CN115293599A - Big data acquisition of wisdom city system that gathers - Google Patents
Big data acquisition of wisdom city system that gathers Download PDFInfo
- Publication number
- CN115293599A CN115293599A CN202210959406.7A CN202210959406A CN115293599A CN 115293599 A CN115293599 A CN 115293599A CN 202210959406 A CN202210959406 A CN 202210959406A CN 115293599 A CN115293599 A CN 115293599A
- Authority
- CN
- China
- Prior art keywords
- data
- summarization
- branch office
- center
- branch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 claims abstract description 5
- 238000013480 data collection Methods 0.000 claims description 8
- 230000005540 biological transmission Effects 0.000 claims description 4
- 238000004364 calculation method Methods 0.000 claims description 3
- 238000004891 communication Methods 0.000 claims description 3
- 238000007726 management method Methods 0.000 abstract description 11
- 238000007405 data analysis Methods 0.000 abstract description 7
- 238000004458 analytical method Methods 0.000 abstract description 6
- 238000011157 data evaluation Methods 0.000 abstract description 6
- 238000001514 detection method Methods 0.000 abstract description 6
- 238000005516 engineering process Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 abstract description 4
- 230000008569 process Effects 0.000 abstract description 4
- 238000007418 data mining Methods 0.000 description 4
- 238000013524 data verification Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000013473 artificial intelligence Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
- G06F16/252—Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Databases & Information Systems (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a big data acquisition and summarization system for a smart city, which comprises various branch office databases for updating data of various departments in real time to manufacture data categories of various departments, the data categories and the various branch office databases transmit latest data to a data arrangement and maintenance center, the data maintenance center issues data to a data summarization center after the data are approved, data auditing, data research and judgment are needed layer by layer in an uploading process, the data are encrypted, the branch office databases upload the data to the data summarization center and then are based on technologies such as cloud computing, big data and the like, a data evaluation system is arranged in the data summarization center, the perfection degree of the smart city and a concise data uploading process can be researched and judged according to the auditing data evaluation system, and simultaneously, due to the fact that resource data uploaded by various branch offices are different, requirements such as all-weather online detection, analysis and prediction, command and scheduling and the like can be guaranteed, city management business modeling and data analysis are realized, and basic public service high-quality balance is realized.
Description
Technical Field
The invention relates to the technical field of mechanical equipment, in particular to a big data acquisition and summarization system for a smart city.
Background
Concept strategies such as 'smart cities' also enter the visual field of people at present when related technologies such as big data mining and the like are rapidly developed. Nowadays, intelligent city concepts need to be comprehensively accessed to business systems of all government departments in city construction, government affair data resources are gathered, data mining and analysis application are strengthened, monitoring of city operation risks by an intelligent management center is actively promoted, however, the problem that how to gather various data in all departments in the government affair system is urgent to solve at present is solved, and therefore a smart city big data acquisition and gathering system is provided for solving the problems.
Disclosure of Invention
The invention aims to provide a smart city big data acquisition and summarization system to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a big data collecting and summarizing system for smart cities comprises branch office databases, wherein the branch office databases update data of all departments in real time to manufacture data types of all departments, the data types and the branch office databases transmit latest data to a data arranging and maintaining center, and the data maintaining center issues the data to a data summarizing center after the data is approved.
And uploading the data types updated in real time in each branch office database through a communication base station inside each branch office in the city, and taking the uploaded original data as the original data for building the intelligent city for the government.
The data auditing comprises data security operation, data encryption operation, data scheduling operation, data calculation operation and the like.
Each branch database comprises a branch infrastructure, a system platform, an information security guarantee system and other databases; the data category of each department of each branch office is represented by db, A = { db1, db2, … … dbn } is the whole data set of each branch office, A is each branch office database, and n is a plurality of different departments.
The data arrangement and maintenance center is a cloud computing-based cloud database for uniformly summarizing and uniformly maintaining the branch offices databases in a uniformly classified manner, R is the data arrangement and maintenance center, R = { A1, A2, … … Ax }, and x is a plurality of different branch offices.
And the data auditing is carried out based on cloud computing, and the data uploading and downloading require specific usbkey.
The data collecting center collects data uploaded by the data sorting maintenance center after the data is audited, the data collecting center is a data collecting center, D = { R1, R2, … … Rf }, and f is a data sorting maintenance center in different regions.
After establishing the data transmission peer-to-peer connection, the data producer filters the original data stream according to the producer configuration and sends the data field selected in the data demand information to the data application party.
Compared with the prior art, the invention has the beneficial effects that:
the data uploaded by each branch office database can be gathered to government affair data resources after being transmitted to the data gathering center, data mining and analysis application are strengthened, the management capabilities of intelligent management in city operation risk detection, comprehensive analysis, study and judgment and the like are improved, meanwhile, due to the fact that the resource data uploaded by each branch office are different, the requirements of all-weather online detection, analysis prediction, command scheduling and the like can be guaranteed, city management business modeling and data analysis are achieved, basic public service high-quality balance and environment improvement are achieved, city influence and crowd happiness are improved, and city management level capability is improved generally.
Drawings
Fig. 1 is a schematic diagram of a data acquisition and transmission process according to the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1:
referring to fig. 1, the present invention provides a technical solution: a big data collection and summary system for a smart city comprises branch office databases, wherein the branch office databases update data of all departments in real time to manufacture data categories of all departments, the data categories and the branch office databases transmit latest data to a data arrangement and maintenance center, and the data maintenance center issues the data to a data summary center after the data is approved.
Each branch database comprises a branch infrastructure, a system platform, an information security guarantee system and other databases; each department data category of each branch is represented by db, a = { db1, db2, … … dbn } is each branch whole data set, a is each branch database, and n is a plurality of different departments.
And uploading the data types updated in real time in each branch office database through a communication base station inside each branch office in the city, and taking the uploaded original data as the original data for building the intelligent city for the government.
The data arrangement maintenance center collects the cloud databases which are based on cloud computing and maintain the data uniformly in a classified and uniform mode for the branch offices, R is the data arrangement maintenance center, R = { A1, A2, … … Ax }, and x is a plurality of different branch offices.
Data cloud auditing is performed based on cloud computing, and specific usbkeys are required for data uploading and downloading.
The data auditing comprises data security operation, data encryption operation, data scheduling operation, data calculation operation and the like.
The data collecting center collects data uploaded by the data sorting and maintaining center after data verification, D is the data collecting center, P = { R1, R2, … … Rf }, and f is the data sorting and maintaining center in different regions.
After establishing the data transmission peer-to-peer connection, the data producer filters the original data stream according to the producer configuration and sends the data field selected in the data demand information to the data application party.
Example 2:
the classified data updated in real time through each sub database is uploaded to a data sorting and maintaining center, and is transmitted to a data summarizing center on the basis of data verification and data encryption;
the branch offices upload data to the data gathering center, and then government affair data resources can be gathered, data mining and analysis application are strengthened, the management capabilities of intelligent management in city operation risk detection, comprehensive analysis, study and judgment and the like are improved, meanwhile, due to the fact that the resource data uploaded by the branch offices are different, the requirements of all-weather online detection, analysis, prediction, command and scheduling and the like can be guaranteed, city management business modeling and data analysis are realized, basic public service high-quality balance and environment improvement are realized, city influence and crowd happiness are improved, and the city management level capability is improved on the whole;
after different departments of data are uploaded by each branch office, the aspects of data sharing, overall application of data results and the like are combed and analyzed; after the data are uploaded to the data gathering center by the branch office databases, the combination of technology + product + organization is realized based on technologies such as cloud computing, internet of things, big data, face recognition and artificial intelligence, the urban digital management operation capacity is improved through the resource integration of data uploading, the urban overall perception capacity is improved, the comprehensive data management capacity is improved, the city early warning capacity is improved, and urban business refinement is promoted;
the data gathering center is provided with a data evaluation system, the perfection degree of the smart city can be researched and judged according to the data evaluation system, and the data is simply uploaded to an auditing process;
the working principle is as follows: when the data are normally uploaded and audited and reach the standard, each branch office database updates each data in real time to manufacture each data category, the data category and each branch office database transmit the latest data to the data arrangement maintenance center, the data maintenance center issues the data to the data gathering center after the data are approved, the data are audited layer by layer in the uploading process, the data are researched and judged, the data are encrypted, each branch office database uploads the data to the data gathering center and then is based on the technologies of cloud computing, big data and the like, a data evaluation system is arranged in the data gathering center, the intelligent city perfection degree can be researched and judged according to the data evaluation system, the data are simply uploaded and audited, meanwhile, due to the fact that the resource data uploaded by each branch office are different, the requirements of online detection, analysis prediction, command scheduling and the like can be guaranteed, all-weather high-quality city business management modeling and data analysis are achieved, and basic public service balance is achieved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (8)
1. The utility model provides a big data acquisition of wisdom city system that gathers, includes each branch office database, its characterized in that: and updating data of each department in real time by each branch office database to manufacture data types of each department, transmitting the latest data to a data arrangement and maintenance center by the data types and each branch office database, and issuing the data to a data summarization center after the data is approved by the data maintenance center.
2. The smart city big data collection and summarization system of claim 1, wherein: each branch database comprises a branch infrastructure, a system platform, an information security guarantee system and other databases; the data category of each department of each branch office is represented by db, A = { db1, db2, … … dbn } is the whole data set of each branch office, A is each branch office database, and n is a plurality of different departments.
3. The smart city big data collection and summarization system of claim 1, wherein: the data arrangement and maintenance center collects the cloud databases based on cloud computing uniformly, which maintain the data uniformly in a classified and uniform manner, for the branch offices, wherein R is the data arrangement and maintenance center, R = { A1, A2, … … Ax }, and x is a plurality of different branch offices.
4. The smart city big data collection and summarization system of claim 1, wherein: and the data auditing is carried out based on cloud computing, and the data uploading and downloading require specific usbkey.
5. The smart city big data collection and summarization system of claim 1, wherein: the data summarization center summarizes data uploaded by the data arrangement maintenance center after the data are audited, D is the data summarization center, D = { R1, R2, … … Rf }, and f is the data arrangement maintenance center in different regions.
6. The smart city big data collection and summarization system of claim 2, wherein: and uploading the data types updated in real time in each branch office database through a communication base station in each branch office in the city, and using the uploaded original data as the original data for building the intelligent city for the government.
7. The smart city big data collection and summarization system of claim 4, wherein: the data auditing comprises data security operation, data encryption operation, data scheduling operation, data calculation operation and the like.
8. The smart city big data collection and summarization system of claim 1, wherein: after establishing the data transmission peer-to-peer connection, the data producer filters the original data stream according to the producer configuration and sends the data fields selected in the data demand information to the data application party.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210959406.7A CN115293599A (en) | 2022-08-10 | 2022-08-10 | Big data acquisition of wisdom city system that gathers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210959406.7A CN115293599A (en) | 2022-08-10 | 2022-08-10 | Big data acquisition of wisdom city system that gathers |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115293599A true CN115293599A (en) | 2022-11-04 |
Family
ID=83827479
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210959406.7A Pending CN115293599A (en) | 2022-08-10 | 2022-08-10 | Big data acquisition of wisdom city system that gathers |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115293599A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115859331A (en) * | 2022-12-23 | 2023-03-28 | 山东宝超楚网络科技有限公司 | Smart city information safety guarantee system |
CN117132130A (en) * | 2023-08-31 | 2023-11-28 | 江西航天国数信息科技有限公司 | Smart city prediction system for modeling by collecting information in real time |
-
2022
- 2022-08-10 CN CN202210959406.7A patent/CN115293599A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115859331A (en) * | 2022-12-23 | 2023-03-28 | 山东宝超楚网络科技有限公司 | Smart city information safety guarantee system |
CN115859331B (en) * | 2022-12-23 | 2023-12-15 | 上海广境信息系统科技有限公司 | Smart city information security guarantee system |
CN117132130A (en) * | 2023-08-31 | 2023-11-28 | 江西航天国数信息科技有限公司 | Smart city prediction system for modeling by collecting information in real time |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN115293599A (en) | Big data acquisition of wisdom city system that gathers | |
CN112241924B (en) | Wisdom gas system | |
CN111787090B (en) | Intelligent treatment platform based on block chain technology | |
CN106781455A (en) | A kind of region Expressway Information system based on cloud computing | |
WO2019137338A1 (en) | Rail traffic information system cloud platform | |
CN105069025A (en) | Intelligent aggregation visualization and management and control system for big data | |
CN115271635A (en) | Intelligent community service platform system | |
CN112241402A (en) | Empty pipe data supply chain system and data management method | |
CN111160867A (en) | Large-scale regional parking lot big data analysis system | |
CN112907197A (en) | Enterprise service portal platform based on business collaboration and construction method | |
CN111311038A (en) | Evaluation method of traffic management and control service index | |
CN112651872A (en) | Community comprehensive treatment system and method based on data middlebox | |
CN102567488A (en) | System and method for mining data of electric vehicle based on cloud computer framework | |
Wang et al. | Big data in telecommunication operators: data, platform and practices | |
CN111026795A (en) | Multi-platform data fusion system based on big data | |
CN116954565A (en) | Smart city message platform publishing method | |
CN111047270A (en) | Intelligent optimal configuration system and method for electronic government forms | |
CN117076463B (en) | Multi-source data aggregation storage system for smart city | |
Ma et al. | Research on the construction of smart cities by the big data platform of the blockchain | |
Zhao et al. | Application of smart city construction in a new data environment | |
CN112216104A (en) | Urban intersection traffic flow prediction method based on multi-source data fusion | |
CN117170871A (en) | Distributed joint modeling system and method for oil-gas pipe network and storage medium | |
CN111476697A (en) | Wisdom road network integrated management platform | |
Zifei et al. | Application of optical network transmission based on 5G network in knowledge management of digital factories | |
CN112417018B (en) | Data sharing method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |