CN115045488A - Equipment is set up with steelframe to basic station construction for communication engineering - Google Patents

Equipment is set up with steelframe to basic station construction for communication engineering Download PDF

Info

Publication number
CN115045488A
CN115045488A CN202210767860.2A CN202210767860A CN115045488A CN 115045488 A CN115045488 A CN 115045488A CN 202210767860 A CN202210767860 A CN 202210767860A CN 115045488 A CN115045488 A CN 115045488A
Authority
CN
China
Prior art keywords
base station
communication engineering
operation platform
steel frame
station construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210767860.2A
Other languages
Chinese (zh)
Inventor
张海滨
张红滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202210767860.2A priority Critical patent/CN115045488A/en
Publication of CN115045488A publication Critical patent/CN115045488A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/22Scaffolds having a platform on an extensible substructure, e.g. of telescopic type or with lazy-tongs mechanism
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/10Steps or ladders specially adapted for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G2005/008Hoisting devices specially adapted as part of a scaffold system

Abstract

The invention discloses a steel frame erecting device for building a base station for communication engineering, which comprises a movable base and an operation platform, the movable base is provided with a fixed frame, the movable base is provided with a scissor type lifting mechanism, the scissor-fork type lifting mechanism is positioned in the fixed frame, the operation platform is arranged on the scissor-fork type lifting mechanism, the lower part of the movable base is provided with a positioning support mechanism, the operating platform is provided with an auxiliary hanging mechanism, the invention can adjust the height of the operating platform by utilizing a scissor-fork type lifting mechanism, thereby realizing that the operation platform is utilized to push the operator to a certain height, further realizing the safety and convenience of the steel frame erection operation, the auxiliary hanging mechanism is arranged on the operation platform, various elements to be installed can be placed in the auxiliary hanging mechanism, one-time lifting is achieved, and the working efficiency of overall erection operation can be greatly improved.

Description

Equipment is set up with steelframe to basic station construction for communication engineering
Technical Field
The invention relates to the technical field of communication engineering construction, in particular to a steel frame erecting device for base station construction for communication engineering.
Background
A base station, i.e. a public mobile communication base station, is an interface device for a mobile device to access the internet, and is a form of a radio station, which is a radio transceiver station for information transmission with a mobile phone terminal through a mobile communication switching center in a certain radio coverage area. The construction of the mobile communication base station is an important part of the investment of mobile communication operators, the construction of the mobile communication base station is generally carried out around the factors of coverage, call quality, investment benefit, difficult construction, convenient maintenance and the like, and the micro base station is characterized by small volume, no need of a machine room and convenient installation compared with a macro base station; single boards with different functions are generally integrated on equipment, so that the maintenance is inconvenient; coverage capability: can install near the antenna, like top of the tower and roof, directly with the wire jumper with signal transmission connection to antenna end, present the cable short, the loss is little, among the prior art, when setting up little basic station steelframe, mostly need use supplementary jacking equipment to carry out the auxiliary operation to the realization sets up to the eminence steelframe, however tradition, supplementary jacking equipment's structure is comparatively simple, and requires highly to the ground flatness of operation position, the operation is comparatively loaded down with trivial details.
Disclosure of Invention
The invention aims to solve the problems, designs steel frame erecting equipment for base station construction for communication engineering, and solves the problems in the background art.
The technical scheme of the invention for realizing the aim is as follows: a steel frame erecting device for base station construction for communication engineering comprises a movable base and an operation platform, wherein a fixed frame is arranged on the movable base, a scissor-fork type lifting mechanism is arranged on the movable base, the scissor-fork type lifting mechanism is positioned in the fixed frame, the operation platform is arranged on the scissor-fork type lifting mechanism, a positioning support mechanism is arranged at the lower part of the movable base, and an auxiliary hanging mechanism is arranged on the operation platform;
the positioning support mechanism comprises four groups of triangular support frames and a hydraulic pushing structure, the four groups of triangular support frames are respectively arranged on the side wall of the fixing frame, and the hydraulic pushing structure is arranged at one end of each triangular support frame;
cut fork elevating system and include: the base is arranged on the movable base, the scissor bracket is arranged on the base, and the connecting plate is arranged on the scissor bracket and connected with the operation platform;
supplementary dress mechanism of hanging includes: place fill, link and lifting control structure and hanging flower basket, place the fill and hang and adorn on operation platform's guardrail lateral wall, the link sets up on the opposite side guardrail lateral wall of arranging operation platform in, the lifting control structure sets up on the link, the hanging flower basket sets up and serves in lifting control structure's one.
The hydraulic pushing structure comprises: the device comprises a connecting seat, a hydraulic cylinder, a support leg and a probing type fixing assembly, wherein the connecting seat is arranged on one end of a triangular support frame, the hydraulic cylinder is arranged on the connecting seat, the piston end of the hydraulic cylinder is vertically downward, the support leg is arranged on the piston end of the hydraulic cylinder, and the probing type fixing assembly is arranged on the side wall of the support leg.
The probing fixing component comprises: thread bush, threaded rod and inserted bar, the thread bush sets firmly on the stabilizer blade lateral wall, the threaded rod spiral runs through the thread bush, the inserted bar sets up on the lower extreme of threaded rod.
The lift control structure includes: mounting bracket, driving motor and promotion coupling assembling, the mounting bracket sets up on the link, driving motor sets up on the link and is located mounting bracket one side, promote coupling assembling and set up on the mounting bracket and one end is connected in driving motor's drive end, the other end is connected with the hanging flower basket.
The lifting connection assembly comprises: connecting axle, wire winding roller and wire rope, the connecting axle rotates to set up on the mounting bracket and one end is connected with driving motor drive end, the fixed suit of wire winding roller is on the connecting axle, wire rope's one end sets firmly on the wire winding roller, the other end is connected with the hanging flower basket.
And the triangular support frame is provided with an assembled counterweight component.
The fabricated counterweight assembly includes: the L-shaped rod is arranged on the side wall of the triangular support frame, and the balancing weights are movably sleeved on the L-shaped rod respectively.
And the movable base is provided with a universal level bubble.
And an auxiliary ladder stand is arranged on the side wall of the fixing frame.
A plurality of anti-skid lines are arranged on the operation platform.
The steel frame erecting equipment for base station construction for communication engineering, which is manufactured by the technical scheme of the invention, moves the device to an operation area, the lower part of the movable base is provided with the positioning and supporting mechanism, the whole device is supported and fixed by the positioning and supporting mechanism, meanwhile, the device is suitable for different terrains to be used, the movable base is provided with the scissor-type lifting mechanism, the height of the operation platform can be adjusted by the scissor-type lifting mechanism, so that the operation platform is used for pushing an operator to a certain height, the safety and the convenience of steel frame erecting operation are further realized, the auxiliary hanging mechanism is arranged on the operation platform, various elements to be installed can be placed in the auxiliary hanging mechanism, the operation efficiency of the whole erecting operation is greatly improved, the problem that in the prior art when a micro base station steel frame is erected is solved, need mostly use supplementary jacking equipment to carry out the auxiliary operation to the realization is to setting up of eminence steelframe, however tradition, supplementary jacking equipment's structure is comparatively simple, and requires comparatively high to the ground roughness of operation position, the comparatively loaded down with trivial details problem of operation.
Drawings
Fig. 1 is a schematic view of a cross-sectional structure of a main view of a steel frame erection device for base station construction for communications engineering according to the present invention.
Fig. 2 is a schematic top view of a steel frame erection device for base station construction in communication engineering according to the present invention.
Fig. 3 is a partially enlarged structural schematic view of a positioning support mechanism of a steel frame erection device for base station construction in communication engineering according to the present invention.
Fig. 4 is a partially enlarged structural schematic diagram of the auxiliary hanging mechanism of the steel frame erecting equipment for base station construction for communication engineering according to the present invention.
Fig. 5 is a schematic view of a partially enlarged structure of a position a of a steel frame erection device for base station construction in communication engineering according to the present invention.
In the figure: 1-a working platform; 2-a fixing frame; 3-a triangular support frame; 4-a base; 5-a scissor bracket; 6-connecting plates; 7-placing a hopper; 8-a connecting frame; 9-hanging baskets; 10-a connecting seat; 11-a hydraulic cylinder; 12-a leg; 13-a threaded sleeve; 14-a threaded rod; 15-inserting a rod; 16-a mounting frame; 17-a drive motor; 18-a connecting shaft; 19-a winding roller; 20-a steel wire rope; a 21-L shaped rod; 22-a counterweight block; 23-universal level bubble; and 24-auxiliary ladder climbing.
Detailed Description
The present invention is described in detail below with reference to the accompanying drawings, as shown in fig. 1 to 5, all electrical components in the present application are connected to their adapted power supplies through wires, and an appropriate controller should be selected according to actual situations to meet control requirements, and specific connection and control sequence should be implemented by referring to the following working principle, in which the electrical connection between the electrical components is implemented in sequence, and the detailed connection means is a known technology in the art, and the following description mainly describes the working principle and process, and does not describe the electrical control.
Example (b): as can be seen from the attached drawings 1-5 of the specification, the scheme comprises a movable base and an operation platform 1, the position relation and the connection relation of the movable base are as follows, a fixed frame 2 is arranged on the movable base, a scissor-type lifting mechanism is arranged on the movable base, the scissor-type lifting mechanism is positioned in the fixed frame 2, the operation platform 1 is arranged on the scissor-type lifting mechanism, a positioning support mechanism is arranged at the lower part of the movable base, an auxiliary hanging mechanism is arranged on the operation platform 1 to move the device to an operation area, the positioning support mechanism is arranged at the lower part of the movable base to support and fix the whole device through the positioning support mechanism and enable the device to adapt to different terrains for use, the scissor-type lifting mechanism is arranged on the movable base, the height of the operation platform 1 can be adjusted by the scissor-type lifting mechanism, and therefore, an operator can be pushed to a certain height by the operation platform 1, the safety and the convenience of the steel frame erection operation are further realized, the auxiliary hanging mechanism is arranged on the operation platform 1, various elements to be installed can be placed in the auxiliary hanging mechanism, one-time lifting is realized, and the working efficiency of the whole erection operation can be greatly improved;
in the specific implementation process, above-mentioned location supporting mechanism includes four group's triangular supports 3 and hydraulic ram and pushes away the structure, and four group's triangular supports 3 set up respectively on the lateral wall of mount 2, and hydraulic ram pushes away the structure and sets up on one of triangular supports 3 and serves, and wherein cut fork elevating system and include: base 4, cut fork support 5 and connecting plate 6, base 4 sets up on portable base, cuts fork support 5 and sets up on base 4, and connecting plate 6 sets up on cutting fork support 5 and is connected with operation platform 1, and above-mentioned supplementary dress mechanism of hanging includes: the device comprises a placing hopper 7, a connecting frame 8, a lifting control structure and a hanging basket 9, wherein the placing hopper 7 is hung on the side wall of a guardrail of an operation platform 1, the connecting frame 8 is arranged on the side wall of the guardrail on the other side of the operation platform 1, the lifting control structure is arranged on the connecting frame 8, the hanging basket 9 is arranged at one end of the lifting control structure, when in use, the device is moved to an operation area and then is fixedly supported by a hydraulic jacking structure on a triangular supporting frame 3, auxiliary parts and tools required by erecting a steel frame are placed in the placing hopper 7, the work can enter the operation platform 1 at will, the scissor bracket 5 is controlled to expand, so that the height of the operation platform 1 is promoted to be lifted, the erecting operation is convenient, and if other workpieces and tools are required in the erecting operation process, the hanging basket 9 can be collected and released by the lifting control structure, therefore, the workpiece and the tool can be conveyed without lifting the operation platform 1 up and down.
As can be seen from fig. 1 to 3 in the specification, in the specific implementation process, the hydraulic pushing structure includes: connecting seat 10, pneumatic cylinder 11, stabilizer blade 12 and the fixed subassembly of formula of probing into, connecting seat 10 sets up and serves in triangular supports frame 3, and pneumatic cylinder 11 sets up on connecting seat 10 and piston end is perpendicular downwards, and stabilizer blade 12 sets up on the piston of pneumatic cylinder 11 is served, and the fixed subassembly of formula of probing into sets up on stabilizer blade 12 lateral wall, and wherein the fixed subassembly of formula of probing into includes: threaded bush 13, threaded rod 14 and inserted bar 15, threaded bush 13 sets firmly on the 12 lateral walls of stabilizer blade, threaded rod 14 spiral runs through threaded bush 13, inserted bar 15 sets up on the lower extreme of threaded rod 14, when using, piston end expansion through the pneumatic cylinder 11 on the control connecting seat 10, thereby promote stabilizer blade 12 downstream, and then make stabilizer blade 12 and ground contact, thereby improve the holistic stability of device, support stabilizer blade 12 the back that targets in place, rotate threaded rod 14, make threaded rod 14 under the spacing connection effect of threaded bush 13, move down along the vertical direction, and then make inserted bar 15 of threaded rod 14 lower extreme insert the below ground, thereby reinforcing device monolithic stationary's stability.
As can be seen from fig. 1 to 5 of the specification, in the implementation process, the lifting control structure includes: mounting bracket 16, driving motor 17 and promotion coupling assembling, mounting bracket 16 sets up on link 8, and driving motor 17 sets up on link 8 and is located mounting bracket 16 one side, and promotion coupling assembling sets up on mounting bracket 16 and one end is connected in driving motor 17's drive end, the other end is connected with hanging flower basket 9, and wherein promotion coupling assembling includes: connecting axle 18, winding roller 19 and wire rope 20, connecting axle 18 rotates to set up on mounting bracket 16 and one end is connected with driving motor 17 drive end, the fixed suit of winding roller 19 is on connecting axle 18, wire rope 20's one end sets firmly on winding roller 19, the other end is connected with hanging flower basket 9, when using, drive end through driving motor 17 on the control link 8 rotates, and then connecting axle 18 on the mounting bracket 16 of area rotates, connecting axle 18 rotates and drives winding roller 19 and rotate, winding roller 19 rotates and then rolls wire rope 20, thereby realize lifting operation of hanging flower basket 9, and the same is good, control driving motor 17's drive end antiport, thereby realize the transfer to hanging flower basket 9.
In concrete implementation process, be provided with assembled counter weight subassembly on the above-mentioned triangular supports frame 3, wherein assembled counter weight subassembly includes: l type pole 21 and a plurality of balancing weight 22, L type pole 21 sets up on the 3 lateral walls of triangular supports frame, and a plurality of balancing weight 22 activity suit respectively are on L type pole 21, when using, can insert L type pole 21 with balancing weight 22 according to the height that operation platform 1 promoted to improve overall device's stability.
In the specific implementation process, the movable base is provided with the universal level bubble 23, the levelness of the movable base is detected, and the hydraulic jacking structure is adjusted according to the monitoring result, so that the movable base is guaranteed to be horizontal.
In the specific implementation process, the side wall of the fixing frame 2 is provided with an auxiliary ladder stand 24, so that an operator can conveniently get on or off the work platform 1.
In the specific implementation process, the operation platform 1 is provided with a plurality of anti-skidding lines, so that the protection performance is improved, and skidding is avoided.
To sum up, the steel frame erecting equipment for base station construction for communication engineering moves a device to an operation area, a positioning support mechanism is arranged at the lower part of a movable base, the whole device is supported and fixed through the positioning support mechanism, meanwhile, the device is suitable for different terrains to be used, a scissor-fork type lifting mechanism is arranged on the movable base, the height of an operation platform 1 can be adjusted through the scissor-fork type lifting mechanism, so that an operator can be pushed to a certain height through the operation platform 1, the safety and the convenience of steel frame erecting operation are further realized, an auxiliary hanging mechanism is arranged on the operation platform 1, various elements to be installed can be placed in the auxiliary hanging mechanism, the operation efficiency of the whole erecting operation can be greatly improved through one-time lifting, the problem that in the prior art, when a micro base station steel frame is erected is solved, need mostly use supplementary jacking equipment to carry out the auxiliary operation to the realization is to setting up of eminence steelframe, however tradition, supplementary jacking equipment's structure is comparatively simple, and requires comparatively high to the ground roughness of operation position, the comparatively loaded down with trivial details problem of operation.
The technical solutions described above only represent the preferred technical solutions of the present invention, and some possible modifications to some parts of the technical solutions by those skilled in the art all represent the principles of the present invention, and fall within the protection scope of the present invention.

Claims (10)

1. A steel frame erecting device for base station construction for communication engineering comprises a movable base and an operation platform (1), and is characterized in that a fixed frame (2) is arranged on the movable base, a scissor-type lifting mechanism is arranged on the movable base, the scissor-type lifting mechanism is located in the fixed frame (2), the operation platform (1) is arranged on the scissor-type lifting mechanism, a positioning and supporting mechanism is arranged at the lower part of the movable base, and an auxiliary hanging and installing mechanism is arranged on the operation platform (1);
the positioning support mechanism comprises four groups of triangular support frames (3) and a hydraulic ejection structure, the four groups of triangular support frames (3) are respectively arranged on the side wall of the fixing frame (2), and the hydraulic ejection structure is arranged at one end of each triangular support frame (3);
cut fork elevating system and include: the base (4) is arranged on the movable base, the scissor bracket (5) is arranged on the base (4), and the connecting plate (6) is arranged on the scissor bracket (5) and connected with the operation platform (1);
supplementary dress mechanism of hanging includes: place fill (7), link (8) and promotion control structure and hanging flower basket (9), place fill (7) and hang and adorn on the guardrail lateral wall of operation platform (1), link (8) set up on the opposite side guardrail lateral wall of operation platform (1), the promotion control structure sets up on link (8), hanging flower basket (9) set up and serve in the one end that promotes the control structure.
2. The steel frame erection equipment for base station construction for communication engineering according to claim 1, wherein the hydraulic ejection structure comprises: connecting seat (10), pneumatic cylinder (11), stabilizer blade (12) and the fixed subassembly of formula of probing into, connecting seat (10) set up in triangular supports frame (3) one and serve, pneumatic cylinder (11) set up on connecting seat (10) and piston end is perpendicular downwards, stabilizer blade (12) set up on the piston end of pneumatic cylinder (11), the fixed subassembly of formula of probing into sets up on stabilizer blade (12) lateral wall.
3. The steel frame erection equipment for base station construction for communication engineering of claim 2, wherein the probing type fixing component comprises: thread bush (13), threaded rod (14) and inserted bar (15), thread bush (13) set firmly on stabilizer blade (12) lateral wall, threaded rod (14) spiral runs through thread bush (13), inserted bar (15) set up on the lower extreme of threaded rod (14).
4. The steel frame erection equipment for base station construction for communication engineering according to claim 1, wherein said lifting control structure comprises: mounting bracket (16), driving motor (17) and promotion coupling assembling, mounting bracket (16) set up on link (8), driving motor (17) set up on link (8) and are located mounting bracket (16) one side, promote coupling assembling and set up on mounting bracket (16) and one end is connected in the drive end of driving motor (17), the other end is connected with hanging flower basket (9).
5. The steel frame erection equipment for base station construction for communication engineering of claim 4, wherein the lifting connection assembly comprises: connecting axle (18), wire winding roller (19) and wire rope (20), connecting axle (18) rotate set up on mounting bracket (16) and one end is connected with driving motor (17) drive end, wire winding roller (19) fixed suit is on connecting axle (18), the one end of wire rope (20) sets firmly on wire winding roller (19), the other end is connected with hanging flower basket (9).
6. The steel frame erection equipment for base station construction for communication engineering according to claim 1, wherein a fabricated counterweight component is arranged on the triangular support frame (3).
7. The steel frame erection equipment for base station construction for communication engineering of claim 6, wherein the fabricated counterweight component comprises: the device comprises an L-shaped rod (21) and a plurality of balancing weights (22), wherein the L-shaped rod (21) is arranged on the side wall of the triangular support frame (3), and the balancing weights (22) are movably sleeved on the L-shaped rod (21) respectively.
8. The steel frame erection equipment for base station construction in communication engineering according to claim 1, wherein a universal leveling bubble (23) is provided on said movable base.
9. The steel frame erection equipment for base station construction for communication engineering according to claim 1, characterized in that an auxiliary ladder (24) is provided on the side wall of the fixing frame (2).
10. The steel frame erecting equipment for base station construction for communication engineering according to claim 1, wherein a plurality of anti-skid threads are formed on the operation platform (1).
CN202210767860.2A 2022-07-01 2022-07-01 Equipment is set up with steelframe to basic station construction for communication engineering Pending CN115045488A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210767860.2A CN115045488A (en) 2022-07-01 2022-07-01 Equipment is set up with steelframe to basic station construction for communication engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210767860.2A CN115045488A (en) 2022-07-01 2022-07-01 Equipment is set up with steelframe to basic station construction for communication engineering

Publications (1)

Publication Number Publication Date
CN115045488A true CN115045488A (en) 2022-09-13

Family

ID=83164635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210767860.2A Pending CN115045488A (en) 2022-07-01 2022-07-01 Equipment is set up with steelframe to basic station construction for communication engineering

Country Status (1)

Country Link
CN (1) CN115045488A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017088252A1 (en) * 2015-11-27 2017-06-01 东南电梯股份有限公司 Hydraulic elevating platform having no guide rails and elevating method
CN210795677U (en) * 2019-06-28 2020-06-19 苏州贝曼重工有限公司 Scissor fork type anti-tilt supporting aerial work platform
CN111321670A (en) * 2020-03-14 2020-06-23 山西省交通规划勘察设计院有限公司 Movable protective device for bridge engineering construction
CN211035055U (en) * 2019-12-17 2020-07-17 湖南屏风马机械科技有限公司 Scissor-fork type space extending arm
CN215368648U (en) * 2021-01-16 2021-12-31 朱思瑶 Lifting type safety protection device for end part of lifting platform
CN216038524U (en) * 2021-09-17 2022-03-15 江苏佳锦建设工程有限公司 Safety protection aerial work platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017088252A1 (en) * 2015-11-27 2017-06-01 东南电梯股份有限公司 Hydraulic elevating platform having no guide rails and elevating method
CN210795677U (en) * 2019-06-28 2020-06-19 苏州贝曼重工有限公司 Scissor fork type anti-tilt supporting aerial work platform
CN211035055U (en) * 2019-12-17 2020-07-17 湖南屏风马机械科技有限公司 Scissor-fork type space extending arm
CN111321670A (en) * 2020-03-14 2020-06-23 山西省交通规划勘察设计院有限公司 Movable protective device for bridge engineering construction
CN215368648U (en) * 2021-01-16 2021-12-31 朱思瑶 Lifting type safety protection device for end part of lifting platform
CN216038524U (en) * 2021-09-17 2022-03-15 江苏佳锦建设工程有限公司 Safety protection aerial work platform

Similar Documents

Publication Publication Date Title
CN115045488A (en) Equipment is set up with steelframe to basic station construction for communication engineering
CN218976148U (en) Electric power overhauls work rack
CN112096036A (en) Communication tower maintenance auxiliary frame for electronic information engineering
CN216446473U (en) Can a plurality of mobilizable construction work platform of erectting on girder steel side by side
CN104934900A (en) Apparatus for maintaining electric power equipment
CN212832684U (en) Self-propelled combined lifting multifunctional aerial work platform truck
CN201074167Y (en) Indoor light movable crane
CN216105888U (en) Movable maintenance platform
CN209929468U (en) Base station ground heightening frame
CN218938601U (en) Optical fiber communication installation equipment
CN215518414U (en) High-strength support for bridge construction
CN220395116U (en) Lifting type building construction platform
CN220150926U (en) Discharging platform
CN219411718U (en) Operation frame for safety protection of high-altitude operation
CN220303261U (en) Building security protection auxiliary device
CN220822421U (en) Bridge cable hoisting system
CN218409105U (en) Movable lifting communication platform
CN219787568U (en) Feeding and discharging platform of large numerical control crankshaft milling machine
CN219837450U (en) Workbench convenient to fix
CN220365277U (en) Device for assisting in translation of hanging basket
CN220596979U (en) Electric power engineering overhauls frame
CN215326612U (en) Fixing frame of crane
CN212425285U (en) Building electromechanical engineering assembled integral installation device
CN215946684U (en) Lift for construction
CN217461370U (en) Climbing type building construction operation platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20220913

WD01 Invention patent application deemed withdrawn after publication