CN115307390A - Pressure pipeline installation equipment and installation method thereof - Google Patents

Pressure pipeline installation equipment and installation method thereof Download PDF

Info

Publication number
CN115307390A
CN115307390A CN202210714653.0A CN202210714653A CN115307390A CN 115307390 A CN115307390 A CN 115307390A CN 202210714653 A CN202210714653 A CN 202210714653A CN 115307390 A CN115307390 A CN 115307390A
Authority
CN
China
Prior art keywords
plate
water
track
water absorption
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210714653.0A
Other languages
Chinese (zh)
Inventor
王智琴
秦雪兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202210714653.0A priority Critical patent/CN115307390A/en
Publication of CN115307390A publication Critical patent/CN115307390A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B5/00Drying solid materials or objects by processes not involving the application of heat
    • F26B5/16Drying solid materials or objects by processes not involving the application of heat by contact with sorbent bodies, e.g. absorbent mould; by admixture with sorbent materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G25/00Conveyors comprising a cyclically-moving, e.g. reciprocating, carrier or impeller which is disengaged from the load during the return part of its movement
    • B65G25/04Conveyors comprising a cyclically-moving, e.g. reciprocating, carrier or impeller which is disengaged from the load during the return part of its movement the carrier or impeller having identical forward and return paths of movement, e.g. reciprocating conveyors
    • B65G25/06Conveyors comprising a cyclically-moving, e.g. reciprocating, carrier or impeller which is disengaged from the load during the return part of its movement the carrier or impeller having identical forward and return paths of movement, e.g. reciprocating conveyors having carriers, e.g. belts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B25/00Details of general application not covered by group F26B21/00 or F26B23/00

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Molecular Biology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention provides a pressure pipeline installation device and an installation method thereof, the pressure pipeline installation device comprises a track, a plurality of water absorption components which absorb water in time are symmetrically and movably installed at the bottom ends of the left inner wall and the right inner wall of the track, and the water absorption components comprise: the water guide assembly and the material guide assembly are movably arranged at the bottom ends of the left inner wall and the right inner wall of the track; the water guide assembly includes: the water absorption device comprises a water absorption groove, a partition plate, a rotating shaft, a guide plate, a water absorption plate and a balance plate, wherein the water absorption grooves are symmetrically and fixedly arranged at the bottom ends of the left inner wall and the right inner wall of the track. This kind of pipeline under pressure erection equipment and mounting method can play and make the track bottom possess the function of absorbing water, when pipeline under pressure was placed in outdoor when placing, even if meet rainy season weather, moist moisture also can in time absorb the clearance to this partial moisture in permeating to the track from ground, prevents that the long-time adhesion of moisture from piling up in the track inner wall, has guaranteed the effect of the normal operating of track interior motor.

Description

Pressure pipeline installation equipment and installation method thereof
Technical Field
The invention relates to the technical field of pipeline installation, in particular to pressure pipeline installation equipment and an installation method thereof.
Background
The part buries the pipeline under pressure underground, and the installation pipeline need be placed in secret mounting groove earlier in the installation, moves to appointed place again, need consume a large amount of manpowers and time, and efficiency is lower, and the pipeline after the installation, is not convenient for detect the pipeline outer wall.
Aiming at the problems, the technical problem that the existing pressure pipeline is low in efficiency when being installed is solved, and the pressure pipeline installation supporting device with the patent number of CN202122548785.4 is inquired through a large amount of retrieval, and comprises a track, wherein a first sliding groove is formed in the track, two first sliding blocks are connected in the first sliding groove in a sliding manner, supporting plates are fixedly connected to the tops of the two first sliding blocks, a second sliding groove is formed in the supporting plates, and two second sliding blocks are connected in the second sliding groove in a sliding manner; this patent is through the track that sets up in the underground, and the fixed establishment that the track top set up, can start the inside two-way lead screw of fixed establishment, drive two support frames and fix the back to unidimensional pipeline, utilize the meshing between the inside tooth of track and the gear, make whole fixed establishment along with the rotation of gear, replace the manpower to remove the pipeline to appointed place after, be favorable to using manpower sparingly and time cost, improve the efficiency of piping erection, but the technical scheme that this patent provided does not possess the function of absorbing water to the bottom end in the track, when pressure pipeline is arranged in outdoor placing, meet rainy season weather, moist moisture permeates to in the track from ground easily, if can not in time absorb the clearance to this partial moisture, the long-time adhesion of moisture is piled up in the track inner wall, influence the normal operating of motor in the track easily.
The invention can make the bottom end of the track have the water absorption function, when the pressure pipeline is placed outdoors, even if wet moisture permeates into the track from the ground in rainy season, the moisture can be absorbed and cleaned in time, the moisture is prevented from being adhered and accumulated on the inner wall of the track for a long time, and the normal operation of the motor in the track is ensured.
Disclosure of Invention
The present invention is directed to solve the technical problems of the background art, and provides a pressure pipe installation apparatus and an installation method thereof.
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides a pipeline under pressure erection equipment, includes the track, inner wall bottom symmetry movable mounting has the subassembly that absorbs water of a plurality of in time absorbing moisture about orbital, the subassembly that absorbs water includes: the water guide assembly and the material guide assembly are movably mounted at the bottom ends of the left inner wall and the right inner wall of the track;
the water guide assembly includes: the water absorption device comprises a water absorption groove, a partition plate, a rotating shaft, a guide plate, a water absorption plate and a balance plate, wherein the water absorption groove is symmetrically and fixedly arranged at the bottom ends of the left inner wall and the right inner wall of a track, the partition plate is fixedly arranged between the middle ends of the left inner wall and the right inner wall of the water absorption groove, the rotating shaft is rotatably arranged at the left upper end and the right upper end of the inside of the water absorption groove, the guide plate is fixedly arranged on the outer surface of one side of the rotating shaft in a surrounding manner, the water absorption plate is fixedly arranged at the tail end of the outer surface of the top side of the guide plate, and the balance plate is fixedly arranged on the outer surface of the other side of the rotating shaft in a surrounding manner;
the guide assembly includes: fixed plate, baffle box, bull stick, commentaries on classics board, slivers, storage plate, film, memory sheetmetal and cardboard, the inside top middle part fixed mounting that absorbs water the groove has the fixed plate, the inside upper end middle part fixed mounting that absorbs water the groove has the baffle box, the equal rotatory bull stick of installing of left part and middle part on the left in the inside upper end that absorbs water the groove, one side surface of bull stick encircles fixed mounting and has the commentaries on classics board, the top side surface tail end slant fixed mounting that changes the board has the sliver, fixed mounting has the storage plate between the inner wall upper end about the fixed plate, the top side surface fixed laminating of storage plate has the film, the bottom side surface middle-end fixed mounting of baffle has the memory sheetmetal, the inner wall lower extreme symmetry fixed mounting has the cardboard about the groove that absorbs water.
Further preferred embodiments: orbital inside upper end slidable mounting has first slider, inside one side fixed mounting of first slider has the motor, the output fixed mounting of motor has the gear, orbital end inner wall equidistance fixed mounting has a plurality of teeth, tooth and gear engagement, the top fixed mounting of first slider has the backup pad, the inside upper end of backup pad is rotated and is installed the lead screw, there is the second slider both ends run through threaded connection about the surface of lead screw, the top fixed mounting of second slider has the support frame, the lateral wall upper end fixed mounting of support frame has the stopper, the top fixed mounting of backup pad has the support, the top slidable mounting of support has the supporting shoe, two be provided with the pipeline body between the stopper.
Further preferred embodiments: the water suction groove is in a U-shaped groove shape with the inside hollow, the front and the back closed and the top end opened, the middle part of the bottom end of the water suction groove is provided with an outlet which penetrates through the water suction groove from top to bottom, and an interval is reserved between the bottom end of the water suction groove and the bottom inner wall of the track.
Further preferred embodiments: the baffle is in the shape of a horizontal long straight plate, and the baffle is made of copper.
Further preferred embodiments: the guide plate is in the shape of a horizontal short straight plate, the outer surface of the tail side of the guide plate is statically abutted to the upper end of the side wall of the water absorption groove under normal conditions, and the water absorption plate is made of sponge.
Further preferred embodiments: the balance plate is in the shape of an inclined short straight plate, the balance plate is magnetic, and the balance plate is in an inclined static balance state with an included angle of 30 degrees with the horizontal plane under a normal condition.
Further preferred embodiments: the guide chute is in a V-shaped groove shape with a wide top and a narrow bottom, penetrates through the guide chute from top to bottom, and is inclined and symmetrical from side to side, and a distance is reserved between the tops of the left end and the right end of the guide chute and the bottoms of the left end and the right end of the guide chute.
Further preferred embodiments: the utility model discloses a quick lime powder storage device, including baffle box, commentaries on classics pole, commentaries on classics board, change board, the baffle box, the pole is close to the top of baffle box, the commentaries on classics board is the thin short straight plate shape of level, the commentaries on classics board has the same magnetism with the balance plate, the tail side surface of commentaries on classics board is static magnetism to be inhaled in the inner wall bottom of fixed plate under normal conditions and is laminated in the laminating, the commentaries on classics board is located the top of balance plate, the sliver is top thin arc strip, the storage plate is concave at the bottom, bilateral symmetry's arc shape, the socket has all been seted up at the both ends about the storage plate, the socket can supply the top of sliver to run through, the opening that runs through from top to bottom middle part of storage plate is seted up in the bottom, the opening is located the baffle box directly over, both ends are fixed laminating in the left and right sides inner wall upper end about the fixed plate respectively about the film, the film seals the socket and the opening of storage plate under normal conditions, the quick lime powder has been installed in advance on the film.
Further preferred embodiments: the memory metal sheet is in a semicircular plate shape with a flat top and a convex bottom and is bilaterally symmetrical, the head end and the tail end of the memory metal sheet are in mutual static mortise and tenon clamping under normal conditions, the arc edge is arranged at the bottom of the left tail end of the memory metal sheet and is statically abutted to the protruding part of the right head end of the memory metal sheet under normal conditions, quicklime powder is also preassembled in the memory metal sheet, the clamping plate is in a thin arc plate shape, the convex upper end of the clamping plate is statically abutted to the bending end of the memory metal sheet, and the top end of the clamping plate is abutted to the outer surface of the bottom side of the partition plate in a sliding mode.
Further preferred embodiments: a method of installing a pressure pipe installation apparatus, the method comprising the steps of:
s1: after the track is arranged underground, the pipeline body is placed at the top of the supporting plate and is supported through the supporting block;
s2: the screw rod is started to rotate to drive the two second sliding blocks to displace, so that the supporting frame clamps two corresponding sides of the pipeline body;
s3: when the pipeline body needs to be moved to a designated place, the motor is started, so that the gear drives the support plate and the pipeline body to move when rotating through the meshing with the plurality of teeth;
s4: when the surface of the pipeline body needs to be detected, the detection device is fixed on the support frames, and then the support frames are moved in the opposite directions of the two sides, so that the limiting blocks move forwards, and the pipeline body is limited.
Has the advantages that:
1. according to the pressure pipeline installation equipment, the water absorption assembly is arranged, when the pipeline body is placed outdoors, in rainy seasons, moist water permeates into the track from the ground and flows onto the water guide assembly of the water absorption assembly, so that the water guide assembly can move after absorbing water, and the water is guided and collected; triggering a material guide assembly of the water absorption assembly to movably deform successively, leading out a water absorption material pre-installed in the material guide assembly outwards in time, absorbing water collected in the water guide assembly, leading out the water to the bottom end of the track, and absorbing and drying the rest water; therefore, under the continuous cooperation of a plurality of groups of water absorption components, the water can be absorbed in time;
2. according to the pressure pipeline installation equipment, the water guide assembly is arranged, and when the inside of the track is in a dry state, the outer surface of the tail side of the guide plate of the water guide assembly is statically abutted to the upper end of the side wall of the water suction groove of the water guide assembly; the balance plate of the water guide assembly is in an inclined static balance state with an included angle of 30 degrees with the horizontal plane; when the moisture penetrates into the track from the ground, the moisture gradually breaks through the state, namely after the moisture penetrates, the moisture adheres to the side wall of the water absorption groove and flows to the tail end of the guide plate, and is sequentially accumulated on the water absorption plate of the water guide assembly and is pre-absorbed by the water absorption plate, and then the guide plate is pressed to rotate downwards, so that the moisture is guided to the partition plate of the water guide assembly below the guide plate and is collected; meanwhile, the balance plate is synchronously driven to rotate upwards so as to trigger the subsequent material guide assembly to move and then lead out the water absorption material to absorb water in time; therefore, the moisture is guided and collected in time, and the water is convenient to absorb;
3. according to the pressure pipeline installation equipment, the material guide assembly is arranged, when the inside of the track is in a dry state, the outer surface of the tail side of the rotating plate of the material guide assembly is in static magnetic attraction fit with the bottom end of the inner wall of the fixing plate of the material guide assembly; a film of the material guide assembly seals a socket and a through port of a material storage plate of the material guide assembly, and quicklime powder pre-loaded on the film does not overflow; the left end and the right end of a memory metal sheet of the material guide assembly are in a bent initial static state, the arc edge at the bottom of the left tail end of the material guide assembly is statically abutted to the convex part at the right head end of the material guide assembly, and quicklime powder in the material guide assembly does not overflow; the convex upper end of the clamping plate of the material guide assembly is statically abutted to the bending end of the memory metal sheet; when moist water permeates into the track from the ground, the state can be gradually broken, namely when the balance plate of the water guide assembly rotates upwards as described above, the rotating plate has the same magnetism as the balance plate, so that the rotating plate and the thin strips are gradually pushed to rotate upwards, when the tip of the top end of the thin strips rotates to the insertion opening of the material storage plate, the top end of the thin film is punctured, the through opening of the material storage plate is opened, quicklime powder pre-installed on the thin film is downwards released onto the partition plate of the water guide assembly, so that the water flowing downwards through the guide plate is absorbed, high-temperature heat is generated, the partition plate generates heat and downwards conducts the high-temperature heat to the memory metal sheet, the lower parts of the left end and the right end of the heated memory metal sheet are bent and deformed towards two sides (at the moment, the clamping plate is pushed towards two sides), the residual quicklime powder pre-installed in the memory metal sheet is downwards released and is outwards guided to the inner wall of the bottom of the track through the outlet of the water absorption groove, the water in the area is absorbed, and the high-temperature heat is generated as well, and the residual water is dried; therefore, the water-absorbing materials can be led out in time, and water absorption is facilitated;
4. to sum up, this kind of pipeline under pressure erection equipment through the combined action of subassembly that absorbs water, water guide subassembly and guide subassembly etc. can make the interior bottom of track end possess the function of absorbing water, when pipeline under pressure was arranged in outdoor the placing, even if meet rainy season weather, moist moisture also can in time absorb the clearance to this partial moisture in permeating to the track from ground, prevents that the long-time adhesion of moisture from piling up in the track inner wall, has guaranteed the normal operating of track interior motor.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic perspective sectional structural view of a part of the track and the water absorption assembly of the present invention.
Fig. 3 is an enlarged schematic view of a portion a in fig. 2 according to the present invention.
Fig. 4 is an enlarged schematic view of the structure at B in fig. 2 according to the present invention.
Fig. 5 is an enlarged schematic view of the structure at C in fig. 2 according to the present invention.
Fig. 6 is a schematic perspective cross-sectional view of a memory metal sheet in the material guiding assembly according to the present invention.
Fig. 7 is a schematic cross-sectional view of the water absorbing assembly when the water guiding assembly and the material guiding assembly are in an active state according to the present invention.
In FIGS. 1-7: 1-track, 2-first slide block, 3-motor, 4-gear, 5-tooth, 6-support plate, 7-screw rod, 8-second slide block, 9-support frame, 10-limit block, 11-support frame, 12-support block, 13-pipeline body, 14-water suction groove, 15-partition plate, 16-rotating shaft, 17-guide plate, 18-water suction plate, 19-balance plate, 20-fixing plate, 21-guide groove, 22-rotating rod, 23-rotating plate, 24-thin strip, 25-material storage plate, 26-film, 27-memory metal sheet and 28-clamping plate.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to fig. 1 to 7 in the embodiment of the present invention.
Example 1
Referring to fig. 1-2 and fig. 7, in an embodiment of the present invention, a pressure pipeline installation apparatus includes a rail 1, a plurality of water absorption assemblies for absorbing water in time are symmetrically and movably installed at bottom ends of left and right inner walls of the rail 1, and the water absorption assemblies include: the water guide assembly and the material guide assembly are movably arranged at the bottom ends of the left inner wall and the right inner wall of the track 1;
the water guide assembly includes: the water absorption device comprises a water absorption groove 14, a partition plate 15, a rotating shaft 16, a guide plate 17, a water absorption plate 18 and a balance plate 19, wherein the water absorption groove 14 is symmetrically and fixedly installed at the bottom ends of the left inner wall and the right inner wall of the track 1, the partition plate 15 is fixedly installed between the middle ends of the left inner wall and the right inner wall of the water absorption groove 14, the rotating shaft 16 is rotatably installed at the left upper end and the right upper end of the interior of the water absorption groove 14, the guide plate 17 is fixedly installed on the outer surface of one side of the rotating shaft 16 in a surrounding mode, the water absorption plate 18 is fixedly installed at the tail end of the outer surface of the top side of the guide plate 17, and the balance plate 19 is fixedly installed on the outer surface of the other side of the rotating shaft 16 in a surrounding mode;
the water guide assembly is convenient for being adhered to the water guide assembly after water permeates into the track 1, so that the water guide assembly moves to guide and collect the water;
the guide subassembly includes: the water suction device comprises a fixed plate 20, a guide groove 21, a rotating rod 22, a rotating plate 23, thin strips 24, a storage plate 25, a film 26, a memory metal sheet 27 and clamping plates 28, wherein the fixed plate 20 is fixedly installed in the middle of the top end inside the water suction groove 14, the guide groove 21 is fixedly installed in the middle of the upper end inside the water suction groove 14, the rotating rod 22 is rotatably installed in the middle of the left part and the right part of the upper end inside the water suction groove 14, the rotating plate 23 is fixedly installed on the outer surface of one side of the rotating rod 22 in a surrounding mode, the thin strips 24 are fixedly installed on the tail end of the outer surface of the top side of the rotating plate 23 in an inclined mode, the storage plate 25 is fixedly installed between the upper ends of the left inner wall and the right inner wall of the fixed plate 20, the film 26 is fixedly attached to the outer surface of the top side of the storage plate 25, the memory metal sheet 27 is fixedly installed at the middle end of the outer surface of the bottom side of the partition plate 15, and the clamping plates 28 are symmetrically and fixedly installed at the lower ends of the left inner wall and the right wall of the water suction groove 14;
the guide subassembly here is for being convenient for take place the activity back at the water guide subassembly, triggers the guide subassembly and takes place activity deformation successively, outwards derives the material that absorbs water of preassembleing in the guide subassembly in time, in time absorbs moisture.
In the embodiment of the invention, a first sliding block 2 is slidably mounted at the upper end inside a track 1, a motor 3 is fixedly mounted at one side inside the first sliding block 2, a gear 4 is fixedly mounted at the output end of the motor 3, a plurality of teeth 5 are fixedly mounted on the bottom inner wall of the track 1 at equal intervals, the teeth 5 are meshed with the gear 4, a supporting plate 6 is fixedly mounted at the top end of the first sliding block 2, a screw rod 7 is rotatably mounted at the upper end inside the supporting plate 6, a second sliding block 8 is connected to the left end and the right end of the outer surface of the screw rod 7 in a penetrating and spiral manner, a supporting frame 9 is fixedly mounted at the top end of the second sliding block 8, a limiting block 10 is fixedly mounted at the upper end of the side wall of the supporting frame 9, a support 11 is fixedly mounted at the top end of the supporting plate 6, a supporting block 12 is slidably mounted at the top end of the support 11, and a pipeline body 13 is arranged between the two limiting blocks 10.
According to the pressure pipeline installation equipment, the water absorption assembly is arranged, when the pipeline body 13 is placed outdoors, in rainy seasons, moist water permeates into the track 1 from the ground and flows onto the water guide assembly of the water absorption assembly, so that the water guide assembly can move after absorbing water, and the water is guided and collected; the guide assembly of the water absorption assembly is triggered to movably deform sequentially, water absorption materials pre-installed in the guide assembly are led out outwards in time, water collected in the water guide assembly is absorbed and led out to the bottom end of the track 1, and residual water is absorbed and dried; therefore, under the continuous cooperation of the multiple groups of water absorption components, the timely absorption of water can be realized.
Example 2
Referring to fig. 2-3 and fig. 7, the embodiment of the present invention is different from embodiment 1 in that: the water suction groove 14 is in a U-shaped groove shape which is hollow inside, closed front and back and opened at the top end, the middle part of the bottom end of the water suction groove 14 is provided with an outlet which penetrates up and down, and a space is reserved between the bottom end of the water suction groove 14 and the inner wall of the bottom of the track 1;
the water suction groove 14 is provided to accommodate the remaining water guide member and the material guide member, and to collect and absorb the water penetrating into the rail 1.
In the embodiment of the invention, the partition plate 15 is in a horizontal long straight plate shape, and the partition plate 15 is made of copper;
the partition 15 is used to receive the water from the top of the water suction tank 14, and to trigger the deformation of the material guiding component part under the partition 15 after the partition 15 heats up.
In the embodiment of the invention, the guide plate 17 is in a horizontal short straight plate shape, the outer surface of the tail side of the guide plate 17 is still pressed against the upper end of the side wall of the water absorption groove 14 under normal conditions, and the water absorption plate 18 is made of sponge;
the guide plate 17 and the water suction plate 18 are arranged so that when water flows into the side wall of the water suction groove 14, the water is accumulated on the water suction plate 18 and is pre-absorbed by the water suction plate, the guide plate 17 is pressed to rotate downwards, and the water is guided to the partition plate 15 to be collected.
In the embodiment of the invention, the balance plate 19 is in the shape of an inclined short straight plate, the balance plate 19 has magnetism, and the balance plate 19 is in an inclined static balance state with an included angle of 30 degrees with the horizontal plane under a normal condition;
the balance plate 19 is used for keeping the right end of the guide plate 17 balanced, and for synchronously driving the balance plate 19 to rotate upwards to trigger the subsequent material guiding assembly to move when the guide plate 17 rotates downwards.
According to the pressure pipeline installation equipment, the water guide assembly is arranged, when the inside of the track 1 is in a dry state, the outer surface of the tail side of the guide plate 17 of the water guide assembly is still abutted to the upper end of the side wall of the water suction groove 14 of the water guide assembly; the balance plate 19 of the water guide assembly is in an inclined static balance state with an included angle of 30 degrees with the horizontal plane; however, when moisture permeates into the track 1 from the ground, the moisture gradually breaks through the state, namely after the moisture permeates, the moisture adheres to the side wall of the water absorption groove 14 and flows to the tail end of the guide plate 17, and is sequentially accumulated on the water absorption plate 18 of the water guide assembly and is pre-absorbed by the water absorption plate, and then the guide plate 17 is pressed to rotate downwards, so that the moisture is guided to the partition plate 15 of the water guide assembly below the guide plate for collection; meanwhile, the balance plate 19 is synchronously driven to rotate upwards so as to trigger the subsequent material guide component to move and then lead out the water absorbing material to absorb water in time; so in order to realize in time guide and the collection to moisture, be convenient for absorb water.
Example 3
Referring to fig. 2-7, the embodiment of the present invention is different from embodiment 1 in that: the fixed plate 20 is in a shape of an arc plate which is convex at the top, symmetrical left and right, thin at the bottom and thick at the top, the fixed plate 20 is made of iron, the guide chute 21 is in a shape of a V-shaped groove which is wide at the top and narrow at the bottom, penetrates up and down and is symmetrical at left and right in an inclined manner, and a distance is reserved between the tops of the left end and the right end of the guide chute 21 and the left bottom and the right bottom of the fixed plate 20;
the fixing plate 20 is used for conveniently matching with the front and rear inner walls of the water absorption groove 14, the storage plate 25 and the film 26 together to contain part of water absorption materials; the material guiding groove 21 is used to facilitate the water absorbing material to flow out to the partition 15 along the material guiding groove 21 after the subsequent film 26 is deformed.
In the embodiment of the invention, the rotating rod 22 is closely adjacent to the top end of the guide chute 21, the rotating plate 23 is in a horizontal thin short straight plate shape, the rotating plate 23 has the same magnetism as the balance plate 19, the outer surface of the tail side of the rotating plate 23 is in a static magnetic attraction fit at the bottom end of the inner wall of the fixed plate 20 under normal conditions, the rotating plate 23 is positioned above the balance plate 19, the thin strip 24 is in a top thin arc strip shape, the storage plate 25 is in an arc plate shape with concave bottom and left and right symmetry, the left and right ends of the storage plate 25 are both provided with sockets through which the top end of the thin strip 24 can penetrate, the middle part of the bottom end of the storage plate 25 is provided with through holes which penetrate up and down, the through holes are positioned right above the guide chute 21, the left and right ends of the thin film 26 are respectively fixedly fit at the upper ends of the left and right inner walls of the fixed plate 20, the thin film 26 seals the sockets and the through holes of the storage plate 25 under normal conditions, and the thin film 26 is preloaded with quicklime powder;
the rotating plate 23, the thin strips 24 and the thin film 26 are convenient for the rotating plate 23 to have the same magnetism as the balance plate 19 when the balance plate 19 rotates upwards, so that the rotating plate 23 and the thin strips 24 are gradually pushed to rotate upwards, when the tip part of the top end of the thin strips 24 rotates to the inserting opening of the storage plate 25, the top end of the thin film 26 is punctured, the through opening of the storage plate 25 is opened, and the water absorbing material which is pre-loaded on the thin film 26 and is formed by quicklime powder is released downwards.
In the embodiment of the invention, the memory metal sheet 27 is in a semicircular plate shape with a flat top and a convex bottom and is bilaterally symmetrical, the head end and the tail end of the memory metal sheet 27 are in mutual static mortise and tenon joint under normal conditions, the bottom of the left tail end of the memory metal sheet 27 is provided with an arc edge, the arc edge is statically abutted to a convex part at the right head end of the memory metal sheet 27 under normal conditions, quicklime powder is also preloaded in the memory metal sheet 27, the clamping plate 28 is in a thin arc plate shape, the convex upper end of the clamping plate 22 is statically abutted to a bending end of the memory metal sheet 27, and the top end of the clamping plate 28 is abutted to the outer surface of the bottom side of the partition plate 15 in a sliding manner;
the memory metal sheet 27 is designed to absorb moisture previously flowing down through the guide plate 17 to generate high temperature heat when the pre-loaded quicklime powder on the film 26 is discharged to the partition plate 15, so that the partition plate 15 generates heat and the high temperature heat is conducted down to the memory metal sheet 27, so that the lower parts of the left and right ends of the memory metal sheet 27 are bent and restored to deform to both sides after being heated, and the residual quicklime powder pre-loaded in the memory metal sheet 27 is discharged downwards and outwards through the bottom outlet of the water suction groove 14 to absorb moisture on the bottom inner wall of the rail 1, generate high temperature heat and dry the residual moisture.
According to the pressure pipeline installation equipment, the material guide assembly is arranged, when the inside of the track 1 is in a dry state, the outer surface of the tail side of the rotating plate 23 of the material guide assembly is in static magnetic attraction fit with the bottom end of the inner wall of the fixing plate 20 of the material guide assembly; a film 26 of the material guide assembly seals the socket and the through port of the material storage plate 25 of the material guide assembly, and quicklime powder pre-loaded on the film 26 does not overflow; the left end and the right end of a memory metal sheet 27 of the material guide assembly are in a bent initial static state, the arc edge at the bottom of the left tail end of the memory metal sheet is statically abutted to the convex part at the right head end of the memory metal sheet, and quicklime powder in the memory metal sheet does not overflow; the convex upper end of the clamping plate 22 of the material guiding component is still abutted to the bending end of the memory metal sheet 27; however, when moisture permeates into the track 1 from the ground, the moisture gradually breaks through the state, that is, when the balance plate 19 of the water guide assembly rotates upwards as described above, the rotating plate 23 has the same magnetism as the balance plate 19, so as to gradually push the rotating plate 23 and the thin strip 24 to rotate upwards, when the tip of the top end of the thin strip 24 rotates to the insertion opening of the storage plate 25, the top end of the thin film 26 is punctured, so as to open the through opening of the storage plate 25, quicklime powder pre-loaded on the thin film 26 is released downwards to the partition plate 15 of the water guide assembly, so that the water previously flowing downwards through the guide plate 17 is absorbed, high-temperature heat is generated, the partition plate 15 generates heat, the high-temperature heat is conducted downwards to the memory metal sheet 27, the lower parts of the left and right ends of the heated memory metal sheet 27 are bent and restored to deform towards both sides (at this time, the clamping plate 22 is pushed open towards both sides), so as to release the quicklime powder of the residual part in the memory metal sheet 27 downwards, the water is led out to the inner wall of the track 1 through the bottom outlet of the water suction groove 14, and the high-temperature water absorption area is dried, and the residual quicklime powder is dried; therefore, the water absorption materials can be guided out in time, and water absorption is facilitated.
Example 4
Referring to fig. 1, in an embodiment of the present invention, an installation method of a pressure pipe installation apparatus includes the following steps:
s1: after the track 1 is arranged underground, the pipeline body 13 is placed on the top of the support plate 6, and the pipeline body 6 is supported by the support blocks 12;
s2: the screw rod 7 is started to rotate to drive the two second sliding blocks 8 to displace, so that the two corresponding sides of the pipeline body 13 are clamped by the supporting frame 9;
s3: when the pipeline body 13 needs to be moved to a designated place, the motor 3 is started, so that the gear 4 drives the support plate 6 and the pipeline body 13 to move when rotating through the meshing with the plurality of teeth 5;
s4: when the surface of the pipeline body 13 needs to be detected, the detection device is fixed on the support frame 9, and then the support frame 9 is moved towards the two sides in the reverse direction, so that the limit block 10 moves forwards to limit the pipeline body 13.

Claims (10)

1. A pressure pipe installation apparatus comprising a track (1), characterized in that: inner wall bottom symmetry movable mounting has the subassembly that absorbs water of a plurality of in time absorbing moisture about track (1), the subassembly that absorbs water includes: the water guide assembly and the material guide assembly are movably mounted at the bottom ends of the left inner wall and the right inner wall of the track (1);
the water guide assembly includes: the water absorption device comprises a water absorption groove (14), a partition plate (15), a rotating shaft (16), a guide plate (17), a water absorption plate (18) and a balance plate (19), wherein the water absorption groove (14) is installed on the track (1), the partition plate (15) and the rotating shaft (16) are installed on the water absorption groove (14), the guide plate (17) and the balance plate (19) are installed on the rotating shaft (16), and the water absorption plate (18) is installed on the guide plate (17);
the guide assembly includes: fixed plate (20), baffle box (21), bull stick (22), commentaries on classics board (23), slender strip (24), storage board (25), film (26), memory sheetmetal (27) and cardboard (28), fixed plate (20), baffle box (21) and bull stick (22) are installed in groove (14) that absorbs water, and commentaries on classics board (23) are installed in bull stick (22), and slender strip (24) are installed in commentaries on classics board (23), and storage board (25) are installed in fixed plate (20), and film (26) have been laminated in storage board (25), and memory sheetmetal (27) are installed in baffle (15), and cardboard (28) are installed in groove (14) that absorbs water.
2. A pressure conduit installation apparatus according to claim 1 wherein: first slider (2) are installed in track (1), motor (3) are installed in first slider (2), gear (4) are installed in motor (3), a plurality of teeth (5) are installed in track (1), backup pad (6) are installed in first slider (2), lead screw (7) are installed in backup pad (6), lead screw (7) are connected with second slider (8), support frame (9) are installed in second slider (8), stopper (10) are installed in support frame (9), support (11) are installed in backup pad (6), supporting shoe (12) are installed in support (11), stopper (10) are provided with pipeline body (13).
3. A pressure conduit installation apparatus according to claim 1 wherein: the water suction groove (14) is in a U-shaped groove shape with a hollow interior, a closed front and back part and an open top end, and an outlet is formed in the water suction groove (14).
4. A pressure conduit installation apparatus according to claim 1 wherein: the partition plate (15) is in a horizontal long straight plate shape, and the partition plate (15) is made of copper.
5. A pressure conduit installation apparatus according to claim 1 wherein: the guide plate (17) is in a horizontal short straight plate shape, and the water absorption plate (18) is made of sponge.
6. A pressure conduit installation apparatus according to claim 1 wherein: the balance plate (19) is in the shape of an inclined short straight plate, and the balance plate (19) has magnetism.
7. A pressure conduit installation apparatus according to claim 1 wherein: the fixing plate (20) is in the shape of an arc plate which is convex at the top, symmetrical left and right, thin at the bottom and thick at the top, the fixing plate (20) is made of iron, and the guide chute (21) is in the shape of a V-shaped chute which is wide at the top, narrow at the bottom, penetrating through the chute from top to bottom and symmetrical left and right in an inclined manner.
8. A pressure conduit installation apparatus according to claim 1 wherein: the rotating plate (23) is in the shape of a horizontal thin short straight plate, the rotating plate (23) has the same magnetism as the balance plate (19), the thin strip (24) is in the shape of a top thin arc strip, the storage plate (25) is in the shape of an arc plate with a concave bottom and symmetrical left and right, a socket and a through hole are formed in the storage plate (25), and quick lime powder is pre-installed on the film (26).
9. A pressure conduit installation apparatus according to claim 1 wherein: the memory metal sheet (27) is in a semicircular plate shape with a convex top, a flat bottom and bilateral symmetry, the memory metal sheet (27) is provided with an arc edge, the memory metal sheet (27) is also preloaded with quicklime powder, and the clamping plate (28) is in a thin arc plate shape.
10. A method for installing pressure pipeline installation equipment is characterized in that: the method comprises the following steps:
s1: after the track (1) is arranged underground, the pipeline body (13) is placed at the top of the supporting plate (6), and the pipeline body (6) is supported through the supporting block (12);
s2: the screw rod (7) is started to rotate to drive the two second sliding blocks (8) to displace, so that the supporting frame (9) clamps the two corresponding sides of the pipeline body (13);
s3: when the pipeline body (13) needs to be moved to a designated place, the motor (3) is started, so that the gear (4) is meshed with the plurality of teeth (5), and the support plate (6) and the pipeline body (13) are driven to move during rotation;
s4: when the surface of the pipeline body (13) needs to be detected, the detection device is fixed on the support frame (9), and then the support frame (9) is moved towards the two sides in the reverse direction, so that the limiting block (10) moves forwards, and the pipeline body (13) is limited.
CN202210714653.0A 2022-06-23 2022-06-23 Pressure pipeline installation equipment and installation method thereof Pending CN115307390A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210714653.0A CN115307390A (en) 2022-06-23 2022-06-23 Pressure pipeline installation equipment and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210714653.0A CN115307390A (en) 2022-06-23 2022-06-23 Pressure pipeline installation equipment and installation method thereof

Publications (1)

Publication Number Publication Date
CN115307390A true CN115307390A (en) 2022-11-08

Family

ID=83854973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210714653.0A Pending CN115307390A (en) 2022-06-23 2022-06-23 Pressure pipeline installation equipment and installation method thereof

Country Status (1)

Country Link
CN (1) CN115307390A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117308541A (en) * 2023-11-28 2023-12-29 南通海之阳环保工程技术有限公司 Horizontal dehydrator
CN117682278A (en) * 2024-01-29 2024-03-12 四川航天拓达玄武岩纤维开发有限公司 Basalt pipeline transportation and storage device and application method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117308541A (en) * 2023-11-28 2023-12-29 南通海之阳环保工程技术有限公司 Horizontal dehydrator
CN117308541B (en) * 2023-11-28 2024-03-12 南通海之阳环保工程技术有限公司 Horizontal dehydrator
CN117682278A (en) * 2024-01-29 2024-03-12 四川航天拓达玄武岩纤维开发有限公司 Basalt pipeline transportation and storage device and application method
CN117682278B (en) * 2024-01-29 2024-04-26 四川航天拓达玄武岩纤维开发有限公司 Basalt pipeline transportation and storage device and application method

Similar Documents

Publication Publication Date Title
CN115307390A (en) Pressure pipeline installation equipment and installation method thereof
CN112575935A (en) Energy-saving glass building curtain wall
CN214793882U (en) Gardens are with soil detection sampling device
CN112360017A (en) Assembled bathroom glass partition wall with dewatering function
CN212979691U (en) Semi-automatic pushing-wiping type blackboard
CN210809931U (en) Social work is with sealing up dampproofing filing cabinet of depositing
CN114659282A (en) Gas condensation type solar heat collecting pipe
CN210597820U (en) Sound insulation ceiling
CN108759133B (en) Solar heat collecting device
CN113947978A (en) Electrical interaction equipment is used in college english teaching
CN216973841U (en) Fireproof and anti-seismic integrated building external wall insulation structure
CN113463802A (en) Suspension type glass curtain wall
CN213359906U (en) Drainage door and window device
CN211575761U (en) Refrigeration accessory drying device
CN210121099U (en) Glass surface cleaning device in sunshine room installation process
CN215506886U (en) Molecular hybridization test tube fixing device
CN216195099U (en) Energy-concerving and environment-protective rainwater collection circulating device
CN211114473U (en) Roof structure
CN216810377U (en) Building wall dampproofing insulation construction
CN220550725U (en) Assembled partition wall convenient to installation
CN214220112U (en) Assembled bathroom glass partition wall with dewatering function
CN216195341U (en) Laborsaving convenient type rainwater is collected and is utilized device
CN116908239B (en) Door and window heat preservation nature check out test set
CN219688089U (en) Material collecting device for tea processing
CN219135129U (en) Benzene board storage box

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication