CN115199133A - Fender is enclosed in construction - Google Patents

Fender is enclosed in construction Download PDF

Info

Publication number
CN115199133A
CN115199133A CN202210868817.5A CN202210868817A CN115199133A CN 115199133 A CN115199133 A CN 115199133A CN 202210868817 A CN202210868817 A CN 202210868817A CN 115199133 A CN115199133 A CN 115199133A
Authority
CN
China
Prior art keywords
mounting frame
wall
shaped mounting
groove
enclosure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210868817.5A
Other languages
Chinese (zh)
Inventor
高文斌
栾天
郭洪春
张荣福
关宏生
张秀
张裕琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anshan Sanye Construction Engineering Co ltd
Original Assignee
Anshan Sanye Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anshan Sanye Construction Engineering Co ltd filed Critical Anshan Sanye Construction Engineering Co ltd
Priority to CN202210868817.5A priority Critical patent/CN115199133A/en
Publication of CN115199133A publication Critical patent/CN115199133A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H3/00Applying liquids to roads or like surfaces, e.g. for dust control; Stationary flushing devices
    • E01H3/04Fixed devices, e.g. permanently- installed flushing means
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/16Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames
    • E04H17/18Corrals, i.e. easily transportable or demountable enclosures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • E04H17/22Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention belongs to the technical field of building equipment, and provides a building construction baffle, which comprises a U-shaped mounting frame, wherein universal wheels are respectively mounted at four corners of the bottom of the U-shaped mounting frame, first positioning grooves are formed in the inner wall of the bottom of the U-shaped mounting frame and are distributed equidistantly, first baffle surrounding rods are mounted between the first positioning grooves and are distributed equidistantly, through grooves are formed in two ends of the top of the U-shaped mounting frame, piston rods are inserted into the inner walls of the through grooves in a sliding mode, a fixing plate is fixed to the tops of the piston rods, and a connecting pipe is mounted at the tops of the fixing plates. According to the invention, through the mutual matching of the through groove and the piston rod, the overall height of the enclosure can be adjusted by using a continuous inflation mode, and the enclosure is not required to be fixed after the adjustment is finished, so that the operation is simple and convenient, the top of the enclosure is provided with the atomizing nozzle, when the raise dust is more, the enclosure can be connected with an external water pipe for dust fall treatment, and the counterweight block arranged at the bottom can improve the overall safety and avoid side turning.

Description

Fender is enclosed in construction
Technical Field
The invention relates to the technical field of building equipment, in particular to a building construction enclosure.
Background
The conditions vary depending on the construction site. The main roads or people flow in the urban area are not less than 2.5 meters, the rest are not less than 1.8 meters, the semi-closed roads or people flow in the urban area are generally commonly found in municipal engineering, and the semi-closed roads or people flow in the urban area are generally characterized in that two or three sides of the urban area are provided with barriers, and one or two sides of the urban area are open, so that materials of construction machines can conveniently enter and exit. How to set is determined according to bidding documents, drawings and site environment under the condition of ensuring safety of construction organization design.
And present building encloses fender in the use, because most enclose the fender and be the integral type structure, just can't adjust after the installation finishes to when meetting some circumstances and need adjusting, can only will enclose the fender and dismantle, change other high fender that encloses, thereby just so can have some inconveniences, often have a large amount of smoke and dust in the work progress moreover, can cause the influence to peripheral resident.
Therefore, chinese patent (application number 201810778471.3) discloses that "a building construction encloses fender", this device encloses the fender and adopts telescopic structure, encloses the fender for current steel sheet, and the space that its transportation process consumed is littleer, and the installation is demolishd and need not going on of lot, only needs the removal through moving the base can realize enclosing the expansion of fender and pack up, has promoted greatly and has enclosed the efficiency that the fender installation was demolishd the operation. But the device can become to be convenient for expand and accomodate, but its stability is relatively poor, at the road surface of unevenness or the weather of blowing, easily turns on one's side and topples over, has certain potential safety hazard, can't carry out altitude mixture control in the use moreover, and the function is single.
Disclosure of Invention
The invention aims to solve the defects in the prior art and provides a building construction enclosure.
In order to achieve the purpose, the invention adopts the following technical scheme:
the utility model provides a fender is enclosed in construction, includes U type mounting bracket, the universal wheel is all installed in U type mounting bracket bottom four corners, and U type mounting bracket bottom inner wall opens the first constant head tank that has the equidistance and distributes, install the first pin that encloses that the equidistance distributes between the first constant head tank, and open at U type mounting bracket top both ends and have logical groove, it has the piston rod to lead to the sliding grafting of inslot wall, and the piston rod top is fixed with the fixed plate, the connecting pipe is installed at the fixed plate top, and connecting pipe top spiro union has the atomizer that the equidistance distributes, the connecting pipe below is connected with the inlet tube, and leads to groove one side inner wall intercommunication and have the gas tube.
Preferably, the outer part of the bottom of the fixing plate is provided with second positioning grooves which are distributed equidistantly, and second surrounding stop rods which are distributed equidistantly are arranged between the second positioning grooves.
Preferably, a first positioning groove is formed under the second surrounding blocking rod, and a second positioning groove is formed above the first surrounding blocking rod.
Preferably, the outer wall of one side of the U-shaped mounting frame is welded with the symmetrically distributed inserting and connecting sleeves, and the outer wall of the other side of the U-shaped mounting frame is welded with the symmetrically distributed inserting and connecting rods.
Preferably, a balancing weight with a fixing groove is clamped and connected below the U-shaped mounting frame.
Preferably, the outer wall welding of fixed plate top one side has the peg, and is fixed with the warning board on the peg.
The invention has the beneficial effects that:
the fender is enclosed in the construction of this design, through leading to mutually supporting of groove and piston rod, utilizes the mode of constantly aerifing to adjust the whole height of enclosing the fender to need not fixedly after the regulation finishes, easy operation is convenient, and it is equipped with atomizer to enclose the fender top, connects outside water pipe when the raise dust is more and can carry out the dust fall and handle, and the balancing weight that the bottom set up can improve whole security, avoids turning on one's side.
Drawings
FIG. 1 is a front view of the overall construction of a construction fence according to the present invention;
FIG. 2 is a side view of an integral split structure of the building construction enclosure according to the present invention;
FIG. 3 is a bottom view of the overall construction of a construction fence according to the present invention;
fig. 4 is a top view of the overall structure of a building construction fence according to the present invention.
In the figure: 1U type mounting bracket, 2 universal wheels, 3 first constant head tank, 4 first fencing pin, 5 logical grooves, 6 piston rods, 7 fixed plates, 8 second constant head tanks, 9 second fencing pin, 10 connecting pipes, 11 atomizer, 12 inlet tubes, 13 grafting sleeve pipes, 14 grafting poles, 15 gas tube, 16 fixed slots, 17 balancing weights, 18 warning boards.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In embodiment 1, referring to fig. 1 to 4, a building construction enclosure comprises a U-shaped mounting frame 1, universal wheels 2 are mounted at four corners of the bottom of the U-shaped mounting frame 1, first positioning grooves 3 are formed in the inner wall of the bottom of the U-shaped mounting frame 1 and are distributed equidistantly, first enclosure bars 4 are mounted between the first positioning grooves 3 and are distributed equidistantly, and through grooves 5 are formed in two ends of the top of the U-shaped mounting frame 1;
a piston rod 6 is inserted into the inner wall of the through groove 5 in a sliding manner, a fixing plate 7 is fixed at the top of the piston rod 6, second positioning grooves 8 which are distributed equidistantly are formed in the outer part of the bottom of the fixing plate 7, and second surrounding stop rods 9 which are distributed equidistantly are arranged between the second positioning grooves 8;
the top of the fixing plate 7 is provided with a connecting pipe 10, the top of the connecting pipe 10 is screwed with atomizing spray heads 11 which are distributed equidistantly, the outer wall of one side of the top of the fixing plate 7 is welded with a hanging nail, a warning plate 18 is fixed on the hanging nail, and the outer wall of one side of the U-shaped mounting frame 1 is welded with symmetrically distributed plug-in sleeves 13.
Example 2:
the embodiment is a further optimization process of embodiment 1, specifically:
through the mutual matching of the through groove 5 and the piston rod 6, the overall height of the enclosure can be adjusted by using a continuous inflation mode, and the enclosure is not required to be fixed after the adjustment is finished, so that the operation is simple and convenient, the top of the enclosure is provided with the atomizing nozzle 11, when the raise dust is more, the enclosure can be subjected to dust fall treatment by being connected with an external water pipe, and the counterweight 17 arranged at the bottom can improve the overall safety and avoid side turning;
the outer wall of the other side of the U-shaped mounting frame 1 is welded with symmetrically distributed inserting rods 14, a first positioning groove 3 is arranged under a second surrounding stop rod 9, a second positioning groove 8 is arranged over a first surrounding stop rod 4, a balancing weight 17 with a fixing groove 16 is clamped and opened under the U-shaped mounting frame 1, a water inlet pipe 12 is connected under the connecting pipe 10, and an inflation pipe 15 is communicated with the inner wall of one side of the through groove 5.
The working principle is as follows: when using this construction to enclose the fender, at first remove the device to the place that needs to use, then enclose the adjacent fender and be close to each other, peg graft and fix inside grafting sleeve pipe 13 with grafting pole 14, accomplish and connect the back with balancing weight 17 fixed mounting and enclose the fender bottom, accomplish and connect the installation back, with the outside water pipe of inlet tube 12 connection, thereby utilize atomizer 11 to atomize the dust fall and handle, the dust fall finishes the back, when needs adjust the height that encloses the fender, only need aerify 15 insides to gas tube, thereby adjust the height of piston rod 6, the realization is to enclosing the regulation of keeping off overall height.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered as the technical solutions and the inventive concepts of the present invention within the technical scope of the present invention.

Claims (6)

1. The utility model provides a construction encloses fender, includes U type mounting bracket (1), its characterized in that, universal wheel (2) are all installed in U type mounting bracket (1) bottom four corners, and U type mounting bracket (1) bottom inner wall opens first constant head tank (3) that have the equidistance and distribute, install the first pin (4) of enclosing that the equidistance distributes between first constant head tank (3), and open at U type mounting bracket (1) top both ends and have logical groove (5), it has piston rod (6) to lead to groove (5) inner wall slip grafting, and piston rod (6) top is fixed with fixed plate (7), connecting pipe (10) are installed at fixed plate (7) top, and connecting pipe (10) top spiro union has atomizer (11) of equidistance distribution, connecting pipe (10) below is connected with inlet tube (12), and leads to groove (5) one side inner wall intercommunication and have gas tube (15).
2. The building construction fence according to claim 1, characterized in that the bottom of the fixing plate (7) is provided with second positioning slots (8) at equal intervals, and second fence rods (9) at equal intervals are arranged between the second positioning slots (8).
3. The building construction fence according to claim 1, wherein a first positioning groove (3) is arranged right below the second fence rod (9), and a second positioning groove (8) is arranged right above the first fence rod (4).
4. The building construction enclosure according to claim 1, wherein the outer wall of one side of the U-shaped mounting frame (1) is welded with symmetrically distributed insertion sleeves (13), and the outer wall of the other side of the U-shaped mounting frame (1) is welded with symmetrically distributed insertion rods (14).
5. The building construction fence as claimed in claim 1, wherein a counterweight (17) with a fixing groove (16) is clamped and connected below the U-shaped mounting frame (1).
6. The building construction fence according to claim 1, wherein a peg is welded to the outer wall of one side of the top of the fixing plate (7), and a warning plate (18) is fixed on the peg.
CN202210868817.5A 2022-07-22 2022-07-22 Fender is enclosed in construction Pending CN115199133A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210868817.5A CN115199133A (en) 2022-07-22 2022-07-22 Fender is enclosed in construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210868817.5A CN115199133A (en) 2022-07-22 2022-07-22 Fender is enclosed in construction

Publications (1)

Publication Number Publication Date
CN115199133A true CN115199133A (en) 2022-10-18

Family

ID=83584128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210868817.5A Pending CN115199133A (en) 2022-07-22 2022-07-22 Fender is enclosed in construction

Country Status (1)

Country Link
CN (1) CN115199133A (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208899979U (en) * 2018-09-20 2019-05-24 郑州大学 A kind of provisional protection column of the civil engineering convenient for assembly
CN210013563U (en) * 2019-02-19 2020-02-04 深圳市简驿投资控股有限公司 Novel road construction that is convenient for dismantle encloses fender
CN210342883U (en) * 2019-07-11 2020-04-17 李军 Baffle is enclosed in simple and easy quick installation
CN212671374U (en) * 2020-07-07 2021-03-09 林波 Geotechnical engineering reconnaissance is with portable fender device that encloses
CN213573381U (en) * 2020-09-25 2021-06-29 魏明杰 City municipal works construction encloses fender with combination formula safety
CN214715289U (en) * 2021-02-05 2021-11-16 韶关市鹏成建筑工程有限公司 Dust device for constructional engineering construction
CN214737661U (en) * 2021-03-10 2021-11-16 湖南望新建设集团股份有限公司 Water smoke dust-proof safety enclosure device for building construction
CN215369132U (en) * 2021-07-29 2021-12-31 深圳市鹏城建工工程有限公司 Adjustable assembled removes encloses fender
CN215803757U (en) * 2021-09-14 2022-02-11 高骥 Fence fixing device for building construction
CN216008506U (en) * 2021-07-23 2022-03-11 云南途腾智能装备有限公司 Scaffold for tunnel engineering convenient to adjust
CN216194291U (en) * 2021-09-22 2022-04-05 安徽富邦建设工程有限公司 Municipal works rail guard with dust fall function
CN216596464U (en) * 2021-10-13 2022-05-24 天津云信通科技有限公司 Electronic fence based on Internet of things
CN218668822U (en) * 2022-07-22 2023-03-21 鞍山三冶建筑工程有限公司 Fender is enclosed in construction

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208899979U (en) * 2018-09-20 2019-05-24 郑州大学 A kind of provisional protection column of the civil engineering convenient for assembly
CN210013563U (en) * 2019-02-19 2020-02-04 深圳市简驿投资控股有限公司 Novel road construction that is convenient for dismantle encloses fender
CN210342883U (en) * 2019-07-11 2020-04-17 李军 Baffle is enclosed in simple and easy quick installation
CN212671374U (en) * 2020-07-07 2021-03-09 林波 Geotechnical engineering reconnaissance is with portable fender device that encloses
CN213573381U (en) * 2020-09-25 2021-06-29 魏明杰 City municipal works construction encloses fender with combination formula safety
CN214715289U (en) * 2021-02-05 2021-11-16 韶关市鹏成建筑工程有限公司 Dust device for constructional engineering construction
CN214737661U (en) * 2021-03-10 2021-11-16 湖南望新建设集团股份有限公司 Water smoke dust-proof safety enclosure device for building construction
CN216008506U (en) * 2021-07-23 2022-03-11 云南途腾智能装备有限公司 Scaffold for tunnel engineering convenient to adjust
CN215369132U (en) * 2021-07-29 2021-12-31 深圳市鹏城建工工程有限公司 Adjustable assembled removes encloses fender
CN215803757U (en) * 2021-09-14 2022-02-11 高骥 Fence fixing device for building construction
CN216194291U (en) * 2021-09-22 2022-04-05 安徽富邦建设工程有限公司 Municipal works rail guard with dust fall function
CN216596464U (en) * 2021-10-13 2022-05-24 天津云信通科技有限公司 Electronic fence based on Internet of things
CN218668822U (en) * 2022-07-22 2023-03-21 鞍山三冶建筑工程有限公司 Fender is enclosed in construction

Similar Documents

Publication Publication Date Title
CN218668822U (en) Fender is enclosed in construction
CN214835380U (en) Spraying dust fall assembly type road construction enclosure
CN210797324U (en) Highway sound barrier with brightening view function
CN115199133A (en) Fender is enclosed in construction
CN211848980U (en) Assembled sliding type protection system for overpass construction
CN112324989B (en) Pipeline laying device for municipal construction
CN210370179U (en) Detachable construction enclosure
CN105926475A (en) Solar photovoltaic sound barrier
CN216690272U (en) Adjustable operating platform for building engineering
CN211736469U (en) Adjustable edge-facing protection system of assembled type
CN216197173U (en) Detachable color steel plate retaining wall
CN218375753U (en) Building enclosure
CN216156482U (en) Environment-friendly watering device for municipal works
CN215056084U (en) Novel spraying dust fall assembled encloses fender
CN210341582U (en) Concrete curing means of highway engineering construction
CN216305449U (en) Adjustable protective railing
CN219452117U (en) Recoverable prefabricated dish knot formula cat ear hole supporting structure
CN216921665U (en) Safety protection frame is used in highway engineering construction
CN214329290U (en) Building steel structure supporting equipment
CN214634988U (en) Dust device is used in road and bridge construction
CN216277272U (en) Municipal administration civil engineering is with enclosing fender
CN216380678U (en) Edge protection device
CN210239345U (en) Instrument formula removes basic green environment-friendly and encloses fender
CN221095940U (en) Construction elevator platform protector
CN215107971U (en) Building safety encloses fender device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20221018