CN111321670A - A mobile protective device for bridge engineering construction - Google Patents

A mobile protective device for bridge engineering construction Download PDF

Info

Publication number
CN111321670A
CN111321670A CN202010178467.0A CN202010178467A CN111321670A CN 111321670 A CN111321670 A CN 111321670A CN 202010178467 A CN202010178467 A CN 202010178467A CN 111321670 A CN111321670 A CN 111321670A
Authority
CN
China
Prior art keywords
protective
threaded rod
engineering construction
rod
bridge engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010178467.0A
Other languages
Chinese (zh)
Inventor
费文
颜芳华
崔晓如
王维涛
苏正扬
张恒东
张科峰
齐永亮
罗强
王芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jiaoke Highway Survey and Design Institute
Shanxi Traffic Planning Survey Design Institute Co Ltd
Original Assignee
Shanxi Jiaoke Highway Survey and Design Institute
Shanxi Traffic Planning Survey Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jiaoke Highway Survey and Design Institute, Shanxi Traffic Planning Survey Design Institute Co Ltd filed Critical Shanxi Jiaoke Highway Survey and Design Institute
Priority to CN202010178467.0A priority Critical patent/CN111321670A/en
Publication of CN111321670A publication Critical patent/CN111321670A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明具体是一种桥梁工程修建施工用的移动式防护装置,解决了现有钢管搭建平台在使用中存在安全系数低、作业效率低下的问题。一种桥梁工程修建施工用的移动式防护装置,防护平台包括支撑板和防护框;升降装置包括剪叉式升降架、两个上连接座和两个下连接座;支撑板的下表面设置有滑杆,滑杆上套设有滑块,两个上连接座分别固定于两个滑块的下表面;底座的上表面设置有一根螺纹杆,两个下连接座螺纹连接于螺纹杆侧面;固定块的后方设置有电机,电机输出轴的右端部固定装配有主动齿轮,螺纹杆上固定装配有从动齿轮。本发明实现了防护装置高度随施工进度灵活调整的目的,能够有效保障作业人员的人身安全,同时操作简单便捷,有效提高了施工效率。

Figure 202010178467

The invention specifically relates to a mobile protection device for bridge engineering construction, which solves the problems of low safety factor and low operation efficiency in the use of the existing steel pipe construction platform. A mobile protective device for bridge engineering construction. The protective platform includes a support plate and a protective frame; the lifting device includes a scissor lift frame, two upper connecting seats and two lower connecting seats; The sliding rod is sleeved with a sliding block, and the two upper connecting seats are respectively fixed on the lower surfaces of the two sliding blocks; a threaded rod is arranged on the upper surface of the base, and the two lower connecting seats are threadedly connected to the side surfaces of the threaded rod; A motor is arranged behind the fixing block, a driving gear is fixedly assembled on the right end of the output shaft of the motor, and a driven gear is fixedly assembled on the threaded rod. The invention achieves the purpose of flexibly adjusting the height of the protective device with the construction progress, can effectively guarantee the personal safety of the operators, is simple and convenient to operate, and effectively improves the construction efficiency.

Figure 202010178467

Description

一种桥梁工程修建施工用的移动式防护装置A mobile protective device for bridge engineering construction

技术领域technical field

本发明涉及桥梁工程用防护装置,具体是一种桥梁工程修建施工用的移动式防护装置。The invention relates to a protective device for bridge engineering, in particular to a mobile protective device for bridge engineering construction.

背景技术Background technique

在桥梁工程中,修建施工分为下部结构施工、上部结构施工、梁式桥施工等。其中,下部结构(如桥梁墩台、墩台基础)的施工中常用由钢管搭建的平台。In bridge engineering, construction is divided into substructure construction, superstructure construction, beam bridge construction and so on. Among them, platforms constructed of steel pipes are commonly used in the construction of substructures (such as bridge piers and pier foundations).

然而实践表明,现有钢管搭建平台在使用中存在以下问题:一是钢管搭建的平台结构简易,牢固性不足,稳定性不佳,安全系数低,易发生安全事故,作业人员的人身安全得不到保障;二是每次搭建的平台只能用于特定高度的施工作业,当桥墩的高度改变后,需要重新搭建平台,以调整平台高度来适应施工进度,费时费力,使用起来不够便捷,影响施工进度,导致作业效率低下。However, practice shows that the existing steel pipe construction platform has the following problems in use: First, the steel pipe construction platform has a simple structure, insufficient firmness, poor stability, low safety factor, easy safety accidents, and poor personal safety of operators. The second is that the platform built each time can only be used for construction operations of a specific height. When the height of the bridge pier is changed, the platform needs to be rebuilt to adjust the height of the platform to adapt to the construction progress, which is time-consuming and labor-intensive, and is not convenient enough to use. Construction progress, resulting in low operating efficiency.

发明内容SUMMARY OF THE INVENTION

本发明为了解决现有钢管搭建平台在使用中存在安全系数低、作业效率低下的问题,提供了一种桥梁工程修建施工用的移动式防护装置。In order to solve the problems of low safety factor and low operation efficiency in use of the existing steel pipe construction platform, the present invention provides a mobile protection device for bridge engineering construction.

本发明是采用如下技术方案实现的:The present invention adopts following technical scheme to realize:

一种桥梁工程修建施工用的移动式防护装置,包括桥墩;还包括水平放置的底座、位于底座上方的防护平台与位于两者之间的升降装置;A mobile protective device for bridge engineering construction, comprising bridge piers; also comprising a horizontally placed base, a protective platform located above the base, and a lifting device located between the two;

底座的下表面设置有若干个行走轮;The lower surface of the base is provided with several walking wheels;

所述防护平台包括水平设置于底座正上方的支撑板和竖向设置于支撑板边部的防护框,桥墩设置于防护框的前方,防护框的左侧和右侧均竖向设置有一个沿前后方向放置的连接板,两个连接板的前端部分别设置有两根位于防护框的前方且沿左右方向对称放置的电动推杆,且两根电动推杆的推杆的方向均朝向桥墩;The protective platform includes a support plate arranged horizontally just above the base and a protective frame vertically arranged on the edge of the support plate. The bridge pier is arranged in front of the protective frame, and the left and right sides of the protective frame are provided with a vertical edge. The connecting plates placed in the front and rear directions, the front ends of the two connecting plates are respectively provided with two electric push rods located in front of the protective frame and placed symmetrically along the left and right directions, and the push rods of the two electric push rods are both directed towards the bridge pier;

所述升降装置包括剪叉式升降架;剪叉式升降架的两个剪臂的上端部分别铰接有两个上连接座、下端部分别铰接有两个带有装配螺孔的下连接座;The lifting device comprises a scissor lift frame; the upper ends of the two scissor arms of the scissor lift frame are respectively hinged with two upper connecting seats, and the lower ends are respectively hinged with two lower connecting seats with assembling screw holes;

支撑板的下表面中部开设有滑槽,滑槽的左侧壁与右侧壁之间设置有滑杆,滑杆上套设有两个可左右滑动的滑块,两个上连接座分别固定于两个滑块的下表面;支撑板下表面的左、右端部均设置有一个支撑块,位于左侧的上连接座与位于左侧的支撑块之间、位于右侧的上连接座与位于右侧的支撑块之间均设置有一根沿左右方向放置的伸缩杆;The middle part of the lower surface of the support plate is provided with a chute, a sliding rod is arranged between the left side wall and the right side wall of the chute, and two sliding blocks that can slide left and right are sleeved on the sliding rod, and the two upper connecting seats are respectively fixed On the lower surfaces of the two sliders; the left and right ends of the lower surface of the support plate are provided with a support block, which is located between the upper connecting seat on the left and the supporting block on the left, and the upper connecting seat on the right is connected to the A telescopic rod placed along the left and right directions is arranged between the support blocks on the right side;

底座的上表面设置有两个左右分布的固定块,两个固定块之间设置有一根可转动的螺纹杆,且螺纹杆侧面左部与右部的螺纹方向相反,两个下连接座分别螺纹连接于螺纹杆侧面的左部与右部;位于左侧的固定块的后方设置有一个输出轴方向朝右的电机,电机输出轴的右端部固定装配有一个主动齿轮,螺纹杆的左端部固定装配有一个与主动齿轮啮合的从动齿轮。The upper surface of the base is provided with two fixed blocks distributed left and right, and a rotatable threaded rod is set between the two fixed blocks, and the thread directions of the left part and the right part of the side surface of the threaded rod are opposite, and the two lower connecting seats are respectively threaded It is connected to the left and right parts of the side surface of the threaded rod; behind the fixing block on the left side is a motor with the output shaft facing to the right, the right end of the motor output shaft is fixedly fitted with a driving gear, and the left end of the threaded rod is fixed A driven gear that meshes with the driving gear is assembled.

工作时,首先通过行走轮将本防护装置推行至施工桥墩处,接着启动两个电动推杆,并调整两推杆之间的距离,直至两推杆均接近桥墩侧面,从而避免本防护装置在升降过程中晃动;然后启动电机,电机输出轴转动带动主动齿轮转动,继而带动从动齿轮转动,从动齿轮转动带动螺纹杆转动,由此带动两个下连接座相向运动,接着在剪叉式升降架的两个剪臂的连杆作用下带动两个上连接座相向运动,与此同时,两个滑块沿着滑杆相向滑动,以减少两个上连接座运动的阻力,两个伸缩杆的长度伸长,使得两个上连接座的左右运动更加稳定,从而实现剪叉式升降架的升高,将防护平台提升至目标高度,由此完成本防护装置的安装。使用过程中,当施工高度改变时,仅需再次启动电机,通过主动齿轮、从动齿轮、螺纹杆、下连接座、上连接座的一系列传动,对防护平台的高度进行调整,以适应施工高度的变化,不必重新搭建装置,有效提高了作业效率。本发明克服了现有钢管搭建平台在使用中存在安全系数低、作业效率低下的问题。When working, first push the protective device to the construction pier through the walking wheel, then start the two electric push rods, and adjust the distance between the two push rods until the two push rods are close to the side of the pier, so as to prevent the protective device from operating at the pier. Shake during the lifting process; then start the motor, the motor output shaft rotates to drive the driving gear to rotate, and then drives the driven gear to rotate, and the driven gear rotates to drive the threaded rod to rotate, thereby driving the two lower connecting seats to move towards each other, and then in the scissor type Under the action of the connecting rods of the two scissor arms of the lifting frame, the two upper connecting seats are moved toward each other. The length of the rod is elongated, so that the left and right movements of the two upper connecting seats are more stable, so that the scissor lift frame can be raised, and the protective platform can be lifted to the target height, thereby completing the installation of the protective device. During use, when the construction height is changed, it is only necessary to start the motor again, and adjust the height of the protective platform through a series of transmissions of the driving gear, the driven gear, the threaded rod, the lower connecting seat and the upper connecting seat to adapt to the construction. When the height changes, there is no need to re-build the device, which effectively improves the work efficiency. The invention overcomes the problems of low safety factor and low operation efficiency in use of the existing steel pipe construction platform.

每根电动推杆的推杆的外端部均设置有一个沿前后方向滚动于桥墩侧壁上的滚轮。The outer end of the push rod of each electric push rod is provided with a roller that rolls on the side wall of the bridge pier along the front and rear directions.

该结构设计方便防护框与桥墩接触,操作简单便捷。The structure is designed to facilitate the contact between the protective frame and the bridge pier, and the operation is simple and convenient.

防护框为矩形结构;防护框的正上方设置有一个防护板,防护框与防护板通过若干根设置于防护框的左、右框边上表面的支撑杆连接;每个连接板与防护框均通过两根连接杆连接。The protective frame is a rectangular structure; a protective plate is arranged directly above the protective frame, and the protective frame and the protective plate are connected by a plurality of support rods arranged on the upper surfaces of the left and right frame edges of the protective frame; each connecting plate and the protective frame are Connected by two connecting rods.

防护板能够为作业人员提供防护作用,避免施工过程中的落石对作业人员造成伤害,进一步提高了本防护装置的安全性。The protective plate can provide protection for the operators, avoid the damage to the operators caused by falling rocks during the construction process, and further improve the safety of the protection device.

各根伸缩杆均为可伸缩套管,每根伸缩杆的左端部与右端部均固定套设有一个卡环、外侧均套设有一根位于两个卡环之间的复位弹簧。Each telescopic rod is a telescopic sleeve, the left end and the right end of each telescopic rod are fixedly sleeved with a snap ring, and the outer side is provided with a return spring located between the two snap rings.

复位弹簧使上连接座的左右滑动更加稳定连贯,进而增加了本防护装置升降过程中的稳定性。The return spring makes the left and right sliding of the upper connecting seat more stable and coherent, thereby increasing the stability of the protection device during the lifting process.

底座的左侧与右侧均水平设置有一个固定耳板,每个固定耳板上均螺纹连接有一个上下贯穿的定位销;行走轮的数量为四个;四个行走轮分别设置于底座下表面的四个角部。The left and right sides of the base are provided with a fixed lug plate horizontally, and each fixed lug plate is threadedly connected with a positioning pin that penetrates up and down; the number of walking wheels is four; the four walking wheels are respectively arranged under the base the four corners of the surface.

行走轮实现了本防护装置的灵活移动,定位销能够将本防护装置稳定固定于地面上,从而保证了整个装置在使用中的稳定性。The traveling wheel realizes the flexible movement of the protective device, and the positioning pin can stably fix the protective device on the ground, thereby ensuring the stability of the entire device in use.

底座的上表面水平设置有带有导向球槽的托板,且导向球槽沿左右方向设置;每个下连接座均通过弧形连接块安装有一个滚珠,且两个滚珠均滚动装配于托板的导向球槽内。The upper surface of the base is provided with a support plate with guide ball grooves horizontally, and the guide ball grooves are arranged in the left and right directions; each lower connecting seat is installed with a ball through the arc connecting block, and the two balls are rolled and assembled on the support. in the guide ball groove of the plate.

滚珠与导向球槽能够在保证两个下连接座稳定运动的基础上,为两个下连接座提供支撑作用,进而提升了本防护装置的结构牢固性,增加了本防护装置的使用寿命。The balls and the guide ball groove can provide support for the two lower connecting seats on the basis of ensuring the stable movement of the two lower connecting seats, thereby improving the structural firmness of the protective device and increasing the service life of the protective device.

两个固定块上各固定有一个套筒,螺纹杆的两端分别转动穿设于两个套筒内;螺纹杆的侧面延伸设置有三个等间距分布的挡环,从动齿轮固定套设于位于左侧的挡环上,两个下连接座与三个挡环交错设置;螺纹杆侧面上三个挡环之间的部分为螺纹面,且螺纹杆侧面上的其余部分均为光滑面。A sleeve is fixed on each of the two fixing blocks, and the two ends of the threaded rod are respectively rotated and passed through the two sleeves; the side of the threaded rod is extended with three retaining rings distributed at equal intervals, and the driven gear is fixedly sleeved in the two sleeves. On the retaining ring on the left side, two lower connecting seats and three retaining rings are alternately arranged; the part between the three retaining rings on the side of the threaded rod is a threaded surface, and the rest of the side of the threaded rod is a smooth surface.

挡环能够为两个下连接座的运动提供限位作用,进而提高了本防护装置对防护平台高度控制的准确性。The retaining ring can provide a limiting effect for the movement of the two lower connecting seats, thereby improving the accuracy of the protection device for height control of the protection platform.

本发明结构设计合理可靠,实现了防护装置高度随施工进度灵活调整的目的,而且安全系数高,能够有效保障作业人员的人身安全,同时操作简单便捷,有效提高了施工效率,进一步的,结构牢固,使用过程中稳定性好,具有高度控制准确、使用寿命长的优点。The structure of the invention is reasonable and reliable, realizes the purpose of flexibly adjusting the height of the protective device with the construction progress, and has a high safety factor, which can effectively protect the personal safety of the operators, and at the same time, the operation is simple and convenient, and the construction efficiency is effectively improved, and further, the structure is firm. , Good stability during use, highly accurate control and long service life.

附图说明Description of drawings

图1是本发明的结构示意图;Fig. 1 is the structural representation of the present invention;

图2是图1中A处的局部放大示意图;Fig. 2 is the partial enlarged schematic diagram of A place in Fig. 1;

图3是本发明中底座的俯视图。Figure 3 is a top view of the base of the present invention.

图中,1-底座,2-行走轮,3-支撑板,4-防护框,5-连接板,6-电动推杆,7-剪叉式升降架,8-上连接座,9-下连接座,10-滑槽,11-滑杆,12-滑块,13-支撑块,14-伸缩杆,15-固定块,16-螺纹杆,17-电机,18-主动齿轮,19-从动齿轮,20-滚轮,21-防护板,22-支撑杆,23-连接杆,24-卡环,25-复位弹簧,26-固定耳板,27-定位销,28-托板,29-弧形连接块,30-滚珠,31-套筒,32-挡环。In the figure, 1-base, 2-travel wheel, 3-supporting plate, 4-protective frame, 5-connecting plate, 6-electric push rod, 7-scissor lift, 8-upper connecting seat, 9-lower Connection base, 10-chute, 11-slide rod, 12-slider, 13-support block, 14- telescopic rod, 15-fixed block, 16-threaded rod, 17-motor, 18-drive gear, 19-slave Moving gear, 20-roller, 21-protection plate, 22-support rod, 23-connecting rod, 24-retaining ring, 25-return spring, 26-fixed lug plate, 27-positioning pin, 28-support plate, 29- Arc connecting block, 30-ball, 31-sleeve, 32-backstop.

具体实施方式Detailed ways

一种桥梁工程修建施工用的移动式防护装置,包括桥墩;还包括水平放置的底座1、位于底座1上方的防护平台与位于两者之间的升降装置;A mobile protective device for bridge engineering construction, comprising a bridge pier; also comprising a horizontally placed base 1, a protective platform located above the base 1 and a lifting device located between the two;

底座1的下表面设置有若干个行走轮2;The lower surface of the base 1 is provided with several walking wheels 2;

所述防护平台包括水平设置于底座1正上方的支撑板3和竖向设置于支撑板3边部的防护框4,桥墩设置于防护框4的前方,防护框4的左侧和右侧均竖向设置有一个沿前后方向放置的连接板5,两个连接板5的前端部分别设置有两根位于防护框4的前方且沿左右方向对称放置的电动推杆6,且两根电动推杆6的推杆的方向均朝向桥墩;The protection platform includes a support plate 3 that is horizontally arranged just above the base 1 and a protection frame 4 that is vertically arranged at the edge of the support plate 3. The bridge pier is arranged in front of the protection frame 4, and the left and right sides of the protection frame 4 are both. A connecting plate 5 is arranged vertically along the front-rear direction, and the front ends of the two connecting plates 5 are respectively provided with two electric push rods 6 located in front of the protective frame 4 and placed symmetrically along the left-right direction, and the two electric push rods The direction of the push rod of rod 6 is all towards the bridge pier;

所述升降装置包括剪叉式升降架7;剪叉式升降架7的两个剪臂的上端部分别铰接有两个上连接座8、下端部分别铰接有两个带有装配螺孔的下连接座9;The lifting device includes a scissor lift frame 7; the upper ends of the two scissor arms of the scissor lift frame 7 are respectively hinged with two upper connecting seats 8, and the lower ends are respectively hinged with two lower ends with assembly screw holes. connection seat 9;

支撑板3的下表面中部开设有滑槽10,滑槽10的左侧壁与右侧壁之间设置有滑杆11,滑杆11上套设有两个可左右滑动的滑块12,两个上连接座8分别固定于两个滑块12的下表面;支撑板3下表面的左、右端部均设置有一个支撑块13,位于左侧的上连接座8与位于左侧的支撑块13之间、位于右侧的上连接座8与位于右侧的支撑块13之间均设置有一根沿左右方向放置的伸缩杆14;A chute 10 is opened in the middle of the lower surface of the support plate 3 , a sliding rod 11 is arranged between the left side wall and the right side wall of the chute 10 , and two sliding blocks 12 that can slide left and right are sleeved on the sliding rod 11 . Each upper connecting seat 8 is respectively fixed on the lower surfaces of the two sliders 12; the left and right ends of the lower surface of the support plate 3 are provided with a supporting block 13, the upper connecting seat 8 on the left side and the supporting block on the left side A telescopic rod 14 placed along the left and right directions is provided between the 13 and between the upper connecting seat 8 on the right side and the support block 13 on the right side;

底座1的上表面设置有两个左右分布的固定块15,两个固定块15之间设置有一根可转动的螺纹杆16,且螺纹杆16侧面左部与右部的螺纹方向相反,两个下连接座9分别螺纹连接于螺纹杆16侧面的左部与右部;位于左侧的固定块15的后方设置有一个输出轴方向朝右的电机17,电机17输出轴的右端部固定装配有一个主动齿轮18,螺纹杆16的左端部固定装配有一个与主动齿轮18啮合的从动齿轮19。The upper surface of the base 1 is provided with two fixed blocks 15 distributed left and right, a rotatable threaded rod 16 is provided between the two fixed blocks 15, and the thread directions of the left part and the right part of the side surface of the threaded rod 16 are opposite. The lower connecting seat 9 is respectively threadedly connected to the left part and the right part of the side surface of the threaded rod 16; behind the fixing block 15 on the left side is provided a motor 17 whose output shaft is directed to the right, and the right end of the output shaft of the motor 17 is fixedly assembled with a motor 17. A driving gear 18, the left end of the threaded rod 16 is fixedly fitted with a driven gear 19 meshing with the driving gear 18.

每根电动推杆6的推杆的外端部均设置有一个沿前后方向滚动于桥墩侧壁上的滚轮20。The outer end of the push rod of each electric push rod 6 is provided with a roller 20 that rolls on the side wall of the bridge pier in the front-rear direction.

防护框4为矩形结构;防护框4的正上方设置有一个防护板21,防护框4与防护板21通过若干根设置于防护框4的左、右框边上表面的支撑杆22连接;每个连接板5与防护框4均通过两根连接杆23连接。The protective frame 4 is a rectangular structure; a protective plate 21 is provided directly above the protective frame 4, and the protective frame 4 and the protective plate 21 are connected by a plurality of support rods 22 arranged on the upper surfaces of the left and right frame edges of the protective frame 4; each Each connecting plate 5 and the protective frame 4 are connected by two connecting rods 23 .

各根伸缩杆14均为可伸缩套管,每根伸缩杆14的左端部与右端部均固定套设有一个卡环24、外侧均套设有一根位于两个卡环24之间的复位弹簧25。Each telescopic rod 14 is a telescopic sleeve, the left end and the right end of each telescopic rod 14 are fixedly sleeved with a snap ring 24 , and the outer side is provided with a return spring located between the two snap rings 24 . 25.

底座1的左侧与右侧均水平设置有一个固定耳板26,每个固定耳板26上均螺纹连接有一个上下贯穿的定位销27;行走轮2的数量为四个;四个行走轮2分别设置于底座1下表面的四个角部。The left and right sides of the base 1 are provided with a fixed lug plate 26 horizontally, and each fixed lug plate 26 is threadedly connected with a positioning pin 27 that penetrates up and down; the number of the traveling wheels 2 is four; 2 are respectively arranged on the four corners of the lower surface of the base 1 .

底座1的上表面水平设置有带有导向球槽的托板28,且导向球槽沿左右方向设置;每个下连接座9均通过弧形连接块29安装有一个滚珠30,且两个滚珠30均滚动装配于托板28的导向球槽内。The upper surface of the base 1 is horizontally provided with a support plate 28 with guiding ball grooves, and the guiding ball grooves are arranged in the left-right direction; each lower connecting seat 9 is installed with a ball 30 through an arc-shaped connecting block 29, and two balls are installed 30 are rolled and assembled in the guide ball groove of the support plate 28 .

两个固定块15上各固定有一个套筒31,螺纹杆16的两端分别转动穿设于两个套筒31内;螺纹杆16的侧面延伸设置有三个等间距分布的挡环32,从动齿轮19固定套设于位于左侧的挡环32上,两个下连接座9与三个挡环32交错设置;螺纹杆16侧面上三个挡环32之间的部分为螺纹面,且螺纹杆16侧面上的其余部分均为光滑面。A sleeve 31 is fixed on each of the two fixing blocks 15, and the two ends of the threaded rod 16 are respectively rotated through the two sleeves 31; The movable gear 19 is fixedly sleeved on the retaining ring 32 on the left side, and the two lower connecting seats 9 and the three retaining rings 32 are alternately arranged; the part between the three retaining rings 32 on the side of the threaded rod 16 is a threaded surface, and The rest of the sides of the threaded rod 16 are smooth.

具体实施过程中,两个上连接座8与两个下连接座9均通过转轴铰接于剪叉式升降架7的剪臂的端部。In the specific implementation process, the two upper connecting bases 8 and the two lower connecting bases 9 are both hinged to the ends of the scissor arms of the scissor lift frame 7 through the rotating shaft.

Claims (7)

1.一种桥梁工程修建施工用的移动式防护装置,包括桥墩;其特征在于:还包括水平放置的底座(1)、位于底座(1)上方的防护平台与位于两者之间的升降装置;1. A mobile protective device for bridge engineering construction, comprising a bridge pier; characterized in that: it also comprises a horizontally placed base (1), a protective platform positioned above the base (1), and a lifting device positioned between the two ; 底座(1)的下表面设置有若干个行走轮(2);The lower surface of the base (1) is provided with several traveling wheels (2); 所述防护平台包括水平设置于底座(1)正上方的支撑板(3)和竖向设置于支撑板(3)边部的防护框(4),桥墩设置于防护框(4)的前方,防护框(4)的左侧和右侧均竖向设置有一个沿前后方向放置的连接板(5),两个连接板(5)的前端部分别设置有两根位于防护框(4)的前方且沿左右方向对称放置的电动推杆(6),且两根电动推杆(6)的推杆的方向均朝向桥墩;The protective platform comprises a support plate (3) arranged horizontally directly above the base (1) and a protective frame (4) vertically arranged on the edge of the support plate (3), and the bridge pier is arranged in front of the protective frame (4), The left and right sides of the protective frame (4) are vertically provided with a connecting plate (5) placed in the front-rear direction, and the front ends of the two connecting plates (5) are respectively provided with two connecting plates (5) located in the protective frame (4). The electric push rods (6) placed in front and symmetrically along the left and right directions, and the push rods of the two electric push rods (6) are both directed towards the bridge pier; 所述升降装置包括剪叉式升降架(7);剪叉式升降架(7)的两个剪臂的上端部分别铰接有两个上连接座(8)、下端部分别铰接有两个带有装配螺孔的下连接座(9);The lifting device includes a scissor lift frame (7); the upper ends of the two scissor arms of the scissor lift frame (7) are respectively hinged with two upper connecting seats (8), and the lower ends are hinged with two belts respectively A lower connecting seat (9) with mounting screw holes; 支撑板(3)的下表面中部开设有滑槽(10),滑槽(10)的左侧壁与右侧壁之间设置有滑杆(11),滑杆(11)上套设有两个可左右滑动的滑块(12),两个上连接座(8)分别固定于两个滑块(12)的下表面;支撑板(3)下表面的左、右端部均设置有一个支撑块(13),位于左侧的上连接座(8)与位于左侧的支撑块(13)之间、位于右侧的上连接座(8)与位于右侧的支撑块(13)之间均设置有一根沿左右方向放置的伸缩杆(14);A chute (10) is provided in the middle of the lower surface of the support plate (3), a sliding rod (11) is arranged between the left side wall and the right side wall of the chute (10), and two sliding rods (11) are sleeved on the sliding rod (11). There are two sliders (12) that can slide left and right, the two upper connecting seats (8) are respectively fixed on the lower surfaces of the two sliders (12); the left and right ends of the lower surface of the support plate (3) are provided with a support Block (13), between the upper connecting seat (8) on the left and the supporting block (13) on the left, and between the upper connecting seat (8) on the right and the supporting block (13) on the right Each is provided with a telescopic rod (14) placed along the left and right directions; 底座(1)的上表面设置有两个左右分布的固定块(15),两个固定块(15)之间设置有一根可转动的螺纹杆(16),且螺纹杆(16)侧面左部与右部的螺纹方向相反,两个下连接座(9)分别螺纹连接于螺纹杆(16)侧面的左部与右部;位于左侧的固定块(15)的后方设置有一个输出轴方向朝右的电机(17),电机(17)输出轴的右端部固定装配有一个主动齿轮(18),螺纹杆(16)的左端部固定装配有一个与主动齿轮(18)啮合的从动齿轮(19)。The upper surface of the base (1) is provided with two fixed blocks (15) distributed left and right, a rotatable threaded rod (16) is provided between the two fixed blocks (15), and the left side of the threaded rod (16) Opposite to the thread direction of the right part, the two lower connecting seats (9) are respectively threadedly connected to the left part and the right part of the side surface of the threaded rod (16); an output shaft direction is arranged behind the fixing block (15) on the left side. The motor (17) facing right, the right end of the output shaft of the motor (17) is fixedly fitted with a driving gear (18), and the left end of the threaded rod (16) is fixedly fitted with a driven gear that meshes with the driving gear (18). (19). 2.根据权利要求1所述的一种桥梁工程修建施工用的移动式防护装置,其特征在于:每根电动推杆(6)的推杆的外端部均设置有一个沿前后方向滚动于桥墩侧壁上的滚轮(20)。2. A mobile protective device for bridge engineering construction according to claim 1, characterized in that: the outer end of the push rod of each electric push rod (6) is provided with a Rollers (20) on the side walls of the piers. 3.根据权利要求1所述的一种桥梁工程修建施工用的移动式防护装置,其特征在于:防护框(4)为矩形结构;防护框(4)的正上方设置有一个防护板(21),防护框(4)与防护板(21)通过若干根设置于防护框(4)的左、右框边上表面的支撑杆(22)连接;每个连接板(5)与防护框(4)均通过两根连接杆(23)连接。3. A mobile protective device for bridge engineering construction according to claim 1, characterized in that: the protective frame (4) is a rectangular structure; a protective plate (21) is provided directly above the protective frame (4). ), the protective frame (4) and the protective plate (21) are connected by a number of support rods (22) arranged on the upper surfaces of the left and right frame edges of the protective frame (4); each connecting plate (5) is connected to the protective frame ( 4) Both are connected by two connecting rods (23). 4.根据权利要求1所述的一种桥梁工程修建施工用的移动式防护装置,其特征在于:各根伸缩杆(14)均为可伸缩套管,每根伸缩杆(14)的左端部与右端部均固定套设有一个卡环(24)、外侧均套设有一根位于两个卡环(24)之间的复位弹簧(25)。4. A mobile protective device for bridge engineering construction according to claim 1, characterized in that: each telescopic rod (14) is a telescopic sleeve, and the left end of each telescopic rod (14) A snap ring (24) is fixedly sleeved with the right end, and a return spring (25) located between the two snap rings (24) is sleeved on the outer side. 5.根据权利要求1所述的一种桥梁工程修建施工用的移动式防护装置,其特征在于:底座(1)的左侧与右侧均水平设置有一个固定耳板(26),每个固定耳板(26)上均螺纹连接有一个上下贯穿的定位销(27);行走轮(2)的数量为四个;四个行走轮(2)分别设置于底座(1)下表面的四个角部。5. A mobile protective device for bridge engineering construction according to claim 1, characterized in that: a fixed lug (26) is arranged horizontally on the left and right sides of the base (1), and each The fixing lugs (26) are all screwed with a positioning pin (27) penetrating up and down; the number of traveling wheels (2) is four; corner. 6.根据权利要求1所述的一种桥梁工程修建施工用的移动式防护装置,其特征在于:底座(1)的上表面水平设置有带有导向球槽的托板(28),且导向球槽沿左右方向设置;每个下连接座(9)均通过弧形连接块(29)安装有一个滚珠(30),且两个滚珠(30)均滚动装配于托板(28)的导向球槽内。6. A mobile protective device for bridge engineering construction according to claim 1, characterized in that: the upper surface of the base (1) is horizontally provided with a support plate (28) with a guiding ball groove, and the guiding The ball grooves are arranged in the left-right direction; each lower connecting seat (9) is installed with a ball (30) through the arc-shaped connecting block (29), and the two balls (30) are rollingly assembled on the guide of the support plate (28) inside the ball slot. 7.根据权利要求1所述的一种桥梁工程修建施工用的移动式防护装置,其特征在于:两个固定块(15)上各固定有一个套筒(31),螺纹杆(16)的两端分别转动穿设于两个套筒(31)内;螺纹杆(16)的侧面延伸设置有三个等间距分布的挡环(32),从动齿轮(19)固定套设于位于左侧的挡环(32)上,两个下连接座(9)与三个挡环(32)交错设置;螺纹杆(16)侧面上三个挡环(32)之间的部分为螺纹面,且螺纹杆(16)侧面上的其余部分均为光滑面。7. A mobile protective device for bridge engineering construction according to claim 1, characterized in that: a sleeve (31) is fixed on each of the two fixing blocks (15), and the threaded rod (16) is The two ends are respectively rotatably passed through the two sleeves (31); the side surface of the threaded rod (16) is extended with three retaining rings (32) distributed at equal intervals, and the driven gear (19) is fixedly sleeved on the left side On the retaining ring (32) of the threaded rod (16), the two lower connecting seats (9) and the three retaining rings (32) are staggered; the part between the three retaining rings (32) on the side of the threaded rod (16) is a threaded surface, and The rest of the sides of the threaded rod (16) are smooth.
CN202010178467.0A 2020-03-14 2020-03-14 A mobile protective device for bridge engineering construction Pending CN111321670A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010178467.0A CN111321670A (en) 2020-03-14 2020-03-14 A mobile protective device for bridge engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010178467.0A CN111321670A (en) 2020-03-14 2020-03-14 A mobile protective device for bridge engineering construction

Publications (1)

Publication Number Publication Date
CN111321670A true CN111321670A (en) 2020-06-23

Family

ID=71173274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010178467.0A Pending CN111321670A (en) 2020-03-14 2020-03-14 A mobile protective device for bridge engineering construction

Country Status (1)

Country Link
CN (1) CN111321670A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111728828A (en) * 2020-07-28 2020-10-02 南通市第一人民医院 A pediatric standing rehabilitation device
CN112227211A (en) * 2020-09-30 2021-01-15 焦作大学 Lifting type supporting device for bridge construction
CN113006446A (en) * 2021-03-19 2021-06-22 黄河水利职业技术学院 Multifunctional construction platform
CN113183145A (en) * 2021-05-17 2021-07-30 和县隆盛精密机械有限公司 Positioning clamping sensing device for visual machining and implementation method thereof
CN113513146A (en) * 2021-03-15 2021-10-19 中国建筑第二工程局有限公司 Portable intelligent building construction bearing platform
CN114314458A (en) * 2021-12-31 2022-04-12 山东圣匠机械制造有限公司 Rail type lifting operation platform
CN114809560A (en) * 2022-05-17 2022-07-29 叶昌连 Interior decoration platform convenient to adjust
CN114837391A (en) * 2022-04-14 2022-08-02 陈建稳 Peripheral construction supporting table of safety protection's building
CN115045488A (en) * 2022-07-01 2022-09-13 张海滨 Equipment is set up with steelframe to basic station construction for communication engineering
CN117988207A (en) * 2024-04-03 2024-05-07 山西省交通规划勘察设计院有限公司 Temporary expansion device for bridge

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2366655A1 (en) * 2010-03-15 2011-09-21 René Altena Aerial work platform
CN206219165U (en) * 2016-11-10 2017-06-06 靳昕春 Electric power construction work platform
CN208578306U (en) * 2018-05-23 2019-03-05 长春市城建维护股份有限公司 A kind of constructing tunnel scaffold
CN209260556U (en) * 2018-12-28 2019-08-16 山东华鉴工程检测有限公司 A kind of intelligent big box beam visual defects detection device
CN209651838U (en) * 2019-01-25 2019-11-19 福建农林大学 A kind of removable fork hydraulic lifting platform
CN209815615U (en) * 2019-05-17 2019-12-20 牛锐 Be used for housing construction to use safe companion ladder
CN209958709U (en) * 2018-12-19 2020-01-17 天津市隆美佳装饰工程有限公司 Prevent fitment of turning on one's side with ascending a height frame
CN110820557A (en) * 2019-12-12 2020-02-21 中国铁建大桥工程局集团有限公司 Steel truss arch bridge maintenance car

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2366655A1 (en) * 2010-03-15 2011-09-21 René Altena Aerial work platform
CN206219165U (en) * 2016-11-10 2017-06-06 靳昕春 Electric power construction work platform
CN208578306U (en) * 2018-05-23 2019-03-05 长春市城建维护股份有限公司 A kind of constructing tunnel scaffold
CN209958709U (en) * 2018-12-19 2020-01-17 天津市隆美佳装饰工程有限公司 Prevent fitment of turning on one's side with ascending a height frame
CN209260556U (en) * 2018-12-28 2019-08-16 山东华鉴工程检测有限公司 A kind of intelligent big box beam visual defects detection device
CN209651838U (en) * 2019-01-25 2019-11-19 福建农林大学 A kind of removable fork hydraulic lifting platform
CN209815615U (en) * 2019-05-17 2019-12-20 牛锐 Be used for housing construction to use safe companion ladder
CN110820557A (en) * 2019-12-12 2020-02-21 中国铁建大桥工程局集团有限公司 Steel truss arch bridge maintenance car

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111728828A (en) * 2020-07-28 2020-10-02 南通市第一人民医院 A pediatric standing rehabilitation device
CN112227211A (en) * 2020-09-30 2021-01-15 焦作大学 Lifting type supporting device for bridge construction
CN113513146B (en) * 2021-03-15 2022-07-01 中国建筑第二工程局有限公司 Portable intelligent building construction bearing platform
CN113513146A (en) * 2021-03-15 2021-10-19 中国建筑第二工程局有限公司 Portable intelligent building construction bearing platform
CN113006446A (en) * 2021-03-19 2021-06-22 黄河水利职业技术学院 Multifunctional construction platform
CN113006446B (en) * 2021-03-19 2022-09-23 黄河水利职业技术学院 Multifunctional construction platform
CN113183145A (en) * 2021-05-17 2021-07-30 和县隆盛精密机械有限公司 Positioning clamping sensing device for visual machining and implementation method thereof
CN114314458A (en) * 2021-12-31 2022-04-12 山东圣匠机械制造有限公司 Rail type lifting operation platform
CN114837391A (en) * 2022-04-14 2022-08-02 陈建稳 Peripheral construction supporting table of safety protection's building
CN114837391B (en) * 2022-04-14 2023-11-14 南京交通工程有限公司 Safety protection's peripheral construction brace table of building
CN114809560A (en) * 2022-05-17 2022-07-29 叶昌连 Interior decoration platform convenient to adjust
CN115045488A (en) * 2022-07-01 2022-09-13 张海滨 Equipment is set up with steelframe to basic station construction for communication engineering
CN117988207A (en) * 2024-04-03 2024-05-07 山西省交通规划勘察设计院有限公司 Temporary expansion device for bridge
CN117988207B (en) * 2024-04-03 2024-06-04 山西省交通规划勘察设计院有限公司 A temporary expansion device for bridge

Similar Documents

Publication Publication Date Title
CN111321670A (en) A mobile protective device for bridge engineering construction
JP7254942B2 (en) Leveling device and leveling robot
CN114852932B (en) Combined lifting device for civil residence construction
CN110173289A (en) A kind of coal mine roadway is multi-faceted from shifting skid shoe type hydraulic support
CN212222199U (en) A gantry crane outrigger
CN117988245A (en) Crawler-type pushing construction equipment and construction method
CN210049036U (en) A railway laying device
CN109610431B (en) Rammer for straight road section of low-grade highway
CN204456248U (en) A kind of barrier-breaking car
CN210563430U (en) Building templates surface building prosthetic devices
CN220167000U (en) Deep hole grouting detection device for bridge foundation pile
CN104261233B (en) Lifter
CN115404903A (en) Open cut construction method of subway underground station
CN218879349U (en) Jacking fixing piece
CN111456777A (en) A coal mine excavation support device
CN223060601U (en) A hydraulic lifting device
CN107794923B (en) Walking type travelling mechanism of pile driver platform
CN211776058U (en) Civil construction support frame
CN211446579U (en) Multidirectional movable bridge basin-type rubber support
CN220102691U (en) A kind of convergence monitoring device for long-distance water conveyance tunnels
CN212027656U (en) A kind of building construction foundation pile drilling device
CN211006832U (en) Lifting device for cab of crow trolley
CN221589261U (en) Detection device for bridge
CN218174420U (en) Portal frame that toilet's hoist was used
CN221482887U (en) Hydraulic engineering pipeline installation equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200623

RJ01 Rejection of invention patent application after publication