end of the well body plate (14).
4. The landfill power manhole as claimed in claim 1, wherein: two sides of the well plate (14) are respectively provided with a cable port (15).
5. The landfill power manhole as claimed in claim 1, wherein: an iron plate A (2) is arranged on the lower surface of an inner convex ring (3) of the wellhead annular adjusting vertical plate (5).
6. The landfill power manhole as claimed in claim 1, wherein: an iron plate B (7) is arranged on the upper end surface of the convex insert ring (8).
7. The landfill power manhole as claimed in claim 1, wherein: the filler is stone and cement mortar.
8. The landfill power manhole as claimed in claim 1, wherein: the protruding insert ring (8), the wellhead annular adjusting vertical plate (5) and the well cover (1) can be synchronously arranged into a round or square structure.
CN202211196093.0A 2022-09-29 2022-09-29 Easily buried electric power inspection well Active CN115369921B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211196093.0A CN115369921B (en) 2022-09-29 2022-09-29 Easily buried electric power inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211196093.0A CN115369921B (en) 2022-09-29 2022-09-29 Easily buried electric power inspection well

Publications (2)

Publication Number Publication Date
CN115369921A CN115369921A (en) 2022-11-22
CN115369921B true CN115369921B (en) 2023-06-16

Family

ID=84074182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211196093.0A Active CN115369921B (en) 2022-09-29 2022-09-29 Easily buried electric power inspection well

Country Status (1)

Country Link
CN (1) CN115369921B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU4360297A (en) * 1996-10-28 1998-04-30 Max Lindsay Prince Inspection point or access opening
US6385913B1 (en) * 2000-08-01 2002-05-14 Byung Moo Ahn Steel manhole
CN108678027A (en) * 2018-08-03 2018-10-19 郑州市市政设施维修建设有限公司 Bituminous paving is repaiied used in checks well construction protection support device and application method
CN214460613U (en) * 2021-01-18 2021-10-22 北京华强天安送变电工程有限公司 Prefabricated electric power tube well
CN215290265U (en) * 2021-01-13 2021-12-24 徐勇 Concrete reinforcement assembled inspection shaft

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU4360297A (en) * 1996-10-28 1998-04-30 Max Lindsay Prince Inspection point or access opening
US6385913B1 (en) * 2000-08-01 2002-05-14 Byung Moo Ahn Steel manhole
CN108678027A (en) * 2018-08-03 2018-10-19 郑州市市政设施维修建设有限公司 Bituminous paving is repaiied used in checks well construction protection support device and application method
CN215290265U (en) * 2021-01-13 2021-12-24 徐勇 Concrete reinforcement assembled inspection shaft
CN214460613U (en) * 2021-01-18 2021-10-22 北京华强天安送变电工程有限公司 Prefabricated electric power tube well

Also Published As

Publication number Publication date
CN115369921A (en) 2022-11-22

Similar Documents

Publication Publication Date Title
CN101963061B (en) Construction method for underground box culvert of existing railway line
US20220234460A1 (en) Precast block for housing and routing electrical power cables, an electric vehicle charging station using the block and a manufacturing method
CN112503247A (en) Slope section water pipeline and construction method thereof
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN107558483A (en) A kind of building foundation and its construction method for installing wallboard
US12123157B1 (en) Delaminated subway station structure in sea-land connection region and construction method thereof
CN103669400A (en) Typical construction method for prefabricated tube bank
CN112412472B (en) Pipe-jacking working well wall reverse-acting system in soft soil area and construction method and application thereof
CN103669422B (en) Waterproof construction method of pile head of anchor rod static pressure pile
CN115369921B (en) Easily buried electric power inspection well
CN113775344A (en) Tunnel in-situ unilateral extension construction method
CN110117959B (en) Construction method for foundation pit support near river
CN108149694B (en) A kind of wall width based on underground wall body construction longitudinally splices subsidence process
CN108104112B (en) A kind of underground wall body construction method based on the slurrying of original soil original position
CN106368211B (en) Rectangular concrete pile for building piping lane side wall
CN116677061A (en) Municipal rainwater and sewage inspection well integrated prefabricated installation device and construction method thereof
CN108086302B (en) A kind of transverse direction based on underground wall body construction is whole to pour wall width subsidence process
CN110685291A (en) Supporting device for concrete cofferdam in deep water area and construction process thereof
CN206467651U (en) Rectangular concrete pile for building piping lane side wall
CN105951885B (en) A kind of assembled work well standard knot and its installation method in new construction
CN109742715B (en) Arrangement structure of electric power pipe trench after transition and modification and electric power pipe trench transition and modification method
CN108331018B (en) Method for connecting precast concrete comprehensive pipe gallery by using square steel skeleton
CN109371901B (en) Pile bearing type retaining wall of cofferdam in dry period and construction method
CN113339003A (en) Construction method of tunnel integrated arch sheathing trolley
CN215856991U (en) Foam concrete backfilling embankment in karst area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant