CN115293883A - Control method and device for transferring to bank processing system - Google Patents

Control method and device for transferring to bank processing system Download PDF

Info

Publication number
CN115293883A
CN115293883A CN202210951820.3A CN202210951820A CN115293883A CN 115293883 A CN115293883 A CN 115293883A CN 202210951820 A CN202210951820 A CN 202210951820A CN 115293883 A CN115293883 A CN 115293883A
Authority
CN
China
Prior art keywords
target
processing system
bank processing
date
working day
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210951820.3A
Other languages
Chinese (zh)
Inventor
林海燕
陈树伟
李诗宇
冯琦淇
高芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bank of China Ltd
Original Assignee
Bank of China Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bank of China Ltd filed Critical Bank of China Ltd
Priority to CN202210951820.3A priority Critical patent/CN115293883A/en
Publication of CN115293883A publication Critical patent/CN115293883A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/02Banking, e.g. interest calculation or account maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • G06F16/252Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application

Landscapes

  • Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • Technology Law (AREA)
  • General Business, Economics & Management (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The application discloses a control method and a device for transferring a bank processing system, which are used in the field of big data and comprise the following steps: acquiring target data and target time information corresponding to the target data, wherein the target time information is used for sending the target data and comprises a target date and a target moment; responding to the target date as a working day, and judging whether the target time exceeds the closing time of the bank processing system; if the target time exceeds the closing time of the bank processing system, the target data is not transferred to the bank processing system; and if the target time does not exceed the closing time of the bank processing system, transferring the target data to the bank processing system. Therefore, under the condition that the target date is determined to be the working day, whether the target time exceeds the closing time of the bank processing system or not is judged, and if not, the target data is transferred into the bank processing system, so that the problem of manpower account balance consumed due to uneven account accounting between the two systems is solved, and the accounting efficiency of the bank processing system is improved.

Description

Control method and device for transferring to bank processing system
Technical Field
The application relates to the field of big data, in particular to a control method and a control device for a bank transfer processing system.
Background
With the development of internet technology, core banking systems (BANCS) and bank processing systems (GTS) are used in cooperation to handle daily inter-system accounting transactions.
At present, a core bank system can send a processing message to a bank processing system every moment (7 × 24 hour operation mode), and the bank processing system can only receive the processing message during working hours (5 × 8 operation mode), so that the processing message received by the bank processing system during non-working hours needs manual intervention to account the accounting condition between the processing message and a customer account, and the accounting efficiency of the bank processing system is too low.
Therefore, how to improve the efficiency of the accounting of the bank processing system is a key concern to those skilled in the art.
Disclosure of Invention
Based on the above problems, the present application provides a method and an apparatus for controlling a bank-to-bank processing system, so as to improve the accounting efficiency of the bank processing system. The embodiment of the application discloses the following technical scheme:
in a first aspect, the application discloses a control method for a trans-banking processing system, comprising:
acquiring target data and target time information corresponding to the target data, wherein the target time information is used for sending the target data and comprises a target date and a target time;
responding to the target date as a working day, and judging whether the target time exceeds the closing time of a bank processing system;
if the target time exceeds the closing time of the bank processing system, the target data is not transferred to the bank processing system;
and if the target time does not exceed the closing time of the bank processing system, transferring the target data to the bank processing system.
Optionally, the method further includes:
and if the target time exceeds the closing time of the bank processing system, judging whether the target data is transferred to the bank processing system on the next day of the target date.
Optionally, after the responding to the target date is a working day, the method further includes:
responding to the condition that the bank processing system is in a data writing state, and judging whether the target time exceeds the closing time of the bank processing system;
and responding to the fact that the bank processing system is not in a data writing state, and judging whether the target data is transferred to the bank processing system on the next day of the target date.
Optionally, after the obtaining of the target data and the target time information corresponding to the target data, the method further includes:
responding to the target date as a non-working day, and judging that the non-working day is in a working day state or in a non-working day state;
if the non-working day is in a working day state, executing a step of judging whether the target time exceeds the closing time of the bank processing system;
and if the non-working day is in a non-working day state, judging whether the target data is transferred to a bank processing system on the next day of the target date.
Optionally, after the obtaining of the target data and the target time information corresponding to the target data, the method further includes:
acquiring a rule set corresponding to the bank processing system, wherein the rule set comprises a target date rule and a target time rule;
the step of judging whether the target time exceeds the closing time of the bank processing system in response to the target date being the working day comprises the following steps:
and judging whether the target date is a working day or not based on the target date rule, and if the target date is the working day, judging whether the target time exceeds the closing time of a bank processing system or not based on the target time rule.
In a second aspect, the present application discloses a control device for a trans-banking system, comprising:
the device comprises a first acquisition module, a second acquisition module and a third acquisition module, wherein the first acquisition module is used for acquiring target data and target time information corresponding to the target data, the target time information is used for sending the target data, and the target time information comprises a target date and a target time;
the judging module is used for responding to the fact that the target date is a working day and judging whether the target time exceeds the closing time of the bank processing system or not;
the first transfer module is used for not transferring the target data to the bank processing system if the target time exceeds the closing time of the bank processing system;
and the second transferring module is used for transferring the target data to the bank processing system if the target time does not exceed the closing time of the bank processing system.
Optionally, the apparatus further comprises:
and the first judgment sub-module is used for judging whether the target data is transferred to a bank processing system on the next day of the target date if the target time exceeds the closing time of the bank processing system.
Optionally, the method further includes:
the second judgment sub-module is used for responding to the data writing state of the bank processing system and judging whether the target time exceeds the closing time of the bank processing system;
and the third judgment submodule is used for responding to the situation that the bank processing system is not in a data writing state, and judging whether the target data is transferred to the bank processing system on the next day of the target date.
Optionally, the method further includes:
the fourth judgment submodule is used for responding to the fact that the target date is a non-working day, and judging that the non-working day is in a working day state or in a non-working day state;
the execution module is used for executing the step of judging whether the target time exceeds the closing time of the bank processing system if the non-workday is in a workday state;
and the fifth judgment submodule is used for judging whether the target data is transferred to a bank processing system on the next day of the target date if the non-workday is in a non-workday state.
Optionally, the method further includes:
the second acquisition module is used for acquiring a rule set corresponding to the bank processing system, wherein the rule set comprises a target date rule and a target time rule;
the judging module comprises:
and the sixth judgment submodule is used for judging whether the target date is a working day or not based on the target date rule, and judging whether the target time exceeds the closing time of the bank processing system or not based on the target time rule if the target date is the working day.
Compared with the prior art, the method has the following beneficial effects:
the method comprises the steps of firstly obtaining target data and target time information corresponding to the target data, wherein the target time information is used for sending the target data, the target time information comprises a target date and a target time, then responding to the fact that the target date is a working day, judging whether the target time exceeds the closing time of a bank processing system, and finally if the target time exceeds the closing time of the bank processing system, not transferring the target data to the bank processing system, and if the target time does not exceed the closing time of the bank processing system, transferring the target data to the bank processing system. Therefore, under the condition that the target date is determined to be the working day, whether the target time exceeds the closing time of the bank processing system or not is judged, and if not, the target data is transferred into the bank processing system, so that the problem of manpower account balance consumed due to uneven account accounting between the two systems is solved, and the accounting efficiency of the bank processing system is improved.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without inventive exercise.
Fig. 1 is a flowchart of a control method of a sub-banking processing system according to an embodiment of the present application;
fig. 2 is a schematic structural diagram of a control device of a sub-banking processing system according to an embodiment of the present application.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments in the present application without any creative effort belong to the protection scope of the present application.
It should be noted that the control method and apparatus for transferring to a bank processing system provided by the present application are used in the field of big data, and the foregoing is only an example, and does not limit the application fields of the names of the method and apparatus provided by the present application.
As described above, currently, the core banking system can send a processing message to the banking processing system every moment (7 × 24 hour operation mode), and the banking processing system can only receive the processing message during the working time (5 × 8 operation mode), so that the processing message received by the banking processing system during the non-working time needs manual intervention to account the accounting condition between the processing message and the customer account, which results in low accounting efficiency of the banking processing system. Therefore, how to improve the accounting efficiency of the bank processing system is a key issue of attention of those skilled in the art.
The method comprises the steps of firstly obtaining target data and target time information corresponding to the target data, wherein the target time information is used for sending the target data, the target time information comprises a target date and a target time, then responding to the fact that the target date is a working day, judging whether the target time exceeds the closing time of a bank processing system, and finally if the target time exceeds the closing time of the bank processing system, not transferring the target data to the bank processing system, and if the target time does not exceed the closing time of the bank processing system, transferring the target data to the bank processing system. Therefore, under the condition that the target date is determined to be the working day, whether the target time exceeds the closing time of the bank processing system or not is judged, and if not, the target data is transferred into the bank processing system, so that the problem of manpower account balance consumed due to uneven account accounting between the two systems is solved, and the accounting efficiency of the bank processing system is improved.
The method provided by the embodiment of the application can be executed by software on the terminal equipment. The terminal device may be, for example, a mobile phone, a tablet computer, a computer, or the like. The software may be, for example, system software.
In order that those skilled in the art will better understand the disclosure, the following detailed description will be given with reference to the accompanying drawings.
Method embodiment
The following describes a control method of a sub-banking processing system according to an embodiment of the present application.
Referring to fig. 1, which is a flowchart of a control method of a sub-banking processing system according to an embodiment of the present application, as shown in fig. 1, the method may include:
s101: and acquiring target data and target time information corresponding to the target data.
In this step, the core banking system (BANCS) acquires target data and target time information corresponding to the target data when the target data is transmitted, the target time information is used for transmitting the target data, the target time information is time information when the target data is acquired, the target time information includes a target date and a target time, the target data may be a GTS message, the GTS message is used for account accounting between the core banking system and a bank processing system, and the bank processing system may be a GTS (international settlement and trade financing centralized processing system), which is not limited herein.
As an implementation manner, after the target data and the target time information corresponding to the target data are obtained, a rule set corresponding to the bank processing system is further obtained, where the rule set is used to determine whether to send the target data to the bank processing system, where the rule set includes a target date rule and a target time rule, the target date rule is used to determine whether the target date is a working day or a non-working day, and the target time rule is used to determine whether the target time exceeds a closing time of the bank processing system.
And further, judging that the target date is the working day time based on the target date rule, and judging whether the target time exceeds the closing time of the bank processing system based on the target time rule. In this case, a calendar code may be set in the target date rule, and then the target date may be determined based on the calendar code, which is not specifically limited herein.
S102: and responding to the fact that the target date is a working day, and judging whether the target time exceeds the closing time of a bank processing system.
In this step, the closing time of the bank processing system is set by the staff, and is generally set to be four o' clock and half am of the day, and when the target date is the working day, whether the target time exceeds the closing time of the bank processing system is judged.
Further, after the target date is judged to be the working day, whether the bank processing system is in a data writing state is judged, if the bank processing system is in the data writing state, the data writing state is that the core bank system sends target data to the bank processing system, and whether the target time exceeds the closing time of the bank processing system is judged; if the bank processing system is not in the data writing state, whether to transfer the target data to the bank processing system is judged on the next day of the target date, the data writing state of the bank processing system can be adjusted, and the closing time of the bank processing system can be fixed, which is not limited specifically herein. Therefore, the problem of manpower account balancing consumption caused by uneven accounting accounts between two systems is solved, and the accounting efficiency of the bank processing system is improved. After the bank processing system is not in the data writing state, the target data is stored in the database, so that whether the target data is transferred to the bank processing system is judged on the next day of the target date, and the database can be a mysql database, which is not limited specifically herein.
S103: and if the target time exceeds the closing time of the bank processing system, the target data is not transferred to the bank processing system.
In this step, if the target time exceeds the closing time of the bank processing system, the target data is not transferred to the bank processing system. That is, the target data is not transferred to the bank processing system on the target date, and whether or not the target data is transferred to the bank processing system is determined again on the next day of the target date.
S104: and if the target time does not exceed the closing time of the bank processing system, transferring the target data to the bank processing system.
In this step, if the target time exceeds the closing time of the bank processing system, the target data is transferred into the bank processing system.
In addition, as an implementable embodiment, when the target date is judged to be the non-working date based on the target date rule after the target data and the target time information corresponding to the target data are acquired, the non-working date is judged to be the working date state or the working date state again. The non-working day is judged to be in a working day state or in a non-working day state only aiming at the vacation and rest period, and the ordinary non-working days are all in a non-working day state (namely not working). For example, the saturday is mid-autumn festival and belongs to a holiday period, so that the saturday needs to be rested, the saturday is in a non-working day and working day state, correspondingly, the saturday does not need to be rested, and the saturday is in a non-working day and non-working day state.
Further, when the non-working day is in the working day state, executing the step of judging whether the target time exceeds the closing time of the bank processing system; when the non-working day is in the non-working day state, the target data is not transferred into the bank processing system within the target date, and whether the target data is transferred into the bank processing system is judged again on the next day of the target date.
Therefore, the alternative scheme mainly explains how to realize the automatic transfer of the target data to the bank processing system without manual intervention. Specifically, in this alternative, first, target data and target time information corresponding to the target data are obtained, the target time information is used for sending the target data, the target time information includes a target date and a target time, then, in response to the target date being a working day, whether the target time exceeds a bank processing system closing time or not is judged, finally, if the target time exceeds the bank processing system closing time, the target data are not transferred to the bank processing system, and if the target time does not exceed the bank processing system closing time, the target data are transferred to the bank processing system.
In summary, in the embodiment, under the condition that the target date is determined to be the working day, whether the target time exceeds the closing time of the bank processing system is judged, and if not, the target data is transferred to the bank processing system, so that the problem of manpower balance consumed due to uneven accounting accounts between the two systems is solved, and the accounting efficiency of the bank processing system is improved.
Device embodiment
In the following, a control device of a trans-banking processing system provided in an embodiment of the present application is introduced, and a control device of a trans-banking processing system described below and a control method of a trans-banking processing system described above may be referred to correspondingly.
Referring to fig. 2, which is a schematic structural diagram of a control apparatus of a sub-banking processing system according to an embodiment of the present application, as shown in fig. 2, the apparatus may include:
a first obtaining module 100, configured to obtain target data and target time information corresponding to the target data, where the target time information is used to send the target data, and the target time information includes a target date and a target time;
the judging module 200 is configured to respond to that the target date is a working day, and judge whether the target time exceeds a bank processing system closing time;
a first transfer module 300, configured to not transfer the target data to a bank processing system if the target time exceeds a bank processing system closing time;
and a second transferring module 400, configured to transfer the target data to a bank processing system if the target time does not exceed a closing time of the bank processing system.
Optionally, the apparatus further comprises:
and the first judgment sub-module is used for judging whether the target data is transferred to a bank processing system on the next day of the target date if the target time exceeds the closing time of the bank processing system.
Optionally, the method further includes:
the second judgment submodule is used for responding to the situation that the bank processing system is in a data writing state and judging whether the target time exceeds the closing time of the bank processing system or not;
and the third judgment sub-module is used for responding to the situation that the bank processing system is not in a data writing state, and judging whether the target data is transferred to the bank processing system on the next day of the target date.
Optionally, the method further includes:
a fourth judging submodule, configured to judge, in response to that the target date is a non-workday, whether the non-workday is a workday state or a non-workday state;
the execution module is used for executing the step of judging whether the target time exceeds the closing time of the bank processing system if the non-working day is in the working day state;
and the fifth judgment submodule is used for judging whether the target data is transferred to a bank processing system on the next day of the target date if the non-workday is in a non-workday state.
Optionally, the method further includes:
the second acquisition module is used for acquiring a rule set corresponding to the bank processing system, wherein the rule set comprises a target date rule and a target time rule;
the judging module comprises:
and the sixth judgment submodule is used for judging whether the target date is a working day or not based on the target date rule, and judging whether the target time exceeds the closing time of the bank processing system or not based on the target time rule if the target date is the working day.
The control device of the bank transfer processing system provided in the embodiment of the present application has the same beneficial effects as the control method of the bank transfer processing system provided in the above embodiment, and therefore, the description thereof is omitted.
It should be noted that the control method and device for transferring the bank processing system provided by the invention can be used in the field of big data. The above description is only an example, and does not limit the application field of the control method and apparatus for transferring to a bank processing system provided by the present invention.
In addition, in the embodiments of the present application, the names "first" and "second" (if present) in the names "first" and "second" are only used for name identification, and do not represent the first and second in sequence.
The embodiments are described in a progressive manner in the specification, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other. The device disclosed by the embodiment corresponds to the method disclosed by the embodiment, so that the description is simple, and the relevant points can be referred to the method part for description.
Those of skill would further appreciate that the various illustrative components and algorithm steps described in connection with the embodiments disclosed herein may be implemented as electronic hardware, computer software, or combinations of both, and that the components and steps of the various examples have been described above generally in terms of their functionality in order to clearly illustrate this interchangeability of hardware and software. Whether such functionality is implemented as hardware or software depends upon the particular application and design constraints imposed on the implementation. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present application.
The steps of a method or algorithm described in connection with the embodiments disclosed herein may be embodied directly in hardware, in a software module executed by a processor, or in a combination of the two. A software module may reside in Random Access Memory (RAM), memory, read Only Memory (ROM), electrically programmable ROM, electrically erasable programmable ROM, registers, hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art.
The above provides a detailed description of a method and an apparatus for controlling a trans-banking processing system. The principles and embodiments of the present application are described herein using specific examples, which are only used to help understand the method and its core idea of the present application. It should be noted that, for those skilled in the art, it is possible to make several improvements and modifications to the present application without departing from the principle of the present application, and such improvements and modifications also fall within the scope of the claims of the present application.

Claims (10)

1. A control method for a trans-banking processing system is characterized by comprising the following steps:
acquiring target data and target time information corresponding to the target data, wherein the target time information is used for sending the target data and comprises a target date and a target moment;
responding to the target date as a working day, and judging whether the target time exceeds the closing time of a bank processing system;
if the target time exceeds the closing time of the bank processing system, the target data is not transferred to the bank processing system;
and if the target time does not exceed the closing time of the bank processing system, transferring the target data to the bank processing system.
2. The method of claim 1, further comprising:
and if the target time exceeds the closing time of the bank processing system, judging whether the target data is transferred to the bank processing system on the next day of the target date.
3. The method of claim 1, further comprising, after said responding to said target date being a weekday:
responding to the situation that the bank processing system is in a data writing state, and judging whether the target time exceeds the closing time of the bank processing system;
and responding to the condition that the bank processing system is not in a data writing state, and judging whether the target data is transferred to the bank processing system on the next day of the target date.
4. The method according to claim 1, further comprising, after the obtaining target data and target time information corresponding to the target data:
responding to the target date as a non-working day, and judging that the non-working day is in a working day state or in a non-working day state;
if the non-working day is in the working day state, executing a step of judging whether the target time exceeds the closing time of the bank processing system;
and if the non-working day is in a non-working day state, judging whether the target data is transferred to a bank processing system on the next day of the target date.
5. The method according to claim 1, further comprising, after the obtaining target data and target time information corresponding to the target data:
acquiring a rule set corresponding to the bank processing system, wherein the rule set comprises a target date rule and a target time rule;
the step of judging whether the target time exceeds the closing time of the bank processing system in response to the target date being the working day comprises the following steps:
and judging whether the target date is a working day or not based on the target date rule, and if the target date is the working day, judging whether the target time exceeds the closing time of a bank processing system or not based on the target time rule.
6. A control apparatus for a transbanking system, comprising:
the device comprises a first acquisition module, a first display module and a first display module, wherein the first acquisition module is used for acquiring target data and target time information corresponding to the target data, the target time information is used for sending the target data, and the target time information comprises a target date and a target moment;
the judging module is used for responding to the fact that the target date is a working day and judging whether the target time exceeds the closing time of the bank processing system;
the first transfer module is used for not transferring the target data to the bank processing system if the target time exceeds the closing time of the bank processing system;
and the second transfer-in module is used for transferring the target data to the bank processing system if the target time does not exceed the closing time of the bank processing system.
7. The apparatus of claim 6, further comprising:
and the first judgment sub-module is used for judging whether the target data is transferred to a bank processing system on the next day of the target date if the target time exceeds the closing time of the bank processing system.
8. The apparatus of claim 6, further comprising:
the second judgment sub-module is used for responding to the data writing state of the bank processing system and judging whether the target time exceeds the closing time of the bank processing system;
and the third judgment submodule is used for responding to the situation that the bank processing system is not in a data writing state, and judging whether the target data is transferred to the bank processing system on the next day of the target date.
9. The apparatus of claim 6, further comprising:
the fourth judgment submodule is used for responding to the fact that the target date is a non-working day, and judging that the non-working day is in a working day state or in a non-working day state;
the execution module is used for executing the step of judging whether the target time exceeds the closing time of the bank processing system if the non-workday is in a workday state;
and the fifth judgment submodule is used for judging whether the target data is transferred to a bank processing system on the next day of the target date if the non-workday is in a non-workday state.
10. The apparatus of claim 6, further comprising:
the second acquisition module is used for acquiring a rule set corresponding to the bank processing system, wherein the rule set comprises a target date rule and a target time rule;
the judging module comprises:
and the sixth judgment submodule is used for judging whether the target date is a working day or not based on the target date rule, and judging whether the target time exceeds the closing time of the bank processing system or not based on the target time rule if the target date is the working day.
CN202210951820.3A 2022-08-09 2022-08-09 Control method and device for transferring to bank processing system Pending CN115293883A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210951820.3A CN115293883A (en) 2022-08-09 2022-08-09 Control method and device for transferring to bank processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210951820.3A CN115293883A (en) 2022-08-09 2022-08-09 Control method and device for transferring to bank processing system

Publications (1)

Publication Number Publication Date
CN115293883A true CN115293883A (en) 2022-11-04

Family

ID=83828425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210951820.3A Pending CN115293883A (en) 2022-08-09 2022-08-09 Control method and device for transferring to bank processing system

Country Status (1)

Country Link
CN (1) CN115293883A (en)

Similar Documents

Publication Publication Date Title
US20070044099A1 (en) Prompting for execution or delay of scheduled job
CN107945002B (en) Automatic account checking method, system and storage device
CN111651494A (en) Data processing method, device, equipment and computer readable storage medium
CN111028074B (en) Method, system, server and storage medium for updating and inquiring overdue bill
CN112785262B (en) Mobile loan management method, mobile loan management system, mobile loan management server, and mobile loan management storage medium
CN115293883A (en) Control method and device for transferring to bank processing system
CN111400283B (en) Data processing method, system, electronic equipment and storage medium
CN103578027A (en) Method and device for transferring accounts
CN115409498A (en) Data processing method, device, equipment and medium
CN102447798B (en) Recharge-for-recovery method and device
CN113436018A (en) Asset hosting business processing method and device, storage medium and electronic equipment
CN112634006A (en) Account checking processing method and device, electronic equipment and storage medium
CN113485742A (en) Host application version registration method and device
CN113076297A (en) Data processing method, device and storage medium
CN112634010A (en) Fund preallocation processing method, device, electronic equipment and medium
CN107590028B (en) Information processing method and server
CN107402752B (en) Timing triggering method and device for application
JP5128081B2 (en) Credit card settlement processing method, credit card settlement processing system, portable terminal, and computer program
CN104202654A (en) Electric power information processing method and system
CN110852880A (en) Transaction data pushing method, device and system, computer equipment and storage medium
CN110008283B (en) Data processing method and device based on data tag
WO2004111896A1 (en) Computer system and computer-implemented method for creating travel-expense statements
CN111211997B (en) Message processing method, device and system
CN112037037A (en) Method and device for matching remittance message with position message
JP7189193B2 (en) Information processing device, information processing method, and program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination