CN115030495A - Novel aluminum template retention pulling piece - Google Patents

Novel aluminum template retention pulling piece Download PDF

Info

Publication number
CN115030495A
CN115030495A CN202210813895.5A CN202210813895A CN115030495A CN 115030495 A CN115030495 A CN 115030495A CN 202210813895 A CN202210813895 A CN 202210813895A CN 115030495 A CN115030495 A CN 115030495A
Authority
CN
China
Prior art keywords
pull
piece
tab
segment
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210813895.5A
Other languages
Chinese (zh)
Inventor
李俊宏
赵永强
张思达
潘寒
孙克平
胡中平
聂俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Science and Innovation Industry Development Co Ltd
Original Assignee
China Construction Third Bureau Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Construction Engineering Co Ltd filed Critical China Construction Third Bureau Construction Engineering Co Ltd
Priority to CN202210813895.5A priority Critical patent/CN115030495A/en
Publication of CN115030495A publication Critical patent/CN115030495A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • E04G9/06Forming boards or similar elements the form surface being of metal
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a novel aluminum template retention pull piece, which comprises a pull piece body and two positioning assemblies, wherein the pull piece body comprises a middle section and two pull piece sections symmetrically arranged at two ends of the middle section, the two positioning assemblies are respectively arranged on the two pull piece sections, each positioning assembly consists of two positioning pieces, and the two positioning pieces are symmetrically arranged at two sides of the corresponding pull piece section. The invention is helpful to solve the problems that the installation mode of the steel pull sheet required by the retention of the existing aluminum template is relatively rigid, the steel pull sheet is generally transversely connected with the aluminum mold by complicated pins, the installation is inconvenient, the recovery rate of the steel pull sheet is low, and the like.

Description

Novel aluminum template retention pulling piece
Technical Field
The invention relates to the technical field of aluminum template retention, in particular to a novel aluminum template retention pull piece.
Background
Compared with a screw system, the aluminum formwork pulling piece system does not need to be punched, holes cannot be reserved in the wall body after the formwork is removed, the risk of outer wall leakage is greatly reduced, and the aluminum formwork pulling piece system has the characteristics of high construction speed, good construction quality, labor and time saving, low cost and the like.
In an aluminum template pull piece system, the most main accessory is an aluminum template steel pull piece, the conventional aluminum template steel pull piece directly influences the construction efficiency of an aluminum mould on site, such as the integral portability and the installation convenience of the steel pull piece, the speed of the installation of the aluminum mould directly influences the site concrete pouring, so the integral construction period progress of the site is influenced, the conventional pull piece on the market is an 45/50 manganese steel pull piece, the cost of a single piece of spreading and selling for large-scale projects is in a decreasing trend along with the increase of the project amount, but the weight of the single piece of steel pull piece is lighter in relative weight, but the quantity and the weight of the required steel pull piece are exponentially increased along with the accumulation of the project amount, the conventional steel pull piece installation mode is relatively dead, the conventional steel pull piece is transversely connected with the aluminum mould through complicated pinning, the installation is inconvenient and the installation efficiency is low, and the pull piece can swing up and down during the installation, greatly affecting the installation efficiency.
Disclosure of Invention
The invention aims to solve the technical problem of providing a novel aluminum template retention pull piece which is convenient to be connected and fixed with an aluminum template.
In order to solve the technical problems, the invention adopts the following technical scheme: the utility model provides a novel aluminium template maintenance pulling-on piece, includes pulling-on piece body and two locating component, the pulling-on piece body includes that the setting of interlude and two symmetries is in the pulling-on piece section at interlude both ends, two locating component sets up respectively two draw on the piece, locating component comprises two first locating parts, and two the setting of first locating part symmetry is corresponding draw the both sides of piece.
Further, the first positioning piece is composed of two symmetrical buckles arranged at intervals, and each buckle comprises a straight strip base connected with the pull piece section and a quarter sphere auxiliary part connected to the top of the straight strip base.
Furthermore, the interlude includes fixed cover and two and prolongs rectangular, two it is provided with the second setting element respectively to prolong on the rectangular, just the second setting element can with corresponding prolong rectangular with fixed cover is connected.
Furthermore, the second positioning piece is a triangular rib, the fixed sleeve is provided with six fixing holes matched with the second positioning piece along the length direction, and the second positioning piece can be matched with any fixing hole in an inserting manner.
Furthermore, the fixed orifices are square holes, 5mm in width and 10mm in length, and the distance between adjacent fixed orifices is 10 mm.
Furthermore, the extension strip is also provided with scale marks.
Furthermore, the interlude still includes that two are connected respectively two prolong the piece of accepting of rectangular outer end, accept to offer the recess on the piece, be provided with the screw thread post on the groove diapire of recess, it is close to draw the piece the one end of interlude be provided with the widening piece that the recess matches, widening piece can stretch into in the recess with screw thread post threaded connection.
Furthermore, the bearing block is of a round table-shaped structure, the side of the bearing block with a small area is connected with the extension strip, and the side of the bearing block with a large area is connected with the pull piece section.
Further, the pulling-on piece body still includes two separation blades, two the separation blade sets up respectively two pull-on piece keeps away from the one end of interlude.
Furthermore, the corners of the baffle sheets are all in a round angle structure.
The invention has the beneficial effects that:
the novel aluminum template retention pull piece is provided with a pull piece body and two positioning assemblies, the pull piece body comprises a middle section and two pull sections, the positioning assemblies comprise two first positioning pieces, when an aluminum template is installed, the aluminum template is positioned on two sides of the pull sections on two sides and is directly fixed with a pin hole of the aluminum template through the first positioning pieces, the original installation time for taking a pin is reduced, the operation of adjustment required during project field installation is reduced by the simplest method, the installation efficiency is accelerated, and when concrete is poured, the middle section is completely embedded into a concrete wall.
Drawings
FIG. 1 is a structural elevation view of the novel aluminum form retention tab of the present invention in an unstretched condition;
FIG. 2 is a front view of the novel aluminum form retention tab of the present invention in a stretched state;
FIG. 3 is a partial cross-sectional left view of the retention tab of the aluminum form of the present invention;
FIG. 4 is a cross-sectional view of the novel aluminum form retention tab construction of the present invention;
FIG. 5 is a side view of the novel aluminum form retention tab construction of the present invention;
FIG. 6 is an enlarged view of the invention at A shown in FIG. 3;
FIG. 7 is a schematic view of a connection manner between an extension bar and a second positioning element according to the present invention.
The components in the drawings are labeled as follows: 1. a pull tab body; 101. a middle section; 1011. fixing a sleeve; 1012. a strip extending; 1013. a second positioning member; 1014. a fixing hole; 1015. scale lines; 1016. a bearing block; 1017. a groove; 1018. a threaded post; 102. pulling the segments; 103. a widening block; 104. a baffle plate; 2. a first positioning member; 201. buckling; 2011. a straight bar base; 2012. a quarter sphere auxiliary part.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
It should be noted that if the description of "first", "second", etc. is provided in the embodiment of the present invention, the description of "first", "second", etc. is only for descriptive purposes and is not to be construed as indicating or implying relative importance or implicitly indicating the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In addition, the meaning of "and/or" appearing throughout includes three juxtapositions, exemplified by "A and/or B" including either A or B or both A and B. In addition, "a plurality" means two or more. In addition, technical solutions between various embodiments may be combined with each other, but must be realized by a person skilled in the art, and when the technical solutions are contradictory or cannot be realized, such a combination should not be considered to exist, and is not within the protection scope of the present invention.
See fig. 1-7.
The novel aluminum template retention pull tab comprises a pull tab body 1 and two positioning assemblies, wherein the pull tab body 1 comprises a middle section 101 and two pull tab sections 102 which are symmetrically arranged at two ends of the middle section 101, the two positioning assemblies are respectively arranged on the two pull tab sections 102, each positioning assembly comprises two first positioning pieces 2, and the two first positioning pieces 2 are symmetrically arranged at two sides of the corresponding pull tab section 102.
The novel aluminum template retention pull piece is provided with a pull piece body 1 and two positioning assemblies, wherein the pull piece body 1 comprises a middle section 101 and two pull pieces 102, each positioning assembly comprises two first positioning pieces 2, when an aluminum template is installed, the aluminum template is positioned on two sides of the pull pieces 102 on two sides and is directly fixed with pin holes of the aluminum template through the first positioning pieces 2, the original installation time for taking pins is reduced, the operation of adjustment and correction required during project field installation is reduced by the simplest method, the installation efficiency is accelerated, the middle section 101 is completely embedded into a concrete wall when concrete is poured, and in the invention, the length of a flange plate of the aluminum template is just equal to the length of the pull piece sections 102.
In an embodiment, the first positioning element 2 is composed of two symmetrical and spaced buckles 201, and the buckles 201 include a straight bar base 2011 connected with the pull segment 102 and a quarter sphere auxiliary part 2012 connected to the top of the straight bar base 2011. In this embodiment, the diameter of the quarter spheroid subsidiary portion 2012 of setting is greater than the diameter of straight bar basal portion 2011, ensure that buckle 201 can block in the pinhole of aluminum mould board and assist the flange plate that the portion 2012 blocked the aluminum mould board through the quarter spheroid, the effect of connecting fixed adjacent aluminum mould is realized, solve the loaded down with trivial details installation problem of original pin, can prevent simultaneously that the aluminum mould board from appearing the mould that rises when pouring, simultaneously through the fixed effect of separation blade 104, also prevent the condition that leaps up and down appears in pulling-on piece body 1 when fixed aluminum mould board.
In one embodiment, the middle section 101 includes a fixing sleeve 1011 and two elongated strips 1012, wherein the two elongated strips 1012 are respectively provided with a second positioning member 1013, and the second positioning member 1013 can connect the corresponding elongated strip 1012 with the fixing sleeve 1011. Design like this, realize interlude 101's adjustable dismantlement function, the accessible is adjusted second setting element 1013 and fixed cover 1011's hookup location, the whole length of rectangular 1012 and fixed cover 1011 is prolonged in the adjustable, interlude 101's whole length promptly for pulling-on piece body 1 can be adjusted according to thickness between the interior wallboard of different aluminum mould boards, and then has reduced the time that the distance between the interior wallboard of the earlier stage of construction need according to aluminum mould board selects and purchases the pulling-on piece of different sizes.
In one embodiment, the second positioning element 1013 is a triangular prism, the fixing sleeve 1011 has six fixing holes 1014 matching with the second positioning element 1013 along the length direction, and the second positioning element 1013 can be inserted into any one of the fixing holes 1014. By the design, the second positioning member 1013 is a triangular rib, which facilitates the insertion and matching with the fixing hole 1014, when the second positioning member 1013 is not inserted, the position of the extension strip 1012 can be adjusted, and when the second positioning member 1013 is fixed, the second positioning member 1013 is inserted into the fixing hole 1014.
In one embodiment, the fastening holes 1014 are square holes 5mm wide and 10mm long, and the distance between adjacent fastening holes 1014 is 10 mm.
In one embodiment, the extension strip 1012 is further provided with a scale 1015. By the design, when the length of the middle section 101 is adjusted through the second positioning part 1013 and the fixing hole 1014, the current overall length of the pull tab can be accurately known through the scale lines 1015, and the error is reduced by properly adjusting the current overall length of the pull tab.
In an embodiment, the middle section 101 further includes two receiving blocks 1016 respectively connected to outer ends of the two extending strips 1012, a groove 1017 is formed on the receiving block 1016, a threaded column 1018 is disposed on a bottom wall of the groove 1017, a widening block 103 matching with the groove 1017 is disposed at an end of the pulling segment 102 close to the middle section 101, and the widening block 103 can extend into the groove 1017 to be in threaded connection with the threaded column 1018. Design like this, through the threaded connection who holds the piece 1016 and widen piece 103, the function can be dismantled in the realization, and convenient the dismantlement, when fixed aluminum mould board, aluminum mould board is pasted in holding the piece 1016 and is drawn the side of piece 102, just pour the back at fixed aluminum mould board, can directly will draw the piece 102 to screw down through the rotation and can retrieve, next time can directly adopt and buy interlude 101 connect use can, reduce construction cost, and in this embodiment, recess 1017 and widen piece 103 and be cylinder body type structure.
In one embodiment, the receiving block 1016 has a truncated cone shape, and the smaller area side of the receiving block 1016 is connected to the extension strip 1012 and the larger area side is connected to the pulling segment 102. By the design, when the aluminum template is fixed, the aluminum template is attached to the surface with the larger area of the bearing block 1016 and the side surface of the pull segment 102, the surface with the larger area of the bearing block 1016 can be provided with the sealing washer, the sealing washer can enhance the tightness of the connection between the bearing block 1016 and the aluminum template, and meanwhile, the inclined state of the bus of the bearing block 1016 can prevent concrete from overflowing to the surface with the larger area of the bearing block 1016 during pouring, so that the pull segment 102 cannot be detached.
In an embodiment, the pull tab body 1 further includes two blocking pieces 104, and the two blocking pieces 104 are respectively disposed at one ends of the two pull tab segments 102 away from the middle segment 101. Design like this for during the compound die of aluminum mould board, the whole section of pulling-on piece section 102 is cliied by aluminum mould board, and separation blade 104 closely laminates with the edge of a wing end of aluminum mould board, and when concreting, when both sides aluminum mould board outwards expanded, can tightly draw the both sides edge of a wing end of aluminum mould board by separation blade 104, first setting element 2 cooperation second setting element 103 can prevent to rise the appearance of mould.
In one embodiment, the corners of the baffle plate 104 are rounded. Design like this for in the installation, when preventing that separation blade 104 from exposing outside, the condition of staff fish tail will appear in the corner.
In one embodiment, the tab body 1, the positioning assembly and the second positioning member 1013 are made of glass fiber reinforced plastic material. Due to the design, the integral material of the invention is lighter and more suitable for field labor personnel to carry and take, and the tensile strength is higher.
The invention discloses a novel aluminum template retention pull tab which is made of glass fiber reinforced plastics, the length of a middle section 101 of a pull tab body 1 can be adjusted according to the actual cast-in-place wall thickness on site through a second positioning piece 1013 and a fixing hole 1014, two sides of the pull tab section 102 are respectively provided with a buckle 201, when an aluminum template is installed, two sides of the pull tab section 102 are clamped by the aluminum template, a bearing block 1016 is propped against the aluminum template, the buckle 201 can be inserted into a pin jack reserved on the aluminum template, the complex process of installing a pin on site and punching the pin is avoided, in addition, two ends of the pull tab section 102 are also provided with a baffle 104, the vertical movement phenomenon in the aluminum template installation process can be prevented, the pull tab body 1 is made of glass fiber reinforced plastics materials, the weight is lighter than that of the traditional steel pull tab and is more convenient to carry, when the pull tab body 1 is installed on a single-side aluminum template, in the mold removal stage, the pull tab section 102 can be quickly detached by rotating, and recycle, labour saving and time saving has great help to the efficiency of construction that promotes the project scene for this maintenance pulling-on piece possesses the convenient, cyclic utilization, the convenient to carry and the characteristic of a multi-purpose of installation.
It should be understood that the examples and embodiments described herein are for illustrative purposes only and are not intended to limit the scope of the present disclosure, and that various modifications or changes in light thereof will be suggested to persons skilled in the art and are to be included within the spirit and purview of this disclosure.

Claims (10)

1. The utility model provides a novel aluminium template maintenance pulling-on piece, its characterized in that includes pulling-on piece body (1) and two locating component, the setting that pulling-on piece body (1) includes interlude (101) and two symmetries is in pulling segment (102) at interlude (101) both ends, two locating component sets up respectively two pull on segment (102), locating component comprises two first locating part (2), and two the setting of first locating part (2) symmetry is corresponding pull the both sides of segment (102).
2. The new aluminum form retention tab as claimed in claim 1, characterized in that the first locator (2) consists of two symmetrical and spaced-apart snaps (201), the snaps (201) comprising a straight base (2011) connected with the pull segment (102) and a quarter sphere appendage (2012) connected at the top of the straight base (2011).
3. The new aluminum die plate retention tab as claimed in claim 1, wherein the middle section (101) comprises a fixing sleeve (1011) and two elongated strips (1012), wherein the two elongated strips (1012) are respectively provided with a second positioning member (1013), and the second positioning members (1013) can connect the corresponding elongated strips (1012) with the fixing sleeve (1011).
4. The new aluminum die plate retention tab as claimed in claim 3, wherein the second positioning member (1013) is a triangular prism, the fixing sleeve (1011) has six fixing holes (1014) along its length for cooperating with the second positioning member (1013), and the second positioning member (1013) can engage with any of the fixing holes (1014) by plugging.
5. The new aluminum form retention tab of claim 4 wherein said securing holes (1014) are square holes 5mm wide and 10mm long, with a 10mm spacing between adjacent securing holes (1014).
6. The new aluminum form retention tab as recited in claim 4, wherein the elongated strip (1012) is further provided with graduations (1015).
7. The novel aluminum template retention pull tab as claimed in claim 4, wherein the middle section (101) further comprises two bearing blocks (1016) respectively connected to the outer ends of the two extension strips (1012), a groove (1017) is formed in each bearing block (1016), a threaded column (1018) is arranged on the bottom wall of the groove (1017), one end, close to the middle section (101), of the pull segment (102) is provided with a widening block (103) matched with the groove (1017), and the widening block (103) can extend into the groove (1017) to be in threaded connection with the threaded column (1018).
8. The novel aluminum form retention tab as claimed in claim 7, wherein the receiving block (1016) is a truncated cone-shaped structure, and the side of the receiving block (1016) with the smaller area is connected to the elongated strip (1012) and the side with the larger area is connected to the tab segment (102).
9. The new aluminum die plate retention tab as claimed in any one of claims 1 to 8, characterized in that the tab body (1) further comprises two baffles (104), the two baffles (104) being respectively provided at an end of the two pull tab segments (102) remote from the middle segment (101).
10. The aluminum form retention tab of claim 9, wherein the corners of the flap (104) are rounded.
CN202210813895.5A 2022-07-11 2022-07-11 Novel aluminum template retention pulling piece Pending CN115030495A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210813895.5A CN115030495A (en) 2022-07-11 2022-07-11 Novel aluminum template retention pulling piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210813895.5A CN115030495A (en) 2022-07-11 2022-07-11 Novel aluminum template retention pulling piece

Publications (1)

Publication Number Publication Date
CN115030495A true CN115030495A (en) 2022-09-09

Family

ID=83129483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210813895.5A Pending CN115030495A (en) 2022-07-11 2022-07-11 Novel aluminum template retention pulling piece

Country Status (1)

Country Link
CN (1) CN115030495A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200372771Y1 (en) * 2004-10-28 2005-01-14 윤안구 Fixing Bracket of Tie for Aluminum Euroform
CN209585629U (en) * 2019-01-31 2019-11-05 江门志特新材料科技有限公司 A kind of building aluminum alloy mould plate tab system strenthening member
CN211173117U (en) * 2019-09-19 2020-08-04 中国建筑第八工程局有限公司 Three-section adjustable counter-pulling water-stopping screw
CN212078698U (en) * 2020-03-23 2020-12-04 山东鼎旺天成防水科技有限公司 Waterproof split bolt device
CN212836724U (en) * 2020-07-13 2021-03-30 首铝(天津)模板科技有限公司 Aluminum template structure of zipper pull
CN215484685U (en) * 2020-12-28 2022-01-11 广东沃尔世家新型建材科技有限公司 Take stagnant water pulling-on piece device
CN215671110U (en) * 2021-01-14 2022-01-28 中建一局集团第二建筑有限公司 Recoverable wall pulling-on piece of end for aluminum alloy template system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200372771Y1 (en) * 2004-10-28 2005-01-14 윤안구 Fixing Bracket of Tie for Aluminum Euroform
CN209585629U (en) * 2019-01-31 2019-11-05 江门志特新材料科技有限公司 A kind of building aluminum alloy mould plate tab system strenthening member
CN211173117U (en) * 2019-09-19 2020-08-04 中国建筑第八工程局有限公司 Three-section adjustable counter-pulling water-stopping screw
CN212078698U (en) * 2020-03-23 2020-12-04 山东鼎旺天成防水科技有限公司 Waterproof split bolt device
CN212836724U (en) * 2020-07-13 2021-03-30 首铝(天津)模板科技有限公司 Aluminum template structure of zipper pull
CN215484685U (en) * 2020-12-28 2022-01-11 广东沃尔世家新型建材科技有限公司 Take stagnant water pulling-on piece device
CN215671110U (en) * 2021-01-14 2022-01-28 中建一局集团第二建筑有限公司 Recoverable wall pulling-on piece of end for aluminum alloy template system

Similar Documents

Publication Publication Date Title
CN206903216U (en) Stair step aluminum alloy mould plate
CN115030495A (en) Novel aluminum template retention pulling piece
CN206091289U (en) A formwork support for pouring frame post
CN214942328U (en) Reinforced energy-saving building concrete formwork device
CN216664980U (en) Complementary instrument is consolidated with anti bank in water room
CN216893235U (en) Balcony railing reserved cup mouth structure
CN212583262U (en) Template fixing device and template frame applying same
CN205935677U (en) Aluminum mould board form removal ware
CN110259115B (en) Concrete formwork for real estate construction
CN106223602A (en) A kind of sectioned wall template
CN207813012U (en) A kind of small space floor template structure
CN207847075U (en) A kind of wall form upper end reinforcement assembly
CN215331444U (en) Hook bolt back rib is used for aluminium mould wallboard to have not pulling-on piece to consolidate
CN207812786U (en) A kind of interior decoration metal ceiling plate easy to disassemble
CN221321416U (en) Anti-drop mounting structure that glass curtain wall and wall connection
CN209837700U (en) Brace structure for building template system
CN218623297U (en) Device for adjusting deviation of internal and external angles between templates
CN213774446U (en) Template for building engineering convenient to dismantle
CN220827946U (en) High-performance fiber concrete bottom plate assembled steel bar truss floor support plate
CN219080976U (en) Detachable buckle spare for building carrier plate
CN219241348U (en) Concrete pouring template
CN218467083U (en) Vertical lines template structure of outer wall
CN210659279U (en) Aluminum die K plate supporting device
CN208681814U (en) A kind of Form board frame of shear wall casting mold
CN215368687U (en) Concrete placement template for building convenient to splice fast

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20221130

Address after: 3301, Office Building 3B, Vanke Times Square, No. 85, Longcheng Avenue, Shangjing Community, Longcheng Street, Longgang District, Shenzhen, Guangdong 518000

Applicant after: China Construction Third Engineering Bureau Science and Innovation Industry Development Co.,Ltd.

Address before: 430000 No. 552 Guan Shan Road, Hubei, Wuhan

Applicant before: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd.

TA01 Transfer of patent application right