CN115293718A - Decision system and method for power project supervision management - Google Patents

Decision system and method for power project supervision management Download PDF

Info

Publication number
CN115293718A
CN115293718A CN202210460278.1A CN202210460278A CN115293718A CN 115293718 A CN115293718 A CN 115293718A CN 202210460278 A CN202210460278 A CN 202210460278A CN 115293718 A CN115293718 A CN 115293718A
Authority
CN
China
Prior art keywords
module
decision
information
data
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210460278.1A
Other languages
Chinese (zh)
Inventor
黄赐豪
揭曦
肖波
袁汉忠
杨进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Chuangcheng Construction Management & Consultation Co ltd
Original Assignee
Guangdong Chuangcheng Construction Management & Consultation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Chuangcheng Construction Management & Consultation Co ltd filed Critical Guangdong Chuangcheng Construction Management & Consultation Co ltd
Priority to CN202210460278.1A priority Critical patent/CN115293718A/en
Publication of CN115293718A publication Critical patent/CN115293718A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/242Query formulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2453Query optimisation
    • G06F16/24534Query rewriting; Transformation
    • G06F16/24539Query rewriting; Transformation using cached or materialised query results
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N20/00Machine learning
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Data Mining & Analysis (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Databases & Information Systems (AREA)
  • Computational Linguistics (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Medical Informatics (AREA)
  • Computing Systems (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Evolutionary Computation (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a decision system for supervision and management of electric power projects, which comprises a data acquisition module, wherein the data acquisition module is connected with a data classification module, a data storage module and a data processing module, the data classification module, the data storage module and the data processing module are all connected with an electric power scheduling information visual analysis cloud platform through a wireless transmission module, the electric power scheduling information visual analysis cloud platform is connected with an intelligent device terminal and a PC terminal, the electric power scheduling information visual analysis cloud platform is connected with a service query module and a display module, the service query module is connected with a machine learning model and a historical problem database, the electric power scheduling information visual analysis cloud platform is connected with an identity recognition module, the identity recognition module is connected with an information extraction module, and the information extraction module is connected with an information display module. The method and the system improve the decision efficiency and accuracy of power project supervision and management.

Description

Decision system and method for power project supervision management
Technical Field
The invention relates to the technical field of power engineering, in particular to a decision system and a decision method for power project supervision management.
Background
The power project management is always an important subject in power engineering, field workers often cannot quickly and timely feed back when encountering problems, the flow is more after the feedback and often cannot timely return, so that the field operation is greatly influenced, the management level is low, the efficiency cannot be improved, the decision of a manager is influenced, and the decision method and the decision system for power project supervision and management need to be provided for solving the problems.
Disclosure of Invention
In view of the above, one of the objectives of the present invention is to provide a decision system for power project supervision and management to solve the drawbacks in the prior art, and the other objective of the present invention is to provide a decision method for power project supervision and management.
In order to achieve the purpose of the first aspect, the invention adopts the following technical scheme:
the utility model provides a decision-making system for electric power project supervision management, includes data acquisition module, data acquisition module is connected with data classification module, data storage module, data processing module, data classification module, data storage module, data processing module all are connected with the visual analysis cloud platform of electric power scheduling information through wireless transmission module, the visual analysis cloud platform of electric power scheduling information is connected with smart machine terminal and/or PC terminal, the visual analysis cloud platform of electric power scheduling information is connected with service query module and display module, service query module is connected with machine learning model, historical problem database, the visual analysis cloud platform of electric power scheduling information is connected with identification module, identification module is connected with the information extraction module, the information extraction module is connected with the information display module, the information display module is connected with the decision-making module.
Furthermore, the data acquisition module comprises a GPS positioning module, an electric power equipment operation parameter acquisition module, an electric power network topology structure chart generation module and an electric power equipment state prediction module.
Further, the data processing module comprises an early warning prompt module, an image operation module and an analysis comparison module.
Further, the historical problem database comprises a retrieval optimization module, a problem statistical catalogue and a problem solution statistical table.
Further, the decision module comprises a decision evaluation module and a risk evaluation module.
Another objective of the present invention is to provide a method for a decision system for power project supervision and management, comprising the following steps:
the data acquisition module acquires information of the power equipment, classifies the acquired information through the data classification module, stores the information through the data storage module, and analyzes and processes the information through the data processing module;
when field personnel need management personnel to make a decision, a decision request is sent through an intelligent device terminal and/or a PC terminal, a power scheduling information visualization analysis cloud platform provides historical problem reference service through a service query module according to uploaded data information, specifically, a historical problem database can be used for realizing historical approximate problem query and displaying a historical decision method through a display module, and meanwhile, a machine learning model is used for giving related decision suggestions;
and a manager with decision authority logs in the power scheduling information visual analysis cloud platform, the summarized information received by the power scheduling information visual analysis cloud platform can be extracted through the information extraction module, the extracted information is displayed through the information display module, and finally, the manager makes a final decision through the decision module.
Further, the decision module comprises a decision evaluation module and a risk evaluation module, the decision evaluation module can evaluate the rationality of each decision, and the risk evaluation module can evaluate the risk of each decision.
Further, the data processing module comprises an early warning prompt module, an image operation module and an analysis comparison module, wherein the early warning prompt module can give an early warning to risks, the image operation module can process collected images, and the analysis comparison module is used for comparing with historical data.
Compared with the prior art, the invention has the beneficial effects that:
according to the invention, the wireless transmission module transmits the field acquisition information to the power scheduling information visual analysis cloud platform, the power scheduling information visual analysis cloud platform combines the uploaded data information according to the problems fed back by field personnel, a machine learning model can be used for providing relevant decision suggestions, a problem statistical catalog and a problem solution statistical table can be inquired by referring to a historical problem database, and a historical decision method can be rapidly found for reference, so that the manager can be helped to rapidly make the most appropriate decision arrangement, the problems can be rapidly solved, and the decision efficiency and the decision accuracy of power project supervision management are improved.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention. The objectives and other advantages of the present invention will be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
Drawings
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be further described in detail with reference to the accompanying drawings, in which:
fig. 1 is a schematic diagram illustrating a decision system for power project supervision and management according to the present invention.
Detailed Description
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. It should be understood that the preferred embodiments are illustrative of the invention only and are not limiting upon the scope of the invention.
As shown in fig. 1, the decision system for electric power project supervision and management in this embodiment includes a data acquisition module, the data acquisition module is connected with a data classification module, a data storage module, a data processing module, the data classification module, the data storage module, the data processing module are all connected with a visual analysis cloud platform of electric power scheduling information through a wireless transmission module, the visual analysis cloud platform of electric power scheduling information is connected with an intelligent device terminal, a PC terminal, the visual analysis cloud platform of electric power scheduling information is connected with a service query module, a display module, the service query module is connected with a machine learning model, a historical problem database, the visual analysis cloud platform of electric power scheduling information is connected with an identity recognition module, the identity recognition module is connected with an information extraction module, the information extraction module is connected with an information display module, and the information display module is connected with a decision module.
The data acquisition module comprises a GPS positioning module, an electric power equipment operation parameter acquisition module, an electric power network topological structure diagram generation module and an electric power equipment state prediction module, the data processing module comprises an early warning prompt module, an image operation module and an analysis comparison module, the historical problem database comprises a retrieval optimization module, a problem statistical catalog and a problem solution statistical table, and the decision module comprises a decision evaluation module and a risk evaluation module.
The method for the decision system for power project supervision management comprises the following steps:
s1, a data acquisition module acquires information of the power equipment, classifies the acquired information through a data classification module, stores the information through a data storage module, and analyzes and processes the information through a data processing module;
s2, when no field personnel need to make a decision by a manager, a decision request is sent out through an intelligent device terminal and/or a PC terminal, according to uploaded data information, a power scheduling information visual analysis cloud platform provides historical problem reference service through a service query module, specifically, a historical problem database can be used for realizing historical approximate problem query and displaying a historical decision method through a display module, and meanwhile, a machine learning model is used for giving out related decision suggestions;
and S3, logging in the power scheduling information visual analysis cloud platform by a manager, extracting the summarized information received by the power scheduling information visual analysis cloud platform through an information extraction module, displaying the extracted information through an information display module (at the moment, historical approximate problem query can be realized by utilizing a historical problem database, a historical decision method can be displayed through a display module, relevant decision suggestions given by a machine learning model can also be combined and displayed in the information display module), and finally, carrying out final decision by the manager through the decision module.
The power scheduling information visual analysis cloud platform needs to log in after being identified by the identity identification module, a plurality of login accounts can be set in the system, a plurality of managers are added, the decision evaluation module can evaluate the rationality of each decision, and the risk evaluation module can evaluate the risk of each decision, so that more decision support can be provided for the decision manager according to the evaluation result.
The working principle of the invention is as follows: the data acquisition module acquires information of the power equipment, the data acquisition module classifies the acquired information through the data classification module, the acquired information is stored through the data storage module and is sorted through the data processing module, the early warning prompt module can give early warning to risks, the image operation module can process the acquired images, and the analysis and comparison module is used for comparing the acquired images with historical data; the wireless transmission module transmits the data information to the power scheduling information visual analysis cloud platform, and according to the problems uploaded by field personnel, on the power scheduling information visual analysis cloud platform, relevant decision suggestions can be given by using a machine learning model of the service query module, and a problem statistical catalog and a problem solution statistical table can be queried by using a reference historical problem database, so that a historical decision method can be quickly found. Even if supervision is not on site, other related personnel with decision-making rights can select a corresponding decision-making scheme, so that the problems can be solved quickly, and the decision-making efficiency and the decision-making accuracy of power project supervision management are improved.
It should be understood that portions of the present invention may be implemented in hardware, software, firmware, or a combination thereof. In the above embodiments, the various steps or methods may be implemented in software or firmware stored in memory and executed by a suitable instruction execution system. For example, if implemented in hardware, as in another embodiment, any one or combination of the following technologies, which are well known in the art, may be used: a discrete logic circuit having a logic gate circuit for implementing a logic function on a data signal, an application specific integrated circuit having an appropriate combinational logic gate circuit, a Programmable Gate Array (PGA), a Field Programmable Gate Array (FPGA), or the like.
It will be understood by those skilled in the art that all or part of the steps carried out in the method of implementing the above embodiments may be implemented by hardware related to instructions of a program, which may be stored in a computer readable storage medium, and the program, when executed, may include one or a combination of the steps of the method embodiments.
In addition, functional units in the embodiments of the present invention may be integrated into one processing module, or each unit may exist alone physically, or two or more units are integrated into one module. The integrated module can be realized in a hardware mode, and can also be realized in a software functional module mode. The integrated module, if implemented in the form of a software functional module and sold or used as a stand-alone product, may also be stored in a computer readable storage medium.
Finally, the above embodiments are only intended to illustrate the technical solutions of the present invention and not to limit the present invention, and although the present invention has been described in detail with reference to the preferred embodiments, it will be understood by those skilled in the art that modifications or equivalent substitutions may be made on the technical solutions of the present invention without departing from the spirit and scope of the technical solutions, and all of them should be covered by the claims of the present invention.

Claims (8)

1. A decision-making system for power project supervision management comprises a data acquisition module, and is characterized in that: the data acquisition module is connected with a data classification module, a data storage module and a data processing module, the data classification module, the data storage module and the data processing module are all connected with a power scheduling information visual analysis cloud platform through a wireless transmission module, the power scheduling information visual analysis cloud platform is connected with an intelligent device terminal and/or a PC terminal, the power scheduling information visual analysis cloud platform is connected with a service query module and a display module, the service query module is connected with a machine learning model and a historical problem database, the power scheduling information visual analysis cloud platform is connected with an identity recognition module, the identity recognition module is connected with an information extraction module, the information extraction module is connected with an information display module, and the information display module is connected with a decision-making module.
2. The method and system of claim 1 for decision making for power project proctoring management, wherein: the data acquisition module comprises a GPS positioning module, an electric power equipment operation parameter acquisition module, an electric power network topology structure chart generation module and an electric power equipment state prediction module.
3. The method and system of claim 1 for decision making for power project proctoring management, wherein: the data processing module comprises an early warning prompt module, an image operation module and an analysis comparison module.
4. The method and system of claim 1 for decision making for power project proctoring management, wherein: the historical problem database comprises a retrieval optimization module, a problem statistical catalogue and a problem solution statistical table.
5. The method and system of claim 1 for decision making for power project proctoring management, wherein: the decision module comprises a decision evaluation module and a risk evaluation module.
6. A method of applying a decision making system for power project proctoring management according to any one of claims 1 to 5, characterized by: the method comprises the following steps:
the data acquisition module acquires information of the power equipment, classifies the acquired information through the data classification module, stores the information through the data storage module, and analyzes and processes the information through the data processing module;
when field personnel need to make a decision by management personnel, a decision request is sent through an intelligent device terminal and/or a PC terminal, according to uploaded data information, a power dispatching information visualization analysis cloud platform provides historical problem reference service through a service query module, specifically, a historical problem approximate problem query can be realized by utilizing a historical problem database, a historical decision method is displayed through a display module, and meanwhile, a machine learning model is utilized to give a relevant decision suggestion;
the manager logs in the power scheduling information visual analysis cloud platform, the information extraction module can extract the collected information received by the power scheduling information visual analysis cloud platform, the extracted information is displayed through the information display module, and finally the manager makes a final decision through the decision module.
7. A method for a decision making system for power project proctoring management as defined in claim 6, wherein: the decision module comprises a decision evaluation module and a risk evaluation module, the decision evaluation module can evaluate the rationality of each decision, and the risk evaluation module can evaluate the risk of each decision.
8. A method for a decision making system for power project proctoring management as defined in claim 6, wherein: the data processing module comprises an early warning prompting module, an image operation module and an analysis comparison module, wherein the early warning prompting module can give an early warning to risks, the image operation module can process collected images, and the analysis comparison module is used for comparing with historical data.
CN202210460278.1A 2022-04-28 2022-04-28 Decision system and method for power project supervision management Pending CN115293718A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210460278.1A CN115293718A (en) 2022-04-28 2022-04-28 Decision system and method for power project supervision management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210460278.1A CN115293718A (en) 2022-04-28 2022-04-28 Decision system and method for power project supervision management

Publications (1)

Publication Number Publication Date
CN115293718A true CN115293718A (en) 2022-11-04

Family

ID=83820653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210460278.1A Pending CN115293718A (en) 2022-04-28 2022-04-28 Decision system and method for power project supervision management

Country Status (1)

Country Link
CN (1) CN115293718A (en)

Similar Documents

Publication Publication Date Title
CN107909300A (en) Intelligent plant management platform and method
CN105574593B (en) Track state static detection and control system and method based on cloud computing and big data
CN103699698A (en) Method and system for track traffic failure recognition based on improved Bayesian algorithm
CN104091070A (en) Rail transit fault diagnosis method and system based on time series analysis
CN111159165B (en) Cloud platform-based electric power underground low-power consumption edge computing system and method thereof
CN112785458A (en) Intelligent management and maintenance system for bridge health big data
CN107862392B (en) Equipment account management and control method based on power distribution network intelligent operation and maintenance management and control platform
CN105160477A (en) RFID-based geographical position simulation positioning method and asset equipment management system using the method
CN105488118A (en) Electrical equipment fault information display method and device
CN103914058B (en) The fault diagnosis and alarm method and system of a kind of oil-gas pipeline industrial control equipment remote monitoring system
CN113627784A (en) Enterprise asset management intelligent decision-making system based on industrial internet
CN116010456A (en) Equipment processing method, server and rail transit system
CN117114420B (en) Image recognition-based industrial and trade safety accident risk management and control system and method
CN202976181U (en) Bridge management system based on Internet of Things and 3D GIS
CN108258802B (en) Method and device for monitoring running condition of power distribution equipment in power distribution network
CN113659712A (en) Power equipment big data label operation platform and method
CN116094174A (en) Knowledge graph-based power grid operation and maintenance monitoring method, system, equipment and medium
CN115293718A (en) Decision system and method for power project supervision management
CN115719139A (en) Dispatching self-checking system for power grid dispatching operation management
CN114139747A (en) AIOps intelligent operation and maintenance system based on artificial intelligence technology
CN113111815B (en) Transformer substation pattern verification method, device and equipment
CN109257206A (en) A kind of method of data inputting and evaluation diagnostic message feedback
CN115018332B (en) Visual management system of thermal power plant based on virtual reality
CN117458711B (en) Power grid dispatching work monitoring management system based on Internet of things
CN117008559B (en) Data acquisition and processing method and system applied to organic fertilizer production system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication