CN115079571A - Intelligent optimization control method for satellite power supply fault reconstruction based on wild goat algorithm - Google Patents

Intelligent optimization control method for satellite power supply fault reconstruction based on wild goat algorithm Download PDF

Info

Publication number
CN115079571A
CN115079571A CN202210735650.5A CN202210735650A CN115079571A CN 115079571 A CN115079571 A CN 115079571A CN 202210735650 A CN202210735650 A CN 202210735650A CN 115079571 A CN115079571 A CN 115079571A
Authority
CN
China
Prior art keywords
fault
load
group
reconstruction
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210735650.5A
Other languages
Chinese (zh)
Other versions
CN115079571B (en
Inventor
章仕起
李中琴
郭小强
张力戈
孔寒冰
卢志刚
华长春
乔瑟夫·格莱罗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanshan University
Original Assignee
Yanshan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanshan University filed Critical Yanshan University
Priority to CN202210735650.5A priority Critical patent/CN115079571B/en
Publication of CN115079571A publication Critical patent/CN115079571A/en
Application granted granted Critical
Publication of CN115079571B publication Critical patent/CN115079571B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • G05B13/042Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/27Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/04Constraint-based CAD
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Engineering & Computer Science (AREA)
  • Evolutionary Computation (AREA)
  • Physics & Mathematics (AREA)
  • Software Systems (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Medical Informatics (AREA)
  • Artificial Intelligence (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Automation & Control Theory (AREA)
  • Computer Hardware Design (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses an intelligent optimization control method for satellite power supply fault reconstruction based on a wild goat algorithm, and relates to the technical field of power electronics. According to the invention, a multi-target function of maximum recovery load and minimum power loss of a load grade under a fault condition is established by sampling the electric quantity through a sensor, power supply construction and the like are determined as constraint conditions, and the weight occupied by two targets in the multi-target function is determined by applying a linear weighting method, so that a comprehensive target model of a system is constructed to obtain an optimal fault recovery switch sequence. According to the method, the wild goat algorithm and the intelligent control unit are combined, the wild goat algorithm is introduced on the basis of considering multi-objective function optimization, the speed of solving the optimal solution of the reconstruction algorithm can be effectively increased, and the convergence speed is better. The use of combining intelligent control unit can realize the double detection of reconstruction scheme, prevent to take place the secondary failure, provide certain fault-tolerant rate for system recovery, improved the accuracy of reconstruction result.

Description

Intelligent optimization control method for satellite power supply fault reconstruction based on wild goat algorithm
Technical Field
The invention relates to the technical field of power electronics, in particular to an intelligent optimization control method for satellite power supply fault reconstruction based on a wild goat algorithm.
Background
Because the complexity of the spacecraft task is higher and higher, the power of load equipment is increased continuously, and the requirement on reliability is gradually improved, the satellite power supply and distribution system gradually develops towards the direction of fault autonomous diagnosis and autonomous recovery. The current more common method for realizing fault reconstruction consists of a ground detection system and an improved reconstruction algorithm. However, the implementation of the reconstruction scheme based on the ground detection system depends on data transmission of the satellite computer and the ground communication detection system, and after consultation by a ground expert, a reconstruction instruction is sent to the satellite for fault reconstruction, and this control method causes waste of fault reconstruction time, poor real-time detection performance, and risk of fault expansion. The most common algorithm for power restoration can realize real-time detection of faults and autonomous restoration on the satellite, but the wide-area solving algorithm has low solving efficiency and is easy to fall into a local optimal solution, so that the solving accuracy is not high, and in this respect, the reconstruction method provided for the dynamic purpose has a weak optimization result and low precision.
Disclosure of Invention
The invention aims to provide an intelligent optimization control method for satellite power supply fault reconstruction based on a wild goat algorithm, and solves the technical problems that the fault reconstruction has poor real-time detection performance, the wide-area solving algorithm has low efficiency and is easy to fall into the current situation of local optimization. The method can detect the fault in real time, and improve the accuracy and rapidity of the reconstruction scheme.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows: the intelligent optimization control method for satellite power supply fault reconstruction based on the wild goat algorithm comprises the following steps:
step S1, designing a hierarchical control system, wherein the hierarchical control system comprises a mathematical physical layer and a network information layer which performs information interaction with the mathematical physical layer through a sensor, the mathematical physical layer comprises a sampling unit and a control unit, and the network information layer comprises a fault detection unit, a fault area detection unit, a fault reconstruction unit and an intelligent control agent unit; the sensor transmits physical quantity obtained by sampling the load output end by the mathematical physical layer to the network information layer for data detection;
step S2, detecting sampling parameters, judging whether a fault occurs, if the signal abnormality is detected, judging that the fault occurs, positioning the fault, and respectively transmitting the fault information to step S3 and step S4; if the signal is normal, the step S5 is carried out, a normal signal is sent to the intelligent control agent, and the intelligent control agent continues to work;
step S3, after receiving the fault signal and the fault positioning information, searching the optimal switch sequence of the system for fault reconstruction based on the wild goat algorithm under the premise of considering the load grade to obtain the reconstruction scheme of the optimal power restoration under the load grade, and transmitting the reconstruction scheme to the intelligent control system in the step S5 for switching the switch;
step S4, when receiving the fault signal, the fault area detection unit positions and calculates the total load capacity of the fault area detected by the fault information
Figure BDA0003715277740000021
And will load the total capacity
Figure BDA0003715277740000022
Transmitting to the intelligent control unit to provide the intelligent control system with the line capacity constraint in step S5;
step S5, after receiving the signal from the system, the intelligent control unit sends a switch command to the line of each load, and in the normal mode of the system: after receiving the normal signal of step S2, the system does not adjust the switching sequence, and keeps the current switching mode; in a system failure mode: after receiving the fault reconfiguration sequence of step S3, performing the operation of step S4 to switch the optimal switching sequence transmitted to the line according to the load priority and the line capacity;
and step S6, after the fault reconstruction is completed, detecting a current electric quantity signal, transmitting the current electric quantity signal to a physical layer through a sensor to perform a new round of closed-loop control of the line electric quantity, and repeating the actions.
The technical scheme of the invention is further improved as follows: in step S1, the physical quantity sampled by the load output end by the mathematical physical layer includes the priority ω of N loads i Resistance R on the ith branch in different switch conducting states i Current I i Voltage V i Load L on ith bus i And the load state y i Load state y i The normal state is represented as 1 and the fault state is represented as 0.
The technical scheme of the invention is further improved as follows: the process of detecting the sampling parameter in step S2 is as follows: according to the branch current I i Voltage V i And whether the values of the bus current and the bus voltage exceed the threshold values thereof, namely: i is i >I imax And V i >V imax (ii) a When the detection unit detects that the electric quantity values of the system are normal, the detection unit judges that the line works in a normal state, and the detection unit sends a normal signal to the intelligent control unit; when the real-time detection signal is abnormal, the detection unit judges that the line has a fault, and respectively transmits an abnormal signal to the fault reconstruction unit in the step S3 to enable the fault reconstruction unit to execute a reconstruction function; the failure information is sent to the failure area detection in step S4 to calculate the failure volume.
The technical scheme of the invention is further improved as follows: the specific steps of searching the optimal switch sequence of the system for fault reconstruction based on the wild goat algorithm under the premise of considering the load level in the step S3 are as follows:
step S31, composition of multi-objective function model
Using linear weighting according to the maximum recovery load f 1 And minimum power loss f 2 Is of importanceThe degree is used as weight, and a comprehensive objective function F is obtained through calculation, wherein the formula is as follows:
Figure BDA0003715277740000031
Figure BDA0003715277740000032
F=λ 1 f 12 f 2
wherein, ω is i Is the priority, R, of the load i Is the resistance, L, on the ith branch in different switch on states i Is the load on the ith bus, y i Is a load state, a load state y i The normal state is represented as 1, and the fault state is represented as 0, lambda 1 And λ 2 Is a constant;
step S32, inequality constraint condition: the inequality constraint conditions comprise node voltage limit value constraint, line transmission power constraint and transmission line current constraint;
1) node voltage limit constraints
After the satellite power supply is connected to the power distribution network, the voltage V of each node i The relevant constraints are satisfied as follows:
V imax >V i >V imin
2) line transmission power constraint
The transmission power of the line between the nodes meets the relevant constraint conditions as follows:
P ij <P ijmax
P ij representing the power, P, of the line transmission between nodes ijmax Is the maximum value of the transmission power of the line;
3) transmission line current constraints
Current I flowing in the line i The relevant constraints are satisfied as follows:
I imax >I i >I imin
step (ii) ofS33, initializing population: the load switches are numbered, binary coding is adopted, the switch states are represented by 0 and 1, the switch-off state is 0, the switch-on state is 1, and the switch states are combined together to form a problem solution omega g i Wherein ω g i =f[x i1 ,x i2 ...x iN ];
Step S34, evaluating the individuals: the weight of each independent solution is calculated according to the comprehensive objective function:
Figure BDA0003715277740000041
Figure BDA0003715277740000042
Figure BDA0003715277740000043
wherein N is var Is the dimension of each problem optimization, N wg Is the number of members of the group, f (wg) i ) Is wg per individual i Weight value of F (wg) i ) Is the value of the integrated objective function;
then, performing equal-number grouping on the individuals, and then performing calculation on the proportion of each individual in the group, wherein the weight of the optimal switching sequence is 1, the other groups are 0-1, the individual with the high weight of the group is selected as a leader of the group, and the other individuals are followers;
step S35, group movement: after grouping, each group will move towards the best try direction, and the leader and follower in the group will have two different movement trends, as follows:
1) the leader will follow its own motion vector v i (t) and best try direction p i (t) carrying out group movement with followers in the collar group;
2) direction v of movement of follower ik (t) there are three trends of influence: the follower's own motion vector and best try direction and the leader's motion direction;
the following is the calculation of the motion formulas for the leader and follower, respectively:
the leader: v i (t+1)=ω×v i (t)+R×rand×(p i (t)-ωg i (t)),
Following the person: v i (t+1)=ω×v i (t)+R×rand×(p i (t)-ωg i (t))+W lk (t)×rand×(ωg lk (t)-ωg i (t)),
Where ω represents the inertial weight, R represents the learning coefficient, W lk Is the weight of the kth leader, rand is a random parameter, typically taken as 0 or 1, v i (t) is the motion vector at time t, p i (t) is the best try direction,. omega.g i (t) is the ith individual weight,. omega.g lk (t) is the average weight in the population, v ik (t) is the motion vector of the follower;
step S36, reevaluation: re-evaluating each group in each population after mobile updating, and re-calculating the weight of each independent individual and selecting a leader;
step S37, group cooperation: in the process of finding the optimal switch sequence, the weights of individuals in groups are updated regularly in the groups, leader weights are compared among the groups, the group with high weight attracts the individual with the lowest weight in the group with low weight and then reduces the weight of the group, and the weight of the group is calculated as follows:
Figure BDA0003715277740000051
Figure BDA0003715277740000052
is the weight of the i-th group population, N g Is the number of groups, N Gi Is the number of followers of the group, W li Is the weight of the ith group population leader,
Figure BDA0003715277740000053
is a group heelThe weighted sum of the followers;
through the increase of the number of iterations, the group with low leader weight gradually loses its group members, even the leader, which is the best sequence for reconstruction when different groups composed of independent individuals are merged into the same group due to mutual attraction of the weights and only has one leader.
The technical scheme of the invention is further improved as follows: in the system failure mode in step S5, the intelligent control unit performs the following operations: calculating the available power capacity ARC of the line shown in the switching sequence after the optimal switching sequence of the system obtained in step S3 i Then the ARC is applied i And total capacity of fault load
Figure BDA0003715277740000054
Comparing, and judging whether the current line can support system recovery;
if it is satisfied with
Figure BDA0003715277740000055
Then the normal recovery of the system is carried out; if the load is not satisfied, the load with high priority level is recovered, then a switch exchange table is established, the switch capacity of the nearby line is calculated, the pressure of load recovery is transmitted to the nearby line, and when the capacity of each line meets the requirement, but partial loads with low priority levels are not recovered by power supply, load shedding reconstruction is performed.
Due to the adoption of the technical scheme, the invention has the technical progress that:
1. the invention can detect the working state of the power supply circuit in real time, and reduces the danger of fault expansion;
2. according to the solving scheme based on the wild goat algorithm, on the basis of the multi-objective optimization function, the solving speed of the reconstruction sequence can be effectively increased, the situation that the reconstruction sequence is trapped in local optimization is avoided, and the accuracy of system solving is improved;
3. the invention provides a method for combining intelligent control units, which can realize double detection of a reconstruction scheme on the basis of obtaining an optimal reconstruction sequence of a system, provide a certain fault-tolerant rate for system recovery and improve the accuracy of a reconstruction result.
Drawings
FIG. 1 is an overall block diagram of the operation of the present invention;
FIG. 2 is a schematic diagram of the power switch in step S33 according to the present invention;
fig. 3 is a schematic diagram of the operation of the intelligent control unit of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
the following provides a detailed description of the preferred embodiments of the present invention with reference to the accompanying drawings.
As shown in FIG. 1, the intelligent control method for satellite power failure reconstruction based on the wild goat algorithm comprises the following steps:
step S1, designing a hierarchical control system, wherein the hierarchical control system comprises a mathematical physical layer and a network information layer which performs information interaction with the mathematical physical layer through a sensor, the mathematical physical layer comprises a sampling unit and a control unit, and the network information layer comprises a fault detection unit, a fault area detection unit, a fault reconstruction unit and an intelligent control agent unit; wherein:
the sampling unit and the control unit are used for carrying out information interaction with a network information layer through a sensor, and comprise various electrical parameters of a satellite power supply system;
the fault detection is to perform information interaction with a sampling unit of a physical layer through a sensor, directly connect with a fault area detection and fault reconstruction unit and an intelligent control unit of a network layer, detect a current signal of a current circuit in real time and judge whether the current circuit works normally;
the fault area detection is connected with the fault detection and intelligent control unit, and when a circuit fault signal is received, the total load capacity of the fault area is judged and sent to the control unit; the circuit does not work when in normal operation;
the intelligent control unit is connected with the fault reconstruction, fault area detection and fault detection unit and has two working modes, when a circuit is in fault, a switch instruction is sent to each load line switch to realize the process of power supply fault reconstruction, then the reconstructed electrical quantity is sent to the sensor, the circuit is not reconstructed when being normal, and only information is transmitted with the sensor.
The sensor transmits physical quantity obtained by sampling the load output end by the mathematical physical layer to the network information layer for data detection; the physical quantity obtained by sampling the load output end by the mathematical physical layer comprises the priority omega of N loads i Resistance R on the ith branch in different switch conducting states i Current I i Voltage V i Load L on ith bus i And the load state y i Load state y i The normal state is represented as 1 and the fault state is represented as 0.
Step S2, detecting sampling parameters, judging whether a fault occurs, if the signal abnormality is detected, judging that the fault occurs, positioning the fault, and respectively transmitting the fault information to step S3 and step S4; if the signal is detected to be normal, step S5 is performed to send a normal signal to the intelligent control agent to continue working.
The process of detecting the sampling parameters comprises the following steps: according to the branch current I i Voltage V i And whether the values of the bus current and the bus voltage exceed the threshold values thereof, namely: i is i >I imax And V i >V imax (ii) a When the detection unit detects that the electric quantity values of the system are normal, the detection unit judges that the line works in a normal state, and the detection unit sends a normal signal to the intelligent control unit; when the real-time detection signal is abnormal, the detection unit judges that the line has a fault, and respectively transmits an abnormal signal to the fault reconstruction unit in the step S3 to enable the fault reconstruction unit to execute a reconstruction function; the failure information is sent to the failure area detection in step S4 to calculate the failure volume.
And S3, after receiving the fault signal and the fault positioning information, searching the optimal switch sequence of the system for fault reconstruction based on the wild goat algorithm under the premise of considering the load grade to obtain a reconstruction scheme of optimal power restoration under the load grade, and transmitting the reconstruction scheme to the intelligent control system in the step S5 for switching the switch.
The method comprises the following specific steps of searching the optimal switch sequence of the system for fault reconstruction on the premise of considering the load grade based on the wild goat algorithm:
step S31, composition of multi-objective function model
The linear weighting method is adopted, the difference of the objective function values in dimension, order of magnitude and attention degree is considered through different weighting coefficients, the incomparable contradiction among feasible schemes is basically solved, and the maximum recovery load f is used 1 And minimum power loss f 2 The importance degree of the fault recovery switch is used as weight, and a comprehensive objective function F is calculated, so that the multi-objective function can be effectively and accurately embodied, and an optimal fault recovery switch sequence is obtained.
The formula is as follows:
Figure BDA0003715277740000081
Figure BDA0003715277740000082
F=λ 1 f 12 f 2
wherein, ω is i Is the priority, R, of the load i Is the resistance, L, of the ith branch in the on-state of different switches i Is the load on the ith bus, y i Is a load state, a load state y i The normal state is represented as 1, and the fault state is represented as 0, lambda 1 And λ 2 Is a constant;
step S32, inequality constraint condition: in the research of the optimization configuration problem of the satellite power supply fault, inequality constraints are considered besides equality constraint conditions, wherein the inequality constraint conditions comprise node voltage limit value constraints, line transmission power constraints and transmission line current constraints;
1) node voltage limit constraints
After the satellite power supply is connected to the power distribution network, the overlarge satellite power supply capacity can be introducedThe local voltage of the starting and distribution network is out of limit, so that the voltage V of each node must be ensured i All relevant constraints are satisfied:
V imax >V i >V imin
2) line transmission power constraint
The power supply setting constraint is that the transmission capacity of the transmission line is limited to a certain extent because the type of the wire of the power grid is fixed. Therefore, the transmission power of the line needs to be controlled within a certain range to prevent negative damage to the power system.
The transmission power of the line between the nodes meets the relevant constraint conditions as follows:
P ij <P ijmax
P ij representing the power, P, of the line transmission between nodes ijmax Is the maximum value of the transmission power of the line;
3) transmission line current constraints
When the power supply system works abnormally, the current flowing in the line may exceed the maximum allowable load current, which causes the power system to malfunction: the current I flowing through the connected line is required to be influenced by the stable operation of the power system i And (6) carrying out constraint. Current I flowing in the line i The relevant constraints are satisfied as follows:
I imax >I i >I imin
step S33, initializing population: the load switches are numbered, binary coding is adopted, the switch states are represented by 0 and 1, the switch-off state is 0, the switch-on state is 1, and the switch states are combined together to form a problem solution omega g i Wherein ω g i =f[x i1 ,x i2 ...x iN ]For example, the switch [ S ] of FIG. 2 1-1 ,S 1-2 ……S 1-n ]=[0,0,...0]For each problem solution, perform an equal number N Gi Random grouping of (2);
step S34, evaluating the individuals: the weight of each independent solution is calculated according to the comprehensive objective function:
Figure BDA0003715277740000091
Figure BDA0003715277740000092
Figure BDA0003715277740000093
wherein N is var Is the dimension of each problem optimization, N wg Is the number of members of the group, f (wg) i ) Is wg per individual i Weight value of F (wg) i ) Is the value of the integrated objective function;
then, grouping the individuals in equal number, and calculating the proportion of each individual in the group, wherein the weight of the optimal switching sequence is 1, and the others are 0-1, the individual with the high weight of the group is selected as a leader of the group, and the other individuals are followers;
step S35, group movement: after grouping, each group will move towards the best try direction, and the leader and follower in the group will have two different movement trends, as follows:
1) the leader will follow its own motion vector v i (t) and best try direction p i (t) carrying out group movement with followers in the collar group;
2) direction v of movement of follower ik (t) there are three trends of influence: the follower's own motion vector and best try direction and the leader's motion direction;
the following is the calculation of the motion formulas for the leader and follower, respectively:
the leader: v i (t+1)=ω×v i (t)+R×rand×(p i (t)-ωg i (t)),
The following person: v i (t+1)=ω×v i (t)+R×rand×(p i (t)-ωg i (t))+W lk (t)×rand×(ωg lk (t)-ωg i (t)),
Where omega represents the weight of the inertia,r represents a learning coefficient, W lk Is the weight of the kth leader, rand is a random parameter, typically taken as 0 or 1, v i (t) is the motion vector at time t, p i (t) is the best try direction,. omega.g i (t) is the ith individual weight,. omega.g lk (t) is the average weight in the population, v ik (t) is the motion vector of the follower;
step S36, reevaluation: re-evaluating each group in each population after mobile updating, and re-calculating the weight of each independent individual and selecting a leader;
step S37, group cooperation: in the process of finding the optimal switch sequence, the weights of individuals in groups are updated regularly in the groups, leader weights are compared among the groups, the group with high weight attracts the individual with the lowest weight in the group with low weight and then reduces the weight of the group, and the weight of the group is calculated as follows:
Figure BDA0003715277740000101
Figure BDA0003715277740000102
is the weight of the i-th group population, N g Is the number of groups, N Gi Is the number of followers of the group, W li Is the weight of the ith group population leader,
Figure BDA0003715277740000103
is the weighted sum of the followers in the group;
through the increase of the number of iterations, the group with low leader weight gradually loses its group members, even the leader, which is the best sequence for reconstruction when different groups composed of independent individuals are merged into the same group due to mutual attraction of the weights and only has one leader.
Step S4, when receiving the fault signal, the fault area detection unit positions and calculates the total load capacity of the fault area detected by the fault information
Figure BDA0003715277740000104
And will load the total capacity
Figure BDA0003715277740000105
Transmitting to the intelligent control unit to provide the intelligent control system with the line capacity constraint in step S5;
step S5, after receiving the signal from the system, the intelligent control unit sends a switch command to the line of each load, and in the normal mode of the system: after receiving the normal signal of step S2, the system does not adjust the switching sequence, and keeps the current switching mode; in a system failure mode: after receiving the fault reconfiguration sequence of step S3, performing the operation of step S4 to switch the optimal switching sequence transmitted to the line according to the load priority and the line capacity;
as shown in fig. 3, after receiving a system signal, the intelligent control unit may determine a failure mode, and if the system is normal, maintain the current switching mode, not change the system switching sequence, and continue to detect the current electrical quantity; if the system shows a fault, the following operations are performed:
after the optimal switching sequence after algorithm reconstruction is obtained in the fault mode, ARC is calculated i I.e. the available power capacity of the line shown in the switching sequence, which is then combined with the total capacity of the fault load
Figure BDA0003715277740000111
And comparing to judge whether the current line can support system recovery.
If it is satisfied with
Figure BDA0003715277740000112
Then the normal recovery of the system is carried out; if not, the priority load grade is high, the recovery is carried out, then a switch exchange table is established, the calculation of the switch capacity of the nearby line is carried out, the pressure of load recovery is transmitted to the nearby line, and if the pressure is supposed to be required to be opened on 1-m (m) lines (K1 lines in the optimal switch sequence)<N) switches, but not due to line capacityAnd if the requirements are met, the loads with high priority levels are ranked in a descending order, the maximum capacity is recovered, the remaining unrepaired parts establish a switching table, the line power capacity of the K2 line is calculated, a possible recovery plan and load distribution are formulated, and the steps are sequentially carried out.
By establishing the switch table, recovery can be performed according to the load grade, a certain fault tolerance rate can be given to the reconstructed optimal switch sequence, and the situation that the optimal switch sequence falls into the local optimal predicament is prevented. And when the capacity of each line meets the requirement, but partial low-grade loads still have no power supply recovery, performing load shedding reconstruction.
And step S6, after the fault reconstruction is completed, detecting a current electric quantity signal, transmitting the current electric quantity signal to a physical layer through a sensor to perform a new round of closed-loop control of the line electric quantity, and repeating the actions.

Claims (5)

1. The intelligent optimization control method for satellite power supply fault reconstruction based on the wild goat algorithm is characterized by comprising the following steps of: the method comprises the following steps:
step S1, designing a hierarchical control system, wherein the hierarchical control system comprises a mathematical physical layer and a network information layer which performs information interaction with the mathematical physical layer through a sensor, the mathematical physical layer comprises a sampling unit and a control unit, and the network information layer comprises a fault detection unit, a fault area detection unit, a fault reconstruction unit and an intelligent control agent unit; the sensor transmits physical quantity obtained by sampling the load output end by the mathematical physical layer to the network information layer for data detection;
step S2, detecting sampling parameters, judging whether a fault occurs, if the signal abnormality is detected, judging that the fault occurs, positioning the fault, and respectively transmitting the fault information to step S3 and step S4; if the signal is detected to be normal, performing step S5, sending a normal signal to the intelligent control agent, and continuing working;
step S3, after receiving the fault signal and the fault positioning information, searching the optimal switch sequence of the system for fault reconstruction based on the wild goat algorithm under the premise of considering the load grade to obtain the reconstruction scheme of the optimal power restoration under the load grade, and transmitting the reconstruction scheme to the intelligent control system in the step S5 for switching the switch;
step S4, when receiving the fault signal, the fault area detection unit positions and calculates the total load capacity of the fault area detected by the fault information
Figure FDA0003715277730000011
And will load the total capacity
Figure FDA0003715277730000012
Transmitting to the intelligent control unit to provide the intelligent control system with the line capacity constraint in step S5;
step S5, after receiving the signal from the system, the intelligent control unit sends a switch command to the line of each load, and in the normal mode of the system: after receiving the normal signal of step S2, the system does not adjust the switching sequence, and keeps the current switching mode; in a system failure mode: after receiving the fault reconfiguration sequence of step S3, performing the operation of step S4 to switch the optimal switching sequence transmitted to the line according to the load priority and the line capacity;
and step S6, after the fault reconstruction is completed, detecting the current electrical quantity signal, transmitting the current electrical quantity signal to the physical layer through the sensor to perform a new round of closed-loop control of the line electrical quantity, and repeating the above actions.
2. The wild goat algorithm-based intelligent optimization control method for satellite power failure reconstruction as claimed in claim 1, wherein: in step S1, the physical quantity sampled by the load output end by the mathematical physical layer includes the priority ω of N loads i Resistance R on the ith branch in different switch conducting states i Current I i Voltage V i Load L on ith bus i And the load state y i Load state y i The normal state is represented as 1 and the fault state is represented as 0.
3. The wild goat algorithm-based intelligent optimization for satellite power failure reconstruction as claimed in claim 2The chemical control method is characterized by comprising the following steps: the process of detecting the sampling parameter in step S2 is as follows: according to the branch current I i Voltage V i And whether the values of the bus current and the bus voltage exceed the threshold values thereof, namely: i is i >I imax And V i >V imax (ii) a When the detection unit detects that the electric quantity values of the system are normal, the detection unit judges that the line works in a normal state, and the detection unit sends a normal signal to the intelligent control unit; when the real-time detection signal is abnormal, the detection unit judges that the line has a fault, and respectively transmits an abnormal signal to the fault reconstruction unit in the step S3 to enable the fault reconstruction unit to execute a reconstruction function; the failure information is sent to the failure area detection in step S4 to calculate the failure volume.
4. The wild goat algorithm-based intelligent optimization control method for satellite power failure reconstruction as claimed in claim 3, wherein: the specific steps of searching the optimal switch sequence of the system for fault reconstruction based on the wild goat algorithm under the premise of considering the load level in the step S3 are as follows:
step S31, composition of multi-objective function model
Using linear weighting according to the maximum recovery load f 1 And minimum power loss f 2 The importance degree of the target function is used as weight, and a comprehensive objective function F is obtained through calculation, wherein the formula is as follows:
Figure FDA0003715277730000021
Figure FDA0003715277730000022
F=λ 1 f 12 f 2
wherein, ω is i Is the priority, R, of the load i Is the resistance, L, of the ith branch in the on-state of different switches i Is the load on the ith bus, y i Is a load state, a load state y i The normal state is represented as 1, and the fault state is represented as 0, lambda 1 And λ 2 Is a constant;
step S32, inequality constraint condition: the inequality constraint conditions comprise node voltage limit constraint, line transmission power constraint and transmission line current constraint;
1) node voltage limit constraints
After the satellite power supply is connected to the power distribution network, the voltage V of each node i The relevant constraints are satisfied as follows:
V imax >V i >V imin
2) line transmission power constraint
The transmission power of the line between the nodes meets the relevant constraint conditions as follows:
P ij <P ijmax
P ij representing the power, P, of the line transmission between nodes ijmax Is the maximum value of the transmission power of the line;
3) transmission line current constraints
Current I flowing in the line i The relevant constraints are satisfied as follows:
I imax >I i >I imin
step S33, initializing population: the load switches are numbered, binary coding is adopted, the switch states are represented by 0 and 1, the switch-off state is 0, the switch-on state is 1, and the switch states are combined together to form a problem solution omega g i Wherein ω g i =f[x i1 ,x i2 ...x iN ];
Step S34, evaluating the individuals: the weight of each independent solution is calculated according to the comprehensive objective function:
Figure FDA0003715277730000031
Figure FDA0003715277730000032
Figure FDA0003715277730000033
wherein N is var Is the dimension of each problem optimization, N wg Is the number of members of the group, f (wg) i ) Is wg per individual i Weight value of F (wg) i ) Is the value of the integrated objective function;
then, performing equal-number grouping on the individuals, and then performing calculation on the proportion of each individual in the group, wherein the weight of the optimal switching sequence is 1, the other groups are 0-1, the individual with the high weight of the group is selected as a leader of the group, and the other individuals are followers;
step S35, group movement: after grouping, each group will move towards the best try direction, and the leader and follower in the group will have two different movement trends, as follows:
1) the leader will follow its own motion vector v i (t) and best try direction p i (t) carrying out group movement with followers in the collar group;
2) direction v of movement of follower ik (t) there are three trends of influence: the follower's own motion vector and best try direction and the leader's motion direction;
the following is the calculation of the motion formulas for the leader and follower, respectively:
the leader: v i (t+1)=ω×v i (t)+R×rand×(p i (t)-ωg i (t)),
Following the person: v i (t+1)=ω×v i (t)+R×rand×(p i (t)-ωg i (t))+W lk (t)×rand×(ωg lk (t)-ωg i (t)),
Where ω represents the inertial weight, R represents the learning coefficient, W lk Is the weight of the kth leader, rand is a random parameter, typically taken as 0 or 1, v i (t) is the motion vector at time t, p i (t) is the best try direction,. omega.g i (t) is the ith individual weight,. omega.g lk (t) is the average weight in the population, v ik (t) is the motion vector of the follower;
step S36, reevaluation: re-evaluating each group in each population after mobile updating, and re-calculating the weight of each independent individual and selecting a leader;
step S37, group cooperation: in the process of finding the optimal switch sequence, the weights of individuals in groups are updated regularly in the groups, leader weights are compared among the groups, the group with high weight attracts the individual with the lowest weight in the group with low weight and then reduces the weight of the group, and the weight of the group is calculated as follows:
Figure FDA0003715277730000041
Figure FDA0003715277730000042
is the weight of the i-th group population, N g Is the number of groups, N Gi Is the number of followers of the group, W li Is the weight of the ith group population leader,
Figure FDA0003715277730000043
is the weighted sum of the followers in the group;
through the increase of the number of iterations, the group with low leader weight gradually loses its group members, even the leader, which is the best sequence for reconstruction when different groups composed of independent individuals are merged into the same group due to mutual attraction of the weights and only has one leader.
5. The wild goat algorithm-based intelligent optimization control method for satellite power failure reconstruction as claimed in claim 3, wherein: in the system failure mode in step S5, the intelligent control unit performs the following operations: calculating the available work of the circuit shown in the switching sequence after the optimal switching sequence of the system is obtained according to the step S3Rate capacity ARC i Then the ARC is applied i And total capacity of fault load
Figure FDA0003715277730000044
Comparing, and judging whether the current line can support system recovery;
if it is satisfied with
Figure FDA0003715277730000051
Then the normal recovery of the system is carried out; if the load is not satisfied, the load with high priority level is recovered, then a switch exchange table is established, the switch capacity of the nearby line is calculated, the pressure of load recovery is transmitted to the nearby line, and when the capacity of each line meets the requirement, but partial loads with low priority levels are not recovered by power supply, load shedding reconstruction is performed.
CN202210735650.5A 2022-06-27 2022-06-27 Intelligent optimization control method for satellite power supply fault reconstruction based on wild goat algorithm Active CN115079571B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210735650.5A CN115079571B (en) 2022-06-27 2022-06-27 Intelligent optimization control method for satellite power supply fault reconstruction based on wild goat algorithm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210735650.5A CN115079571B (en) 2022-06-27 2022-06-27 Intelligent optimization control method for satellite power supply fault reconstruction based on wild goat algorithm

Publications (2)

Publication Number Publication Date
CN115079571A true CN115079571A (en) 2022-09-20
CN115079571B CN115079571B (en) 2022-12-30

Family

ID=83254741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210735650.5A Active CN115079571B (en) 2022-06-27 2022-06-27 Intelligent optimization control method for satellite power supply fault reconstruction based on wild goat algorithm

Country Status (1)

Country Link
CN (1) CN115079571B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106374456A (en) * 2016-09-14 2017-02-01 国网天津市电力公司 Power supply recovery method of power distribution network comprising distributed power supplies after fault
CN108711881A (en) * 2018-05-08 2018-10-26 国网山东省电力公司青岛供电公司 A kind of active distribution network fault recovery method containing distributed generation resource and micro-capacitance sensor
CN110994598A (en) * 2019-11-26 2020-04-10 国家电网有限公司 Multi-target power grid fault recovery method and device
CN113036823A (en) * 2021-03-10 2021-06-25 海南电网有限责任公司电力科学研究院 Distributed power distribution network optimization reconstruction method
CN113036760A (en) * 2021-03-31 2021-06-25 国网上海市电力公司 Method and system for recovering power grid load after disaster and computer readable medium
CN114336638A (en) * 2022-01-28 2022-04-12 国家电网有限公司 Medium-voltage active power distribution network dynamic reconstruction method based on bubbling model

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106374456A (en) * 2016-09-14 2017-02-01 国网天津市电力公司 Power supply recovery method of power distribution network comprising distributed power supplies after fault
CN108711881A (en) * 2018-05-08 2018-10-26 国网山东省电力公司青岛供电公司 A kind of active distribution network fault recovery method containing distributed generation resource and micro-capacitance sensor
CN110994598A (en) * 2019-11-26 2020-04-10 国家电网有限公司 Multi-target power grid fault recovery method and device
CN113036823A (en) * 2021-03-10 2021-06-25 海南电网有限责任公司电力科学研究院 Distributed power distribution network optimization reconstruction method
CN113036760A (en) * 2021-03-31 2021-06-25 国网上海市电力公司 Method and system for recovering power grid load after disaster and computer readable medium
CN114336638A (en) * 2022-01-28 2022-04-12 国家电网有限公司 Medium-voltage active power distribution network dynamic reconstruction method based on bubbling model

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
ALIREZA SHEFAEI 等: "Wild Goats Algorithm:An Evolutionary Algorithm to Solve the Real-World Optimization Problems", 《IEEE》 *
BO LEE 等: "Fault detection and reconstruction for micro-satellite power subsystem based on PCA", 《IEEE》 *
卢志刚 等: "基于改进蚁群算法的配电网故障后恢复重构", 《人工智能在电力系统中的应用》 *
景皓 等: "基于主从博弈理论的含分布式发电的主动配电网故障恢复方法", 《智慧电力》 *
矫德强 等: "主动配电网故障重构粒子群算法", 《长春工业大学学报》 *

Also Published As

Publication number Publication date
CN115079571B (en) 2022-12-30

Similar Documents

Publication Publication Date Title
Farag et al. A two ways communication-based distributed control for voltage regulation in smart distribution feeders
WO2022016622A1 (en) Adaptive optimization and control method in event of failure of true bipolar flexible direct-current power transmission system
Xu et al. Multiagent-based reinforcement learning for optimal reactive power dispatch
CN103001216B (en) Method for quickly restoring power supply of power distribution network containing distributed power source
CN111697566B (en) Reliability assessment method for active power distribution network information physical system considering information failure
CN113078630B (en) Low-voltage distribution network topology identification method based on real-time measurement data
CN110311398B (en) Connection topology, control system and method of novel energy storage battery system
CN111262243A (en) Intelligent identification and optimization method for operation mode of park power distribution system
CN112491050A (en) Main and distribution network accident recovery processing method based on index set weight
Guan et al. A multi-agent-based self-healing framework considering fault tolerance and automatic restoration for distribution networks
CN111882125B (en) Electric power information physical system cascading failure prediction method based on risk element theory
CN110350511A (en) It is a kind of based on turn power supply affinity a distribution network failure restoration methods
CN114814467A (en) Power distribution network fault positioning method
Wang et al. Multi-agent and ant colony optimization for ship integrated power system network reconfiguration
CN108667027A (en) Ac and dc systems power flow transfer search containing flexible direct current and quantitative analysis method
CN108270216A (en) A kind of Complicated Distribution Network fault recovery system and method for considering multiple target
Mi et al. Multiagent distributed secondary control for energy storage systems with lossy communication networks in DC microgrid
CN109193731B (en) Power control method for flexible direct current power grid system receiving end fault
CN115079571B (en) Intelligent optimization control method for satellite power supply fault reconstruction based on wild goat algorithm
CN116362377A (en) Large power grid region cooperative power flow regulation and control method based on multi-agent strategy gradient model
CN115408866A (en) Time-varying topological structure-based constellation on-orbit health assessment method and terminal
Kumar et al. Fuzzy logic based stability index power system voltage stability enhancement
CN111313483A (en) Multi-photovoltaic power station cooperative frequency modulation system based on neighborhood communication and control method
Zendehdel Robust agent based distribution system restoration with uncertainty in loads in smart grids
CN117394440B (en) Micro-grid-connected off-grid control method and system based on DDPG algorithm

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant