CN115250478A - Building 5G coverage construction scheme determination method, device, equipment and storage medium - Google Patents

Building 5G coverage construction scheme determination method, device, equipment and storage medium Download PDF

Info

Publication number
CN115250478A
CN115250478A CN202110470332.6A CN202110470332A CN115250478A CN 115250478 A CN115250478 A CN 115250478A CN 202110470332 A CN202110470332 A CN 202110470332A CN 115250478 A CN115250478 A CN 115250478A
Authority
CN
China
Prior art keywords
coverage
building
target building
determining
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110470332.6A
Other languages
Chinese (zh)
Other versions
CN115250478B (en
Inventor
王新业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
China Mobile Group Shanghai Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
China Mobile Group Shanghai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd, China Mobile Group Shanghai Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN202110470332.6A priority Critical patent/CN115250478B/en
Publication of CN115250478A publication Critical patent/CN115250478A/en
Application granted granted Critical
Publication of CN115250478B publication Critical patent/CN115250478B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/18Network planning tools
    • H04W16/20Network planning tools for indoor coverage or short range network deployment

Abstract

The invention provides a building 5G coverage construction scheme determination method, a device, equipment and a storage medium, wherein the method comprises the steps of determining whether a target building has indoor coverage of a 4G indoor sub-coverage system; under the condition that a target building is covered by a 4G indoor sub-coverage system, acquiring a building coverage area related to a design scheme, counting first 4G coverage conditions of different areas based on the building coverage area, and determining a 5G coverage construction scheme corresponding to the target building according to the first 4G coverage conditions of the different areas; under the condition that the target building is not covered indoors by the 4G indoor sub-coverage system, the second 4G coverage condition of the boundary of the target building is obtained, and the 5G coverage construction scheme corresponding to the target building is determined according to the second 4G coverage condition, so that the scheme determination cost can be reduced, and the scheme determination accuracy is improved.

Description

Building 5G coverage construction scheme determination method, device, equipment and storage medium
Technical Field
The invention relates to the technical field of wireless communication, in particular to a method, a device, equipment and a storage medium for determining a building 5G coverage construction scheme.
Background
In the age of 5G revolution, the development of 5G networks enables the industry of Internet of things to emerge more innovative solutions. More services are made possible. The intelligent building market presents the blowout situation, and intelligent building becomes more high-efficient, the accurate, the low consumption environmental protection of management, demonstrates very big interactivity of serving because of the joining of 5G.
The existing building coverage construction scheme determination method is mainly used for evaluating the 5G signal coverage condition in a building through 5G simulation software, a building test traversal method or a 5G MR positioning mode. The 5G simulation software evaluates the coverage condition of 5G signals in the building, and the coverage condition in the building is finally calculated mainly by combining base station parameters (including information such as base station position, height and power parameters), link budget (signal loss and gain on a link), propagation models (loss of different frequency band space propagation), building penetration loss and other data. According to the building test traversal method, manual CQT test is carried out through a 5G test terminal and software, and the current 5G coverage condition can be evaluated most accurately. And the 5G MR positioning mode (such as MDT, a fingerprint database and the like) refers to the 4G MR positioning mode, acquires 5G MR positioning data, and counts sampling points and levels positioned in the building to represent the building coverage condition.
The existing building coverage construction scheme determination methods have the problems of high measurement cost and insufficient measurement precision. The coverage condition of the 5G signals in the building is evaluated through 5G simulation software, and due to the fact that needed work parameters are many and the work parameters cannot be completely and accurately consistent with the actual condition of the existing network, for example, longitude and latitude, height, link budget and penetration loss are set through human estimation and have great difference with the actual condition; the propagation model correction is generally a general model for each scene, and the propagation losses of all actual places are different, so the simulation is generally more suitable for the whole network macroscopic statistical analysis, and the accurate fixed-point evaluation is often different from the actual test. According to the building test traversal method, 5G outdoor stations around a lot of buildings are planned and constructed, the built effect is difficult to confirm, in addition, the manual test cost is high, and large-scale coverage analysis and evaluation cannot be carried out except individual scenes actually. Due to the fact that the number of 5G MRs is too small at present through a 5G MR positioning mode (such as MDT, a fingerprint database and the like), samples are not enough to support coverage statistics, and meanwhile, 5G base stations in many places are not planned or built. In addition, the 5GMR positioning mode is not as mature as that of 4G, and 4G MR positioning is not very accurate due to the problems of working parameter accuracy, reported data precision error and the like.
Disclosure of Invention
The invention provides a building 5G coverage construction scheme determination method, a building 5G coverage construction scheme determination device, building 5G coverage construction equipment and a storage medium, which are used for solving the defects of high measurement cost and insufficient measurement precision in the prior art and realizing the determination of a building 5G coverage construction scheme with low cost and accuracy.
In a first aspect, the present invention provides a method for determining a building 5G coverage construction scheme, including:
determining whether the target building has indoor coverage of a 4G indoor sub-coverage system;
under the condition that a target building is covered by a 4G indoor sub-coverage system, acquiring a building coverage area related to a design scheme, counting first 4G coverage conditions of different areas based on the building coverage area, and determining a 5G coverage construction scheme corresponding to the target building according to the first 4G coverage conditions of the different areas;
and under the condition that the target building does not have indoor coverage of a 4G indoor coverage system, acquiring a second 4G coverage condition of the boundary of the target building, and determining a 5G coverage construction scheme corresponding to the target building according to the second 4G coverage condition.
In one embodiment, the obtaining of the building coverage area related to the design scheme, counting first 4G coverage conditions of different areas based on the building coverage area, and determining a 5G coverage construction scheme corresponding to the target building according to the first 4G coverage conditions of the different areas includes:
acquiring a building coverage area related to a design scheme, and counting first 4G coverage conditions of different areas according to MR data of 4G indoor sub-cells of the different areas, wherein the first 4G coverage conditions comprise: a plurality of sampling points in different areas and 4G outdoor neighboring cell receiving coverage levels reported by each sampling point in a measuring way;
according to the first 4G coverage conditions of different areas, calculating the level of the target building after upgrading the 5G base station;
determining the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building based on the level of the target building after upgrading the 5G base station;
and determining a 5G coverage construction scheme corresponding to the target building according to the current 5G coverage and the predicted 5G coverage.
In one embodiment, the acquiring a second 4G coverage condition of the boundary of the target building, and determining a 5G coverage construction scheme corresponding to the target building according to the second 4G coverage condition includes:
calculating a second 4G coverage condition of the target building boundary according to the MR grid positioning or MDT data, wherein the second 4G coverage condition comprises 4G outdoor macro station MR sampling points and levels of outdoor levels;
according to the second 4G coverage condition, calculating the level of the target building after upgrading the 5G base station;
determining the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building based on the level of the target building after upgrading the 5G base station;
and determining a 5G coverage construction scheme corresponding to the target building according to the current 5G coverage and the predicted 5G coverage.
In one embodiment, the calculating the level of the target building after 5G base station upgrade comprises:
calculating the level of the target building after upgrading the 5G base station by adopting a preset 4G and 5G coverage conversion relation;
the preset 4G and 5G coverage conversion relation is expressed by the following formula:
the 5G reduced receiving level =4G receiving level +4/5G site transmitting power difference +4/5G antenna gain difference +4/5G terminal receiving capacity difference +4/5G frequency coverage difference delta;
wherein the 4/5G frequency coverage difference Δ =20 × log (bin 1/bin 2).
In one embodiment, the determining the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building based on the level of the target building after upgrading the 5G base station comprises:
if the number of the target area sampling points is the first number, determining the first sampling point of which the maximum value of the 5G converted receiving level is greater than the 5G access coverage level threshold in each sampling point;
counting the number of second sampling points of the outdoor 4G stations which are measured in the first sampling points and are upgraded to 5G stations;
counting the number of third sampling points of outdoor 4G sites which are measured in the first sampling points and are not upgraded to 5G sites;
determining the current 5G coverage rate corresponding to the target area according to the second sampling point quantity and the first quantity;
and determining the predicted 5G coverage rate corresponding to the target area according to the second sampling point quantity, the third sampling point quantity and the first quantity.
In one embodiment, determining a 5G coverage construction scheme corresponding to the target building according to the current 5G coverage and the predicted 5G coverage comprises:
if the current 5G coverage rate is larger than a first preset threshold value, determining that the target area does not need to be covered by a 5G room;
if the current 5G coverage rate is smaller than a first preset threshold value and the predicted 5G coverage rate is larger than the first preset threshold value, determining to upgrade the outdoor station which is not upgraded to the 5G station and corresponds to the target area;
if the predicted 5G coverage rate is smaller than a first preset threshold value, determining that a target area needs to be built for 5G indoor coverage;
and determining a 5G coverage construction scheme corresponding to the target building based on the 5G coverage construction schemes corresponding to different areas.
In one embodiment, further comprising:
when the sample of the sampling point located at the target building by the 4G outdoor macro station MR is not enough to judge the 5G coverage condition of the target building, the following operations are carried out:
calculating a third 4G coverage condition of an adjacent area outside the boundary of the target building according to MR grid positioning or MDT data, wherein the third 4G coverage condition comprises 4G MR sampling points and levels of outdoor levels of the adjacent area outside the boundary of the target building;
according to the third 4G coverage condition, calculating the level of the target building after upgrading the 5G base station;
determining the predicted indoor minimum 5G receiving level of the building corresponding to the target building based on the level of the target building after upgrading the 5G base station;
and determining a 5G coverage construction scheme corresponding to the target building according to the predicted indoor minimum 5G receiving level of the building.
In a second aspect, the present invention provides a building 5G coverage construction plan determination apparatus, including:
the judging module is used for determining whether the target building has indoor coverage of the 4G indoor sub-coverage system;
the first scheme determining module is used for acquiring a building coverage range related to a design scheme under the condition that a target building is covered by a 4G indoor sub-coverage system, counting first 4G coverage conditions of different areas based on the building coverage range, and determining a 5G coverage construction scheme corresponding to the target building according to the first 4G coverage conditions of the different areas;
and the second scheme determining module is used for acquiring a second 4G coverage condition of the boundary of the target building under the condition that the target building does not have indoor coverage of the 4G indoor sub-coverage system, and determining a 5G coverage construction scheme corresponding to the target building according to the second 4G coverage condition.
In a third aspect, the present invention provides an electronic device comprising a processor and a memory storing a computer program, wherein the processor implements the steps of the building 5G coverage construction plan determination method when executing the computer program.
In a fourth aspect, the present invention provides a processor-readable storage medium, wherein the processor-readable storage medium stores a computer program for causing the processor to execute the steps of the building 5G coverage construction plan determination method.
According to the building 5G coverage construction scheme determining method, the building 5G coverage construction scheme determining device, the building 5G coverage construction scheme determining equipment and the storage medium, the 4G coverage conditions of different areas are counted under the condition that the target building is covered by the 4G indoor coverage sub-coverage system, the real building coverage condition can be accurately positioned, the 4G coverage condition of the boundary of the target building is obtained under the condition that the target building is not covered by the 4G indoor coverage sub-coverage system, the 5G coverage construction scheme of the target building is determined according to the 4G coverage condition, the scheme determining cost is reduced, and the scheme determining accuracy is improved.
Drawings
In order to more clearly illustrate the technical solutions of the present invention or the prior art, the drawings needed for the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and those skilled in the art can also obtain other drawings according to the drawings without creative efforts.
Fig. 1 is a schematic flow chart of a building 5G coverage construction scheme determination method provided by the present invention;
fig. 2 is a second schematic flowchart of the building 5G coverage construction scheme determination method provided by the present invention;
fig. 3 is a third schematic flow chart of a building 5G coverage construction scheme determination method provided by the present invention;
fig. 4 is a schematic structural diagram of a building 5G coverage construction scheme determination device provided by the invention;
fig. 5 is a schematic structural diagram of an electronic device provided in the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without inventive step based on the embodiments of the present invention, are within the scope of protection of the present invention.
The building 5G coverage construction scheme determination method of the present invention is described below with reference to fig. 1 to 3.
Fig. 1 is a flowchart of a method for determining a building 5G coverage construction plan according to an embodiment of the present invention, and in an embodiment, as shown in fig. 1, the method includes the following steps:
and step 100, determining whether the target building has indoor coverage of the 4G indoor sub-coverage system.
Specifically, the plan of whether the target building is covered by the 4G indoor sub-coverage system or not may be determined by the indoor sub-building worker of the operator referring to whether the building is covered by the 4G indoor sub-coverage system or not, or whether the target building is covered by the 4G indoor sub-coverage system or not may be determined by the design drawing of the target building, which is not specifically limited herein.
Step 101, under the condition that a target building is covered by a 4G indoor sub-coverage system, acquiring a building coverage area related to a design scheme, counting first 4G coverage conditions of different areas based on the building coverage area, and determining a 5G coverage construction scheme corresponding to the target building according to the first 4G coverage conditions of the different areas.
Specifically, in step 100, when it is determined that the target building has indoor coverage of a 4G indoor sub-coverage system, a building coverage area related to a design scheme of the target building is obtained, and first 4G coverage conditions of different areas are counted based on the building coverage area, where the building coverage area is generally different floors corresponding to different cells, and the building coverage area may be divided into different areas, such as a floor 1-3 area and a floor 4-6 area. And determining a 5G coverage construction scheme corresponding to the target building according to the first 4G coverage condition of the different areas.
Optionally, according to the first 4G coverage conditions of different areas, 5G coverage construction schemes corresponding to the different areas may be determined, and finally, the 5G coverage construction schemes corresponding to the target building are formed. And determining whether the building is covered by indoor sub-construction or by the outdoor current 5G macro-station or the outdoor 5G macro-station constructed subsequently according to outdoor opening requirements and indoor construction requirements corresponding to each region of the whole building, investment, construction progress and the like.
102, under the condition that the target building does not have indoor coverage of a 4G indoor coverage system, acquiring a second 4G coverage condition of the boundary of the target building, and determining a 5G coverage construction scheme corresponding to the target building according to the second 4G coverage condition.
Specifically, in step 100, when it is determined that the target building has no indoor coverage of the 4G indoor coverage system, a second 4G coverage condition of the boundary of the target building is obtained, and according to the second 4G coverage condition, a 5G coverage construction scheme corresponding to the target building is determined.
The method for determining the building 5G coverage construction scheme provided by the embodiment of the invention can accurately position the real coverage condition in the building, and determine the 5G coverage construction scheme of the target building according to the 4G coverage condition, thereby reducing the scheme determination cost and improving the accuracy of scheme determination.
Fig. 2 is a second flowchart of a building 5G coverage construction scheme determination method according to an embodiment of the present invention, as shown in fig. 2, in an embodiment, the method includes the following steps:
and 200, determining that the target building has indoor coverage of a 4G indoor sub-coverage system.
Step 201, acquiring a building coverage area related to a design scheme, and counting first 4G coverage conditions of different areas according to MR data of 4G indoor sub-cells of the different areas, where the first 4G coverage conditions include: and a plurality of sampling points in different areas and each sampling point measure and report the receiving coverage level of the 4G outdoor neighboring area.
The floor 1-3 area in the building coverage area related to the design scheme is taken as an example for explanation, the floor 1-3 area is covered by two cells, the first cell is provided with a sampling points, the second cell is provided with b sampling points, and each sampling point is provided with a plurality of 4G outdoor receiving coverage levels corresponding to the measured outdoor neighboring cells and frequency bands corresponding to the frequency points of the neighboring cells. And counting the received coverage levels of the 4G outdoor adjacent cells reported by the measurement of the a sampling points of the first cell and the b sampling points of the second cell to obtain the first 4G coverage condition of the floor 1-3 area.
And 202, calculating the level of the target building after upgrading the 5G base station according to the first 4G coverage conditions of different areas.
Specifically, the level after the 5G base station is upgraded in the same address of the relevant cell can be calculated according to the 4G outdoor neighboring cell reception coverage levels measured and reported by the sampling points in different areas in step 201, and by combining the propagation model, the positions of the neighboring cells, the building loss, and the difference between the 4G link and the 5G link, each sampling point has a plurality of measured 4G outdoor reception coverage levels of the outdoor neighboring cells, and a plurality of 5G converted reception levels corresponding to each sampling point can be calculated correspondingly, so that the level after the target building is upgraded to the 5G base station is obtained.
And 203, determining the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building based on the level of the target building after upgrading the 5G base station.
Specifically, according to the multiple 5G converted receiving levels corresponding to each sampling point calculated in step 202, sampling points meeting preset conditions are selected, and according to the number of the sampling points meeting the preset conditions, the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building are determined. When the current 5G coverage rate is calculated, the sampling points meeting the preset conditions comprise the measured sampling points of the outdoor 4G station upgraded to the 5G station, and do not comprise the 5G subsequent construction station. And when the predicted 5G coverage rate is calculated, the sampling points meeting the preset conditions comprise the measured sampling points of the upgraded outdoor 4G station and the sampling points of the non-upgraded outdoor 4G station as the 5G stations.
And 204, determining a 5G coverage construction scheme corresponding to the target building according to the current 5G coverage and the predicted 5G coverage.
Specifically, a preset 5G indoor coverage rate can be determined according to a 5G indoor coverage rate obtained by an operator based on user perception requirements, namely the proportion of sampling points in the building, which are larger than a certain minimum level threshold, and a 5G coverage construction scheme corresponding to the target building is determined according to the relation between the preset 5G indoor coverage rate and the current 5G coverage rate and the predicted 5G coverage rate. For example, if the current 5G coverage rate is greater than a preset 5G indoor coverage rate, it is determined that the target area does not need to be built for 5G indoor coverage; if the current 5G coverage rate is smaller than a preset 5G indoor coverage rate and the predicted 5G coverage rate is larger than the preset 5G indoor coverage rate, determining to upgrade an outdoor station which is not upgraded to a 5G station and corresponds to the target area; and if the predicted 5G coverage rate is smaller than the preset 5G indoor coverage rate, determining that the target area needs to be built for 5G indoor coverage. And determining a 5G coverage construction scheme corresponding to the target building based on the 5G coverage construction schemes corresponding to different areas.
According to the embodiment of the invention, the level of the 5G base station upgraded at the same site is estimated by combining the outdoor sampling statistics of the MR adjacent region of the existing 4G room with the difference of the 4G link and the 5G link, so that the coverage condition in a real building can be accurately positioned. Because the measured level actually occurs indoors, the geographic position is the most accurate, and in addition, because the 4G outdoor acquisition of the adjacent region is adopted, the coverage effect estimation after the co-site construction can be carried out on the points which are not constructed by 5G. The coverage conditions of different floors of the building are positioned by floor areas, so that the areas where the 5G rooms need to be planned and constructed actually are positioned more accurately, and the building 5G coverage construction scheme is determined.
Fig. 3 is a third flowchart of a method for determining a building 5G coverage construction plan according to an embodiment of the present invention, as shown in fig. 3, in an embodiment, the method includes the following steps:
and step 300, determining that the target building does not have indoor coverage of the 4G indoor sub-coverage system.
Step 301, calculating a second 4G coverage condition of the target building boundary according to the MR grid positioning or MDT data, wherein the second 4G coverage condition comprises 4G outdoor macro station MR sampling points and levels of outdoor levels.
The MDT (Minimization of Drive-tests) is an automatic Drive test technology introduced by 3GPP in the LTE system for acquiring and reporting measurement data of a general user/commercial terminal through network configuration, and as long as the user terminal turns on the GPS and supports the MDT function, the terminal can automatically report MDT data including user location information to the base station. MDT and MR are similar, comprise RSRP, RSRQ and other fields, contain GPS longitude and latitude information and can be used for big data analysis.
Specifically, the second 4G coverage condition of the target building boundary can be obtained by MR grid positioning or MDT data calculation, the MDT data has sampling point longitude and latitude, sampling points and levels in the building are counted in combination with the building boundary, and the obtained second 4G coverage condition includes a plurality of outdoor level 4G outdoor macro-station MR sampling points and a plurality of levels corresponding to each sampling point.
And 302, calculating the level of the target building after upgrading the 5G base station according to the second 4G coverage condition.
Specifically, according to the 4G outdoor macro-station MR sampling points and levels of the outdoor levels in step 301, the levels of the sampling points after the 5G base station is upgraded at the same site can be calculated by combining the propagation model, the peripheral cell positions, the building loss and the 4G and 5G link differences, each 4G outdoor macro-station MR sampling point corresponds to a plurality of levels, a plurality of 5G reduced receiving levels of each sampling point can be correspondingly calculated, and the levels of the target building after the 5G base station is upgraded are obtained.
And step 303, determining the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building based on the level of the target building after upgrading the 5G base station.
Specifically, according to the multiple 5G converted receiving levels corresponding to each sampling point calculated in step 302, sampling points meeting preset conditions are selected, and according to the number of the sampling points meeting the preset conditions, the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building are determined. When the current 5G coverage rate is calculated, the sampling points meeting the preset conditions comprise the measured sampling points of the outdoor 4G station upgraded to the 5G station, and do not comprise the 5G subsequent construction station. And when the predicted 5G coverage rate is calculated, the sampling points meeting the preset conditions comprise the measured sampling points of the upgraded outdoor 4G station and the sampling points of the non-upgraded outdoor 4G station as the 5G stations.
And step 304, determining a 5G coverage construction scheme corresponding to the target building according to the current 5G coverage and the predicted 5G coverage.
Specifically, a preset 5G indoor coverage rate can be determined according to a 5G indoor coverage rate obtained by an operator based on user perception requirements, namely the proportion of sampling points in the building, which are larger than a certain minimum level threshold, and a 5G coverage construction scheme corresponding to the target building is determined according to the relation between the preset 5G indoor coverage rate and the current 5G coverage rate and the predicted 5G coverage rate. For example, if the current 5G coverage rate is greater than a preset 5G indoor coverage rate, it is determined that the target area does not need to be built for 5G indoor coverage; if the current 5G coverage rate is smaller than a preset 5G indoor coverage rate and the predicted 5G coverage rate is larger than the preset 5G indoor coverage rate, determining to upgrade an outdoor station which is not upgraded to a 5G station and corresponds to the target area; and if the predicted 5G coverage rate is smaller than the preset 5G indoor coverage rate, determining that the target area needs to be built for 5G indoor coverage. And determining a 5G coverage construction scheme corresponding to the target building based on the 5G coverage construction schemes corresponding to different areas.
According to the embodiment of the invention, the sampling points falling on the inner side of the building are counted by adopting a relatively mature 4GMR positioning mode for the building without 4G rooms, and then the coverage condition of the site opened or planned by 5G at the same address is calculated by link conversion. For some buildings with large building areas, the outdoor level of the building can be counted, and the coverage interval of the coverage level is roughly calculated by combining the wall partition condition of the design drawing. Compared with 5G MR positioning, the method has the advantages that on one hand, the MR data volume is larger and more objective, on the other hand, the positioning method is more mature at present, and the precision is higher relative to 5G.
In one embodiment, the level after the target building is upgraded to the 5G base station is calculated in step 202 or step 302 by the following method:
and calculating the level of the target building after upgrading the 5G base station by adopting a preset 4G and 5G coverage conversion relation, wherein the preset 4G and 5G coverage conversion relation is expressed by adopting the following formula:
the 5G converted receiving level =4G receiving level +4/5G site transmitting power difference +4/5G antenna gain difference +4/5G terminal receiving capacity difference +4/5G frequency coverage difference delta;
wherein the 4/5G frequency coverage difference Δ =20 × log (bin 1/bin 2).
The 4/5G frequency coverage difference Δ may be converted according to a free space propagation model L =32.5+20 log (frequency band) +20 log (distance), and when the distances are consistent, different frequency band values are substituted, so that the path loss difference between different frequency bands is Δ =20 log (frequency band 1/frequency band 2), and when 4G and 5G co-stations in the scheme, the distances are consistent, so that the 4/5G frequency coverage difference Δ =20 log (frequency band 1/frequency band 2).
According to the embodiment of the invention, the preset 4G and 5G coverage conversion relation is combined with the 4/5G site transmitting power difference, the 4/5G antenna gain difference, the 4/5G terminal receiving capacity difference and the 4/5G frequency coverage difference delta, so that the accuracy of the calculated level of the target building after upgrading the 5G base station is improved, and the accuracy of scheme determination is improved.
In one embodiment, the determining the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building based on the level of the target building after upgrading the 5G base station in step 202 or step 302 specifically includes the following steps:
step 400, if the number of the target area sampling points is the first number, determining the first sampling point of each sampling point, wherein the maximum value of the 5G converted receiving level is greater than the 5G access coverage level threshold.
Specifically, a plurality of sampling points exist in the target area, each sampling point corresponds to a plurality of 5G converted receiving levels, and if the maximum value of the plurality of 5G converted receiving levels corresponding to a single sampling point is greater than the 5G access coverage level threshold, the sampling point is a first sampling point, otherwise, if the maximum value of the plurality of 5G converted receiving levels corresponding to a single sampling point is less than or equal to the 5G access coverage level threshold, the sampling point is not a first sampling point, and thus, the first sampling point of the sampling points in the target area is determined.
And 401, counting the number of the second sampling points of the outdoor 4G station upgraded to the 5G station in the first sampling points.
Specifically, the outdoor 4G station measured by the first sampling point may have been upgraded to a 5G station or not upgraded to the 5G station, the sampling point of the outdoor 4G station measured by the first sampling point that has been upgraded to the 5G station is determined to be a second sampling point, and the number of the second sampling points is counted.
And 402, counting the number of the third sampling points of the outdoor 4G sites which are measured in the first sampling points and are not upgraded to the 5G sites.
Specifically, the outdoor 4G station measured by the first sampling point may have been upgraded to a 5G station or not upgraded to a 5G station, the sampling point of the first sampling point, where the outdoor 4G station measured by the first sampling point has not been upgraded to a 5G station, is determined to be a third sampling point, and the number of the third sampling points is counted.
And step 403, determining the current 5G coverage rate corresponding to the target area according to the second number of sampling points and the first number.
Specifically, the current 5G coverage rate corresponding to the target area can be determined according to the proportion of the second sampling point number in the first number.
For example, cell 1 has a sampling points, the number of sampling points in each sampling point, whose maximum value after the 4G reception level is converted into the 5G level is greater than the 5G access coverage level threshold after measurement, is Na, na1 is the number of sampling points measured that the outdoor 4G station has been upgraded to the cell of the 5G station, na2 is the number of sampling points measured that the outdoor 4G station has not been upgraded to the cell of the 5G station, and Na = Na1+ Na2.
The cell 2 has b sampling points, the number of the sampling points in each sampling point, which is measured that the maximum value after the 4G receiving level is converted into the 5G level is greater than the threshold of the 5G access coverage level, is Nb, nb1 is the number of the measured sampling points of the cell in which the outdoor 4G station has been upgraded to the 5G station, nb2 is the number of the measured sampling points of the cell in which the outdoor 4G station has not been upgraded to the 5G station, and Nb = Nb1+ Nb2.
In addition, for Na2 and Nb2, the stations can be split according to the number of outdoor stations, for example, two stations can be split into Na2 and Na3, so that the effect of outdoor construction 2 or 3 or both 2 and 3 can be judged respectively, and outdoor macro-station coverage can be selectively constructed.
Floor 1-3 zone currently 5G coverage = (Na 1+ Nb 1)/(a + b).
And 404, determining the predicted 5G coverage rate corresponding to the target area according to the number of the second sampling points, the number of the third sampling points and the first number.
Specifically, the predicted 5G coverage corresponding to the target area can be determined according to the proportion of the sum of the second number of sample points and the third number of sample points in the first number.
For example, cell 1 has a sampling points, the number of sampling points in each sampling point, whose maximum value after the 4G reception level is converted into the 5G level is greater than the 5G access coverage level threshold after measurement, is Na, na1 is the number of sampling points measured that the outdoor 4G station has been upgraded to the cell of the 5G station, na2 is the number of sampling points measured that the outdoor 4G station has not been upgraded to the cell of the 5G station, and Na = Na1+ Na2.
The cell 2 has b sampling points, the number of the sampling points in each sampling point, which is greater than the threshold of 5G access coverage level after the 4G receiving level is converted into 5G level, is measured, nb1 is the number of the sampling points of the cell where the outdoor 4G station has been upgraded to the 5G station, nb2 is the number of the sampling points of the cell where the outdoor 4G station has not been upgraded to the 5G station, and Nb = Nb1+ Nb2.
Floor 1-3 zone prediction 5G coverage = (Na 1+ Na2+ Nb1+ Nb 2)/(a + b).
According to the embodiment of the invention, the current 5G coverage rate and the predicted 5G coverage rate are calculated according to the number of the second sampling points, the number of the third sampling points and the first number, so that the accuracy of the determined current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building is improved, and then the 5G coverage construction scheme corresponding to the target building is determined according to the current 5G coverage rate and the predicted 5G coverage rate, so that the scheme determination cost is reduced, and the accuracy of scheme determination is improved.
In one embodiment, the step 202 or the step 302 of determining the 5G coverage construction scheme corresponding to the target building according to the current 5G coverage and the predicted 5G coverage specifically includes the following steps:
step 500, if the current 5G coverage rate is greater than a first preset threshold, determining that the target area does not need to be covered by a 5G indoor area.
Specifically, the current 5G coverage is greater than the first preset threshold, which indicates that the current 5G coverage in the target area meets the requirement, and therefore, the target area does not need to be covered by 5G indoor.
Step 501, if the current 5G coverage is smaller than a first preset threshold and the predicted 5G coverage is larger than the first preset threshold, determining to upgrade the outdoor station which is not upgraded to the 5G station and corresponds to the target area.
Specifically, the current 5G coverage is smaller than a first preset threshold, which indicates that the current 5G coverage in the target area cannot meet the requirement, and the 5G site needs to be upgraded or 5G indoor coverage needs to be built, and because the predicted 5G coverage is larger than the first preset threshold, and when the predicted 5G coverage is calculated, the sampling points meeting the preset condition include the measured sampling points of the outdoor 4G site that is upgraded and the sampling points of the outdoor 4G site that is not upgraded, it is determined that the outdoor site corresponding to the target area that is not upgraded to the 5G site is upgraded.
Step 502, if the predicted 5G coverage rate is smaller than a first preset threshold, determining that a target area needs to be covered by 5G indoor coverage.
Specifically, because the current 5G coverage is equal to or less than the predicted 5G coverage, if the predicted 5G coverage is less than the first preset threshold, the current 5G coverage is less than the first preset threshold, which indicates that the current 5G coverage in the target area cannot meet the requirement, the 5G site needs to be upgraded or the 5G indoor coverage needs to be built, and because the predicted 5G coverage is less than the first preset threshold, that is, the upgraded 5G coverage still cannot meet the requirement, the target area needs to be built with the 5G indoor coverage.
Step 503, determining a 5G coverage construction scheme corresponding to the target building based on the 5G coverage construction schemes corresponding to different areas.
Specifically, the 5G coverage construction scheme corresponding to the target building is finally determined according to outdoor opening requirements and indoor construction requirements corresponding to each region of the whole building, combined investment, construction progress and the like. The 5G coverage construction scheme corresponding to the target building comprises coverage by indoor partition construction, coverage by outdoor current 5G macro-station or subsequent coverage by constructed 5G macro-station.
According to the embodiment of the invention, the 5G construction scheme of each area is determined based on the current 5G coverage rate and the size relation between the predicted 5G coverage rate and the first preset threshold value, and the 5G coverage construction scheme corresponding to the target building is determined based on the 5G coverage construction schemes corresponding to different areas, so that the scheme determination cost is reduced, and the scheme determination accuracy is improved.
In one embodiment, if the sample of the sampling point of the 4G outdoor macro station MR located at the target building is not enough to judge the 5G coverage condition of the target building, the following steps are executed:
step 600, calculating a third 4G coverage condition of the adjacent area outside the boundary of the target building according to the MR grid positioning or MDT data, wherein the third 4G coverage condition comprises 4G MR sampling points and levels of outdoor levels of the adjacent area outside the boundary of the target building.
Specifically, for some large buildings, when samples of sampling points of 4G outdoor macro-station MR positioning falling in the buildings are found to be too few to judge the building coverage condition after positioning, the 4G MR sampling points and the level condition of outdoor levels of adjacent areas outside the building boundary are calculated according to MR grid positioning or MDT data. And counting the sampling points and levels of the first-layer grids outside the building by combining the longitude and the latitude of the MDT data with the sampling points and the building boundary.
Step 601, according to the third 4G coverage condition, calculating the level of the target building after upgrading the 5G base station.
Specifically, the level of the relevant cell after the 5G base station is upgraded at the same address is calculated through the coverage conversion relation between the 5G base station and the 4G base station. The 5G and 4G coverage conversion relationship has been described in the above embodiments, and is not described herein again to avoid repetition.
And step 602, determining the predicted indoor minimum 5G receiving level of the building corresponding to the target building based on the level of the target building after upgrading the 5G base station.
Specifically, a 5G reception level in a first wall of the building is calculated according to an electronic map, wherein the 5G reception level = an outdoor reception level-a penetration loss level. Indoor maximum 5G receiving levels obtained after different outdoor grid cells are converted are arranged in different regions of the large building in the south, the west and the north, and meanwhile if a building internal structure drawing exists, the 5G levels in a building depth region are further converted according to space propagation loss corresponding to space distance and penetrating loss corresponding to a wall body, so that the indoor minimum 5G receiving levels predicted by the building are obtained. The method is similar to the current indoor building simulation, and finally the buildings with too few positioning sampling points can be obtained.
And 603, determining a 5G coverage construction scheme corresponding to the target building according to the predicted indoor minimum 5G receiving level of the building.
Specifically, the 5G level of the building depth area is further converted according to the space propagation loss corresponding to the space distance and the penetration loss corresponding to the wall body, so that the indoor minimum 5G receiving level predicted by the building is obtained, and the 5G coverage construction scheme corresponding to the target building is determined according to the indoor minimum 5G receiving level predicted by the building.
According to the embodiment of the invention, when the sampling point samples of the target building are not enough to judge the 5G coverage condition of the target building, the 5G coverage construction scheme corresponding to the target building is determined according to the indoor minimum 5G receiving level predicted by the building corresponding to the target building, so that the deviation of scheme determination caused by insufficient sampling points is avoided, and the accuracy of scheme determination is improved.
The building 5G coverage construction scheme determining apparatus provided by the present invention is described below, and the building 5G coverage construction scheme determining apparatus described below and the building 5G coverage construction scheme determining method described above may be referred to in correspondence with each other.
Another embodiment of the present invention provides a building 5G coverage construction plan determination apparatus, as shown in fig. 4, including: a decision module 410, a first scheme determination module 420, and a second scheme determination module 430, wherein,
the judging module 410 is used for determining whether the target building has indoor coverage of the 4G indoor sub-coverage system;
the first scheme determining module 420 is configured to, when a target building has indoor coverage of a 4G indoor sub-coverage system, obtain a building coverage area related to a design scheme, count first 4G coverage conditions of different areas based on the building coverage area, and determine a 5G coverage construction scheme corresponding to the target building according to the first 4G coverage conditions of the different areas;
the second scheme determining module 430 is configured to, when the target building does not have indoor coverage of the 4G indoor sub-coverage system, obtain a second 4G coverage condition of the boundary of the target building, and determine, according to the second 4G coverage condition, a 5G coverage construction scheme corresponding to the target building.
The building 5G coverage construction scheme determining device provided by the embodiment of the invention can accurately position the real coverage condition in the building, and determine the 5G coverage construction scheme of the target building according to the 4G coverage condition, thereby reducing the scheme determining cost and improving the scheme determining accuracy.
Optionally, the first scheme determining module 420 is specifically configured to: acquiring a building coverage area related to a design scheme, and counting first 4G coverage conditions of different areas according to MR data of 4G indoor sub-cells of the different areas, wherein the first 4G coverage conditions comprise: a plurality of sampling points in different areas and 4G outdoor neighboring cell receiving coverage levels reported by each sampling point in a measuring way; according to the first 4G coverage conditions of different areas, calculating the level of the target building after upgrading the 5G base station; determining the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building based on the level of the target building after upgrading the 5G base station; and determining a 5G coverage construction scheme corresponding to the target building according to the current 5G coverage and the predicted 5G coverage.
According to the building 5G coverage construction scheme determining device provided by the embodiment of the invention, the level of the 5G base station upgraded at the same address is estimated by combining the outdoor sampling statistics of the MR adjacent region of the existing 4G indoor division with the difference of the 4G link and the 5G link, so that the coverage condition in a real building can be accurately positioned. Because the measured level actually occurs indoors, the geographic position is the most accurate, and in addition, because the 4G outdoor acquisition of the adjacent region is adopted, the coverage effect estimation after the co-site construction can be carried out on the points which are not constructed by 5G. The coverage conditions of different floors of the building are positioned by floor areas, so that the areas where the 5G rooms need to be planned and constructed actually are positioned more accurately, and the building 5G coverage construction scheme is determined.
Optionally, the second scheme determining module 430 is specifically configured to: calculating a second 4G coverage condition of the target building boundary according to the MR grid positioning or MDT data, wherein the second 4G coverage condition comprises 4G outdoor macro station MR sampling points and levels of outdoor levels; according to the second 4G coverage condition, calculating the level of the target building after upgrading the 5G base station; determining the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building based on the level of the target building after upgrading the 5G base station; and determining a 5G coverage construction scheme corresponding to the target building according to the current 5G coverage and the predicted 5G coverage.
According to the building 5G coverage construction scheme determining device provided by the embodiment of the invention, the sampling points falling on the inner side of the building are counted by adopting a relatively mature 4G MR (magnetic resonance) positioning mode for the building without 4G rooms, and the coverage condition of the site which is opened or planned by the same site 5G is calculated by link conversion. For some buildings with large building areas, the outdoor level of the building can be counted, and the coverage interval of the coverage level is roughly calculated by combining the wall partition condition of the design drawing. Compared with 5G MR positioning, the method has the advantages that on one hand, the MR data volume is larger and more objective, on the other hand, the positioning method is more mature at present, and the precision is higher relative to 5G.
Optionally, the calculating the level after the target building upgrades the 5G base station specifically includes: calculating the level of the target building after upgrading the 5G base station by adopting a preset 4G and 5G coverage conversion relation; the preset 4G and 5G coverage conversion relation is expressed by the following formula: the 5G converted receiving level =4G receiving level +4/5G site transmitting power difference +4/5G antenna gain difference +4/5G terminal receiving capacity difference +4/5G frequency coverage difference delta; wherein the 4/5G frequency coverage difference Δ =20 × log (bin 1/bin 2).
The building 5G coverage construction scheme determining device provided by the embodiment of the invention combines the preset 4G and 5G coverage conversion relation with the 4/5G site transmitting power difference, the 4/5G antenna gain difference, the 4/5G terminal receiving capacity difference and the 4/5G frequency coverage difference delta, improves the accuracy of the calculated level of the target building after upgrading the 5G base station, and improves the scheme determining accuracy.
Optionally, determining the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building based on the level after the target building upgrades the 5G base station, including determining a first sampling point of which the maximum value of the 5G converted receiving level in each sampling point is greater than a 5G access coverage level threshold if the number of the sampling points in the target area is a first number; counting the number of second sampling points of the outdoor 4G station which is measured in the first sampling points and is upgraded to the 5G station; counting the number of third sampling points of outdoor 4G sites which are measured in the first sampling points and are not upgraded to 5G sites; determining the current 5G coverage rate corresponding to the target area according to the second sampling point quantity and the first quantity; and determining the predicted 5G coverage rate corresponding to the target area according to the second sampling point quantity, the third sampling point quantity and the first quantity.
According to the building 5G coverage construction scheme determining device provided by the embodiment of the invention, the current 5G coverage rate and the predicted 5G coverage rate are calculated according to the number of the second sampling points, the number of the third sampling points and the first number, so that the accuracy of the determined current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building is improved, the 5G coverage construction scheme corresponding to the target building is further determined according to the current 5G coverage rate and the predicted 5G coverage rate, the scheme determining cost is reduced, and the scheme determining accuracy is improved.
Optionally, the determining, according to the current 5G coverage and the predicted 5G coverage, a 5G coverage construction scheme corresponding to the target building includes: if the current 5G coverage rate is larger than a first preset threshold value, determining that the target area does not need to be covered by a 5G room; if the current 5G coverage rate is smaller than a first preset threshold value and the predicted 5G coverage rate is larger than the first preset threshold value, determining to upgrade the outdoor station which is not upgraded to the 5G station and corresponds to the target area; if the predicted 5G coverage rate is smaller than a first preset threshold value, determining that a target area needs to be built for 5G indoor coverage; and determining a 5G coverage construction scheme corresponding to the target building based on the 5G coverage construction schemes corresponding to different areas.
The building 5G coverage construction scheme determining device provided by the embodiment of the invention determines the 5G construction scheme of each area based on the current 5G coverage rate and the size relationship between the predicted 5G coverage rate and the first preset threshold value, and determines the 5G coverage construction scheme corresponding to the target building based on the 5G coverage construction schemes corresponding to different areas, so that the scheme determining cost is reduced, and the scheme determining accuracy is improved.
Optionally, the building 5G coverage construction scheme determining apparatus further includes a third scheme determining module, configured to, if the sample of the sampling point located in the target building by the 4G outdoor macro station MR is not sufficient to determine the 5G coverage condition of the target building, perform the following operations:
calculating a third 4G coverage condition of an adjacent area outside the boundary of the target building according to MR grid positioning or MDT data, wherein the third 4G coverage condition comprises 4G MR sampling points and levels of outdoor levels of the adjacent area outside the boundary of the target building; according to the third 4G coverage condition, calculating the level of the target building after upgrading the 5G base station; determining the predicted indoor minimum 5G receiving level of the building corresponding to the target building based on the level of the target building after upgrading the 5G base station; and determining a 5G coverage construction scheme corresponding to the target building according to the predicted indoor minimum 5G receiving level of the building.
According to the building 5G coverage construction scheme determining device provided by the embodiment of the invention, when the sampling point samples of the target building are not enough to judge the 5G coverage condition of the target building, the 5G coverage construction scheme corresponding to the target building is determined through the predicted indoor minimum 5G receiving level of the building corresponding to the target building, so that the scheme determination deviation caused by insufficient sampling points is avoided, and the scheme determination accuracy is improved.
The building 5G coverage construction scheme determining device provided by the invention can realize each process realized by the method embodiments of fig. 1 to fig. 3, and achieve the same technical effect, and is not repeated here for avoiding repetition.
Fig. 5 illustrates a physical structure diagram of an electronic device, which may include, as shown in fig. 5: a processor (processor) 510, a Communication Interface (Communication Interface) 520, a memory (memory) 530 and a Communication bus 540, wherein the processor 510, the Communication Interface 520 and the memory 530 are communicated with each other via the Communication bus 540. Processor 510 may invoke computer programs in memory 530 to perform the steps of the building 5G coverage plan determination method, including, for example: determining whether the target building has indoor coverage of a 4G indoor sub-coverage system; under the condition that a target building is covered by a 4G indoor sub-coverage system, acquiring a building coverage area related to a design scheme, counting first 4G coverage conditions of different areas based on the building coverage area, and determining a 5G coverage construction scheme corresponding to the target building according to the first 4G coverage conditions of the different areas; and under the condition that the target building does not have indoor coverage of the 4G indoor sub-coverage system, acquiring a second 4G coverage condition of the boundary of the target building, and determining a 5G coverage construction scheme corresponding to the target building according to the second 4G coverage condition.
Furthermore, the logic instructions in the memory 530 may be implemented in the form of software functional units and stored in a computer readable storage medium when the software functional units are sold or used as independent products. Based on such understanding, the technical solution of the present invention may be embodied in the form of a software product, which is stored in a storage medium and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-only memory (ROM), a Random Access Memory (RAM), a magnetic disk, an optical disk, or other various media capable of storing program codes.
In another aspect, the present invention also provides a computer program product comprising a computer program stored on a non-transitory computer readable storage medium, the computer program comprising program instructions which, when executed by a computer, enable the computer to perform the building 5G coverage construction scheme determination method provided by the above methods, the method comprising: determining whether the target building has indoor coverage of a 4G indoor sub-coverage system; acquiring a building coverage range related to a design scheme under the condition that a target building has indoor coverage of a 4G indoor sub-coverage system, counting first 4G coverage conditions of different areas based on the building coverage range, and determining a 5G coverage construction scheme corresponding to the target building according to the first 4G coverage conditions of the different areas; and under the condition that the target building does not have indoor coverage of the 4G indoor sub-coverage system, acquiring a second 4G coverage condition of the boundary of the target building, and determining a 5G coverage construction scheme corresponding to the target building according to the second 4G coverage condition.
On the other hand, an embodiment of the present application further provides a processor-readable storage medium, where the processor-readable storage medium stores a computer program, where the computer program is configured to cause the processor to execute the method provided in each of the above embodiments, for example, including: determining whether the target building has indoor coverage of a 4G indoor sub-coverage system; under the condition that a target building is covered by a 4G indoor sub-coverage system, acquiring a building coverage area related to a design scheme, counting first 4G coverage conditions of different areas based on the building coverage area, and determining a 5G coverage construction scheme corresponding to the target building according to the first 4G coverage conditions of the different areas; and under the condition that the target building does not have indoor coverage of the 4G indoor sub-coverage system, acquiring a second 4G coverage condition of the boundary of the target building, and determining a 5G coverage construction scheme corresponding to the target building according to the second 4G coverage condition.
The processor-readable storage medium can be any available medium or data storage device that can be accessed by a processor, including, but not limited to, magnetic memory (e.g., floppy disks, hard disks, magnetic tape, magneto-optical disks (MOs), etc.), optical memory (e.g., CDs, DVDs, BDs, HVDs, etc.), and semiconductor memory (e.g., ROMs, EPROMs, EEPROMs, non-volatile memories (NAND FLASH), solid State Disks (SSDs)), etc.
The above-described embodiments of the apparatus are merely illustrative, and the units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of the present embodiment. One of ordinary skill in the art can understand and implement it without inventive effort.
Through the above description of the embodiments, those skilled in the art will clearly understand that each embodiment may be implemented by software plus a necessary general hardware platform, and may also be implemented by hardware. Based on the understanding, the above technical solutions substantially or otherwise contributing to the prior art may be embodied in the form of a software product, which may be stored in a computer-readable storage medium, such as ROM/RAM, magnetic disk, optical disk, etc., and includes several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the method according to the various embodiments or some parts of the embodiments.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (10)

1. A building 5G coverage construction scheme determination method is characterized by comprising the following steps:
determining whether the target building has indoor coverage of a 4G indoor sub-coverage system;
acquiring a building coverage range related to a design scheme under the condition that a target building has indoor coverage of a 4G indoor sub-coverage system, counting first 4G coverage conditions of different areas based on the building coverage range, and determining a 5G coverage construction scheme corresponding to the target building according to the first 4G coverage conditions of the different areas;
and under the condition that the target building does not have indoor coverage of the 4G indoor sub-coverage system, acquiring a second 4G coverage condition of the boundary of the target building, and determining a 5G coverage construction scheme corresponding to the target building according to the second 4G coverage condition.
2. The method as claimed in claim 1, wherein the step of obtaining the building coverage area related to the design scheme, counting the first 4G coverage conditions of different areas based on the building coverage area, and determining the 5G coverage construction scheme corresponding to the target building according to the first 4G coverage conditions of the different areas comprises:
acquiring a building coverage area related to a design scheme, and counting first 4G coverage conditions of different areas according to MR data of 4G indoor sub-cells of the different areas, wherein the first 4G coverage conditions comprise: a plurality of sampling points in different areas and 4G outdoor neighboring cell receiving coverage levels reported by each sampling point in a measuring way;
according to the first 4G coverage conditions of different areas, calculating the level of the target building after upgrading the 5G base station;
determining the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building based on the level of the target building after upgrading the 5G base station;
and determining a 5G coverage construction scheme corresponding to the target building according to the current 5G coverage and the predicted 5G coverage.
3. The method for determining the 5G coverage construction scheme as claimed in claim 1, wherein the step of obtaining the second 4G coverage condition of the boundary of the target building and determining the 5G coverage construction scheme corresponding to the target building according to the second 4G coverage condition comprises:
calculating a second 4G coverage condition of the target building boundary according to the MR grid positioning or MDT data, wherein the second 4G coverage condition comprises 4G outdoor macro-station MR sampling points and levels of outdoor levels;
according to the second 4G coverage condition, calculating the level of the target building after upgrading the 5G base station;
determining the current 5G coverage rate and the predicted 5G coverage rate corresponding to the target building based on the level of the target building after upgrading the 5G base station;
and determining a 5G coverage construction scheme corresponding to the target building according to the current 5G coverage and the predicted 5G coverage.
4. The 5G coverage construction scheme determination method according to claim 2 or 3, wherein the calculating the level after the target building is upgraded to the 5G base station comprises:
calculating the level of the target building after upgrading the 5G base station by adopting a preset 4G and 5G coverage conversion relation;
the preset 4G and 5G coverage conversion relation is expressed by the following formula:
the 5G converted receiving level =4G receiving level +4/5G site transmitting power difference +4/5G antenna gain difference +4/5G terminal receiving capacity difference +4/5G frequency coverage difference delta;
wherein the 4/5G frequency coverage difference Δ =20 × log (bin 1/bin 2).
5. The 5G coverage construction scheme determination method of claim 2 or 3, wherein the determining the current 5G coverage and the predicted 5G coverage corresponding to the target building based on the level of the target building after upgrading the 5G base station comprises:
if the number of the target area sampling points is the first number, determining the first sampling point of which the maximum value of the 5G converted receiving level is greater than the 5G access coverage level threshold in each sampling point;
counting the number of second sampling points of the outdoor 4G station which is measured in the first sampling points and is upgraded to the 5G station;
counting the number of third sampling points of outdoor 4G sites which are measured in the first sampling points and are not upgraded to 5G sites;
determining the current 5G coverage rate corresponding to the target area according to the second sampling point quantity and the first quantity;
and determining the predicted 5G coverage rate corresponding to the target area according to the second sampling point quantity, the third sampling point quantity and the first quantity.
6. The 5G coverage construction scheme determination method of claim 5, wherein the determining a 5G coverage construction scheme corresponding to the target building according to the current 5G coverage and the predicted 5G coverage comprises:
if the current 5G coverage rate is larger than a first preset threshold value, determining that the target area does not need to be covered by a 5G room;
if the current 5G coverage rate is smaller than a first preset threshold value and the predicted 5G coverage rate is larger than the first preset threshold value, determining to upgrade the outdoor station which is not upgraded to the 5G station and corresponds to the target area;
if the predicted 5G coverage rate is smaller than a first preset threshold value, determining that 5G indoor coverage needs to be built in a target area;
and determining a 5G coverage construction scheme corresponding to the target building based on the 5G coverage construction schemes corresponding to different areas.
7. The 5G coverage construction scheme determination method according to claim 1, further comprising:
if the sample of the 4G outdoor macro station MR located at the sampling point of the target building is not enough to judge the 5G coverage condition of the target building, the following operations are executed:
calculating a third 4G coverage condition of an adjacent area outside the boundary of the target building according to MR grid positioning or MDT data, wherein the third 4G coverage condition comprises 4G MR sampling points and levels of outdoor levels of the adjacent area outside the boundary of the target building;
according to the third 4G coverage condition, calculating the level of the target building after upgrading the 5G base station;
determining the predicted indoor minimum 5G receiving level of the building corresponding to the target building based on the level of the target building after upgrading the 5G base station;
and determining a 5G coverage construction scheme corresponding to the target building according to the predicted indoor minimum 5G receiving level of the building.
8. A building 5G coverage construction plan determination apparatus, comprising:
the judging module is used for determining whether the target building has indoor coverage of a 4G indoor sub-coverage system;
the system comprises a first scheme determining module, a second scheme determining module and a third scheme determining module, wherein the first scheme determining module is used for acquiring a building coverage range related to a design scheme under the condition that a target building has indoor coverage of a 4G indoor coverage system, counting first 4G coverage conditions of different areas based on the building coverage range, and determining a 5G coverage construction scheme corresponding to the target building according to the first 4G coverage conditions of the different areas;
and the second scheme determining module is used for acquiring a second 4G coverage condition of the boundary of the target building under the condition that the target building does not have indoor coverage of a 4G indoor coverage system, and determining a 5G coverage construction scheme corresponding to the target building according to the second 4G coverage condition.
9. An electronic device comprising a processor and a memory storing a computer program, wherein the processor when executing the computer program implements the steps of the building 5G coverage construction plan determination method as claimed in any one of claims 1 to 7.
10. A processor readable storage medium, wherein the processor readable storage medium stores a computer program for causing a processor to perform the steps of the building 5G coverage construction scheme determination method of any one of claims 1 to 7.
CN202110470332.6A 2021-04-28 2021-04-28 Building 5G coverage construction scheme determining method, device, equipment and storage medium Active CN115250478B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110470332.6A CN115250478B (en) 2021-04-28 2021-04-28 Building 5G coverage construction scheme determining method, device, equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110470332.6A CN115250478B (en) 2021-04-28 2021-04-28 Building 5G coverage construction scheme determining method, device, equipment and storage medium

Publications (2)

Publication Number Publication Date
CN115250478A true CN115250478A (en) 2022-10-28
CN115250478B CN115250478B (en) 2023-09-19

Family

ID=83696963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110470332.6A Active CN115250478B (en) 2021-04-28 2021-04-28 Building 5G coverage construction scheme determining method, device, equipment and storage medium

Country Status (1)

Country Link
CN (1) CN115250478B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109963289A (en) * 2017-12-26 2019-07-02 中国移动通信集团公司 A kind of indoor distribution base station method for building up and device
CN110831015A (en) * 2018-08-14 2020-02-21 中国移动通信集团设计院有限公司 Indoor weak coverage identification method and device
EP3675547A1 (en) * 2017-08-23 2020-07-01 ZTE Corporation Base station deployment method and device
CN112261666A (en) * 2020-11-09 2021-01-22 牟茹月 Indoor automatic coverage system and method
KR20210026520A (en) * 2019-08-30 2021-03-10 주식회사 케이티 System and method for predicting wireless communication coverage based on measurement data

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3675547A1 (en) * 2017-08-23 2020-07-01 ZTE Corporation Base station deployment method and device
CN109963289A (en) * 2017-12-26 2019-07-02 中国移动通信集团公司 A kind of indoor distribution base station method for building up and device
CN110831015A (en) * 2018-08-14 2020-02-21 中国移动通信集团设计院有限公司 Indoor weak coverage identification method and device
KR20210026520A (en) * 2019-08-30 2021-03-10 주식회사 케이티 System and method for predicting wireless communication coverage based on measurement data
CN112261666A (en) * 2020-11-09 2021-01-22 牟茹月 Indoor automatic coverage system and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
舒文琼;: "爱立信:室内数字化覆盖方案是4G向5G演进的必然选择", 通信世界, no. 16 *
钟云富;曾昭才;黄冠英;: "室内覆盖低成本建设模式研究", 广东通信技术, no. 07 *

Also Published As

Publication number Publication date
CN115250478B (en) 2023-09-19

Similar Documents

Publication Publication Date Title
US9730080B2 (en) Network coverage planning method and apparatus of evolution communication system
US8060102B2 (en) System and method for coverage analysis in a wireless network
US9229090B2 (en) Method for indoor/outdoor call judgment
US6041236A (en) Method and apparatus for minimizing the number of samples needed to determine cell area coverage reliability in a radiotelephone system
US8374596B2 (en) Method and apparatus for deriving pathloss estimation values
CN107846688B (en) Wireless network site planning method and device based on multiple operators
EP2416602B1 (en) Radio wave state measurement system, radio wave state measurement method, and storage medium in which radio wave state measurement program is stored
US9949144B2 (en) Method and apparatus for controlling radio parameters, network operation management apparatus, and radio base station
US6006095A (en) Method and apparatus for estimating cell radius and area coverage reliability in a radiotelephone system
US6173185B1 (en) Method and apparatus for minimizing the area sampled to determine cell area coverage reliability in a radiotelephone system
WO2012166032A1 (en) Method, node and system for management of a mobile network
US5966661A (en) Method and apparatus for a radiotelephone system optimized for cell boundary coverage reliability
US5983106A (en) Method and apparatus for minimizing the number of samples needed to determine cell radius coverage contour reliability in a radiotelephone system
US20110021156A1 (en) Margin design apparatus, margin design system, margin design method, and program
CN115250478B (en) Building 5G coverage construction scheme determining method, device, equipment and storage medium
CN105493543A (en) Information processing apparatus, radio communication system, and terminal position estimation method
CN116133037A (en) Wireless network evaluation method and device
CN114095854A (en) Indoor distribution network interference source positioning method based on MDT data and electronic equipment
Plets et al. A mobile app for real-time testing of path-loss models and optimization of network planning
CN111432429B (en) Wireless channel model matching correction method based on map information
CN108235338B (en) TD-LTE user type identification method and base station
US20170254878A1 (en) Position Adjustment in Mobile Communications Networks
CN115119213A (en) Network coverage prediction method, device thereof and computer readable storage medium
KR20060039581A (en) Method and recording medium for optimizing area representation electric wave model
Vieira et al. Introducing Redundancy in the Radio Planning of LPWA Networks for Internet of Things.

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant