CN115305871A - 堤坝道路护坡的生态环境修复施工方法 - Google Patents

堤坝道路护坡的生态环境修复施工方法 Download PDF

Info

Publication number
CN115305871A
CN115305871A CN202211020773.7A CN202211020773A CN115305871A CN 115305871 A CN115305871 A CN 115305871A CN 202211020773 A CN202211020773 A CN 202211020773A CN 115305871 A CN115305871 A CN 115305871A
Authority
CN
China
Prior art keywords
slope
layer
ecological environment
woven geotextile
protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211020773.7A
Other languages
English (en)
Inventor
杨少武
王天野
杨昊
李小刚
张超
宋成亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN202211020773.7A priority Critical patent/CN115305871A/zh
Publication of CN115305871A publication Critical patent/CN115305871A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/128Coherent linings made on the spot, e.g. cast in situ, extruded on the spot
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips
    • E02B3/125Flexible prefabricated covering elements, e.g. mats, strips mainly consisting of vegetable material, e.g. wood, reeds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/129Polyhedrons, tetrapods or similar bodies, whether or not threaded on strings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/06Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/06Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against corrosion by soil or water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/08Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Abstract

本发明公开了一种堤坝道路护坡的生态环境修复施工方法,本方法分别在坡底和坡顶浇筑坡脚和设置砼站石封边,分层进行路基填筑、压实,间隔设置土工格栅并用U型钉进行固定;在边坡铺设砂砾垫层和第一层无纺土工布;坡面打设方木桩和玻璃钢锚钎;铺设雷诺护垫或格宾网,内部石料中间设置排水管,排水管管壁间隔交错打孔后外包土工布;依次铺设第二层无纺土工布和蜂巢格室;在蜂巢格室表面稳固回填土并撒播绿化种子。本方法克服传统堤坝道路护坡结构的缺陷,在进行堤坝道路护坡防护加固的同时实现生态环境修复,既能满足堤坝道路护坡的防护要求,又能恢复施工造成的生态环境破坏,减少水土流失,达到生态环境修复的目的。

Description

堤坝道路护坡的生态环境修复施工方法
技术领域
本发明涉及建筑施工技术领域,尤其涉及一种堤坝道路护坡的生态环境修复施工方法。
背景技术
生态环境是人类社会经济可持续发展的基础,良好的生态环境是人类生存和生活的必要条件之一。
生态环境退化问题已经成为维持人类生存和社会经济可持续发展的严重威胁,如何整治日趋恶化的生态环境,防止生态环境的退化,有效处理和解决全球生态环境退化问题,恢复和重建已经受损的生态环境的原有结构和功能,是改善生态环境、提高区域生产力、实现可持续发展的关键,已经成为全人类面临的共同课题。
传统堤坝道路护坡大都为浆砌或干砌块石、现浇混凝土、预制混凝土块体结构,很少考虑堤坝与周边生态环境及景观的统一,因此在不同程度上,对景观、环境和生态产生了不良的影响,以至于护坡建筑物割裂了土壤与水体的关系,使水体与土地及其生物环境相分离,破坏了自然水系的生态。生态型护坡工程,其内涵是利用植物或植物与其他工程材料的结合,在堤坝护坡上构建具有生态功能的防护系统,实现岸坡的抗冲蚀、抗滑动和生态恢复,以达到维持河岸稳定,提高坡面植物生态环境,营造生物多样性,增强河流自净能力,改善人居环境等目的。
发明内容
本发明所要解决的技术问题是提供一种堤坝道路护坡的生态环境修复施工方法,本方法克服传统堤坝道路护坡结构的缺陷,在进行堤坝道路护坡防护加固的同时实现生态环境修复,既能满足堤坝道路护坡的防护要求,又能恢复施工造成的生态环境破坏,减少水土流失,达到生态环境修复的目的。
为解决上述技术问题,本发明堤坝道路护坡的生态环境修复施工方法包括如下步骤:
步骤一、坡底采用C20素混凝土浇筑坡脚,坡脚尺寸为1×1.5m,坡顶采用C15砼站石封边,砼站石的尺寸为20×65cm;
步骤二、分层进行路基填筑、压实,间隔60cm设置土工格栅,土工格栅对边坡进行反包,反包长度不小于2m,并用U型钉进行固定;
步骤三、在边坡依次铺设10cm厚的砂砾垫层和第一层无纺土工布,第一层无纺土工布采用缝合接头或搭接,第一层无纺土工布松弛铺设;
步骤四、在距离坡顶和坡脚50cm位置分别间隔打设方木桩,坡顶和坡脚的方木桩之间间隔打设玻璃钢锚钎,玻璃钢锚钎间距按1m布置;
步骤五、在砂砾垫层表面铺设雷诺护垫或格宾网,雷诺护垫或格宾网内填充的石料粒径为100~150mm,石料中间沿坡面设置排水管,排水管管壁间隔交错打孔后外包200g/m2的土工布;
步骤六、在雷诺护垫或格宾网表面铺设第二层无纺土工布,第二层无纺土工布采用缝合接头或搭接,第二层无纺土工布松弛铺设;
步骤七、在第二层无纺土工布表面铺设蜂巢格室,并安装蜂巢格室的限位帽;
步骤八、在蜂巢格室表面稳固回填土并撒播绿化种子。
进一步,所述步骤三和步骤六中,第一层无纺土工布和第二层无纺土工布采用缝合接头时,缝合接头的缝合宽度不小于5cm,采用搭接时,搭接宽度不小于50cm。
进一步,所述步骤五中,石料的平均粒径为125mm,排水管是管径为75mm的 PVC管,管壁打孔的孔径为6mm、间距为100mm。
进一步,所述步骤七中,相邻蜂巢格室之间侧边互搭、槽孔对齐后采用连键插入槽孔连接,相邻蜂巢格室之间端部互搭后采用连键插入槽孔连接。
由于本发明堤坝道路护坡的生态环境修复施工方法采用了上述技术方案,即本方法分别在坡底和坡顶浇筑坡脚和设置砼站石封边,分层进行路基填筑、压实,间隔设置土工格栅并用U型钉进行固定;在边坡铺设砂砾垫层和第一层无纺土工布;坡面打设方木桩和玻璃钢锚钎;铺设雷诺护垫或格宾网,内部石料中间设置排水管,排水管管壁间隔交错打孔后外包土工布;依次铺设第二层无纺土工布和蜂巢格室;在蜂巢格室表面稳固回填土并撒播绿化种子。本方法克服传统堤坝道路护坡结构的缺陷,在进行堤坝道路护坡防护加固的同时实现生态环境修复,既能满足堤坝道路护坡的防护要求,又能恢复施工造成的生态环境破坏,减少水土流失,达到生态环境修复的目的。
附图说明
下面结合附图和实施方式对本发明作进一步的详细说明:
图1为本发明堤坝道路护坡的生态环境修复施工方法示意图;
图2图1中A部放大示意图;
图3为本方法中相邻蜂巢格室之间侧边连接示意图;
图4为本方法中相邻蜂巢格室之间端部连接示意图。
具体实施方式
实施例如图1和图2所示,本发明堤坝道路护坡的生态环境修复施工方法包括如下步骤:
步骤一、坡底采用C20素混凝土浇筑坡脚1,坡脚1尺寸为1×1.5m,坡顶采用C15砼站石2封边,砼站石2的尺寸为20×65cm;
步骤二、分层进行路基填筑、压实,间隔60cm设置土工格栅3,土工格栅3对边坡进行反包,反包长度不小于2m,并用U型钉进行固定;
步骤三、在边坡依次铺设10cm厚的砂砾垫层4和第一层无纺土工布5,第一层无纺土工布5采用缝合接头或搭接,第一层无纺土工布5松弛铺设;
步骤四、在距离坡顶和坡脚50cm位置分别间隔打设方木桩6,坡顶和坡脚的方木桩6之间间隔打设玻璃钢锚钎7,玻璃钢锚钎7间距按1m布置;
步骤五、在砂砾垫层4表面铺设雷诺护垫8或格宾网,雷诺护垫8或格宾网内填充的石料粒径为100~150mm,石料中间沿坡面设置排水管81,排水管81管壁间隔交错打孔后外包200g/m2的土工布;
步骤六、在雷诺护垫8或格宾网表面铺设第二层无纺土工布9,第二层无纺土工布9采用缝合接头或搭接,第二层无纺土工布9松弛铺设;
步骤七、在第二层无纺土工布9表面铺设蜂巢格室10,并安装蜂巢格室10的限位帽;
步骤八、在蜂巢格室10表面稳固回填土并撒播绿化种子。
优选的,所述步骤三和步骤六中,第一层无纺土工布5和第二层无纺土工布9采用缝合接头时,缝合接头的缝合宽度不小于5cm,采用搭接时,搭接宽度不小于50cm。
优选的,所述步骤五中,石料的平均粒径为125mm,排水管81是管径为75mm的 PVC管,管壁打孔的孔径为6mm、间距为100mm。
如图3和图4所示,优选的,所述步骤七中,相邻蜂巢格室10之间侧边互搭、槽孔对齐后采用连键11插入槽孔连接,相邻蜂巢格室10之间端部互搭后采用连键11插入槽孔连接。
本施工方法中砂垫层的作用为找平层兼排水层;无纺土工布主要起到保护作用,防止泥土或砂垫层伴随强降雨入侵至下一结构层;雷诺护垫或格宾网用于提高河床边坡的稳定性,保护河床边坡防止冲刷;蜂巢格室用于减缓流速,消减水流能量,涣散水流,从而减小水流对边坡的侵蚀,蜂巢格室对土体具有杰出的附着效果;方木桩的主要作用起到张开蜂巢格室;玻璃钢锚钎嵌固至土体,避免蜂巢格式整体滑移;排水管用于疏散强降雨雨水侵入结构层后迅速排放,减少雨水对土体边坡的影响。
本方法施工作业简单方便,安全可靠,可有效进行路基边坡加固,雷诺护垫或格宾网与蜂巢格室组合的边坡更稳固,实现边坡的生态环境修复,减少水土流失。有效提高堤坝路基加固的同时与周边景观、环境相融合,在河道岸坡上构建具有生态功能的防护系统,实现岸坡的抗冲蚀、抗滑动和生态环境修复,达到维持堤坝稳定、提高坡面植物生态环境、营造生物多样性、增强河流自净能力、改善人居环境的目的。

Claims (4)

1.一种堤坝道路护坡的生态环境修复施工方法,其特征在于本方法包括如下步骤:
步骤一、坡底采用C20素混凝土浇筑坡脚,坡脚尺寸为1×1.5m,坡顶采用C15砼站石封边,砼站石的尺寸为20×65cm;
步骤二、分层进行路基填筑、压实,间隔60cm设置土工格栅,土工格栅对边坡进行反包,反包长度不小于2m,并用U型钉进行固定;
步骤三、在边坡依次铺设10cm厚的砂砾垫层和第一层无纺土工布,第一层无纺土工布采用缝合接头或搭接,第一层无纺土工布松弛铺设;
步骤四、在距离坡顶和坡脚50cm位置分别间隔打设方木桩,坡顶和坡脚的方木桩之间间隔打设玻璃钢锚钎,玻璃钢锚钎间距按1m布置;
步骤五、在砂砾垫层表面铺设雷诺护垫或格宾网,雷诺护垫或格宾网内填充的石料粒径为100~150mm,石料中间沿坡面设置排水管,排水管管壁间隔交错打孔后外包200g/m2的土工布;
步骤六、在雷诺护垫或格宾网表面铺设第二层无纺土工布,第二层无纺土工布采用缝合接头或搭接,第二层无纺土工布松弛铺设;
步骤七、在第二层无纺土工布表面铺设蜂巢格室,并安装蜂巢格室的限位帽;
步骤八、在蜂巢格室表面稳固回填土并撒播绿化种子。
2.根据权利要求1所述的堤坝道路护坡的生态环境修复施工方法,其特征在于:所述步骤三和步骤六中,第一层无纺土工布和第二层无纺土工布采用缝合接头时,缝合接头的缝合宽度不小于5cm,采用搭接时,搭接宽度不小于50cm。
3.根据权利要求1所述的堤坝道路护坡的生态环境修复施工方法,其特征在于:所述步骤五中,石料的平均粒径为125mm,排水管是管径为75mm的 PVC管,管壁打孔的孔径为6mm、间距为100mm。
4.根据权利要求1所述的堤坝道路护坡的生态环境修复施工方法,其特征在于:所述步骤七中,相邻蜂巢格室之间侧边互搭、槽孔对齐后采用连键插入槽孔连接,相邻蜂巢格室之间端部互搭后采用连键插入槽孔连接。
CN202211020773.7A 2022-08-24 2022-08-24 堤坝道路护坡的生态环境修复施工方法 Pending CN115305871A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211020773.7A CN115305871A (zh) 2022-08-24 2022-08-24 堤坝道路护坡的生态环境修复施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211020773.7A CN115305871A (zh) 2022-08-24 2022-08-24 堤坝道路护坡的生态环境修复施工方法

Publications (1)

Publication Number Publication Date
CN115305871A true CN115305871A (zh) 2022-11-08

Family

ID=83864044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211020773.7A Pending CN115305871A (zh) 2022-08-24 2022-08-24 堤坝道路护坡的生态环境修复施工方法

Country Status (1)

Country Link
CN (1) CN115305871A (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204825784U (zh) * 2015-08-03 2015-12-02 申新山 一种边坡生态防护系统
JP2016102313A (ja) * 2014-11-27 2016-06-02 旭化成ジオテック株式会社 擁壁構造体及びその構築工法
CN205576841U (zh) * 2016-04-15 2016-09-14 北京市水利规划设计研究院 硬质坡面植生结构
CN107513983A (zh) * 2017-10-09 2017-12-26 杨勇 一种蜂巢格室型用于堤坝生态治理及雨水净化系统及其施工方法
CN108708239A (zh) * 2018-07-28 2018-10-26 新疆维吾尔自治区交通规划勘察设计研究院 一种返包式土工格栅陡坡路堤结构及施工方法
CN109024487A (zh) * 2018-09-04 2018-12-18 中交第二公路勘察设计研究院有限公司 一种寒区库岸边坡防渗抗冻的防护系统及其施工方法
CN213740871U (zh) * 2020-11-17 2021-07-20 深圳中轩生态环境科技有限公司 一种蜂巢平铺式生态土稳护坡

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016102313A (ja) * 2014-11-27 2016-06-02 旭化成ジオテック株式会社 擁壁構造体及びその構築工法
CN204825784U (zh) * 2015-08-03 2015-12-02 申新山 一种边坡生态防护系统
CN205576841U (zh) * 2016-04-15 2016-09-14 北京市水利规划设计研究院 硬质坡面植生结构
CN107513983A (zh) * 2017-10-09 2017-12-26 杨勇 一种蜂巢格室型用于堤坝生态治理及雨水净化系统及其施工方法
CN108708239A (zh) * 2018-07-28 2018-10-26 新疆维吾尔自治区交通规划勘察设计研究院 一种返包式土工格栅陡坡路堤结构及施工方法
CN109024487A (zh) * 2018-09-04 2018-12-18 中交第二公路勘察设计研究院有限公司 一种寒区库岸边坡防渗抗冻的防护系统及其施工方法
CN213740871U (zh) * 2020-11-17 2021-07-20 深圳中轩生态环境科技有限公司 一种蜂巢平铺式生态土稳护坡

Similar Documents

Publication Publication Date Title
CN103410159B (zh) 膨胀土路堑边坡支护结构及其施工方法
CN103510441B (zh) 防止寒区公路水损破坏的立体排水路基结构及施工方法
Keller Application of geosynthetics on low-volume roads
CN203403426U (zh) 膨胀土路堑边坡支护结构
CN106368238B (zh) 一种具有生态恢复功能的蜂窝土工格室挡土墙及其构筑方法
CN102966072B (zh) 软弱土地基上堤防加宽加高工程结合面处治的施工方法
CN105200881B (zh) 高寒区路基冻害综合处治结构的施工方法
CN104234061A (zh) 一种加筋生态混凝土护坡及其施工方法
CN203498721U (zh) 一种防止寒区公路水损破坏的立体排水路基结构
CN214882659U (zh) 一种防治箱涵顶部新建道路不均匀沉降的路基处理结构
CN113802426A (zh) 采用片石挤密加筋垫层法处理新近填土路基的方法
CN203716064U (zh) 一种便于疏通的路基渗沟
CN112195965A (zh) 膨胀土路堑挡土墙
CN209854656U (zh) 一种堤防
CN102561368B (zh) 一种预压实加筋土块柔性支护结构
CN216515520U (zh) 一种富水区域高填方工程地下排水结构
AU2021102288A4 (en) Composite Replacement Structure and Treatment for Soft Base of Coastal Mudflat
CN212896290U (zh) 一种软土地基加筋土石换填基础结构
CN115305871A (zh) 堤坝道路护坡的生态环境修复施工方法
CN111321705B (zh) 一种泥石流拦挡坝的建设方法
CN103898824B (zh) 高寒冻土地区路基用塑料排水板处理基底的方法
CN112854131A (zh) 一种水源保护区生态护岸及其施工方法
CN111287040A (zh) 液态土道路构造方法
KR20150021098A (ko) 수변구조물 강화공법
CN218562232U (zh) 道路边坡的护坡结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination