CN115110683B - Temporary overhanging curtain wall structure and installation method - Google Patents

Temporary overhanging curtain wall structure and installation method Download PDF

Info

Publication number
CN115110683B
CN115110683B CN202210901864.5A CN202210901864A CN115110683B CN 115110683 B CN115110683 B CN 115110683B CN 202210901864 A CN202210901864 A CN 202210901864A CN 115110683 B CN115110683 B CN 115110683B
Authority
CN
China
Prior art keywords
aluminum plate
curtain wall
closing
installing
wall unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210901864.5A
Other languages
Chinese (zh)
Other versions
CN115110683A (en
Inventor
覃斌
胡朝一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Kurbon Curtain Wall Decoration Co ltd
Original Assignee
Hunan Kurbon Curtain Wall Decoration Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Kurbon Curtain Wall Decoration Co ltd filed Critical Hunan Kurbon Curtain Wall Decoration Co ltd
Priority to CN202210901864.5A priority Critical patent/CN115110683B/en
Publication of CN115110683A publication Critical patent/CN115110683A/en
Application granted granted Critical
Publication of CN115110683B publication Critical patent/CN115110683B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The invention discloses a curtain wall structure overhanging in the air and an installation method, wherein the curtain wall structure is connected with a main body structure in an overhanging way, the curtain wall structure comprises a plurality of curtain wall units which are sequentially connected, each curtain wall unit is formed by enclosing an outer-covered framework by a top aluminum plate, a front aluminum plate, a bottom aluminum plate and a closing-in aluminum plate, the closing-in aluminum plate is also used for closing-in connection of the curtain wall unit and the main body structure, a notch is arranged on the bottom aluminum plate, a bottom blocking aluminum plate is arranged on the notch, and a top rear-loading aluminum plate is arranged at the top of the framework corresponding to the notch. The framework is provided with a detachable lifting lug for installing and using the curtain wall unit, and the installation method comprises the following steps: prefabricating curtain wall units; hoisting a curtain wall unit; erecting a hanging basket and installing a bottom closing-in aluminum plate; and (3) dismantling the hanging basket, firstly buckling and installing the bottom plugging aluminum plate from top to bottom, then installing the top, then installing the aluminum plate, and finally installing the top closing-in aluminum plate. The invention greatly improves the installation efficiency; the construction method has the advantages that the construction cost of the high-altitude construction platform is saved, and meanwhile interference between the hanging basket steel wire rope and the aluminum plate is avoided.

Description

Temporary overhanging curtain wall structure and installation method
Technical Field
The invention relates to the technical field of installation of a temporary overhanging curtain wall, in particular to a temporary overhanging curtain wall structure and an installation method.
Background
In modern buildings, aluminum plate curtain walls are widely used due to the advantages of light dead weight, convenient forming, strong metal texture, adjustable color and the like, and besides the large-area continuous dry hanging application on building facades, the aluminum plate curtain walls are increasingly used as cornices and lines with various shapes. In high-rise buildings, particularly super high-rise buildings, the cornices of interlayer lines and tops are always in a high-altitude temporary state, no ready work platform exists, and the problems of how to arrange a high-altitude construction platform, how to efficiently install and ensure the safety of operators become troublesome engineering. The molding cornice is formed by enclosing four aluminum plates into a closed cavity, the aluminum plates on the top and the bottom are required to be installed generally, if a hanging basket is adopted for construction, the aluminum plates on the bottom cannot be installed due to interference of a hanging basket steel wire rope and the aluminum plates, and therefore a feasible and convenient method for installing the overhanging curtain wall in the open air is urgently needed.
The current on-site manufacturing flow of the aluminum plate curtain wall is as follows: cutting and blanking the steel section according to the modeling specification on site; welding and forming a steel member; the aluminum plates were mounted block by block. Three methods for building a construction platform in the sky are provided: a. and (3) a full scaffold, b, a temporary cantilever construction platform and 3, a hanging basket. However, the existing curtain wall installation method has the following defects:
1. all cutting, welding and plate mounting operations are performed on site, so that the on-site manufacturing and mounting work content is more, the working intensity of workers is high, the mounting efficiency is low, and the mounting quality is unstable under the influence of human factors;
2. the construction platform is technically infeasible to erect full scaffold from the ground when the high-rise is in the sky, the construction platform is huge in cost, and the construction platform needs to be repeatedly erected when being constructed at different heights and different positions;
3. when the hanging basket is used for construction, due to interference of the hanging basket steel wire rope and the aluminum plate, part of the aluminum plate on the bottom surface cannot be installed.
Disclosure of Invention
The invention aims to provide an overhanging curtain wall structure and an installing method, which solve the problems that the overhanging curtain wall structure is more in field manufacturing and installing work content, large in working strength of workers and unstable in installing quality due to human factors, the overhanging curtain wall structure cannot be erected on the field, or the construction platform is huge in cost, and the overhead operation is inconvenient and unsafe for the workers.
The invention is realized in such a way that the curtain wall structure is connected with the main body structure in a overhanging way, the curtain wall structure comprises a plurality of curtain wall units which are sequentially connected, the curtain wall units comprise a framework, a top aluminum plate, a bottom aluminum plate, a front aluminum plate and a closing-in aluminum plate, the top aluminum plate is fixed at the top of the framework, the bottom aluminum plate is fixed at the bottom of the framework, the front aluminum plate is fixed at one overhanging end of the framework, the closing-in aluminum plate is used for closing-in connection between the curtain wall units and the main body structure,
be equipped with detachable lug on the skeleton, be equipped with the breach on the bottom aluminum plate, the skeleton top with dress aluminum plate after the top is installed to the position that the breach on the bottom aluminum plate corresponds, be equipped with bottom shutoff aluminum plate on the breach.
When the curtain wall unit is assembled, firstly, assembling a top aluminum plate, a front aluminum plate and a bottom aluminum plate on the framework, and then, overhanging and connecting the framework and the main body structure; and finally, sequentially installing a bottom closing-in aluminum plate, a bottom plugging aluminum plate, a top rear-mounted aluminum plate and a top closing-in aluminum plate, wherein a gap on the bottom aluminum plate and the position of the top rear-mounted aluminum plate are penetrated by a steel wire rope of a hanging basket so as to realize the installation of the bottom closing-in aluminum plate after the curtain wall unit is installed, and the lifting lugs are used for the lifting of the curtain wall unit, so that the connection installation of the curtain wall unit and a main structure is realized. Compared with the existing curtain wall unit structure, the curtain wall unit can be prefabricated in advance in a factory and then transported to a construction site for hoisting, so that the working efficiency is improved; the use of the hanging basket avoids the problems that the construction of the scaffold is technically infeasible to erect the scaffold from the ground when the high-rise is in the sky, the cost for erecting the cantilever construction platform in the sky is huge, and the construction of different heights and different positions is required to be repeatedly erected; the aluminum plate is assembled behind the top and the aluminum plate is plugged at the bottom, and meanwhile, the problem that when the hanging basket is adopted for construction, the aluminum plate at the bottom cannot be installed due to interference of a hanging basket steel wire rope and the aluminum plate is solved.
The invention further adopts the technical scheme that: the top binding off aluminum plate is used for binding off with main structure at curtain unit top and is connected, the bottom binding off aluminum plate is used for curtain unit bottom and main structure carry out binding off and are connected.
The invention further adopts the technical scheme that: the top binding off aluminum plate is L type, top binding off aluminum plate one end with dress aluminum plate sealing connection behind top aluminum plate and the top, the other end is connected with major structure, top binding off aluminum plate both sides and adjacent top binding off aluminum plate sealing connection.
The invention further adopts the technical scheme that: the bottom binding off aluminum plate is L, bottom binding off aluminum plate one end with bottom aluminum plate sealing connection other end with the major structure is connected, bottom binding off aluminum plate both sides and adjacent bottom binding off aluminum plate sealing connection.
The invention further adopts the technical scheme that: the top closing-in aluminum plate and the bottom closing-in aluminum plate are respectively used for closing-in connection with the main structure on the upper side and the lower side of the curtain wall unit, and the closing-in connection is required to be carried out on a construction site because errors of the main structure are required to be digested and absorbed, so that the top closing-in aluminum plate and the bottom closing-in aluminum plate are not installed when the curtain wall unit is prefabricated in a factory, and the curtain wall unit is installed after being lifted; the top aluminum plate, front aluminum plate and bottom aluminum plate are installed when the curtain wall unit is prefabricated in the factory. The side of each curtain wall unit is provided with a top rear-mounted aluminum plate, a notch is formed in the bottom aluminum plate corresponding to the top rear-mounted aluminum plate, and a bottom plugging aluminum plate is arranged at the position of the notch. The aluminum plate installed behind the top of each curtain wall unit is not installed when the curtain wall unit factory is prefabricated, the aluminum plate at the bottom of each curtain wall unit with a notch and other aluminum plates at the bottom without a notch are installed when the curtain wall unit factory is prefabricated, but the aluminum plate at the bottom of each curtain wall unit is not installed at first.
The purpose of this arrangement is: after the hoisting and splicing of the two adjacent curtain wall units are completed, steel wire ropes for installing hanging baskets can be hoisted through gaps on the aluminum plates at the tops of the two adjacent curtain wall units and the corresponding aluminum plates at the bottoms. After the hanging basket is erected, the hanging basket is used as a construction platform, and the installation of the bottom closing-in aluminum plate can be completed. Because the relative positions of the notches on the aluminum plates at the bottoms of the adjacent curtain wall units determine the length of the hanging basket, the divided lengths of the curtain wall units are matched with the length of the hanging basket.
The invention further adopts the technical scheme that: the bottom shutoff aluminum plate is arranged in breach department on the bottom aluminum plate with the bottom aluminum plate sealing connection at breach place, just bottom shutoff aluminum plate still with on the adjacent curtain unit bottom aluminum plate sealing connection.
The invention further adopts the technical scheme that: the bottom shutoff aluminum plate adopts the structure of buckling installation from top to bottom, there is Z hem bottom shutoff aluminum plate all around, bottom shutoff aluminum plate realizes the sealing connection of bottom shutoff aluminum plate and next-door neighbour bottom aluminum plate through the form of extrusion adhesive tape. Riveting a long aluminum component with a T-shaped groove on the folded edge, wherein the T-shaped groove is used for installing a sealing rubber strip; the smaller and better the splicing seam between the bottom plugging aluminum plate and the bottom aluminum plate with the notch in the curtain wall unit, the more the splicing seam between the bottom plugging aluminum plate and the non-notch bottom aluminum plate of the curtain wall unit adjacent to the curtain wall unit needs to be consistent with the glue seam between the adjacent bottom aluminum plates, so that the specifications of the sealing rubber strips on the three folded edges of the bottom plugging aluminum plate spliced by the bottom aluminum plate with the notch in the curtain wall unit are the same, and the sealing rubber strips on the folded edges spliced by the non-notch bottom aluminum plate of the curtain wall unit adjacent to the curtain wall unit are longer.
The invention further adopts the technical scheme that: the bottom shutoff aluminum plate and the three hem positions that open the bottom aluminum plate concatenation of breach in its place curtain unit are located, form the installation frame of bottom shutoff aluminum plate through setting up the angle steel, and the bottom shutoff aluminum plate passes the position of dress aluminum plate after the top from top to bottom lock three hem can laminate with the installation frame after in place, and the screw of beating carries out fastening connection, and the installation frame both forms the braced frame of bottom shutoff aluminum plate and can inject the position of bottom shutoff aluminum plate again.
The invention further adopts the technical scheme that: the bottom plugging aluminum plate is spliced with a bottom aluminum plate with a notch in a curtain wall unit where the bottom plugging aluminum plate is located, and is spliced with a bottom aluminum plate without a notch of a curtain wall unit adjacent to the curtain wall unit where the bottom plugging aluminum plate is located. And at the opening position of the notch of the bottom aluminum plate, the installation frame is not arranged at the edge folding position of the bottom sealing aluminum plate spliced with the adjacent non-notch bottom aluminum plate, and the splicing of the bottom sealing aluminum plate and the non-notch bottom aluminum plate of the curtain wall unit adjacent to the curtain wall unit is directly realized through extruding the sealing rubber strip. Considering the occupation of the lower chord member of the main truss girder, in order to avoid interference of the lower blocking aluminum plate when the lower blocking aluminum plate is horizontally buckled, the lower blocking aluminum plate is buckled and installed, the plate edge of the opening position corresponding to the notch of the lower blocking aluminum plate is in a lower position, and is firstly inserted into the bottom of the lower chord member of the main truss girder, and then slowly buckled and leveled.
The invention further adopts the technical scheme that: the framework comprises a main truss girder and a transverse secondary girder connected with the adjacent main truss girders, and the transverse secondary girder penetrates through two ends of the main truss girder to form a plug cavity part and a plug head part respectively.
The invention further adopts the technical scheme that: the plug-in head part and the plug-in cavity part of each curtain wall unit are arranged in pairs left and right, so that the adjacent curtain wall units can be plugged in.
The invention further adopts the technical scheme that: when the curtain wall units are assembled, each curtain wall unit is lifted and moved through four lifting lugs, and the left and right adjacent curtain wall units are horizontally inserted into the inserting cavity parts of the left units through the inserting heads of the right units to achieve inter-unit splicing.
The invention further adopts the technical scheme that: the lifting lug for lifting can be made into a detachable form and can be repeatedly used. The lifting lugs are arranged on the outer side face of the upper chord of the main truss girder at the edge of each curtain wall unit, the lifting lugs are fastened with the upper chord through bolts before lifting, and the lifting lugs can be disassembled and assembled on the next curtain wall unit to be installed after lifting.
The invention further adopts the technical scheme that: and the adjacent curtain wall units are spliced through the matching of the splicing cavity parts and the splicing head parts, and the lifting lugs are arranged on the outer side surfaces of the upper chords of the main truss girder.
The invention also provides an installation method of the temporary overhanging curtain wall structure, which comprises the following steps:
step one, prefabricating a curtain wall unit: completing the manufacture of a framework, and installing a top aluminum plate, a front aluminum plate and a bottom aluminum plate on the framework for later use;
step two, installing a curtain wall unit: hoisting the curtain wall units in the first step, connecting the curtain wall units in the first step with embedded parts on a main body structure, and sequentially splicing and connecting the curtain wall units in the first step;
step three, installing a closing-in aluminum plate: erecting a construction hanging basket, wherein steel wire ropes on two sides of the hanging basket penetrate through the position of the top rear mounting aluminum plate and the notch of the bottom aluminum plate on the curtain wall unit in the adjacent step two, and lifting the hanging basket to the working height, and using the hanging basket as a construction platform to finish the installation of the bottom closing-in aluminum plate; lowering the hanging basket to the ground, disassembling the steel wire rope and the hanging basket, and installing the bottom closing-in aluminum plates of all curtain wall units one by one in the same way;
and step four, on the curtain wall unit in the step three, which is provided with the bottom closing-in aluminum plate, firstly, passing through the top and then installing the aluminum plate to fasten the bottom plugging aluminum plate at the installation notch from top to bottom, then installing the top and then installing the aluminum plate, and finally installing the top closing-in aluminum plate.
The invention further adopts the technical scheme that: in the first step, a curtain wall unit is prefabricated in a factory, the installation of a top aluminum plate, a front aluminum plate and a bottom aluminum plate is completed in the factory, sealant is applied to the seams of the prefabricated aluminum plates, and then the prefabricated aluminum plates are transported to a construction site.
The invention further adopts the technical scheme that: the curtain wall unit is prefabricated in a factory: and (3) assembling the keels, installing a top aluminum plate, a front aluminum plate and a bottom aluminum plate, reserving a top closing-in aluminum plate, a bottom closing-in aluminum plate, a top rear-loading aluminum plate and a bottom plugging aluminum plate, and transporting the assembled curtain wall unit to a construction site.
The invention further adopts the technical scheme that: and in the second step, detachable lifting lugs are arranged on the framework before lifting, the lifting lugs are detached to the next curtain wall unit to be installed after the installation is completed, and splicing is realized between the curtain wall units through splicing.
The invention further adopts the technical scheme that: the curtain wall units are hoisted one by one, and the upper chord member and the lower chord member of the main truss girder are hinged with embedded parts on the main structure to realize the fastening connection of the curtain wall units and the main structure. Before hoisting, installing a lifting lug on each curtain wall unit, and after the installation is completed, removing the lifting lug and installing the lifting lug on the next curtain wall unit to be installed; the curtain wall units are horizontally inserted into the splicing cavity parts of the adjacent installed units through the self splicing heads, so that splicing among the units is realized.
The invention further adopts the technical scheme that: install top binding off aluminum plate, top aluminum plate, front portion aluminum plate, bottom binding off aluminum plate, bottom shutoff aluminum plate on the skeleton, installation aluminum plate and major structure enclose and close after the top.
The invention further adopts the technical scheme that: erecting a construction hanging basket, wherein the hanging basket is firstly placed on the ground, steel wire ropes on two sides of the hanging basket pass through the position of the top rear-mounted aluminum plate on the adjacent curtain wall units and the corresponding notch on the bottom aluminum plate from top to bottom from the front end of the hanging arm, the steel wire ropes are lowered to the hanging basket, and the steel wire ropes are fixedly connected with the hanging basket to lift the hanging basket to the working height; the hanging basket is used as a construction platform, so that the installation of the bottom closing-in aluminum plate can be completed, and sealant is applied to the joint of the bottom closing-in aluminum plate; and (3) dropping the hanging basket to the ground, separating the steel wire rope from the hanging basket, and retracting the steel wire rope upwards. And erecting the hanging basket to the next adjacent curtain wall unit to be installed in the same manner.
The invention further adopts the technical scheme that: after the aluminum plate is installed at the top and the aluminum plate is closed at the top, sealant should be applied at the corresponding aluminum plate joint.
The invention has the beneficial effects that: when the curtain wall unit is assembled, firstly, assembling a top aluminum plate, a front aluminum plate and a bottom aluminum plate on the framework, and then connecting and installing the curtain wall unit and the main body structure; finally, sequentially installing a bottom closing-in aluminum plate, a bottom plugging aluminum plate, a top rear-mounted aluminum plate and a top closing-in aluminum plate; the notch on the bottom aluminum plate and the position of the aluminum plate mounted at the back of the top are used for the steel wire rope of the hanging basket to pass through so as to realize the installation of the bottom closing-in aluminum plate after the curtain wall unit is installed. Compared with the existing curtain wall unit structure, the curtain wall unit structure can be prefabricated in a factory in advance and then transported to a construction site for hoisting, so that the on-site manufacturing and installing work content is sufficiently reduced, the installing efficiency is greatly improved, the influence of human factors is small, and the installing quality is stable; the use of the hanging basket avoids the problems that the construction of the scaffold is technically infeasible to erect the scaffold from the ground when the high-rise is in the sky, the cost for erecting the cantilever construction platform in the sky is huge, and the construction of different heights and different positions is required to be repeatedly erected; the aluminum plate is assembled behind the top and the aluminum plate is plugged at the bottom, and meanwhile, the problem that when the hanging basket is adopted for construction, the aluminum plate at the bottom cannot be installed due to interference of a hanging basket steel wire rope and the aluminum plate is solved.
Drawings
FIG. 1 is a top view of a curtain wall unit of a temporary overhanging curtain wall structure according to the present invention;
FIG. 2 is a schematic structural view of a curtain wall structure with overhanging in the air;
FIG. 3 is a schematic view of the structure of the curtain wall unit framework provided by the invention;
FIG. 4 is a schematic view of the structure of the curtain wall structure when the curtain wall structure is installed;
FIG. 5 is a schematic view of the connection of a notched bottom aluminum panel to a bottom aluminum panel on an adjacent curtain wall unit provided by the present invention;
FIG. 6 is an enlarged view of point B provided by the present invention;
FIG. 7 is a cross-sectional view A-A provided by the present invention.
Reference numerals: 0. curtain wall unit, 2, top aluminum plate, 3, bottom aluminum plate, 4, front aluminum plate, 6, top rear aluminum plate, 7, bottom plugging aluminum plate, 8, lifting lug, 51, top closing aluminum plate, 52, bottom closing aluminum plate, 11, main truss girder, 12, transverse secondary girder, 13, plug cavity part and 14, plug head part.
Detailed Description
Other advantages and effects of the present invention will become apparent to those skilled in the art from the following disclosure, which describes the embodiments of the present invention with reference to specific examples. The invention may be practiced or carried out in other embodiments that depart from the specific details, and the details of the present description may be modified or varied from the spirit and scope of the present invention.
It should be noted that, the structures, proportions, sizes and the like shown in the drawings attached to the present specification are used for understanding and reading only in conjunction with the disclosure of the present specification, and are not intended to limit the applicable limitations of the present invention, so that any modification of the structures, variation of proportions or adjustment of sizes of the structures, proportions and the like should not be construed as essential to the present invention, and should still fall within the scope of the disclosure of the present invention without affecting the efficacy and achievement of the present invention. Also, the terms such as "upper," "lower," "left," "right," "middle," and "a" and the like recited in the present specification are merely for descriptive purposes and are not intended to limit the scope of the invention, but are intended to provide relative positional changes or modifications without materially altering the technical context in which the invention may be practiced.
Embodiment one:
figures 1-7 show a curtain wall construction of overhanging in the sky, the curtain wall construction is connected with a main body structure, the curtain wall construction comprises a curtain wall unit 0 which is connected in turn, the curtain wall unit 0 comprises a framework, a top aluminum plate 2, a bottom aluminum plate 3, a front aluminum plate 4 and a closing-in aluminum plate, the top aluminum plate 2 is fixed at the top of the framework, the bottom aluminum plate 3 is fixed at the bottom of the framework, the front aluminum plate 4 is fixed at one end of the framework overhanging, the closing-in aluminum plate is used for closing-in connection of the curtain wall unit with the main body structure,
be equipped with detachable lug 8 on the skeleton, be equipped with the breach on the bottom aluminum plate 3, the skeleton top with install top back dress aluminum plate 6 in the position that the breach on the bottom aluminum plate 3 corresponds, be equipped with bottom shutoff aluminum plate 7 on the breach.
When the curtain wall unit is assembled, firstly, assembling a top aluminum plate, a front aluminum plate and a bottom aluminum plate on the framework, and then connecting the framework with the main body structure; and finally, sequentially installing a bottom closing-in aluminum plate, a bottom plugging aluminum plate, a top rear-mounted aluminum plate and a top closing-in aluminum plate, wherein a gap on the bottom aluminum plate and the position of the top rear-mounted aluminum plate are penetrated by a steel wire rope of a hanging basket so as to realize the installation of the bottom closing-in aluminum plate after the curtain wall unit is installed, and the lifting lugs are used for the lifting of the curtain wall unit, so that the connection installation of the curtain wall unit and a main structure is realized. Compared with the existing curtain wall unit structure, the curtain wall unit structure can be prefabricated in advance in a factory and then transported to a construction site for hoisting, so that the working efficiency is improved; the use of the hanging basket avoids the problems that the construction of the scaffold is technically infeasible to erect the scaffold from the ground when the high-rise is in the sky, the cost for erecting the cantilever construction platform in the sky is huge, and the construction of different heights and different positions is required to be repeatedly erected; the aluminum plate is assembled behind the top and the aluminum plate is plugged at the bottom, and meanwhile, the problem that when the hanging basket is adopted for construction, the aluminum plate at the bottom cannot be installed due to interference of a hanging basket steel wire rope and the aluminum plate is solved.
In this embodiment, the top binding off aluminum plate 51 is used for the curtain wall unit top is closed off with the major structure and is connected, the bottom binding off aluminum plate 52 is used for the curtain wall unit bottom is closed off with the major structure and is connected.
In this embodiment, the top binding off aluminum plate 51 is L type, top binding off aluminum plate 51 one end with top aluminum plate 2 and top back dress aluminum plate 6 sealing connection, the other end is connected with main structure, top binding off aluminum plate 51 both sides and adjacent top binding off aluminum plate 51 sealing connection.
In this embodiment, the bottom binding off aluminum plate 52 is L type, bottom binding off aluminum plate 52 one end with bottom aluminum plate 3 sealing connection other end with the major structure is connected, bottom binding off aluminum plate 52 both sides and adjacent bottom binding off aluminum plate 52 sealing connection.
In this embodiment, the top closing-in aluminum plate and the bottom closing-in aluminum plate are respectively used for closing-in connection with the main structure on the upper side and the lower side of the curtain wall unit, and because errors of the main structure are required to be digested and absorbed, the closing-in connection is required to be performed on a construction site, so that the top closing-in aluminum plate and the bottom closing-in aluminum plate are not installed when the curtain wall unit is prefabricated in a factory, and are installed after the curtain wall unit is lifted; the top aluminum plate, front aluminum plate and bottom aluminum plate are installed when the curtain wall unit is prefabricated in the factory. The side of each curtain wall unit is provided with a top rear-mounted aluminum plate, a notch is formed in the bottom aluminum plate corresponding to the top rear-mounted aluminum plate, and a bottom plugging aluminum plate is arranged at the position of the notch. The aluminum plate installed behind the top of each curtain wall unit is not installed when the curtain wall unit factory is prefabricated, the aluminum plate at the bottom of each curtain wall unit with a notch and other aluminum plates at the bottom without a notch are installed when the curtain wall unit factory is prefabricated, but the aluminum plate at the bottom of each curtain wall unit is not installed at first.
The purpose of this arrangement is: after the hoisting and splicing of the two adjacent curtain wall units are completed, steel wire ropes for installing hanging baskets can be hoisted through gaps on the aluminum plates at the tops of the two adjacent curtain wall units and the corresponding aluminum plates at the bottoms. After the hanging basket is erected, the hanging basket is used as a construction platform, and the installation of the bottom closing-in aluminum plate can be completed. Because the relative positions of the notches on the aluminum plates at the bottoms of the adjacent curtain wall units determine the length of the hanging basket, the divided lengths of the curtain wall units are matched with the length of the hanging basket.
In this embodiment, the bottom plugging aluminum plate 7 is disposed at the notch on the bottom aluminum plate 3 and is in sealing connection with the bottom aluminum plate 3 where the notch is located, and the bottom plugging aluminum plate 7 is also in sealing connection with the bottom aluminum plate 3 on the adjacent curtain wall units.
In this embodiment, bottom shutoff aluminum plate adopts the structure of buckling installation from top to bottom, bottom shutoff aluminum plate has Z hem all around, bottom shutoff aluminum plate realizes the sealing connection of bottom shutoff aluminum plate and next-door neighbour bottom aluminum plate through the form of extrusion adhesive tape. Riveting a long aluminum component with a T-shaped groove on the folded edge, wherein the T-shaped groove is used for installing a sealing rubber strip; the smaller and better the splicing seam between the bottom plugging aluminum plate and the bottom aluminum plate with the notch in the curtain wall unit, the more the splicing seam between the bottom plugging aluminum plate and the non-notch bottom aluminum plate of the curtain wall unit adjacent to the curtain wall unit needs to be consistent with the glue seam between the adjacent bottom aluminum plates, so that the specifications of the sealing rubber strips on the three folded edges of the bottom plugging aluminum plate spliced by the bottom aluminum plate with the notch in the curtain wall unit are the same, and the sealing rubber strips on the folded edges spliced by the non-notch bottom aluminum plate of the curtain wall unit adjacent to the curtain wall unit are longer.
In this embodiment, bottom shutoff aluminum plate and the bottom aluminum plate concatenation of opening the breach in its place curtain unit three hem positions department forms bottom shutoff aluminum plate's installation frame through setting up the angle steel, and three hem can laminate with the installation frame after the position of dress aluminum plate is followed from top to bottom lock in place behind bottom shutoff aluminum plate passes the top, and the screw is beaten in the application and fastening connection, and the installation frame both forms bottom shutoff aluminum plate's braced frame can inject bottom shutoff aluminum plate's position again.
In this embodiment, the bottom plugging aluminum plate needs to be spliced with a bottom aluminum plate with a notch in the curtain wall unit where the bottom plugging aluminum plate is located, and also needs to be spliced with a bottom aluminum plate with a non-notch of the curtain wall unit next to the curtain wall unit where the bottom plugging aluminum plate is located. And at the opening position of the notch of the bottom aluminum plate, the installation frame is not arranged at the edge folding position of the bottom sealing aluminum plate spliced with the adjacent non-notch bottom aluminum plate, and the splicing of the bottom sealing aluminum plate and the non-notch bottom aluminum plate of the curtain wall unit adjacent to the curtain wall unit is directly realized through extruding the sealing rubber strip. Considering the occupation of the lower chord member of the main truss girder, in order to avoid interference of the lower blocking aluminum plate when the lower blocking aluminum plate is horizontally buckled, the lower blocking aluminum plate is buckled and installed, the plate edge of the opening position corresponding to the notch of the lower blocking aluminum plate is in a lower position, and is firstly inserted into the bottom of the lower chord member of the main truss girder, and then slowly buckled and leveled.
In this embodiment, the framework includes a main truss girder 11 and a transverse secondary girder 12 connecting adjacent main truss girders 11, and the transverse secondary girder 12 passes through two ends of the main truss girder 11 to form a socket cavity portion 13 and a socket head portion 14, respectively.
In this embodiment, the plug-in head portion 14 and the plug-in cavity portion 13 of each curtain wall unit are arranged in pairs left and right, so that adjacent curtain wall units can be plugged.
In this embodiment, when the curtain wall units are assembled, each curtain wall unit is lifted and moved through four lifting lugs 8, and the left and right adjacent curtain wall units are horizontally inserted into the plugging cavity part 13 of the left unit through the plugging head part 14 of the right unit to realize inter-unit splicing.
In this embodiment, the lifting lug 8 for lifting is made into a detachable form and can be repeatedly used. The lifting lug 8 is arranged on the outer side surface of the upper chord of the main truss girder at the edge of each curtain wall unit, the lifting lug is fastened with the upper chord through bolts before lifting, and the lifting lug can be disassembled and assembled on the next curtain wall unit to be installed after lifting.
In this embodiment, the adjacent curtain wall units are spliced by matching the splicing cavity portion 13 with the splicing head portion 14, and the lifting lug 8 is arranged on the outer side face of the upper chord of the main truss beam 11.
Embodiment two:
the method for installing the temporary overhanging curtain wall structure according to the first embodiment comprises the following steps:
step one, prefabricating a curtain wall unit: completing the manufacture of a framework, and installing a top aluminum plate, a front aluminum plate and a bottom aluminum plate on the framework for later use;
step two, installing a curtain wall unit: hoisting the curtain wall units in the first step, connecting the curtain wall units in the first step with embedded parts on a main body structure, and sequentially splicing and connecting the curtain wall units in the first step;
step three, installing a closing-in aluminum plate: erecting a construction hanging basket, wherein steel wire ropes on two sides of the hanging basket penetrate through the position of the top rear mounting aluminum plate and the notch of the bottom aluminum plate on the curtain wall unit in the adjacent step two, and lifting the hanging basket to the working height, and using the hanging basket as a construction platform to finish the installation of the bottom closing-in aluminum plate; lowering the hanging basket to the ground, disassembling the steel wire rope and the hanging basket, and installing the bottom closing-in aluminum plates of all curtain wall units one by one in the same way;
and step four, on the curtain wall unit in the step three, which is provided with the bottom closing-in aluminum plate, firstly, passing through the top and then installing the aluminum plate to fasten the bottom plugging aluminum plate at the installation notch from top to bottom, then installing the top and then installing the aluminum plate, and finally installing the top closing-in aluminum plate.
In this embodiment, the curtain wall units are prefabricated in a factory, the installation of the top aluminum plate, the front aluminum plate and the bottom aluminum plate is completed in the factory, and sealant is applied to the seams of the prefabricated aluminum plates, and then the prefabricated aluminum plates are transported to a construction site.
In this embodiment, the curtain wall units are prefabricated at the factory: and (3) assembling the keels, installing a top aluminum plate, a front aluminum plate and a bottom aluminum plate, reserving a top closing-in aluminum plate, a bottom closing-in aluminum plate, a top rear-loading aluminum plate and a bottom plugging aluminum plate, and transporting the assembled curtain wall unit to a construction site.
In this embodiment, a detachable lifting lug is mounted on the framework before lifting in the second step, and is dismounted to the next curtain wall unit to be mounted after mounting, and splicing is achieved between the curtain wall units through splicing.
In the embodiment, curtain wall units are hoisted one by one, and the upper chord member and the lower chord member of the main truss girder are hinged with embedded parts on the main structure to realize the fastening connection of the curtain wall units and the main structure. Before hoisting, installing a lifting lug on each curtain wall unit, and after the installation is completed, removing the lifting lug and installing the lifting lug on the next curtain wall unit to be installed; the curtain wall units are horizontally inserted into the splicing cavity parts 13 of the adjacent installed units through the self splicing heads 14 to realize splicing among the units.
In this embodiment, install top binding off aluminum plate, top aluminum plate, front portion aluminum plate, bottom binding off aluminum plate, bottom shutoff aluminum plate and top back installation aluminum plate and major structure on the skeleton enclose and close.
In the embodiment, a construction hanging basket is erected, the hanging basket is firstly placed on the ground, steel wire ropes on two sides of the hanging basket just penetrate through the positions of the top rear aluminum plates on the adjacent curtain wall units and the corresponding notches on the bottom aluminum plates from top to bottom from the front ends of the hanging arms, the steel wire ropes are lowered to the hanging basket, the steel wire ropes are fixedly connected with the hanging basket, and the hanging basket is lifted to the working height; the hanging basket is used as a construction platform, so that the installation of the bottom closing-in aluminum plate can be completed, and sealant is applied to the joint of the bottom closing-in aluminum plate; and (3) dropping the hanging basket to the ground, separating the steel wire rope from the hanging basket, and retracting the steel wire rope upwards. And erecting the hanging basket to the next adjacent curtain wall unit to be installed in the same manner.
In this embodiment, after the top aluminum plate is installed, the sealing glue should be applied to the corresponding aluminum plate seam after the top aluminum plate is installed.
The foregoing description of the preferred embodiments of the invention is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the invention.

Claims (9)

1. A method for installing a temporary overhanging curtain wall structure is characterized in that,
the curtain wall structure comprises a plurality of curtain wall units (0) which are sequentially connected, the curtain wall units (0) comprise a framework, a top aluminum plate (2), a bottom aluminum plate (3), a front aluminum plate (4) and a closing-in aluminum plate, the top aluminum plate (2) is fixed at the top of the framework, the bottom aluminum plate (3) is fixed at the bottom of the framework, the front aluminum plate (4) is fixed at one overhanging end of the framework, the closing-in aluminum plate is used for closing-in connection between the curtain wall units (0) and a main body structure,
the detachable lifting lugs (8) are arranged on the framework, a notch is formed in the bottom aluminum plate (3), a top rear aluminum plate (6) is arranged at the top of the framework and corresponds to the notch on the bottom aluminum plate (3), and a bottom plugging aluminum plate (7) is arranged on the notch;
the installation method comprises the following steps:
step one, prefabricating a curtain wall unit: completing the manufacture of a framework, and installing a top aluminum plate, a front aluminum plate and a bottom aluminum plate on the framework for later use;
step two, installing a curtain wall unit: hoisting the curtain wall units in the first step, connecting the curtain wall units in the first step with embedded parts on a main body structure, and sequentially splicing and connecting the curtain wall units in the first step;
step three, installing a closing-in aluminum plate: erecting a construction hanging basket, wherein steel wire ropes on two sides of the hanging basket penetrate through the position of the top rear mounting aluminum plate and the notch of the bottom aluminum plate on the curtain wall unit in the adjacent step two, and lifting the hanging basket to the working height, and using the hanging basket as a construction platform to finish the installation of the bottom closing-in aluminum plate; lowering the hanging basket to the ground, disassembling the steel wire rope and the hanging basket, and installing the bottom closing-in aluminum plates of all curtain wall units one by one in the same way;
and step four, on the curtain wall unit in the step three, which is provided with the bottom closing-in aluminum plate, firstly, passing through the top and then installing the aluminum plate to fasten the bottom plugging aluminum plate at the installation notch from top to bottom, then installing the top and then installing the aluminum plate, and finally installing the top closing-in aluminum plate.
2. The method for installing a curtain wall construction of claim 1, wherein the first step is to prefabricate the curtain wall units in a factory, complete the installation of the top aluminum plate, the front aluminum plate and the bottom aluminum plate in the factory, and then transport the curtain wall units to a site.
3. The method for installing the overhanging curtain wall structure in the open air according to claim 1, wherein detachable lifting lugs are installed on the framework before being lifted in the second step, the lifting lugs are detached to the next curtain wall unit to be installed after the installation is completed, and splicing is achieved between the curtain wall units through splicing.
4. The method for installing the overhanging curtain wall structure in the open state according to claim 1, wherein the top closing-in aluminum plate (51) and the bottom closing-in aluminum plate (52) are included, the top closing-in aluminum plate (51) is used for closing-in connection between the top of the curtain wall unit (0) and the main structure, and the bottom closing-in aluminum plate (52) is used for closing-in connection between the bottom of the curtain wall unit (0) and the main structure.
5. The method for installing the overhanging curtain wall structure in the open state according to claim 4, wherein the top closing-in aluminum plate (51) is L-shaped, one end of the top closing-in aluminum plate (51) is in sealing connection with the top aluminum plate (2) and the top rear mounting aluminum plate (6), the other end of the top closing-in aluminum plate is connected with the main body structure, and two sides of the top closing-in aluminum plate (51) are in sealing connection with the adjacent top closing-in aluminum plates (51).
6. The method for installing the overhanging curtain wall structure in the open state according to claim 4, wherein the bottom closing-in aluminum plate (52) is L-shaped, one end of the bottom closing-in aluminum plate (52) is in sealing connection with the bottom aluminum plate (3), the other end of the bottom closing-in aluminum plate is in sealing connection with the main body structure, and two sides of the bottom closing-in aluminum plate (52) are in sealing connection with the adjacent bottom closing-in aluminum plates (52).
7. The method for installing the overhanging curtain wall structure in the open air according to claim 4, wherein the notch of the bottom aluminum plate (3) is sealed and connected with the bottom aluminum plate (3) where the notch is located, and the bottom aluminum plate (7) is also sealed and connected with the bottom aluminum plate (3) on the adjacent curtain wall units.
8. The method for installing the overhanging curtain wall structure in the open air according to claim 4, wherein the framework comprises a main truss girder (11) and a transverse secondary girder (12) connected with the adjacent main truss girders (11), and the transverse secondary girder (12) passes through two ends of the main truss girder (11) to form a splicing cavity part (13) and a splicing head part (14) respectively.
9. The method for installing the overhanging curtain wall structure in the open air according to claim 8, characterized in that the adjacent curtain wall units are spliced by matching the splicing cavity parts (13) with the splicing head parts (14), and the lifting lugs (8) are arranged on the outer side surfaces of the upper chords of the main truss beams (11).
CN202210901864.5A 2022-07-28 2022-07-28 Temporary overhanging curtain wall structure and installation method Active CN115110683B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210901864.5A CN115110683B (en) 2022-07-28 2022-07-28 Temporary overhanging curtain wall structure and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210901864.5A CN115110683B (en) 2022-07-28 2022-07-28 Temporary overhanging curtain wall structure and installation method

Publications (2)

Publication Number Publication Date
CN115110683A CN115110683A (en) 2022-09-27
CN115110683B true CN115110683B (en) 2023-09-26

Family

ID=83335356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210901864.5A Active CN115110683B (en) 2022-07-28 2022-07-28 Temporary overhanging curtain wall structure and installation method

Country Status (1)

Country Link
CN (1) CN115110683B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009287316A (en) * 2008-05-30 2009-12-10 Ykk Ap株式会社 Curtain wall, and construction method of curtain wall
JP2015071879A (en) * 2013-10-02 2015-04-16 清水建設株式会社 Curtain wall-mounting method, and curtain wall-lifting box for use in the same
CN108060731A (en) * 2017-11-17 2018-05-22 江河创建集团股份有限公司 Overhang big all-wing aircraft type unitized curtain wall system and its installation method
CN112942789A (en) * 2021-02-04 2021-06-11 广东世纪达建设集团有限公司 Water drop type curtain wall construction method
CN113136993A (en) * 2021-04-02 2021-07-20 中建一局集团建设发展有限公司 Overhanging outer curtain wall supporting structure of building adjacent to historical landscape protection and construction method thereof
CN216196507U (en) * 2021-11-08 2022-04-05 中国建筑第二工程局有限公司 Curtain construction hanging basket suspension device
CN114412181A (en) * 2022-01-11 2022-04-29 永威置业集团有限公司 Aluminum alloy large-modeling hoisting construction process

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009287316A (en) * 2008-05-30 2009-12-10 Ykk Ap株式会社 Curtain wall, and construction method of curtain wall
JP2015071879A (en) * 2013-10-02 2015-04-16 清水建設株式会社 Curtain wall-mounting method, and curtain wall-lifting box for use in the same
CN108060731A (en) * 2017-11-17 2018-05-22 江河创建集团股份有限公司 Overhang big all-wing aircraft type unitized curtain wall system and its installation method
CN112942789A (en) * 2021-02-04 2021-06-11 广东世纪达建设集团有限公司 Water drop type curtain wall construction method
CN113136993A (en) * 2021-04-02 2021-07-20 中建一局集团建设发展有限公司 Overhanging outer curtain wall supporting structure of building adjacent to historical landscape protection and construction method thereof
CN216196507U (en) * 2021-11-08 2022-04-05 中国建筑第二工程局有限公司 Curtain construction hanging basket suspension device
CN114412181A (en) * 2022-01-11 2022-04-29 永威置业集团有限公司 Aluminum alloy large-modeling hoisting construction process

Also Published As

Publication number Publication date
CN115110683A (en) 2022-09-27

Similar Documents

Publication Publication Date Title
CN215291318U (en) Mounting structure of attached lifting scaffold
CN114961334B (en) High-altitude large-span overhanging structure closed protection dismantling system and construction method thereof
CN112112418B (en) Construction method of high-rise building aluminum formwork climbing frame combined system
CN114876239B (en) High-altitude overhanging structure closed protection dismantling system and construction method thereof
CN115110683B (en) Temporary overhanging curtain wall structure and installation method
CN113006334B (en) Assembly type light partition wall batten connecting device adopting double dovetail connection
CN113756503B (en) Construction method of Z-shaped streamer hall
CN216811161U (en) Modular structure of airport terminal corridor
CN114439242A (en) Construction method for optimizing and hoisting and reinforcing assembled overhanging complex component
CN113006324B (en) Sandwich plate installation method for steel structure factory building
CN215670944U (en) A operation platform that is used for high altitude to encorbelment roofing framework beam veneer construction
CN114922356B (en) Roof lighting skylight with electric smoke exhaust fan and construction method thereof
CN218841522U (en) Regularization tower crane attaches wall operation platform
CN218405953U (en) Newly-built curtain system of existing building
CN219548015U (en) Concrete building module
CN219773292U (en) Fireproof isolation belt between inner layers of curtain wall
CN109098453B (en) Outer wall surface installation and construction process of sandwich board of steel structure factory building
CN218347206U (en) Steel skeleton composite door frame
JP2919827B1 (en) All-weather temporary scaffolding device and method of using all-weather temporary scaffolding device
CN212836243U (en) Outer hanging prefabricated outer window containing auxiliary frame wallboard module, external wall panel and housing construction
CN220133647U (en) Light easy-to-use observation tower for meteorological field
CN219451432U (en) Construction frame for curved curtain wall
CN208950110U (en) The curved arc full glass curtain wall of super 10m high
CN212358830U (en) Assembled steel-aluminum composite structure external wall panel
CN115492388B (en) Construction method for vertical-surface cable membrane of huge-width outward-inclined cable back-pulling system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A suspended curtain wall structure and installation method in the air

Granted publication date: 20230926

Pledgee: Bank of Changsha Limited by Share Ltd. Hualong branch

Pledgor: HUNAN KURBON CURTAIN WALL DECORATION CO.,LTD.

Registration number: Y2021430000001

PE01 Entry into force of the registration of the contract for pledge of patent right