CN109963289A CN201711436296.1A CN201711436296A CN109963289A CN 109963289 A CN109963289 A CN 109963289A CN 201711436296 A CN201711436296 A CN 201711436296A CN 109963289 A CN109963289 A CN 109963289A
Authority
CN
China
Prior art keywords
base station
new buildings
networking
indoor distribution
frequency range
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711436296.1A
Other languages
Chinese (zh)
Other versions
CN109963289B (en
Inventor
宀冲环
岳廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
China Mobile Group Inner Mongolia Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
China Mobile Group Inner Mongolia Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd, China Mobile Group Inner Mongolia Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN201711436296.1A priority Critical patent/CN109963289B/en
Publication of CN109963289A publication Critical patent/CN109963289A/en
Application granted granted Critical
Publication of CN109963289B publication Critical patent/CN109963289B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/18Network planning tools
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/18Network planning tools
    • H04W16/20Network planning tools for indoor coverage or short range network deployment
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W84/00Network topologies
    • H04W84/18Self-organising networks, e.g. ad-hoc networks or sensor networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the invention discloses a kind of indoor distribution base station method for building up and device, method includes: the perimeter data according to New Buildings, it is determined whether using the band networking mode of indoor distribution base station;According to the band networking mode of indoor distribution base station, then networking frequency range is determined according to the frequency range of the peripheral base station of New Buildings;If judgement knows that the plane of a loop shortest distance in New Buildings is more than threshold value, indoor distribution base station is created using networking frequency range in New Buildings according to the band networking mode of indoor distribution base station.Not only it is able to satisfy indoor depth coverage, and solve because building it is newly-built caused by peripheral path network deterioration and without covering problem, this programme only relates to inside communication common carrier simultaneously, without new website reply and complicated network optimization measure, the effectively save network optimization used time, human cost and cost of investment are reduced, effectively promotion operating income, improves the networking cost performance of network.

Description

A kind of indoor distribution base station method for building up and device
Technical field
The present embodiments relate to technical field of communication network, and in particular to a kind of indoor distribution base station method for building up and dress It sets.
Background technique
Indoor distribution base station (abbreviation room point) construction is applied to indoor depth covering more, and covering scene is mostly residential block, row Political affairs Administrative Area, market, shopping center etc..Since 4G is high frequency networking, and outdoor macro base station (abbreviation macro station) construction is applied more In outdoor wide covering, covering scene is road, village, lake, farmland etc..It is different from 2G low frequency networking, signal was receiving Attenuation is larger in journey.In construction, city county town macro station coverage distance is only 500 meters, and the regions such as rural area are only 2000 meters, than it 2G coverage distance has lacked more than 5 times.This is the main reason for causing the 4G epoch intensively to be built a station.
In addition, with the fast development of IT industry, user's use habit also occurs obviously to change, and user not only uses on road Voice service, more time can use data service indoors.The prior art should be covered extensively in network construction and also want depth Covering.Therefore, in the 4G epoch, other than intensively building macro base station and meeting wide covering demand, high-volume builds indoor distributed system It is its important symbol for being different from the 2G epoch to meet depth covering, or even says in the following 5G " Internet of Things " or even " Wan Lian Net " epoch, depth covering demand can be protruded more, and indoor distributed system base station construction certainly will enter " blowout " phase.
When now net construction, depth covering problem is usually two extreme, first, operator is usually before new building completion, By establishing indoor distributed system in new building with property agreement to complete the covering of the depth of signal in building.At this point, because For new building especially heavy construction, periphery macro station signal can be generated to block and cause ambient signal deterioration or no signal.And lead to Normal solution is mostly newly-built macro station, or adjusts the parameters for having macro station and carry out covering tuning.Second, owner of estate considers The problems such as investment, the non-construction area exploitation of more options, many building exploitation early periods are the unfrequented soils such as arable land, therefore The building is built up rear surrounding and is covered without any signal, needs that newly-built macro station is mating to road and periphery covers.
The case where new building ambient signal caused by construction for new building deteriorates, usually by adjusting existing macro station Parameters carry out covering tuning, and macro station is created after optimization has no resolution.However the new website in the case where intensively building a station relatively Location problem becomes maximum difficult point.After building for new building, nearby related mating no coverage condition, can only pass through newly-built macro station To solve the problems, such as the network coverage.And if new building is heavy construction, as 1000M × 1100M rectangular-ambulatory-plane is built.Consider 4G covering Radius city is only 500M, and by the periphery covering of entire square building, conventional method needs at least two macro station just to can solve to build The matched covering problem in periphery is built, in addition, this kind of annular building is also contemplated that annular middle position, it is possible to due to annular building Blocking leads to Signal Degrade or no signal.
Both the above situation, removes addressing hardly possible, the objective factors such as coverage condition complexity, and newly-built station is built there is also reply is linked up If process is longer, the high problem of human cost, while steel tower is submitted in steel tower, computer room part completely in macro station construction now Company, the problems such as being substantially increased there is also whole construction cost, later period lease expenses, equipment maintenance cost;In addition, due to iron Tower company adheres to different enterprises separately in communication common carrier, has different operation flow and way to manage, leads to equipment construction, failure dimension Shield aspect time delay is serious, and user, which perceives, to be deteriorated, and complaint amount rises.
Summary of the invention
Due to the above problem of the existing technology, the embodiment of the present invention propose a kind of indoor distribution base station method for building up and Device.
In a first aspect, the embodiment of the present invention proposes a kind of indoor distribution base station method for building up, comprising:
According to the perimeter data of New Buildings, it is determined whether using the band networking mode of indoor distribution base station;
According to the band networking mode of the indoor distribution base station, then according to the peripheral base station of the New Buildings Frequency range determines networking frequency range;
If judgement knows that the plane of a loop shortest distance in the New Buildings is more than threshold value, according to the indoor distribution The band networking mode of base station creates indoor distribution base station using the networking frequency range in the New Buildings.
Second aspect, the embodiment of the present invention also propose that device is established in a kind of indoor distribution base station, comprising:
Networking mode determining module, for the perimeter data according to New Buildings, it is determined whether use indoor distribution base The band networking mode stood;
Networking band determination module, for the band networking mode according to the indoor distribution base station, then according to The frequency range of the peripheral base station of New Buildings determines networking frequency range;
Macro station creates module, if for judging to know that the plane of a loop shortest distance in the New Buildings is more than threshold value, Room is then created using the networking frequency range in the New Buildings according to the band networking mode of the indoor distribution base station Interior distributed base station.
The third aspect, the embodiment of the present invention also propose a kind of electronic equipment, comprising:
At least one processor;And
At least one processor being connect with the processor communication, in which:
The memory is stored with the program instruction that can be executed by the processor, and the processor calls described program to refer to Order is able to carry out the above method.
Fourth aspect, the embodiment of the present invention also propose a kind of non-transient computer readable storage medium, the non-transient meter Calculation machine readable storage medium storing program for executing stores computer program, and the computer program makes the computer execute the above method.
As shown from the above technical solution, the embodiment of the present invention determines use by investigating the perimeter data of New Buildings The band networking mode of indoor distribution base station determines networking frequency range according to the frequency range of peripheral base station, and according to band networking mode Indoor distribution base station is created in New Buildings using networking frequency range, is not only able to satisfy indoor depth coverage, but also solve Because building it is newly-built caused by peripheral path network deterioration and without covering problem, while this programme only relates in communication common carrier Portion, without new website reply and complicated network optimization measure, the effectively save network optimization used time reduces human cost and investment Cost, effectively promotion operating income, improve the networking cost performance of network.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Other attached drawings are obtained according to these figures.
Fig. 1 is a kind of flow diagram for indoor distribution base station method for building up that one embodiment of the invention provides;
Fig. 2 (A) (B) is respectively the schematic diagram of a scenario of the newly-built base station that one embodiment of the invention provides and newly-built community;
Fig. 3 (A) (B) (C) is respectively the schematic diagram of a scenario for three kinds of newly-built communities that one embodiment of the invention provides;
Fig. 4 (A) (B) be respectively another embodiment of the present invention provides newly-built base station and newly-built community schematic diagram of a scenario;
Fig. 5 be another embodiment of the present invention provides New Buildings schematic layout pattern;
Fig. 6 be another embodiment of the present invention provides a kind of indoor distribution base station method for building up flow diagram;
Fig. 7 (A) (B) is respectively the map schematic diagram and RSPP test knot for the New Buildings that one embodiment of the invention provides Fruit schematic diagram;
Fig. 8 (A) (B) (C) is respectively layout, outdoor scene and the different frequencies for the New Buildings that one embodiment of the invention provides The schematic diagram of section networking;
Fig. 9 is the structural schematic diagram that device is established in a kind of indoor distribution base station that one embodiment of the invention provides;
Figure 10 is the logic diagram of electronic equipment in one embodiment of the invention.
Specific embodiment
With reference to the accompanying drawing, further description of the specific embodiments of the present invention.Following embodiment is only used for more Technical solution of the present invention is clearly demonstrated, and not intended to limit the protection scope of the present invention.
Fig. 1 shows a kind of flow diagram of indoor distribution base station method for building up provided in this embodiment, comprising:
S101, the perimeter data according to New Buildings, it is determined whether using the band networking mode of indoor distribution base station.
Wherein, the perimeter data of the New Buildings includes: the neighboring area type of New Buildings, New Buildings With at a distance from peripheral base station, the height relationships of new building and neighboring buildings, the shape of New Buildings, newly-built room divide base station Device type, transmission allotment, antenna distribution, electric power is taken, computer room is planned and the road test of New Buildings, measurement report Data and complaint data.
The band networking mode is that networking mode of the networking not have an impact each other is carried out according to different frequency range.
S102, according to the band networking mode of the indoor distribution base station, then according to the periphery of the New Buildings The frequency range of base station determines networking frequency range.
Specifically, the frequency range for counting peripheral base station, by peripheral base station, used frequency range is not considered, using not making Used frequency range carries out networking, prevents mutual frequency range from having an impact.
If S103, judgement know that the plane of a loop shortest distance in the New Buildings is more than threshold value, according to the room The band networking mode of interior distributed base station creates indoor distribution base station using the networking frequency range in the New Buildings.
Wherein, the plane of a loop shortest distance is the shortest distance of plane of a loop in annular building, i.e., most short in circular section Diameter.
Specifically, when creating indoor distribution base station in the New Buildings, to be with newly-built indoor distributed system be according to Support installs the macro station cell of different frequency range additional on its main equipment, specifically needs to consider following factor:
1) surrounding enviroment of New Buildings.Two kinds are broadly divided into, one is it is newly-built in former dense city, the second is opening It is newly-built without overlay area to send out area's class original.Newly-built if it is former close quarters, then considering peripheral base station situation, which will be 2) Illustrate together with peripheral base station distance factor.And in no overlay area new building, then new building and building periphery are nothings Coverage condition.
So when original is without overlay area new building, periphery must no signal, at this point, putting aside other factors to net The influence of network can be used newly-built indoor distributed system and build a station different networking plans, and specific comparison is as shown in Figure 2.According to fig. 2 (A) and (B) comparison uses newly-built indoor distributed system base station different frequency range if building is less than 500M*500M Networking plan only needs 4 cells, as shown in Fig. 2 (B);And traditional networking plan needs 2 base stations, as shown in Fig. 2 (A).Such as The only greenbelt area of fruit building just so creates indoor distributed system base station different frequency range group more than 1000M*1000M Net scheme only needs 8 cells, and traditional networking plan then needs 4 base stations that could complete same side covering.For traditional 4 stations From cost, BBU equipment just saves 76000 yuan, and 100000 yuan of transmission line expense, 4 macro base station studio rent expense conservative estimations 100000/ year, about 3000 yuan of corollary equipments operating expenses such as 400000 yuan of steel tower expense and ammeter PTN etc., in square one Under the fully invested expense of only First Year will save 700,000 yuan or more.
2) at a distance from peripheral base station.This factor and 1) new building in former dense city it is newly-built be it is unified, intensive New building and peripheral base station distance will certainly be within 500M in city, and New Buildings are likely to cause to hide to periphery Gear leads to be blocked regional signal deterioration or no signal.And due within 500M, being unsatisfactory for creating apart from peripheral base station Outdoor macro station condition can pass through what is created preferentially using newly-built indoor distributed system base station different frequency range networking plan at this time Room subsystem creates different frequency range macro station cell, solves the problems, such as the position signal deterioration that is blocked.At this time since original is close quarters, Suggest using alien frequencies section with interference is also easy to produce frequently.If peripheral base station is mostly D band networking, then F frequency then can be used in newly-built community Section, F-band resource abundance frequency range is clean, can reduce interference, promotes channel quality.
3) height of new building and neighboring buildings.In LTE network construction plan, outdoor macro station tower height is more than 50M view For high station, high station may generate area covered, overlapping covering, and island effect etc. causes poor, call drop of co-channel interference, matter etc. more Kind network problem, therefore the base station in existing net higher than 50M needs to adjust to 50M or less.
4) shape of New Buildings.Special shape building such as annular building, being blocked due to building annular may lead Cause greenbelt or vacant lot covering deterioration or without covering.In addition, to consider as when the plane of a loop shortest distance is more than 1000M in building Newly-built community is covered, as shown in Fig. 4 (A);Or consider that newly-built station is covered, the tradition networking side as shown in Fig. 4 (B) Formula.
In terms of cost, traditional networking plan needs to found tower, higher cost in greenbelt.And newly-built indoor distributed system Base station different frequency range networking plan only needs to carry additionally antenna in architectural appearance.In terms of covering, traditional scheme is integrally covered preferably, But high powered antenna can be used using newly-built indoor distributed system base station different frequency range networking plan to make up its covering and omit The problem of difference.In terms of construction, traditional newly-built project needs cloth buried fiber optic cable, and construction volume is more very much not said, it is difficult to obtain owner of estate's Approval, and newly-built indoor distributed system base station different frequency range networking plan does not need cloth buried fiber optic cable then, merely with nearest indoor point Distribution system optical cable can be realized.Therefore, generally speaking, it is more excellent to create indoor distributed system base station different frequency range networking plan Gesture achievees the effect that cost efficiency.
In addition, situation shown in Fig. 4 (A) and (B) is extremely extreme, consider green inside building cost etc. annular building Change band or vacant lot be difficult to reach the diametral distance of 1km, therefore, low power easymarco or BOOKRRU installation, outside See it is small and exquisite easy for installation, extremely be applicable in.
5) device type of room point base station is created, transmission is deployed, antenna distribution, electric power is taken, computer room is planned.
6) room is created to divide the road test of base station, MR data, complain data acquisition.
Factor 5) and 6) the considerations of and the newly-built room point base station of tradition be not much different, it is only necessary to pay close attention to following three and ask Topic:
The hardware main equipment of first, TDD-LTE wireless device is usually by BBU (Building Base band Unit) Also referred to as baseband processing unit, RRU (Radio Remote Unit) i.e. Remote Radio Unit and antenna feeder decorum composition.And BBU equipment is then by machine frame, power module, blower module, UMPT (Universal Main Processing& Transmission unit) i.e. master control transmit veneer, LBBP ((LTE BaseBand Processing board type d) D Type LTE Baseband Processing Unit or the general baseband processing unit of UBBP (Universal BaseBandProcessing unit) and GPS module, totally 6 parts form.Newly-built indoor distributed system base station different frequency range networking plan, needs support the more RRU of multiband BBU equipment and baseband board (general device can be supported).
Second, for room subset support frequency range can according to configuration equipment specification determine, including RRU, antenna feeder can The frequency range of choosing supports F, A, D frequency range such as Huawei DRRU3182-FAD model RRU, does not support E frequency range etc..
Third will consider electricity consumption situation in newly-built outdoor macro station cell at this time, if RRU is more than 30M apart from mains supply, It then needs to purchase power source wire.Due to the electricity consumption particularity of RRU, newly-built indoor distributed system base station different frequency range group is being planned Will make rational planning for Host equipment room when net scheme, and electric situation can not be taken by avoiding the occurrence of.Such as 12 layers of high building, machine is set in Stall Cause scheme that can not implement then creating outdoor macro station cell at about 36 meters of 12 roofs will be difficult to take electricity in room.
The present embodiment determines the band networking using indoor distribution base station by investigating the perimeter data of New Buildings Mode determines networking frequency range according to the frequency range of peripheral base station, and uses networking frequency range in new building according to band networking mode Create indoor distribution base station in object, be not only able to satisfy indoor depth coverage, and solve because building it is newly-built caused by week By-pass road network deteriorates and without covering problem, while this programme only relates to inside communication common carrier, without new website reply and complexity Network optimization measure, the effectively save network optimization used time, reduce human cost and cost of investment, effectively promote business and receive Enter, improves the networking cost performance of network.
Further, on the basis of above method embodiment, the method also includes:
S104, according to the height relationships of the New Buildings and surrounding building, determine outdoor macro station newly-built community Position.
Specifically, in LTE network construction plan, outdoor macro station tower height is more than that 50M is considered as high station, and high station may generate Area covered, overlapping covering, island effect etc. lead to the multiple networks problems such as the poor, call drop of co-channel interference, matter, therefore in existing net Base station higher than 50M needs to adjust to 50M or less.After new building is built well, concrete condition is divided into three kinds, respectively such as Fig. 3 (A) shown in (B) (C).Situation one is shown as shown in Fig. 3, and surrounding buildings are more than 50M, and new building is less than 50M.Situation two is such as Shown in Fig. 3 (B), surrounding buildings and new building are more than 50M.For situation three such as shown in Fig. 3 (C), new building is more than 50M and ratio Neighboring buildings want high.
Situation one, situation two are possible to i.e. existing before new building is not built, it is possible to pass through newly-built indoor point Distribution system, RRU zoom out or create the solution of the traditional means such as macro station.If unresolved then newly-built indoor distributed system can be passed through Base station different frequency range networking plan solves, substantially as shown in Fig. 3 (A) and (B).Specific antenna is hung high and newly-built community number and is needed Depending on actual conditions.
In three kinds of situations, situation third is that most common, do not discuss at this time neighboring buildings whether more than 50M because no matter Whether neighboring buildings will all be blocked more than 50M by new building, and then generate Signal Degrade or no signal situation occur.This Outside, since building is excessively high, to the bottom shops of surface road and neighboring buildings, it also will form " black under tower " phenomenon.Therefore, Road coverage condition is taken into account when the different frequency range networking of newly-built indoor distributed system base station is implemented.It is sharp at new building 20-25M With the newly-built outdoor macro station cell of indoor distributed system lightguide cable link, cell deflection should be towards road and neighboring buildings bottom door Shop.Simultaneously because intensively build a station, phenomena such as when newly-built community uses different frequency range as far as possible, avoids co-channel interference generation.Substantially such as Shown in Fig. 3 (C).Specific antenna hangs high and newly-built community number and antenna azimuth need to be depending on actual conditions.
For comprehensive three kinds of situations, depth can effectively be solved by newly-built indoor distributed system base station different frequency range networking Insufficient problem is covered, and is directed to high station problem, we can make some new technologies such as BOOKRRU and easymarco equipment, Equipment is smaller to be easily installed, and power is smaller, and coverage distance is relatively close it is possible to prevente effectively from antenna hangs high station that is excessively high and generating Problem.3DMIMO technology, difference and traditional antenna, antenna can be used further for the higher high-rise of neighboring buildings Vertical angle reaches 65 °, can effectively solve the problems, such as that skyscraper can not all standing.Generally speaking, some rooms point are covered The long-standing problem that lid is complained is to build a kind of effective reduction of indoor distributed system base station different frequency range networking to complain, and is mentioned Rise the means of index.
Further, on the basis of above method embodiment, before S101, further includes:
The perimeter data of S100, the acquisition New Buildings.
Specifically, data acquisition is a very important link in newly-built planning and designing, can be excellent to subsequent network Chemical industry is made to provide huge convenience.Its perimeter data related generally to includes: the neighboring area type of New Buildings, builds Build object at a distance from peripheral base station, the height relationships of new building and neighboring buildings, the shape of New Buildings, newly-built room divide base The device type stood, transmission allotment, antenna distribution, electric power is taken, computer room plan and the road test of New Buildings, is measured Data reporting and complaint data.
When acquiring perimeter data, clear New Buildings periphery is first had to, is broadly divided into two kinds, one is former close It is newly-built to collect city, the second is newly-built without overlay area in development zone class original.With peripheral base station distance, the new building in dense city It is likely to peripheral base station distance within 500M and generates block, lead to the regional signal deterioration that is blocked, if selected at this time The frequency range that peripheral base station is considered when solving signal deterioration problem by newly-built community, due to being that close quarters are dry with being also easy to produce frequently It disturbs suggestion and uses alien frequencies section.And in no overlay area new building, then can build and build periphery is no coverage condition.Its It is secondary, after the situation of clear building periphery, relevant data acquisition, including new building and neighboring buildings height are carried out to building The acquisition of degree and New Buildings shape.
New building and neighboring buildings height are boundary with 50M, and the macro station in base station planning design being more than 50M is height It stands, that is to say, that outdoor more than 50M or more is substantially no signal.Conversely speaking, if neighboring buildings are more than 50M, it is possible to lead Cause the deterioration of new building ambient signal or without covering.New Buildings shape, if it is rectangular-ambulatory-plane 8-shaped building or circle Building and Center for Architecture have family the forms such as outer vacant lot or greenbelt outdoor environment when, being blocked due to building annular may Greenbelt or vacant lot is caused to cover deterioration or without covering.In addition, being wanted when green bad band or the vacant lot plane shortest distance are more than 1km Consider that newly-built station is covered, situation as shown in Figure 5.
Finally, being then the transmission allotment of newly-built room point base station, antenna distribution, electric power is taken, computer room plans the road Deng Ji drive test Construction plan is divided in the conventional rooms such as examination, MR data, complaint data acquisition.
After completing above-mentioned multi-dimensional data acquisition and acquisition resource data support, as shown in fig. 6, further including judging whether Using newly-built room point base station scheme and planning application is carried out, if it is, the implementation of progress project alternative and performance are tracked and tested It receives.Completing one by whole each step both can solve existing issue, can also take into account the leftover problem for being possible to generate in the future Room subsystem newly-built project enables and creates room subsystem and legacy network seamless interfacing, improves marketing profit improvement user Perception.
Further, on the basis of above method embodiment, S103 is specifically included:
If judgement knows that the plane of a loop shortest distance in the New Buildings is more than threshold value, according to New Buildings The antenna feeder installation of shape and design drawing planning indoor distributed system, determines according to the perimeter data of the New Buildings to outdoor Deflection, pitch angle, installation longitude and latitude and the high planning of extension of macro station newly-built community antenna feeder, and using the networking frequency range described The cell of indoor distribution base station is created in New Buildings.
Correspondingly, the method also includes:
S105, local district identification, base station IDs, Tracking Area Code TAC, downlink frequency point, cell are carried out to newly-built cell Mark, Physical Cell Identifier, ratio of uplink subframe to downlink subframe, root sequence index and radius of society data schema.
Specifically, it if judgement knows that the plane of a loop shortest distance in the New Buildings is more than threshold value, needs in institute The cell that indoor distribution base station is created in New Buildings is stated, specifically includes the following steps:
A1, the installation planning of indoor distributed system antenna feeder is carried out according to architectural modeling and design drawing.
A2, the periphery actual conditions acquired according to step A1 solve outdoor macro station newly-built community antenna feeder weak without covering It is covered as direction, in conjunction with complaint, test case, carries out deflection, pitch angle, longitude and latitude is installed and hangs high plan.
A3, consider that periphery is intensively built a station situation, according in step A1 near acquisition macro station frequency range situation use as far as possible it is different Frequently, it avoids interfering.
A4, data schema is carried out to newly-built cell, including local district identification, ENODEBID, TAC, downlink frequency point, small Area's mark, Physical Cell Identifier, ratio of uplink subframe to downlink subframe, root sequence index, radius of society etc..
Further, on the basis of above method embodiment, the method also includes:
S106, newly-built indoor distribution base station is debugged, and the network behind newly-built indoor distribution base station is surveyed Examination.
Specifically, after the completion of newly-built indoor distribution base station planning, project alternative implementation is carried out.It is carried out according to programme planning After implementation, equipment BBU, RRU and antenna feeder are installed, transmission debugging is carried out, determines that optical path is unimpeded, finally carried out cell and swash It is living, determine that cell no alarm can be normally-open.Room point test and road test are carried out using the proprietary test software of 4G simultaneously, is looked into The weak phenomenon of level is seen if there is, average level value and SINR value before not building a station are compared, check whether to improve obvious while being acquired The perception such as 4G MR coverage rate index and the 4G switching rate, cutting off rate of this base station and peripheral base station after building in 3 weeks are completed to refer to Mark analysis, whether there is situation before checking after grade indoor distributed system base station different frequency range networking in conjunction with customer complaint, tracking changes It is kind, and dynamic adjusts antenna feeder pitch angle and deflection, tests wide covering, whether depth covering signal quality improves, if meet Original programme then provides verifying report, and process terminates.
In practical applications, situation such as Fig. 7 for the somewhere in the map as shown in Fig. 7 (A), after carrying out RSRP test (B) shown in, indoor distribution base station establishment step as shown in connection with fig. 6, specific method for building up the following steps are included:
It should be noted that the present embodiment is or can to sign object in the sections point property signed property agreement It is carried out under the premise of industry agreement.
B1, various dimensions relevant data acquisition.
Data acquisition is a very important link in newly-built planning and designing, and good design scheme can be given subsequent Network optimization provides huge convenience.6 contents of its major design 1. New Buildings periphery, 2. with peripheral base station away from From, 3. new building and neighboring buildings height, 4. New Buildings shape, 5. create room the device type of base station, transmission divided to adjust Match, antenna distribution, electric power is taken, computer room is planned.6. the data such as road test, 4G MR data, complaint acquire.
B2, acquisition resource data support.
Firstly, 1. New Buildings periphery: newly-built without overlay area for rural area original.2. with peripheral base station distance: nearest base Station is the land-reclaimable 9 subsidiary factory's macro base stations of flag before 3km crow.3. new building and neighboring buildings height: new building is that tetra- floor of 15M is built It builds, two tri- floor of 11M are built and 300M × 200M × 10M size plant area.4. New Buildings shape: building with rectangular.⑤ The transmission allotment of newly-built room point base station, antenna distribution, the routine room point construction plan such as electric power is taken, computer room plan, 6. road drive test The acquisition of the data such as examination, 4G MR data, complaint, equal field exploring finish.
B3, newly-built indoor distributed system base station different frequency range networking.
Newly-built indoor distributed system base station different frequency range networking plan is with newly-built indoor distributed system to rely on, in its master Install the newly-built project of different frequency range macro station cell in equipment additional.
New Buildings periphery: the base station distance 3km is only capable of covering outdoor, and interior is in no signal condition, and user demand is Building and plant area are all covered, since it endorsed mobile special line agreement, consider enterprise's business revenue and theoretically most low coverage Meet newly-built macro station condition from base station about 3km, newly-built macro station can be reported.But actual conditions are macro station construction plans in 2017 It is over, needs to report within 2018 construction, user indicates to be difficult to wait 1 year or more time.
2. with peripheral base station distance: considering that macro station distance in periphery is practically in weak overlay area farther out, at this, it is difficult to receive To other base station signals, frequency range is more clean, it is contemplated that D frequency band signals reception attenuation is bigger compared with F-band, and F-band compares D Frequency range propagation is farther, therefore selects F-band.
3. new building and neighboring buildings height: without building, highest building is west side 15M4 layers of office on whole garden periphery Building.Therefore situations such as there is no block.
4. New Buildings shape: for traditional rectangular building, building compact Founder.
Shown in overall condition such as Fig. 8 (A), shown in corresponding realistic picture such as Fig. 8 (B).
5. planning sides such as the device type of newly-built room point base station, transmission are deployed, antenna distribution, electric power are taken, computer room is planned Face can meet.
6. the acquisition of the data such as road test, 4G MR data, complaint is completed.
Overall plan: although in recent years to depth covering work be always emphasis promote project, create room the division of labor make by It is difficult to coordinate in property, each area has that property can not be coordinated to cause depth covering work that can not carry out.Therefore, 6 item datas acquire after, select it is similar to industrial park and can not depth covering the problem of, carry out different location work and plan Depth covers scheme.
Design scheme: office building, dormitory building, three, dining room building carry out E frequency range room point construction.Since plant area is simple Room design, can not install pole and equipment, design the newly-built 2 F-band cells of installation on the highest office building of 15M with this and carry out Plant area's covering, farther out due to coverage distance, cover height difference is smaller, and makeshift house signal loss is larger, preferentially uses big function Rate antenna.Then in dining room roof add pole create 1 F-band cell plant area's covering mend it is blind, it is specific such as Fig. 8 (C) It is shown.
B4, the newly-built mating planning of indoor distributed system base station different frequency range networking plan.
1. antenna feeder installation planning, creates 135 ° of 1 cell deflection, 3 ° of pitch angle;Newly-built 75 ° of 2 cell deflection, pitch angle 3°;Newly-built 115 ° of 3 cell deflection, 3 ° of pitch angle;(pitch angle is default value, and dynamic adjusts during Late Stage Verification);Installation Longitude 108.6857683, latitude 40.79287.Antenna installation position roof pole is hung 15 meters high.2. first with indoor distributed system day Line installation site carries out transmission line route planning, reserves newly-built macro station cell transmission route.3. wireless side data schema, to new It is as shown in the table that the cell built carries out data schema:
B5, project alternative are implemented.
Since the program is just to start to plan in June, 2017, cut-off by the end of October, creates indoor distributed system base station different frequencies Section networking plan has been completed the reply and its design scheme planning audit of the depth covering different location of website.Since equipment does not arrive Goods leads to not construct, therefore follow-up work does not complete.
B6, performance tracking and examination.
Since step B5 is not completed, this step has been only completed cost of investment and Profit Assessment:
This programme cost:
Cell RRU device+construction material+license+ studio rent=5000*3+8000+15000+0 ≈ 38000.
Newly-built list macro station cost:
BBU+ cell RRU device+service charge+license+ steel tower studio rent+steel tower cost=19000+5000*3+10000+ 139000 yuan of 15000+10000+80000 ≈.
Under square one, about 100000 yuan of debt are saved, is 3 times of cost, meanwhile, the works such as build a station, check and accept, testing are built The human cost of network optimization personnel, the time human cost that the time cost and non-moving personnel for giving an written reply the period are rendered an account, built It does not count, cost efficiency effect is prominent.In addition, steel tower studio rent also has generation great variety, interior with regional disparity Mongolia is scarcely populated, and the studio rent amount of money occupy last bit in the whole nation, this project is placed on the ground such as wide of going up north, and certainly will arrive the 20 of cost for saving Even 50 times or more again.
Income assessment of cost: there are about thousand people for plant area, with the flow of daily single subdistrict 1G, if daily single subdistrict 1erl Business amount is as shown in the table, and extreme conservative estimation amounts to about 2.6 ten thousand yuan of annual income.
Income Industrial park creates macro station cell 3 Unit price One annual earnings (member)
Average annual flow 1095G 15 yuan/G 16425
Telephone traffic 1095erl 0.15/ minute 9855
In general, it creates indoor distributed system base station different frequency range networking plan and only creates macro station cell, comparison is newly-built Single macro station saves nearly 100,000 yuan, while generating 2.6 ten thousand yuan of economic benefit.Generally cost efficiency, significant effect, motion sexual valence Than high.
It should be noted that newly-built indoor distributed system base station different frequency range networking plan, enumerate be only specific room point+ Macro station different frequency range networking, but it should be not limited only to specific unit, all room frequency-division sections according to national wireless frequency planning implementation With the same base station different frequency range networking solutions in indoor distribution base station of macro station frequency range, should all be protected.
The present embodiment sufficiently using the resource of newly-built indoor distributed system, divides base station preconsolidation stress advantage using room, passes through The novel Networking construction scheme of base station while compatible alien frequencies section outdoor macro station cell is divided in newly-built room, effectively solves with New Buildings And generate no signal, Signal Degrade, island effect, it is black, high-rise under tower the common network problems such as can not cover, further decrease Cost of investment promotes network quality.Provide a kind of indoor distribution base station different frequency range when building new building room subsystem Networking solutions more reasonably can realize room frequency-division section and common group of the same base station of macro station frequency range according to new building situation Net solves the deterioration of peripheral path network and nothing caused by creating because of building and covers in the indoor depth coverage of satisfaction Lid problem.This motion only relates to inside communication common carrier, gives an written reply without new website, effectively save without complicated network optimization measure The network optimization used time reduces human cost and cost of investment, and effectively promotes operating income, improves the networking sexual valence of 4G network Than.
Fig. 9 shows the structural schematic diagram that device is established in a kind of indoor distribution base station provided in this embodiment, described device It include: that networking mode determining module 901, networking band determination module 902 and macro station create module 903, in which:
The networking mode determining module 901 is used for the perimeter data according to New Buildings, it is determined whether using indoor The band networking mode of distributed base station;
The networking band determination module 902 is used for the band networking mode according to the indoor distribution base station, then root Networking frequency range is determined according to the frequency range of the peripheral base station of the New Buildings;
If the macro station creates module 903 for judging to know that the plane of a loop shortest distance in the New Buildings is more than Threshold value is then new in the New Buildings using the networking frequency range according to the band networking mode of the indoor distribution base station Build indoor distribution base station.
Specifically, the networking mode determining module 901 is according to the perimeter datas of New Buildings, it is determined whether uses room The band networking mode of interior distributed base station;Frequency range of the networking band determination module 902 according to the indoor distribution base station Networking mode then determines networking frequency range according to the frequency range of the peripheral base station of the New Buildings;The macro station creates module 903 If judgement knows that the plane of a loop shortest distance in the New Buildings is more than threshold value, according to the frequency of the indoor distribution base station Section networking mode creates indoor distribution base station using the networking frequency range in the New Buildings.
The present embodiment determines the band networking using indoor distribution base station by investigating the perimeter data of New Buildings Mode determines networking frequency range according to the frequency range of peripheral base station, and uses networking frequency range in new building according to band networking mode Create indoor distribution base station in object, be not only able to satisfy indoor depth coverage, and solve because building it is newly-built caused by week By-pass road network deteriorates and without covering problem, while this programme only relates to inside communication common carrier, without new website reply and complexity Network optimization measure, the effectively save network optimization used time, reduce human cost and cost of investment, effectively promote business and receive Enter, improves the networking cost performance of network.
Further, on the basis of above-mentioned apparatus embodiment, described device further include:
Subdistrict position determining module determines room for the height relationships according to the New Buildings and surrounding building The position of outer macro station newly-built community.
Further, on the basis of above-mentioned apparatus embodiment, the perimeter data of the New Buildings includes: to build Build the neighboring area type of object, New Buildings at a distance from peripheral base station, it is the height relationships of new building and neighboring buildings, new Build the shape of building, the device type of newly-built room point base station, transmission allotment, antenna distribution, electric power is taken, computer room is planned and Road test, measurement report data and the complaint data of New Buildings.
Further, on the basis of above-mentioned apparatus embodiment, described device further include:
Data acquisition module, for acquiring the perimeter data of the New Buildings.
Further, on the basis of above-mentioned apparatus embodiment, if the macro station creates module 903 and is specifically used for judging to obtain Know that the plane of a loop shortest distance in the New Buildings is more than threshold value, is then planned according to the shape of New Buildings and design drawing The antenna feeder of indoor distributed system is installed, and is determined according to the perimeter data of the New Buildings to outdoor macro station newly-built community antenna feeder Deflection, pitch angle, installation longitude and latitude and hang high planning, and created in the New Buildings using the networking frequency range The cell of indoor distribution base station.
Further, on the basis of above-mentioned apparatus embodiment, described device further include:
Data schema module, for newly-built cell carry out local district identification, base station IDs, Tracking Area Code TAC, under Line frequency point, cell ID, Physical Cell Identifier, ratio of uplink subframe to downlink subframe, root sequence index and radius of society data schema.
Further, on the basis of above-mentioned apparatus embodiment, described device further include:
Base station debugging module, for being debugged to newly-built indoor distribution base station, and to newly-built indoor distribution base station after Network tested.
Device is established in indoor distribution base station described in the present embodiment can be used for executing above method embodiment, principle and Technical effect is similar, and details are not described herein again.
Referring to Fig.1 0, the electronic equipment, comprising: processor (processor) 1001,1002 He of memory (memory) Bus 1003;
Wherein,
The processor 1001 and memory 1002 complete mutual communication by the bus 1003;
The processor 401 is used to call the program instruction in the memory 402, to execute above-mentioned each method embodiment Provided method, for example,
According to the perimeter data of New Buildings, it is determined whether using the band networking mode of indoor distribution base station;
According to the band networking mode of the indoor distribution base station, then according to the peripheral base station of the New Buildings Frequency range determines networking frequency range;
If judgement knows that the plane of a loop shortest distance in the New Buildings is more than threshold value, according to the indoor distribution The band networking mode of base station creates indoor distribution base station using the networking frequency range in the New Buildings.
The present embodiment discloses a kind of computer program product, and the computer program product includes being stored in non-transient calculating Computer program on machine readable storage medium storing program for executing, the computer program include program instruction, when described program instruction is calculated When machine executes, computer is able to carry out method provided by above-mentioned each method embodiment, for example,
According to the perimeter data of New Buildings, it is determined whether using the band networking mode of indoor distribution base station;
According to the band networking mode of the indoor distribution base station, then according to the peripheral base station of the New Buildings Frequency range determines networking frequency range;
If judgement knows that the plane of a loop shortest distance in the New Buildings is more than threshold value, according to the indoor distribution The band networking mode of base station creates indoor distribution base station using the networking frequency range in the New Buildings.
The present embodiment provides a kind of non-transient computer readable storage medium, the non-transient computer readable storage medium Computer instruction is stored, the computer instruction makes the computer execute method provided by above-mentioned each method embodiment, example Such as include:
According to the perimeter data of New Buildings, it is determined whether using the band networking mode of indoor distribution base station;
According to the band networking mode of the indoor distribution base station, then according to the peripheral base station of the New Buildings Frequency range determines networking frequency range;
If judgement knows that the plane of a loop shortest distance in the New Buildings is more than threshold value, according to the indoor distribution The band networking mode of base station creates indoor distribution base station using the networking frequency range in the New Buildings.
Those of ordinary skill in the art will appreciate that: realize that all or part of the steps of above method embodiment can pass through The relevant hardware of program instruction is completed, and program above-mentioned can be stored in a computer readable storage medium, the program When being executed, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned includes: ROM, RAM, magnetic disk or light The various media that can store program code such as disk.
The apparatus embodiments described above are merely exemplary, wherein described, unit can as illustrated by the separation member It is physically separated with being or may not be, component shown as a unit may or may not be physics list Member, it can it is in one place, or may be distributed over multiple network units.It can be selected according to the actual needs In some or all of the modules achieve the purpose of the solution of this embodiment.Those of ordinary skill in the art are not paying creativeness Labour in the case where, it can understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can It realizes by means of software and necessary general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, on Stating technical solution, substantially the part that contributes to existing technology can be embodied in the form of software products in other words, should Computer software product may be stored in a computer readable storage medium, such as ROM/RAM, magnetic disk, CD, including several fingers It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes each implementation Method described in certain parts of example or embodiment.
It is noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although reference Invention is explained in detail for previous embodiment, those skilled in the art should understand that: it still can be right Technical solution documented by foregoing embodiments is modified or equivalent replacement of some of the technical features;And this It modifies or replaces, the spirit and model of technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution It encloses.

Claims (10)

1. a kind of indoor distribution base station method for building up characterized by comprising
According to the perimeter data of New Buildings, it is determined whether using the band networking mode of indoor distribution base station;
According to the band networking mode of the indoor distribution base station, then according to the frequency range of the peripheral base station of the New Buildings Determine networking frequency range;
If judgement knows that the plane of a loop shortest distance in the New Buildings is more than threshold value, according to the indoor distribution base station Band networking mode using the networking frequency range in the New Buildings create indoor distribution base station.
2. the method according to claim 1, wherein the method also includes:
According to the height relationships of the New Buildings and surrounding building, the position of outdoor macro station newly-built community is determined.
3. the method according to claim 1, wherein the perimeter data of the New Buildings includes: to build Build the neighboring area type of object, New Buildings at a distance from peripheral base station, it is the height relationships of new building and neighboring buildings, new Build the shape of building, the device type of newly-built room point base station, transmission allotment, antenna distribution, electric power is taken, computer room is planned and Road test, measurement report data and the complaint data of New Buildings.
4. according to the method described in claim 3, it is characterized in that, the perimeter data according to New Buildings, determination are Before the no band networking mode using indoor distribution base station, further includes:
Acquire the perimeter data of the New Buildings.
5. the method according to claim 1, wherein if the judgement knows that the ring in the New Buildings is flat The face shortest distance is more than threshold value, then uses the networking frequency range described according to the band networking mode of the indoor distribution base station Indoor distribution base station is created in New Buildings, is specifically included:
If judgement knows that the plane of a loop shortest distance in the New Buildings is more than threshold value, according to the shape of New Buildings With the antenna feeder installation of design drawing planning indoor distributed system, determined according to the perimeter data of the New Buildings to outdoor macro station Deflection, pitch angle, installation longitude and latitude and the high planning of extension of newly-built community antenna feeder, and using the networking frequency range described newly-built The cell of indoor distribution base station is created in building.
6. according to the method described in claim 5, it is characterized in that, the method also includes:
Local district identification, base station IDs, Tracking Area Code TAC, downlink frequency point, cell ID, physics are carried out to newly-built cell Cell ID, ratio of uplink subframe to downlink subframe, root sequence index and radius of society data schema.
7. method according to claim 1-6, which is characterized in that the method also includes:
Newly-built indoor distribution base station is debugged, and the network behind newly-built indoor distribution base station is tested.
8. device is established in a kind of indoor distribution base station characterized by comprising
Networking mode determining module, for the perimeter data according to New Buildings, it is determined whether using indoor distribution base station Band networking mode;
Networking band determination module, for the band networking mode according to the indoor distribution base station, then according to described newly-built The frequency range of the peripheral base station of building determines networking frequency range;
Macro station creates module, if for judging to know that the plane of a loop shortest distance in the New Buildings is more than threshold value, root Indoor point is created in the New Buildings using the networking frequency range according to the band networking mode of the indoor distribution base station Cloth base station.
9. a kind of electronic equipment characterized by comprising
At least one processor;And
At least one processor being connect with the processor communication, in which:
The memory is stored with the program instruction that can be executed by the processor, and the processor calls described program to instruct energy Enough methods executed as described in claim 1 to 7 is any.
10. a kind of non-transient computer readable storage medium, which is characterized in that the non-transient computer readable storage medium is deposited Computer program is stored up, the computer program makes the computer execute the method as described in claim 1 to 7 is any.
CN201711436296.1A 2017-12-26 2017-12-26 Indoor distribution base station establishing method and device Active CN109963289B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711436296.1A CN109963289B (en) 2017-12-26 2017-12-26 Indoor distribution base station establishing method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711436296.1A CN109963289B (en) 2017-12-26 2017-12-26 Indoor distribution base station establishing method and device

Publications (2)

Publication Number Publication Date
CN109963289A true CN109963289A (en) 2019-07-02
CN109963289B CN109963289B (en) 2020-11-24

Family

ID=67022501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711436296.1A Active CN109963289B (en) 2017-12-26 2017-12-26 Indoor distribution base station establishing method and device

Country Status (1)

Country Link
CN (1) CN109963289B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113297648A (en) * 2021-03-19 2021-08-24 广州天越电子科技有限公司 Optimization method for drawing digital room partition scheme design drawing
CN114978376A (en) * 2022-05-05 2022-08-30 中国电信股份有限公司 Channel interference detection method and device and electronic equipment
CN115250478A (en) * 2021-04-28 2022-10-28 中国移动通信集团上海有限公司 Building 5G coverage construction scheme determination method, device, equipment and storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101247576A (en) * 2006-03-28 2008-08-20 华为技术有限公司 Indoor distribution system and networking method thereof
US20090186615A1 (en) * 2008-01-22 2009-07-23 Samsung Electronics Co.,Ltd. Apparatus and method for terminal handover between systems using different frequency allocations
CN101990212A (en) * 2009-08-04 2011-03-23 中兴通讯股份有限公司 Method and system for networking indoor and outdoor distribution systems
CN104703194A (en) * 2013-12-05 2015-06-10 中兴通讯股份有限公司 Indoor distribution system and realizing method thereof
WO2016176926A1 (en) * 2015-05-04 2016-11-10 中兴通讯股份有限公司 Method, device and system for configuring operating frequency band for base station
CN206294350U (en) * 2016-12-09 2017-06-30 浙江东冠通信技术股份有限公司 Network depth cover type indoor distributed system
CN107241741A (en) * 2017-05-09 2017-10-10 江苏省邮电规划设计院有限责任公司 A kind of TD LTE networks covering method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101247576A (en) * 2006-03-28 2008-08-20 华为技术有限公司 Indoor distribution system and networking method thereof
US20090186615A1 (en) * 2008-01-22 2009-07-23 Samsung Electronics Co.,Ltd. Apparatus and method for terminal handover between systems using different frequency allocations
CN101990212A (en) * 2009-08-04 2011-03-23 中兴通讯股份有限公司 Method and system for networking indoor and outdoor distribution systems
CN104703194A (en) * 2013-12-05 2015-06-10 中兴通讯股份有限公司 Indoor distribution system and realizing method thereof
WO2016176926A1 (en) * 2015-05-04 2016-11-10 中兴通讯股份有限公司 Method, device and system for configuring operating frequency band for base station
CN206294350U (en) * 2016-12-09 2017-06-30 浙江东冠通信技术股份有限公司 Network depth cover type indoor distributed system
CN107241741A (en) * 2017-05-09 2017-10-10 江苏省邮电规划设计院有限责任公司 A kind of TD LTE networks covering method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
THOMAS WIRTH,LARS THIELE,ETC.: "LTE Amplify and Forward Relaying for Indoor Coverage Extension", 《2010 IEEE 72ND VEHICULAR TECHNOLOGY CONFERENCE》 *
徐辉: "现代综合室内通信分布系统建设研究", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *
蒋涛: "高层小区TD_LTE室内外分布协同覆盖技术实现与应用研究", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113297648A (en) * 2021-03-19 2021-08-24 广州天越电子科技有限公司 Optimization method for drawing digital room partition scheme design drawing
CN115250478A (en) * 2021-04-28 2022-10-28 中国移动通信集团上海有限公司 Building 5G coverage construction scheme determination method, device, equipment and storage medium
CN115250478B (en) * 2021-04-28 2023-09-19 中国移动通信集团上海有限公司 Building 5G coverage construction scheme determining method, device, equipment and storage medium
CN114978376A (en) * 2022-05-05 2022-08-30 中国电信股份有限公司 Channel interference detection method and device and electronic equipment

Also Published As

Publication number Publication date
CN109963289B (en) 2020-11-24

Similar Documents

Publication Publication Date Title
CN103052081B (en) Network coverage planing method and the device of evolution communication systems
JP5273664B2 (en) Communication characteristic analysis system, communication characteristic analysis method, and communication characteristic analysis program
CN105282757B (en) A kind of multi-operator wireless network collaborative planning system and planing method that network structure is optimal
CN108124267A (en) Base station automatic planning and device
CN102883348B (en) A kind of system and method that intelligent terminal is tested as wireless network
CN109963289A (en) A kind of indoor distribution base station method for building up and device
CN111669764B (en) Novel mobile base station site selection method, system and computer equipment based on GIS technology
US11910201B2 (en) Method and apparatus for qualifying customers and designing a fixed wireless network using mapping data
CN103822638B (en) The treating method and apparatus of customer position information
CN108271171B (en) Building network condition statistical method and device
CN104284352B (en) Shift position area overlapping coverage optimization method and device
CN114641015B (en) Network evaluation method, device, electronic equipment and storage medium
CN107241743B (en) Power grid private network layout construction method
CN110493788A (en) The method, apparatus and storage medium of communication site's planning
CN109842886A (en) Communication network subtracts frequency logout method and device
JP2013121063A (en) Radio repeater installation support device, and radio repeater installation support method and program
CN108259097B (en) Method and device for correcting wireless propagation model based on MR data
CN104602249B (en) A kind of method and device for determining cell relations
CN109561440A (en) A kind of base station selection method, device and equipment of wireless communication network system
CN102930481A (en) Method and system for analyzing power grid load density
CN107347189A (en) A kind of wireless private network base station planning methods of TD LTE 230
CN107333278A (en) A kind of public mobile communication signal covers the Visual Implementation method
CN112423306B (en) Automatic site selection method for base station
CN111507897B (en) Urban field intensity reconstruction method based on self-adaptive hybrid interpolation
CN106358208A (en) Sector evaluation method and sector evaluation device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant