Prior art keywords
rotary drilling
rotary
pile
hole
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210983631.4A
Other languages
Chinese (zh)
Inventor
史新鹏
肖克龙
陈朝骏
刘海龙
莫永炜
陈金培
肖强
龚远忠
张国林
周文龙
刘正武
张毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Foundation Engineering Co ltd
Original Assignee
Shenzhen Foundation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Foundation Engineering Co ltd filed Critical Shenzhen Foundation Engineering Co ltd
Priority to CN202210983631.4A priority Critical patent/CN115288111A/en
Publication of CN115288111A publication Critical patent/CN115288111A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a rotary drilling hole forming method for a soft upper and hard lower stratum, which comprises the following steps: s1, drilling a plurality of reinforcing pile holes in a loose soil layer in an upper soft and lower hard stratum, pouring reinforcing slurry into the reinforcing pile holes by using a rotary jet pile machine, and solidifying the reinforcing slurry to obtain reinforcing piles; s2, adopting a cutting tooth cylinder of the rotary drilling rig to drill a plurality of rotary drilling holes at the pre-pile forming positions on the reinforced loose soil layer, wherein when the original building enclosure body position in the upper soft lower hard stratum is drilled, the original building enclosure body is cut off and continues to drill downwards, so that the original building enclosure body in the rotary drilling hole is completely cut off, and the bottom of the rotary drilling hole is stable; and S3, taking out the cut original building envelope structure body from the rotary drilling hole, and then completing the pile forming operation. According to the invention, after the loose soil layer is reinforced by the reinforcing piles, the construction surface is firmer, so that the steel casing used in the process of drilling the rotary excavation hole can be shortened, the position of the drilling machine for drilling the rotary excavation hole can be more stable, and the accuracy of the drilled rotary excavation hole is higher.

Description

Rotary drilling hole forming method for upper soft and lower hard stratum
Technical Field
The invention relates to the technical field of stress detection equipment, in particular to a rotary drilling hole forming method for a stratum with a soft upper part and a hard lower part.
Background
After the underground structure is completed and backfilled, the original pit envelope is often discarded inside the fill, forming the underlying envelope. In the subsequent construction of the underground structure, when an original building structure is hidden underground and the upper end of the original building structure is covered with thick loose filling soil, the original building structure is hard, the loose filling soil is soft, the loose filling soil is easy to collapse and repeatedly backfill and rush in the drilling process, so that the material is wasted, the hole forming difficulty is high, collapse and hole shrinkage are easy to occur, the excavation of a foundation pit of a newly-built underground structure or the construction of a supporting pile foundation is influenced, and the problems of high hole forming difficulty in the site, unstable drilling operation and the like are caused.
Disclosure of Invention
Technical problem to be solved
In view of the defects and shortcomings of the prior art, the invention provides a rotary drilling hole forming method for a hard stratum with a soft upper part and a hard lower part, which solves the technical problems of high hole forming difficulty and unstable drilling operation of the hard stratum with the soft upper part and the hard lower part.
(II) technical scheme
In order to achieve the purpose, the invention adopts the main technical scheme that:
a rotary drilling hole forming method for a stratum with a soft upper part and a hard lower part comprises the following steps:
s1, drilling a plurality of reinforcing pile holes in a loose soil layer in the upper soft and lower hard stratum, pouring reinforcing slurry into the reinforcing pile holes by using a jet grouting pile machine, and solidifying the reinforcing slurry to obtain a reinforcing pile;
s2, drilling a plurality of rotary drilling holes at the pre-pile forming positions on the reinforced loose soil layer by adopting a cutting tooth cylinder of the rotary drilling rig, wherein when the rotary drilling rig drills to the position of the original building enclosure structure body in the upper soft and lower hard stratum, the original building enclosure structure body is cut off and continues to drill downwards, so that the original building enclosure structure body in the rotary drilling holes is completely cut off, and the bottom of the rotary drilling holes is stable;
and S3, taking out the cut original building envelope structure body from the rotary drilling hole, and then completing the pile forming operation.
Preferably, before the pile reinforcing hole and the rotary drilling hole are drilled by the rotary drilling rig, a total station is respectively adopted for measurement so as to determine the positions of the pile reinforcing hole and the rotary drilling hole.
Preferably, the reinforcement slurry consists of p.o.42.5r ordinary portland cement, triethanolamine, and water, and the mass ratio of p.o.42.5r ordinary portland cement, triethanolamine, and water is 20.
Preferably, in the process of drilling the pile hole by adopting the rotary drilling rig, the guniting end of the guniting pipe of the rotary pile spraying machine moves downwards along with the drill rod of the rotary drilling rig, and high-pressure water is sprayed in the moving process of the guniting pipe.
Preferably, the pressure of the high-pressure water is 0.6 to 1MPa.
Preferably, in the process of rotating the guniting pipe of the rotary guniting pile machine and pouring the reinforced grout into the reinforced pile hole, the guniting end of the guniting pipe moves upwards from the bottom of the reinforced pile hole and carries out jet grouting, the flow rate of the grouting is 60-70L/min, the grouting pressure is 15-20 MPa, and the rotation angle of the guniting pipe is 5-16 rpm.
Preferably, when the cutting pick barrel of the rotary drilling rig drills a rotary drilling hole, the axis of the drill rod extends in the vertical direction.
Preferably, before drilling the rotary drilling hole, a steel pile casing is arranged at the position of the pre-pile forming position, the diameter of the steel pile casing is 0.2-0.3 m larger than that of the rotary drilling hole, the top end surface of the steel pile casing is 0.2-0.3 m higher than the ground, and the embedding depth of the steel pile casing is more than 1.5 m.
(III) advantageous effects
The invention has the beneficial effects that: (1) The invention reinforces the loose soil layer by the reinforcing piles, improves the strength, rigidity and stability of the loose soil layer, and can reduce the length of the steel casing required for drilling the rotary excavation hole, so that the embedding of the steel casing is not influenced by the original enclosure structure, namely the steel casing is only arranged above the original enclosure structure, and the installation of the steel casing is more convenient.
(2) The reinforcing pile can stabilize the construction surface, ensure the stability of the position of the cutting tooth cylinder drill of the rotary drilling rig and ensure the normal drilling operation.
(3) After the loose soil is reinforced, the rotary excavation hole is drilled through the rotary excavation drilling machine, so that the original enclosure structure can be cut off, the disturbance to the construction surface can be reduced, and the disturbance to the surrounding buildings can be reduced.
Drawings
FIG. 1 is a block flow diagram of the method of the present invention;
fig. 2 is a schematic view of the distribution of the reinforcement pile holes of the present invention.
Detailed Description
For the purpose of better explaining the present invention and to facilitate understanding, the present invention will be described in detail by way of specific embodiments with reference to the accompanying drawings.
Examples
A rotary drilling hole forming method for a stratum with a soft upper part and a hard lower part comprises the following steps:
s1, drilling a plurality of reinforcing pile holes in a loose soil layer by using a drilling machine, and filling reinforcing slurry into the reinforcing pile holes by using a jet grouting pile machine to obtain reinforcing piles after solidification, so that the loose soil layer is reinforced.
The upper soft and lower hard ground layer is a construction surface, the upper end of the construction surface is a thicker loose soil layer, and the lower end of the construction surface is embedded with a hard original enclosure structure.
Before construction, the position, range and thickness of the filled loose soil layer are determined so as to conveniently determine the number and depth of the reinforced pile holes. And the distribution position, the landfill depth and the specific structure of the original enclosure structure at the part of the filled loose soil are determined, so that the speed of the rotary drilling rig for cutting the tooth cylinder drill is conveniently controlled and the depth of the dug rotary drilling hole is determined when the rotary drilling hole is drilled subsequently. The construction site is leveled, local soft and weak positions are filled, the position where the rotary drilling rig is placed is guaranteed to be compact and stable, and the rotary drilling rig does not deflect during working.
The loose soil layer in this example has a thickness of 15m and a width of 1m.
Specifically, S11, preparation before drilling a reinforced pile hole: before drilling a reinforced pile hole, the rotary drilling rig measures and determines the position of the reinforced pile hole through a total station, and a steel bar short pile with the depth of 0.3m is downwards installed at the position of the reinforced pile hole.
S12, drilling a reinforcing pile hole by using a rotary drilling rig: the drill rod of the rotary drilling rig is positioned by the drill rod guide frame, the axis of the drill rod is overlapped with the center of a reinforced pile hole to be processed, the drill rod drills the reinforced pile, the guniting end of the guniting pipe of the rotary spraying pile machine moves downwards along with the drill rod of the rotary drilling rig, and high-pressure water is sprayed in the moving process of the guniting pipe. In order to prevent the collapse of the hole wall of the reinforced pile hole, the pressure of the injected high-pressure water is not too high, and the pressure of the injected high-pressure water is 0.6-1 MPa.
As shown in fig. 2, in order to reinforce the loose soil layer, the loose soil layer is reinforced in an integral reinforcing manner, i.e., the reinforcing pile holes are covered with the loose soil layer, and in order to make the reinforcing piles covered with the loose soil layer, the adjacent reinforcing pile holes are crossed. The diameter of the reinforced pile hole is 60-150 cm, and the depth of the reinforced pile hole is 15m.
S13, injecting grouting into the reinforcing pile hole, and forming a reinforcing pile after solidification: when the reinforced pile hole is filled with reinforced slurry by adopting the rotary jet pile machine, the slurry spraying end of the slurry spraying pipe of the rotary jet pile machine gradually moves upwards from the bottom of the reinforced pile hole to perform jet grouting, the flow rate of the grouting is 60-70L/min, the grouting pressure is 15-20 MPa, the compressed air pressure is 500-700 kPa, the rotating speed is 5-16 rpm, and the lifting speed is 7-20 cm/min.
The components of the used strengthening slurry comprise P.O.42.5R ordinary portland cement and water, and the mass ratio of the P.O.42.5R ordinary portland cement to the water is 1. In order to improve the strength and the impermeability of the reinforced slurry, 0.05 percent of triethanolamine is added into the reinforced slurry. In order to prevent the reinforcing paste from being left for a long time to affect its performance, the reinforcing paste should be used up within 4 hours after mixing and stirring.
During the injection grouting process, a small amount of reinforcing slurry is blown out from the reinforcing pile hole opening. If the injected reinforcing slurry is too much, namely the injected reinforcing slurry accounts for more than 20% of the total injected grouting amount, or no reinforcing slurry is injected from the orifice of the reinforcing pile, whether the effective injection range and the injected grouting amount are proper or not needs to be checked.
And after the jet grouting is finished, quickly moving the jet grouting pipe out of the reinforcing pile hole to the ground, closing the rotary jet grouting pile machine, moving the rotary jet grouting pile machine to the next reinforcing pile hole to be processed, and processing the reinforcing pile hole.
In order to prevent the reinforced slurry remained in the guniting pipe from influencing the next use, the guniting pipe needs to be cleaned after the guniting structure is sprayed, and the reinforced slurry cannot remain in the guniting pipe.
S2, adopting a cutting tooth barrel of the rotary drilling rig to drill a plurality of rotary drilling holes at the pre-pile-forming positions on the reinforced loose soil layer, wherein when the original enclosure structure body in the upper soft and lower hard stratum is drilled, the original enclosure structure body is cut off and continues to drill downwards, and the original enclosure structure body in the rotary drilling holes is completely cut off and the bottom of the rotary drilling holes is stable.
In order to enable the support piles to have sufficient support capacity, the axis of the rotary excavation hole is arranged to extend in the vertical direction. The rotary drilling hole is used for placing a support pile or an engineering pile.
The diameter of the rotary excavation hole is 0.8m, the number of the supporting piles is 4, and the depth of the rotary excavation hole is 40m.
Specifically, S21: preparing before drilling the rotary excavation hole: before drilling the rotary excavation hole, measuring and setting out according to the pile position of a design drawing, measuring and determining the position of a pre-formed pile by using a total station, and downwards installing a steel bar short pile with the depth of 0.3m at the pile position. And installing the steel casing at the position of the pile, wherein the embedding depth of the steel casing is more than 1.5m, the top end surface of the steel casing is 0.2-0.3 m higher than the construction surface, and the diameter of the steel casing is 0.2-0.3 m larger than that of the rotary excavation hole. The clay is tamped layer by layer around the outer side of the steel protection cylinder, the bottom of the steel protection cylinder guarantees the stability of the steel protection cylinder, and the steel protection cylinder is prevented from moving in the drilling process. And the axis of the steel protecting cylinder extends along the vertical direction, the center line of the steel protecting cylinder is parallel to the center line of the rotary digging hole, and the distance between the center line of the steel protecting cylinder and the rotary digging hole is less than 0.02m.
In order to reduce the resistance of drilling the rotary excavation hole, the position of the rotary excavation hole is not overlapped with the position of the reinforced pile hole as much as possible. In this embodiment, the location of the spin-excavated hole does not coincide with the location of the reinforcement pile hole. Of course, in other embodiments, the position of the rotary drilling hole may coincide with the position of the reinforcement pile hole.
S22, drilling a rotary excavation hole by adopting a rotary drilling rig to cut a tooth drill:
the pile position point after the steel casing is installed is drilled by the rotary drilling rig pick drill, in order to enable the rotary drilling holes to extend in the vertical direction, the drill rod needs to be checked at any time in the drilling process of the rotary drilling rig pick drill, and the drill rod is ensured to extend in the vertical direction.
In order to prevent the rotary drilling rig from being damaged in the process of drilling the cutting cylinder, when the rotary drilling rig drills the cutting cylinder to be close to the original building envelope, slow drilling is adopted, and the working state of the rotary drilling rig cutting cylinder is observed in time. When the rotary drilling rig bit barrel drill reaches the position of the original enclosure structure, the rotary drilling rig bit barrel drill continues to move downwards and cuts off the original enclosure structure. And after the original enclosing structure is cut off, the downward drilling is continued for at least 1m, so that the original enclosing structure is completely removed, and the stability of the support pile installed in the rotary drilling hole is ensured. The cutting tooth barrel drill of the rotary drilling rig drives the original enclosure structure to vibrate, the cutting tooth barrel drill of the rotary drilling rig forms certain disturbance on a rotary drilling hole, in order to prevent the hole wall from collapsing, the rotary drilling rig needs to drill at a low speed, and high-quality slurry is coated on the inner wall of the rotary drilling hole.
And S3, taking out the cut-off original enclosure structure body from the rotary drilling hole, then installing a reinforcement cage, and pouring concrete to finish pile forming operation.
In the description of the present invention, it is to be understood that the terms "first", "second" and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implying any number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
In the present invention, unless otherwise explicitly stated or limited, the terms "mounted," "connected," "fixed," and the like are to be construed broadly, e.g., as being permanently connected, detachably connected, or integral; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium; either internal to the two elements or in an interactive relationship of the two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In the present invention, unless expressly stated or limited otherwise, a first feature is "on" or "under" a second feature, and the first and second features may be in direct contact, or the first and second features may be in indirect contact via an intermediate. Also, a first feature "on," "above," and "over" a second feature may be directly on or obliquely above the second feature, or simply mean that the first feature is at a higher level than the second feature. A first feature "under," "beneath," and "under" a second feature may be directly under or obliquely under the second feature, or may simply mean that the first feature is at a lower level than the second feature.
In the description of the present specification, the description of "one embodiment", "some embodiments", "examples", "specific examples" or "some examples", etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above are not necessarily intended to refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Moreover, various embodiments or examples and features of various embodiments or examples described in this specification can be combined and combined by one skilled in the art without being mutually inconsistent.
Although embodiments of the present invention have been shown and described above, it should be understood that the above embodiments are illustrative and not restrictive, and that those skilled in the art may make changes, modifications, substitutions and alterations to the above embodiments without departing from the scope of the present invention.

Claims (9)

1. A rotary drilling hole forming method for a stratum with a soft upper part and a hard lower part is characterized in that: the method comprises the following steps:
s1, drilling a plurality of reinforcing pile holes in a loose soil layer in the upper soft and lower hard stratum, pouring reinforcing slurry into the reinforcing pile holes by using a rotary jet pile machine, and solidifying the reinforcing slurry to obtain reinforcing piles;
s2, drilling a plurality of rotary drilling holes at the pre-pile forming positions on the reinforced loose soil layer by adopting a cutting tooth cylinder of the rotary drilling rig, wherein when the rotary drilling rig drills to the position of the original building enclosure structure body in the upper soft and lower hard stratum, the original building enclosure structure body is cut off and continues to drill downwards, so that the original building enclosure structure body in the rotary drilling holes is completely cut off, and the bottom of the rotary drilling holes is stable;
s3, taking out the cut-off original enclosure structure body from the rotary drilling hole, and then completing pile forming operation.
2. The rotary drilling hole forming method for the upper soft and lower hard formation according to claim 1, characterized in that: before the rotary drilling rig is used for drilling the reinforcing pile hole and the rotary drilling hole, a total station is used for measuring so as to determine the positions of the reinforcing pile hole and the rotary drilling hole.
3. The rotary drilling hole forming method for the upper soft and lower hard formation according to claim 1, characterized in that: the strengthening slurry comprises P.O.42.5R ordinary portland cement and water, and the mass ratio of the P.O.42.5R ordinary portland cement to the water is 1.
4. The rotary drilling hole forming method for the upper soft and lower hard formation according to claim 3, characterized in that: and 0.05 percent of triethanolamine is added into the reinforced slurry.
5. The rotary drilling hole forming method for the upper soft and lower hard formation according to claim 1, characterized in that: when the rotary drilling rig is used for drilling and reinforcing the pile hole, the guniting end of the guniting pipe of the rotary spraying pile machine moves downwards along with a drill rod of the rotary drilling rig, and high-pressure water is sprayed in the moving process of the guniting pipe.
6. The rotary drilling hole forming method for the upper soft and lower hard formation according to claim 5, characterized in that: the pressure of the high-pressure water is 0.6-1 MPa.
7. The rotary drilling hole forming method for the upper soft and lower hard formation according to claim 1, characterized in that: in the process of rotating the guniting pipe of the rotary guniting pile machine and pouring the reinforced grout into the reinforced pile hole, the guniting end of the guniting pipe moves upwards from the bottom of the reinforced pile hole and carries out jet grouting, the flow rate of the grouting is 60-70L/min, the grouting pressure is 15-20 MPa, and the rotation angle of the guniting pipe is 5-16 rpm.
8. The rotary drilling hole forming method for the upper soft and lower hard formation according to claim 1, characterized in that: when a cutting pick barrel of the rotary drilling rig drills a rotary drilling hole, the axis of the drill rod extends in the vertical direction.
9. The rotary drilling hole forming method for the upper soft and lower hard formation according to claim 1, characterized in that: before drilling the rotary digging hole, a steel protecting cylinder is arranged at the position of the pre-pile forming position, the diameter of the steel protecting cylinder is 0.2-0.3 m larger than that of the rotary digging hole, the top end surface of the steel protecting cylinder is 0.2-0.3 m higher than the ground, and the embedding depth of the steel protecting cylinder is more than 1.5 m.
CN202210983631.4A 2022-08-16 2022-08-16 Rotary drilling hole forming method for upper soft and lower hard stratum Pending CN115288111A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210983631.4A CN115288111A (en) 2022-08-16 2022-08-16 Rotary drilling hole forming method for upper soft and lower hard stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210983631.4A CN115288111A (en) 2022-08-16 2022-08-16 Rotary drilling hole forming method for upper soft and lower hard stratum

Publications (1)

Publication Number Publication Date
CN115288111A true CN115288111A (en) 2022-11-04

Family

ID=83830761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210983631.4A Pending CN115288111A (en) 2022-08-16 2022-08-16 Rotary drilling hole forming method for upper soft and lower hard stratum

Country Status (1)

Country Link
CN (1) CN115288111A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101429766A (en) * 2008-11-27 2009-05-13 吴哲慧 Ground strengthened high pressure rotary spraying pile construction technique
CN105649012A (en) * 2015-12-30 2016-06-08 中铁局集团有限公司 Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground
CN108487260A (en) * 2018-03-29 2018-09-04 中冶成都勘察研究总院有限公司 A kind of subway entrance foundation pit rotary digging campshed weakness scall reinforcement means
CN108612096A (en) * 2018-04-02 2018-10-02 中国十七冶集团有限公司 A kind of cement mixing method reinforces the construction method of spiral-digging pore
CN110984126A (en) * 2019-10-10 2020-04-10 中铁隧道集团二处有限公司 Construction method for pre-reinforcing and then forming hole of easy-collapse stratum into cast-in-place pile
CN213269886U (en) * 2020-08-31 2021-05-25 中国建筑第六工程局有限公司 Reinforced structure of upper soft and lower hard shield region
US20220145568A1 (en) * 2019-07-24 2022-05-12 Qingdao university of technology Concrete inside interface processing structure and method for secant pile construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101429766A (en) * 2008-11-27 2009-05-13 吴哲慧 Ground strengthened high pressure rotary spraying pile construction technique
CN105649012A (en) * 2015-12-30 2016-06-08 中铁局集团有限公司 Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground
CN108487260A (en) * 2018-03-29 2018-09-04 中冶成都勘察研究总院有限公司 A kind of subway entrance foundation pit rotary digging campshed weakness scall reinforcement means
CN108612096A (en) * 2018-04-02 2018-10-02 中国十七冶集团有限公司 A kind of cement mixing method reinforces the construction method of spiral-digging pore
US20220145568A1 (en) * 2019-07-24 2022-05-12 Qingdao university of technology Concrete inside interface processing structure and method for secant pile construction
CN110984126A (en) * 2019-10-10 2020-04-10 中铁隧道集团二处有限公司 Construction method for pre-reinforcing and then forming hole of easy-collapse stratum into cast-in-place pile
CN213269886U (en) * 2020-08-31 2021-05-25 中国建筑第六工程局有限公司 Reinforced structure of upper soft and lower hard shield region

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
汪双杰,刘戈,纳启财: ""多年冻土区公路工程施工关键技术"", 31 March 2019, 上海科学技术出版社, pages: 298 - 299 *

Similar Documents

Publication Publication Date Title
AU2020103672A4 (en) Construction method of rotary drilling hole-forming and jet mixing cement-soil occlusion curtain piles
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN108951612A (en) A kind of subway tunnel shield end reinforcement means
CN101962949A (en) Long spiral double-pipe high-pressure stir-jet grouting pile construction method and device
CN102943466A (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN102286984A (en) Water-stop curtain and construction method thereof
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN107975375A (en) A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel
CN111810198A (en) Tunnel earth surface directional large-caliber deep hole grouting device and grouting method
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN112392049A (en) Excavation construction method for deep foundation pit in weak stratum
CN111364449A (en) Construction method and structure for penetrating karst cave of precast tubular pile
CN114059527A (en) Large-diameter mixing pile construction method suitable for high-groundwater-level hard soil layer
CN113006109B (en) Construction method of waterproof curtain of foundation pit of highly permeable stratum area
CN110777775A (en) Foundation pit structure and construction method thereof
CN108755671B (en) Construction method of triaxial mixing pile of water-rich gravel layer
CN111560964B (en) Construction method of rear anti-seepage system of foundation pit
CN113668564A (en) Construction method for supporting and reinforcing open-cut underground passage adjacent to subway station
CN113089655A (en) Construction method in three-pipe rotary spraying pile pit in flowing water environment
CN112252310A (en) Method for deep foundation pit waterproof curtain construction by adopting high-pressure jet grouting pile machine
CN111236214A (en) Construction method for constructing secant pile by lengthening protective cylinder of rotary drilling rig
CN211735404U (en) Anti-over-irrigation system for long spiral bored pile
CN115288111A (en) Rotary drilling hole forming method for upper soft and lower hard stratum

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination