CN115110747A - Building construction elevator climbs frame - Google Patents

Building construction elevator climbs frame Download PDF

Info

Publication number
CN115110747A
CN115110747A CN202210965337.0A CN202210965337A CN115110747A CN 115110747 A CN115110747 A CN 115110747A CN 202210965337 A CN202210965337 A CN 202210965337A CN 115110747 A CN115110747 A CN 115110747A
Authority
CN
China
Prior art keywords
construction elevator
frame
main
board
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210965337.0A
Other languages
Chinese (zh)
Other versions
CN115110747B (en
Inventor
黄旭栋
张文
张钢
王琪
柯峻
陈欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN202210965337.0A priority Critical patent/CN115110747B/en
Publication of CN115110747A publication Critical patent/CN115110747A/en
Application granted granted Critical
Publication of CN115110747B publication Critical patent/CN115110747B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Abstract

The invention provides a building construction elevator climbing frame which comprises an outer fixed frame, wherein the outer fixed frame is arranged on the outer side of a wall body, and a group of electric hoist lifting mechanisms are symmetrically arranged in the outer fixed frame; the inner climbing frame is arranged on the outer fixed frame in a sliding mode through the electric hoist lifting mechanism, the abdicating plate is arranged and integrated with the main walkway plate in the state that the abdicating plate is not turned over, engineering time is greatly shortened, meanwhile, when the inner climbing frame needs to ascend or descend, an attached wall below the inner climbing frame does not need to be detached, the abdicating plate only needs to be adjusted, the main walkway plate and the attached wall of the construction elevator can form an interactive and non-interference penetrating state, after construction is completed on a lower layer, the ascending inner climbing frame can be continuously adjusted, the construction elevator is provided with a construction elevator frame with a corresponding height, upper-layer operation can be continuously performed, a large amount of time can be saved, and accordingly, the engineering completion time is shortened.

Description

Building construction elevator climbs frame
Technical Field
The invention belongs to the field of building construction climbing frames, and particularly relates to a building construction elevator climbing frame.
Background
With the updating of cities and the construction of national green, the requirements for urbanization construction are gradually increased, the construction of main building bodies often needs to pass through dense building groups, and the crowds in the cities are high in density, under the construction condition, the appearance of daily places and safe civilized construction need to be strictly controlled, in addition, the construction process needs to consider various aspects such as construction period, safety, quality and the like, and the influence on the surrounding building groups is minimized, so that the shortening of the construction period becomes a great trend improvement direction under the condition of quality and quantity guarantee.
Based on the above description, the inventor finds that the existing building construction elevator climbing frame mainly has the following defects, such as:
building subject builds fast in the intensive department of building crowd, in construction building subject, it attaches the wall cycle principle to need to install the construction elevator as early as possible to maintain one of construction elevator three-layer, the helping hand inserts indoor professional construction, and attach the wall and need set up in climbing the frame below, climb the frame simultaneously and climb the back, the setting up of attaching the wall needs the certain time, and when attaching the wall and set up the completion back, it can't descend to climb the frame, because the setting that attaches the wall is limited in climbing the frame, and then lead to the construction elevator to be difficult to attach the wall in advance, thereby lead to the construction elevator to be difficult to get into and climb the frame, need according to climbing the frame height and set up in proper order and attach the wall, the construction elevator just can continue to carry out the upper strata operation, need more cost time, and then lead to the main part to alternate the unable normal clear of construction, influence the construction progress.
Aiming at the problems in the prior art, the invention aims to design a building construction elevator climbing frame.
Disclosure of Invention
In order to solve the technical problems, the invention provides a building construction elevator climbing frame to solve the existing problems.
Aiming at the defects of the prior art, the purpose and the effect of the building construction elevator climbing frame are achieved by the following specific technical means: a building construction elevator climbing frame comprises an outer fixed frame, wherein the outer fixed frame is arranged on the outer side of a wall body, and a group of electric hoist lifting mechanisms are symmetrically arranged inside the outer fixed frame;
interior frame of climbing, interior frame of climbing slides through electric block hoist mechanism and sets up on the external fixation frame, interior frame of climbing includes that the main guidance tape, a plurality of montant of three horizontal settings of group walk, the montant includes the quarter butt of two sets of symmetries, the quarter butt is vertical adorn at the long limit both sides of main guidance tape, and is two sets of main guidance tape between the quarter butt is gone and is provided with on the guidance tape and lets the position board, let position board one side be provided with the rotation portion, the opposite side is provided with joint portion, the upset of rotation portion is installed in main guidance tape minor face one side, joint portion below is provided with the elasticity fastener, let the position board through the rotation portion upset back, the part breaks away from main guidance tape forms the passageway.
Preferably, the vertical rod further comprises two symmetrical groups of long rods, the long rods are vertically and fixedly arranged on two sides of the long edge of the main walkway plate far away from the short rod, the lower portion of each long rod is slidably arranged on the outer fixed frame, and a truss is transversely and fixedly arranged between each long rod and the corresponding short rod.
Preferably, still include the controller, the controller sets firmly on the frame is decided outward, the controller is connected with electric block hoist mechanism electricity, electric block hoist mechanism includes the last seat of hanging that a set of symmetry set up, a set of symmetry set up down hang the seat and connect and hang the seat and hang down the electric block between the seat, it is provided with first slider to go up to hang seat one side, first slider sliding connection is on the stock, go up and hang seat opposite side rigid coupling and decide the frame side outward, it is provided with the second slider to hang seat one side down, second slide rail sliding connection decides the frame side outward, hang seat opposite side rigid coupling at the stock down.
Preferably, a first motor for driving the position plate to turn over is arranged on one side of the rotating part of the position plate, the first motor is fixedly installed on the main walkway plate, and the first motor is electrically connected with the controller.
As preferred, the main guidance tape is close to and lets position board one side still to be provided with wide angle monitoring subassembly, wide angle monitoring subassembly is connected with the controller electricity, wide angle monitoring subassembly includes the monitoring head that inside rotation seat, a set of symmetry that are equipped with micro motor set up, rotate a rigid coupling in main guidance tape side, two the monitoring head is 180 rigid couplings on rotating the seat, inside camera module, distance sensing module, the infrared human response module of being provided with of monitoring head.
Preferably, the rotation limit angle interval of the position-letting plate is 90-140 degrees.
Preferably, the elastic clamping piece is a diamond-like clamping piece consisting of two sheets, the sheets have folding angles of 120-140 degrees, the sheets are welded and fixed at the clamping part below the yielding plate, the welding seams of the two sheets are smooth, and the elastic clamping piece can be embedded into a groove matched with the main walkway plate.
As preferred, the main guidance tape is provided with elasticity fastener assorted recess one side, still sets up an assistance warning subassembly, the assistance warning subassembly is including rotating warning board, the drive of installing on the main guidance tape the warning board pivoted second motor, the second motor sets firmly in main guidance tape one side, the recess inboard of main guidance tape is equipped with a side direction heavy groove, inlay in the heavy groove and adorn a inductor, the heavy inslot portion of inductor, and the inductor orientation has a drainage and leads to the groove, the inductor is connected with second motor, controller electricity.
Preferably, the surface of the warning board is pasted with a reflective sticker, and the rotation limit angle interval of the warning board is 85-90 degrees.
Preferably, a tangible bracket is fixedly arranged between two adjacent main walkway plates.
Compared with the prior art, the invention has the following advantagesAdvantageous effects
The invention is provided with the abdicating plate which is combined with the main walkway plate into a whole under the state that the abdicating plate is not turned over, and the function of the abdicating plate is consistent with that of the walkway plate; the main walkway plate is separated from the middle when the position plate is controlled to turn over, a passage through which a construction elevator wall can pass is reserved, so that a construction elevator frame vertically arranged below the main walkway plate can be continuously lifted or built upwards and directly fixed on an attached wall preset in advance outside a wall body, a plurality of construction elevator wall attachments can be preset in advance according to the three-layer one-wall attachment period principle, the engineering time is greatly shortened, meanwhile, when the inner climbing frame needs to be lifted or lowered, the attached wall below does not need to be removed, the position plate only needs to be adjusted, the main walkway plate and the construction elevator wall attachment can form an interactive and non-interference penetrating state, after the lower layer finishes construction, the inner climbing frame can be continuously adjusted to lift, the construction elevator is provided with a construction elevator frame with a corresponding height subsequently, and the upper layer operation can be continuously carried out, can save a large amount of time, then shorten the engineering completion time.
Drawings
Fig. 1 is a schematic structural view of the exterior of a climbing frame of an elevator for building construction according to the present invention.
Fig. 2 is a detailed internal structure diagram of the climbing frame of the building construction elevator of the present invention.
Fig. 3 is a schematic side view of the climbing frame.
Fig. 4 is a schematic structural view of the upper hanging seat.
Fig. 5 is a schematic view of the lower hanging seat.
Fig. 6 is a block diagram of a climbing control module of the building construction elevator.
FIG. 7 is a schematic diagram of a structure of a yield plate.
Fig. 8 is a schematic view of the wide-angle monitoring assembly shown at a in fig. 2.
Fig. 9 is a schematic structural diagram at B in fig. 2.
In the figure: the electric hoist comprises an external fixed frame-1, an electric hoist lifting mechanism-11, an upper hanging seat-111, a lower hanging seat-112 and an electric hoist-113;
a first slide block-1111, a second slide block-1121, a first slide rail-2221 and a second slide rail-121;
upright stanchion-12 and cross bar-13;
an inner climbing frame-2, a main walkway plate-21 yielding plate-211, a rotating part-a, a clamping part-b and a first motor-212;
elastic clip strip-2111, sheet-c;
wide angle monitoring component-213, rotary seat-2131, monitoring head-2132;
a cooperative alarm component-214, an alarm board-2141, a second motor-2142 and an inductor-2143;
a groove-215;
vertical rod-22, short rod-221, long rod-222, truss-223, reinforcing rod-224 and auxiliary walkway plate-225;
an L-shaped bracket-23;
a controller-3, an attached wall-4, a construction elevator-5, a construction elevator frame-6, a wall-7 and a protective net-8.
Detailed Description
The embodiments of the present invention will be described in further detail with reference to the drawings and examples. The following examples are intended to illustrate the invention but are not intended to limit the scope of the invention.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing and simplifying the description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, should not be construed as limiting the invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, e.g., as being fixed or detachable or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The building main body is quickly built at a dense part of a building group, while the building main body is constructed, a construction elevator needs to be installed as soon as possible according to the principle of maintaining a three-layer one-wall-attachment period of the construction elevator, the assistance is inserted into indoor professional construction, the wall-attachment needs to be arranged below a climbing frame, meanwhile, after the climbing frame climbs, the wall-attachment needs a certain time, after the wall-attachment erection is completed, the climbing frame cannot descend, otherwise, the climbing frame needs to be disassembled and built for many times when high-rise operation is carried out, the wall-attachment arrangement is limited by the climbing frame, the construction elevator is difficult to attach the wall in advance, the construction elevator is difficult to enter the climbing frame, the wall-attachment needs to be sequentially erected according to the height of the climbing frame, the construction elevator can continue to carry out upper-level operation, more time is needed, the main body insertion construction cannot be normally carried out, and the construction progress is influenced, so that the building construction elevator climbing frame is designed, can make and climb the frame and realize that the invisible construction elevator attaches presetting of wall 4 and build, directly rise and dodge, and then make the construction elevator rely on presetting to attach wall 4 and build fast.
Examples
As shown in figures 1 to 9:
the invention provides a building construction elevator climbing frame which comprises an outer fixed frame 1, wherein the outer fixed frame 1 is arranged on the outer side of a wall body 7, the outer fixed frame 1 comprises a plurality of upright rods 12 arranged on the outer sides of the upright rods 12 and used for fixing cross rods 13 of two adjacent upright rods 12, and a group of electric hoist lifting mechanisms 11 are symmetrically arranged on the inner sides of a group of symmetrically arranged upright rods in the outer fixed frame 1. The inner climbing frame 2 is arranged on the outer fixing frame 1 in a sliding mode through an electric hoist lifting mechanism 11, the inner climbing frame 2 comprises three groups of transversely arranged main walkway plates 21 and a plurality of vertical rods 22, each vertical rod 22 comprises two groups of symmetrical short rods 221, and the short rods 221 are vertically and fixedly arranged on two sides of the long edge of each main walkway plate 21; in a normal use state, workers carry out transportation of materials and daily work walking through the main walkway plate 21.
Still set firmly a plurality of at stock 222 and walk the guidance tape 21 one side and still set firmly a plurality of and walk guidance tape 225, and main guidance tape 21 is through raising the elevation, and dislocation construction elevator attaches 4 structural beam elevations on the wall, still set firmly L shape support 23 between main guidance tape 21 and vice guidance tape 225, and wherein, vice guidance tape 225 is ordinary to climb the frame guidance tape, forms the connection ladder through L shape support 23, and then can be convenient for constructor's passage.
It is two sets of be provided with on the main guidance tape 21 between the quarter butt 221 and let a board 211, let a board 211 one side be provided with rotation portion a, the opposite side is provided with joint portion b, rotation portion a upset is installed in main guidance tape 21 minor face one side, joint portion b below is provided with elasticity fastener 2111, let a board 211 through rotation portion a upset back, the part breaks away from main guidance tape 21 forms the passageway. Wherein, the abdicating plate 211 is combined with the main walkway plate 21 into a whole under the state of not turning over, and the function of the abdicating plate is consistent with that of the walkway plate 21; when the clamping part b is released and upward force is applied, the rotating part a can be driven to rotate, and then the abdicating plate 211 is overturned, so that the main walkway plate is separated from the middle, and a passage for the construction elevator to pass through the attached wall 4 is reserved.
A construction elevator frame 6 is vertically arranged below the main walkway plate 21 and is positioned right below the yielding plate 211, and a construction elevator 5 is slidably arranged on the side surface of the construction elevator frame 6.
Specifically, on the outer side of the wall body of the fixed outer fixed frame 1, a plurality of construction elevator attached walls 4 can be preset in advance according to a three-layer one-wall attached 4 period principle, the setting positions of the construction attached walls 4 can be crossed and restrained when the abdicating plate 211 ascends, the abdicating plate 211 is overturned and lifted in advance, a channel is formed in the middle of the main walkway plate 21, when the abdicating plate ascends, the construction attached walls 4 can pass through the main walkway plate 21 through the channel, and therefore the main walkway plate 21 and the construction elevator attached walls 4 are in a mutual non-interference passing state through the abdicating plate 211.
In addition, several reinforcing bars 224 are obliquely arranged between the main walkway plate 21 and the short bar 221, between the main walkway plate 21 and the long bar 222, and between the main walkway plate 21 and the truss 223, in the present embodiment, the reinforcing bars 224 are fixed by bolts, and in other embodiments, they may be fixed by construction-dedicated binding bands.
The rotation limit angle interval of the abdicating plate 211 is 90-140 degrees, when the rotation angle of the abdicating plate 211 is not more than 90 degrees, and when one side of the abdicating plate 211 is impacted, the abdicating plate 211 can reset towards the reverse direction of the overturn under the pressing of the self weight, and is easy to interfere with the attached wall 4; when the rotation angle of the abdicating plate 211 exceeds 140 °, the visible surface of the abdicating plate 211 is easily reduced greatly, and the inclined clamping portion b is easily towards the fragile part of the human body, such as the neck and the head, preferably, the rotation limit angle section of the abdicating plate 211 is 110-; in this embodiment, let the bit plate 211 rotation limit angle preferred 124, in the height of the foundation, can maximize the area visible area let the bit plate 211 side, let bit plate 211 self weight suppress in the upset direction when playing the warning effect, let the impact force that the bit plate 211 unilateral can bear increase by a wide margin, very big degree has improved factor of safety.
In addition, in order to prevent the abdicating plate 211 from easily separating from the main walkway plate 21, an elastic fastener 2111 is provided at the clamping portion b of the abdicating plate 211, and the connection state of the abdicating plate 211 and the main walkway plate 21 is strengthened by the elastic fastener 2111. Specifically, the elastic clamping piece 2111 is a diamond-like clamping piece consisting of two sheets c, the sheets c have folding angles of 120-140 degrees, the sheets c are welded and fixed at the clamping part b below the yielding plate 211, the welding seams of the two sheets c are smooth, the elastic clamping piece 2111 can be embedded into a groove 215 matched with the main walkway plate 21, and the width of the groove 215 is 1-3mm smaller than that of the elastic clamping piece 2111.
When the folding angle of the sheet-like object c is smaller than 120 °, the two combined elastic clips 2111 of the sheet-like object c can be inserted into the groove 215 completely, since the guiding thread is short and the width is larger than 3mm, it is necessary to spend a large amount of force to insert the clipping portion c into the main track, when the folding angle of the sheet-like object c is larger than 140 °, the thickness of the combined elastic clip 2111 of the two sheet-like object c is thin and 1mm smaller than the width of the groove 215, and can be easily inserted into the groove 215, and the constraint force is weak, so that the positioning plate 211 is easily separated from the main track plate 21, in this embodiment, the folding angle of the sheet-like object c is preferably 125 + 135 °, the guiding thread is long and the width is larger than 1-2mm of the width of the groove 215, and is easily inserted into the groove 215 and abuts against the inner side of the groove 215 to generate a certain deformation, and further the deformation force acts on the inner wall of the groove 215 to form a certain constraint force, the position plate 2111 is effectively prevented from easily escaping from the groove 215.
In this embodiment, the sheet c is made of 65Mn spring steel with a thickness of 0.5-0.7mm, which has strong fatigue resistance and certain elasticity.
In order to realize sliding climbing of the inner climbing frame 2 on the outer fixed frame 1, the vertical rod 22 further comprises two symmetrical groups of long rods 222, the long rods 222 are vertically and fixedly arranged on two sides of the long side of the main walkway plate 21 far away from the short rod 221, and the lower part of the long rods 222 is slidably arranged on the outer fixed frame 1;
in order to avoid the situation that the strength of the main walkway plate 21 is reduced after the position plate 211 is turned over, a truss 223 is transversely and fixedly arranged between the long rod 222 and the short rod 221, and the truss 223 is arranged in a direction away from one side of the attached wall 4, wherein the truss 223 connects the short rods 221 with the long rod 222, so that the strength of the main walkway plate 21 is enhanced, and the strength of the main walkway plate 21 can be still maintained after the position plate 211 is turned over.
In order to realize that the internal climbing frame 2 climbs inside the external fixed frame 1, meanwhile, for the purpose of enabling, the controller 3 is fixedly arranged on the external fixed frame 1, the controller 3 is electrically connected with the electric hoist lifting mechanism 11, the electric hoist lifting mechanism 11 comprises a set of symmetrically arranged upper hanging seats 111, a set of symmetrically arranged lower hanging seats 112 and an electric hoist 113 connected between the upper hanging seats 111 and the lower hanging seats 112, a first sliding block 1111 is arranged on one side of the upper hanging seats 111, a first sliding rail 2221 is arranged on one side of the long rod 222, the first sliding block 1111 is slidably connected on the first sliding rail 2221, the other side of the upper hanging seats 111 is fixedly connected to the side surface of the vertical rod 12 of the external fixed frame 1, a second sliding block 1121 is arranged on one side of the lower hanging seats 112, the second sliding rail is slidably connected to a second sliding rail 121 on the inner side surface of the vertical rod 12 of the external fixed frame 1, and the other side of the lower hanging seats 112 is fixedly connected to the long rod 222.
The electric hoist in the embodiment is hoisting equipment, has the characteristics of small volume, light dead weight, simplicity in operation, convenience in use and the like, and is generally used in places such as industrial and mining enterprises, storage, docks and the like. And the electric hoist is compact in structure and applied to the building climbing frame, the occupied position is small, and the stability is high.
When the inner climbing frame 2 needs to ascend, the controller 3 can directly control the electric hoist 113 or the electric hoist can be externally connected with control equipment through an electric signal to start the electric hoist 113, further, the lower hanging seat 112 is dragged to move upwards through the electric hoist 113, the inner climbing frame 2 is dragged through the lower hanging seat 112, and the inner climbing frame 2 is driven to move upwards under the stable state of the outer fixed frame 1; the inner climbing frame 2 slides on the outer fixed frame 1, the electric hoist 113 and the outer fixed frame 1 need to be fixed by the upper hanging seat 111, at this time, the upper hanging seat 111 and the inner climbing frame 2 are in a movable connection state, and the lower hanging seat 112 and the bottom of the inner climbing frame 2 are in a fixed state and are in a movable connection state with the outer fixed frame 1; in this embodiment, bolt fastening may be adopted, and in other embodiments, fastening methods such as welding fastening and the like may also be adopted.
When the inner climbing frame 2 needs to descend, the electric hoist 113 can be directly controlled by the controller or externally connected with control equipment through an electric signal, the electric hoist 113 is started, the reverse operation is executed, and then the inner climbing frame 2 can gradually descend.
In order to enable one side of the rotating part a of the position-letting plate 211 to be provided with a first motor 212 for driving the position-letting plate 211 to turn, the first motor 212 is fixedly installed on the main walkway plate 21, and the first motor 212 is electrically connected with the controller 3.
In order to ensure the safety of constructors on the climbing frame, protective nets 8 are arranged on the inner side and the outer side of the climbing frame.
Example 2
As shown in figures 1 to 9:
this embodiment is substantially the same as embodiment 1, except that a wide-angle monitoring unit 213 is added,
at night, when the inner climbing frame 2 gradually rises, the position plate 21 needs to be opened in advance, if the inner climbing frame 2 is not opened in advance, when the inner climbing frame 2 is close to the attached wall 4, if the position plate 21 is not opened completely, impact is easy to occur, and the switch needs to be operated and controlled manually each time, therefore, a wide-angle monitoring assembly 213 is arranged, one side of the main walkway plate 21, which is close to the position plate 211, is also provided with a wide-angle monitoring assembly 213, the wide-angle monitoring assembly 213 is electrically connected with the controller 3, the wide-angle monitoring assembly 213 comprises a rotating seat 2131 internally provided with a micro motor and a group of symmetrically arranged monitoring heads 2132, the rotating seat 2131 is fixedly connected to the side surface of the main walkway plate 21, the two monitoring heads 2132 are fixedly connected to the rotating seat 2131 in a 180-degree manner, and a camera module, a distance sensing module and an infrared human body sensing module are arranged inside the monitoring heads 2132. The camera module is used for recording the working state.
When the electric hoist 113 is started, the rotating seat 2131 controls the two monitoring heads 2132 through the internal micro motor to rotate 90 degrees, the upper part and the lower part are detected simultaneously, the distance between the rotating seat 2131 and the wall attached 4 of the construction elevator is monitored through the internal distance sensing module, and abdication is realized on the wall attached 4; for example: when the distance of the wall attaching 4 monitored by one monitoring head 2132 is gradually close to each other and enters 3m from the distance range, the first motor 212 is driven to be started in the forward direction, so that the transfer location plate 211 is automatically turned over, when the wall attaching 4 passes through the main walkway plate 214, a detection blind area exists, after the detection blind area, when the distance of the wall attaching 4 detected by the other monitoring head 2132 is increased from small to large, and when the distance exceeds 3m, the controller 3 controls the first motor 212 to close the transfer location plate 211.
After the position plate 21 is closed, the rotating seat 2131 controls the two monitoring heads 2132 through the internal micro motor to rotate 90 degrees for resetting. The monitoring heads 2132 monitor the left side and the right side of the main walkway plate 21 respectively, when the infrared human body induction module recognizes that a person is in 1m, the controller 3 restricts the starting of the electric hoist 113 to make the electric hoist in a temporary failure state, and when the person is evacuated, the electric hoist is recovered and can be started again.
Simultaneously for further strengthening night factor of safety, the event main walkway board 21 is provided with elasticity fastener 2111 assorted recess 215 one side, still sets up a cooperation warning subassembly 214, cooperation warning subassembly 214 is including rotating warning board 2141, the drive of installing on main walkway board 21 warning board 2141 pivoted second motor 2142, second motor 2142 sets firmly in main walkway board 21 one side, main walkway board 21's recess 215 inboard is equipped with a lateral heavy groove, inlay a inductor 2143 in the heavy groove.
In the present embodiment, the sensor 2143 is a pressure sensor, and is disposed inside the groove 215.
The inductor 2143 is electrically connected with the second motor 2142 and the controller 3, when the position plate 21 is separated from the groove 215, the inductor 2143 releases the trigger state, and the state is transmitted to the controller 3, and the second motor 2142 is controlled by the controller to drive the warning plate 2141 to turn upwards by 85 degrees, so as to prompt an approaching passer to turn over the position plate in front and simultaneously prevent the articles from accidentally rolling off.
In order to further improve the prompting effect at night, a reflective sticker is attached to the surface of the warning board 2141; the rotation limit angle interval of the warning plate 2141 is 85 to 90 degrees, and the warning plate 2141 is preferably turned upwards by 85 degrees because the warning plate 2141 is shorter, when the rotation angle is 85 degrees, the visual area is slightly smaller, and when the rotation angle is greater than 90 degrees, the interference with the attached wall 4 is caused.
To further prevent inadvertent contact due to stone accumulation, a drain channel is provided in the groove 215 in the direction of the inductor 2143, which in this embodiment is a channel having a length of 10 and a width of 4, but in other embodiments may have other common geometries.
The embodiments of the present invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (10)

1. A building construction elevator climbing frame is characterized by comprising
The outer fixed frame (1) is arranged on the outer side of the wall body, and a group of electric hoist lifting mechanisms (11) are symmetrically arranged in the outer fixed frame (1);
interior climbing frame (2), interior climbing frame (2) slide through electric block hoist lifting mechanism (11) and set up on outer fixed frame (1), interior climbing frame (2) include three main pavement boards (21) of group horizontal setting, a plurality of montant (22), montant (22) include two sets of symmetrical quarter butt (221), quarter butt (221) vertical solid dress is in main pavement board (21) long limit both sides, is provided with on main pavement board (21) between two sets of quarter butt (221) and lets position board (211), let position board (211) one side be provided with rotation portion (a), the opposite side is provided with joint portion (b), rotation portion (a) upset is installed in main pavement board (21) short edge one side, joint portion (b) below is provided with elasticity (2111), let position board (211) break away from main pavement board (21) through rotation portion (a) upset back, forming a channel.
2. The building construction elevator creel according to claim 1, wherein: the vertical rod (22) further comprises two symmetrical groups of long rods (222), the long rods (222) are vertically and fixedly arranged on two sides of the long edge of the main walkway plate (21) far away from the short rod (221), the lower portion of each long rod (222) is slidably arranged on the outer fixed frame (1), and a truss (223) is transversely and fixedly arranged between each long rod (222) and the corresponding short rod (221).
3. The building construction elevator creel according to claim 1, wherein: still include controller (3), controller (3) set firmly on external fixed frame (1), controller (3) are connected with electric block hoist lifting mechanism (11) electricity, electric block hoist lifting mechanism (11) include last seat (111) of hanging that a set of symmetry set up, a set of symmetry set up down hang seat (112) and connect hang seat (111) and hang down electric block (113) between seat (112), it is provided with first slider (1111) to go up seat (111) one side, first slider (1111) sliding connection is on stock (222), go up seat (111) opposite side rigid coupling and decide frame (1) side outward, hang seat (112) one side down and be provided with second slider (1121), second slide rail (1121) sliding connection decides frame (1) side outward, hang seat (112) opposite side rigid coupling down and decide frame (222).
4. The building construction elevator creel according to claim 1, wherein: let rotation portion (a) one side of position board (211) be provided with the drive and let first motor (212) of position board (211) upset, first motor (212) fixed mounting is on main guidance tape (21), and first motor (212) are connected with controller (3) electricity.
5. The construction elevator creeper according to claim 1 or 4, wherein: the utility model discloses a walking board, including main guidance tape board (21), position board (211) one side still is provided with wide angle monitoring subassembly (213), wide angle monitoring subassembly (213) is connected with controller (3) electricity, wide angle monitoring subassembly (213) are including inside rotation seat (2131) that is equipped with micro motor, monitoring head (2132) that a set of symmetry set up, rotate seat (2131) rigid coupling in main guidance tape board (21) side, two monitoring head (2132) are 180 rigid couplings on rotating seat (2131), monitoring head (2132) inside camera module, apart from induction module, infrared human induction module of being provided with.
6. The building construction elevator creel according to claim 1, wherein: the rotation limit angle interval of the position-letting plate (211) is 90-140 degrees.
7. The building construction elevator creel according to claim 1, wherein: the elastic clamping piece (2111) is a diamond-like clamping piece consisting of two sheets (c), the sheets (c) have folding angles of 120-140 degrees, the sheets (c) are welded and fixed at the positions of clamping parts (b) below the position yielding plate (211), welding seams of the two sheets (c) are smooth, and the elastic clamping piece (2111) can be embedded into a groove (215) matched with the main walkway plate (21).
8. The building construction elevator creel according to claim 1, wherein: main guidance tape (21) be provided with elasticity fastener (2111) assorted recess (215) one side, still set up one and move warning subassembly (214) in coordination, warning subassembly (214) including rotate install warning board (2141), the drive on main guidance tape (21) warning board (2141) pivoted second motor (2142), second motor (2142) set firmly in main guidance tape (21) one side, recess (215) inboard of main guidance tape (21) is equipped with a side direction heavy groove, inlay in the heavy groove and adorn an inductor (2143), inside inductor (2143) heavy groove, and inductor (2143) orientation has a drainage logical groove, inductor (2143) are connected with second motor (2142), controller (3) electricity.
9. The building construction elevator creel according to claim 8, wherein: the surface of the warning board (2141) is provided with a reflective sticker, and the rotation limit angle interval of the warning board (2141) is 85-90 degrees.
10. The building construction elevator creel according to claim 1, wherein: an L-shaped bracket (23) is fixedly arranged between two adjacent main walkway plates (21).
CN202210965337.0A 2022-08-12 2022-08-12 Building construction elevator climbs frame Active CN115110747B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210965337.0A CN115110747B (en) 2022-08-12 2022-08-12 Building construction elevator climbs frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210965337.0A CN115110747B (en) 2022-08-12 2022-08-12 Building construction elevator climbs frame

Publications (2)

Publication Number Publication Date
CN115110747A true CN115110747A (en) 2022-09-27
CN115110747B CN115110747B (en) 2023-05-09

Family

ID=83335518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210965337.0A Active CN115110747B (en) 2022-08-12 2022-08-12 Building construction elevator climbs frame

Country Status (1)

Country Link
CN (1) CN115110747B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004360214A (en) * 2003-06-02 2004-12-24 Kajima Corp Scaffold/curing unit and its use method
JP2008208556A (en) * 2007-02-23 2008-09-11 Japan Steels Group Kk Climbing type scaffolding device
CN210659205U (en) * 2019-05-30 2020-06-02 广西建工集团第五建筑工程有限责任公司 U-shaped water intercepting tank for climbing frame and intercepting water of outer wall of high-rise main body
CN112177305A (en) * 2020-09-09 2021-01-05 滁州金诚金属制品有限公司 Aluminum-wood pedal and scaffold with same
CN215331375U (en) * 2021-04-16 2021-12-28 珠海市富冠城建筑工程有限公司 Chain transmission lifting control system for attached scaffold
CN215407311U (en) * 2021-03-05 2022-01-04 深圳市深建业建筑科技有限公司 A protective structure for climbing frame group seam department

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004360214A (en) * 2003-06-02 2004-12-24 Kajima Corp Scaffold/curing unit and its use method
JP2008208556A (en) * 2007-02-23 2008-09-11 Japan Steels Group Kk Climbing type scaffolding device
CN210659205U (en) * 2019-05-30 2020-06-02 广西建工集团第五建筑工程有限责任公司 U-shaped water intercepting tank for climbing frame and intercepting water of outer wall of high-rise main body
CN112177305A (en) * 2020-09-09 2021-01-05 滁州金诚金属制品有限公司 Aluminum-wood pedal and scaffold with same
CN215407311U (en) * 2021-03-05 2022-01-04 深圳市深建业建筑科技有限公司 A protective structure for climbing frame group seam department
CN215331375U (en) * 2021-04-16 2021-12-28 珠海市富冠城建筑工程有限公司 Chain transmission lifting control system for attached scaffold

Also Published As

Publication number Publication date
CN115110747B (en) 2023-05-09

Similar Documents

Publication Publication Date Title
AU2009200043B2 (en) Work platform
CN102180394A (en) Integrated building-block-type lift of strip steel structure
GB2541666A (en) Barrier
CN112412159A (en) Rail guard is used in construction with prevent function of crossing
CN111270867A (en) Novel roof steel truss suspension assembly type elevator structure and construction method thereof
CN202731262U (en) Installation and maintenance safe platform for air conditioner external unit
CN115110747A (en) Building construction elevator climbs frame
CN108625301B (en) Intelligent rail platform structure containing telescopic railing
US20050230194A1 (en) Safety fence at upper part of cab
CN2776454Y (en) Electric elevator escape system used for high-rise building
WO2011158389A1 (en) Fence-like ascent and descent devices
CN107010522B (en) A kind of vertical shaft hoist auxiliary shaft cage safe monitoring device and monitoring method in place
CN110817709A (en) High-rise tower crane driver climbing device
KR200430674Y1 (en) High place working gondola in building
JP4948992B2 (en) Staircase
CN201771394U (en) Burglary-resisting window available for escape
CN212531879U (en) Elevator positioning and protecting device
CN208219449U (en) A kind of intelligence rail platform structure comprising the railing that stretches
CN215107217U (en) Scaffold with safety protection net
CN209481015U (en) A kind of Miniature stair
CN207739687U (en) A kind of inspection climbing frame of container
CN205778409U (en) Antitheft escape window
CN214384124U (en) All-round discernment protector and use its flexible door
JP3796157B2 (en) Aerial work platform
CN218346774U (en) Two-stage turnover plate splicing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant