CN115030161B - Positioning device for steel sheet pile construction - Google Patents
Positioning device for steel sheet pile construction Download PDFInfo
- Publication number
- CN115030161B CN115030161B CN202210692437.0A CN202210692437A CN115030161B CN 115030161 B CN115030161 B CN 115030161B CN 202210692437 A CN202210692437 A CN 202210692437A CN 115030161 B CN115030161 B CN 115030161B
- Authority
- CN
- China
- Prior art keywords
- steering
- positioning
- base plate
- steel sheet
- control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/04—Guide devices; Guide frames
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明公开一种钢板桩施工用定位装置,涉及工程施工领域,包括定位基础盘,所述定位基础盘的后端顶部设置有推进固定机构,推进固定机构的前端设置有转向机构,转向机构的远离推进固定机构的一端设置有转向控制机构,定位基础盘的底端设置有移动机构,所述定位基础盘包括定位底盘,定位底盘后端顶部固定连接有固定引导盘,定位底盘前端顶部固定连接有转向固定底盘,定位底盘中部顶端开设有转向控制孔;同时,本发明在使用时,通过采用双向的控制机构,可在双方向的配合下进行角度的调节,在施工的复杂环境下能够防止紧急情况造成的完全无法使用,可以更加灵活地进行钢板桩的施工定位,减少了人力成本,且提高了工作效率。
The invention discloses a positioning device for steel sheet pile construction, which relates to the field of engineering construction. A steering control mechanism is provided at the end away from the propulsion and fixing mechanism, and a moving mechanism is provided at the bottom of the positioning base plate. The positioning base plate includes a positioning chassis. There is a steering fixed chassis, and a steering control hole is opened at the top of the middle part of the positioning chassis; at the same time, when the present invention is in use, by adopting a two-way control mechanism, the angle can be adjusted under the cooperation of two directions, which can prevent the Completely unusable due to emergencies, the construction positioning of steel sheet piles can be performed more flexibly, labor costs are reduced, and work efficiency is improved.
Description
技术领域technical field
本发明涉及工程施工领域,具体的是一种钢板桩施工用定位装置。The invention relates to the field of engineering construction, in particular to a positioning device for steel sheet pile construction.
背景技术Background technique
钢板桩是带有锁口的一种型钢,其截面有直板形、槽形及Z形等,有各种大小尺寸及联锁形式。常见的有拉尔森式,拉克万纳式等。其优点为:强度高,容易打入坚硬土层;可在深水中施工,必要时加斜支撑成为一个围笼。防水性能好;能按需要组成各种外形的围堰,并可多次重复使用,因此,它的用途广泛。Steel sheet pile is a kind of section steel with lock. Its section has straight plate shape, groove shape and Z shape, etc., and there are various sizes and interlocking forms. The common ones are Larson type, Lackawanna type and so on. Its advantages are: high strength, easy to drive into hard soil layer; it can be constructed in deep water, and if necessary, it can be added with oblique support to form a cage. Good waterproof performance; cofferdams of various shapes can be formed according to needs, and can be reused many times, so it has a wide range of uses.
钢板桩是一种边缘带有联动装置,且这种联动装置可以自由组合以便形成一种连续紧密的挡土或者挡水墙的钢结构体,在相邻两组钢板桩安装时,通常是由工人手扶两组钢板桩,使得两组钢板桩的螺孔部位交叠,再由另一个工人拧紧螺栓,完成安装,但是螺孔的交叠需要工人多次手动校准,安装时间长,降低施工效率,且安装定位的过程必须要两个人同时完成,人力成本耗费大,使用不方便,而不校准的安装定位方式又容易导致相邻两组钢板桩安装位置不均匀,造成结构体受力不均坍塌,实用性差,在对钢板桩进行打桩作业时,一般都会采用施工人员将桩扶好,然后将其打入地下的方法,这种方法不仅定位效果差,还存在一定的危险系数,而且现有的定位装置由于部件繁多,在进行组装和拆卸时特别的麻烦,严重影响工作效率。The steel sheet pile is a kind of steel structure with a linkage device on the edge, and the linkage device can be freely combined to form a continuous and compact retaining wall or water retaining wall. When two adjacent sets of steel sheet piles are installed, usually by Workers hold two groups of steel sheet piles by hand, so that the screw holes of the two groups of steel sheet piles overlap, and then another worker tightens the bolts to complete the installation. However, the overlapping of screw holes requires manual calibration by workers many times, which takes a long time to install and reduces construction costs. efficiency, and the process of installation and positioning must be completed by two people at the same time, the labor cost is high, and it is inconvenient to use, and the installation and positioning method without calibration will easily lead to uneven installation positions of two adjacent groups of steel sheet piles, resulting in uneven force on the structure All collapsed and poor practicability. When piling the steel sheet piles, the construction personnel will generally use the method of supporting the piles and then driving them into the ground. This method not only has poor positioning effect, but also has a certain risk factor. Due to the large number of components in the existing positioning device, it is particularly troublesome to assemble and disassemble, which seriously affects the work efficiency.
发明内容Contents of the invention
为解决上述背景技术中提到的不足,本发明的目的在于提供一种钢板桩施工用定位装置,本发明旨在实用过程中,能够更加便捷地进行钢板桩的定位和角度调整。In order to solve the shortcomings mentioned in the above background technology, the purpose of the present invention is to provide a positioning device for steel sheet pile construction. The purpose of the present invention is to more conveniently perform positioning and angle adjustment of steel sheet piles in the practical process.
本发明的目的可以通过以下技术方案实现:The purpose of the present invention can be achieved through the following technical solutions:
一种钢板桩施工用定位装置,包括定位基础盘,所述定位基础盘的后端顶部设置有推进固定机构,推进固定机构的前端设置有转向机构,转向机构的远离推进固定机构的一端设置有转向控制机构,定位基础盘的底端设置有移动机构。A positioning device for steel sheet pile construction, comprising a positioning foundation plate, a propulsion and fixing mechanism is arranged on the top of the rear end of the positioning foundation plate, a steering mechanism is arranged at the front end of the pushing and fixing mechanism, and the end of the steering mechanism far away from the advancing and fixing mechanism is provided with a For the steering control mechanism, the bottom end of the positioning base plate is provided with a moving mechanism.
进一步地,所述定位基础盘包括定位底盘,定位底盘后端顶部固定连接有固定引导盘,定位底盘前端顶部固定连接有转向固定底盘,定位底盘中部顶端开设有转向控制孔。Further, the positioning base plate includes a positioning chassis, a fixed guide plate is fixedly connected to the top of the rear end of the positioning chassis, a steering fixed chassis is fixedly connected to the top of the front end of the positioning chassis, and a steering control hole is opened at the top of the middle part of the positioning chassis.
进一步地,所述推进固定机构包括固定推进槽,固定推进槽内侧后端固定连接有固定推动块,固定推动块朝向转向机构的一端设置有限位弹簧,限位弹簧远离固定推动块的一端连接有推动限位转向机构,推动限位转向机构外侧设置有转轮驱动机构。Further, the pushing and fixing mechanism includes a fixed pushing slot, and a fixed pushing block is fixedly connected to the rear end of the inside of the fixed pushing slot, and a limit spring is arranged on one end of the fixed pushing block facing the steering mechanism, and a limit spring is connected to an end of the limiting spring far away from the fixed pushing block. Push the limit steering mechanism, and the outside of the limit steering mechanism is provided with a wheel drive mechanism.
进一步地,所述转向机构包括转向引导环,转向引导环内侧设置有钢板桩定位基板,钢板桩定位基板顶端固定连接有控制基座,控制基座远离钢板桩定位基板的一端连接有控制推架,控制推架朝向内侧的一端活动连接有限位控制轮,钢板桩定位基板朝向内侧的一端固定连接有限位引导槽,限位引导槽顶端固定连接有钢板桩引导槽,钢板桩引导槽顶端开设有钢板桩引导孔。Further, the steering mechanism includes a steering guide ring, a steel sheet pile positioning base is arranged inside the steering guide ring, a control base is fixedly connected to the top of the steel sheet pile positioning base, and a control push frame is connected to the end of the control base away from the steel sheet pile positioning base The end of the control push frame facing inward is movably connected to the limit control wheel, the end of the steel sheet pile positioning base facing inward is fixedly connected to the limit guide groove, the top of the limit guide groove is fixedly connected to the steel sheet pile guide groove, and the top of the steel sheet pile guide groove is provided with a Pilot holes for sheet piles.
进一步地,所述转向控制机构包括转向控制支座,转向控制支座固定连接于定位基础盘的后端顶部,转向控制支座顶端后侧固定连接有驱动基板支座,驱动基板支座朝向前端的一侧固定连接有驱动控制基盘,驱动控制基盘朝向前端的一侧固定连接有驱动转向杆,驱动转向杆远离驱动控制基盘的一端连接有驱动转向机构,驱动转向机构远离驱动转向杆的一端连接有转向控制核心,转向控制核心远离转向控制核心的一端固定连接有转向连接支板,转向连接支板远离转向控制核心的一端两侧设置有控制轮支架,控制轮支架远离转向连接支板的一端设置有转向控制核心轮。Further, the steering control mechanism includes a steering control support, the steering control support is fixedly connected to the top of the rear end of the positioning base plate, the rear side of the top end of the steering control support is fixedly connected to the driving substrate support, and the driving substrate support faces the front end One side of the drive control base plate is fixedly connected with a drive control base plate, and the side of the drive control base plate facing the front end is fixedly connected with a drive steering rod. One end of the steering control core is connected with the steering control core, and the end of the steering control core away from the steering control core is fixedly connected with a steering connection support plate, and the side of the end of the steering connection support plate away from the steering control core is provided with a control wheel bracket on both sides, and the control wheel support is far away from the steering connection support. One end of the board is provided with a steering control core wheel.
进一步地,所述移动机构包括第一推进板,第一推进板顶端固定连接于定位基础盘的底端,第一推进板远离定位基础盘的一端固定连接有第一推进支座,第一推进支座外侧两端设置有第一移动转轮,定位基础盘的底端后侧还设置有第二推进板,第二推进板远离定位基础盘的一端固定连接有第二推进支座,第二推进支座外侧两端设置有第二移动转轮。Further, the moving mechanism includes a first push plate, the top end of the first push plate is fixedly connected to the bottom end of the positioning base plate, and the end of the first push plate away from the positioning base plate is fixedly connected with a first propulsion support, and the first push plate The two ends on the outer side of the support are provided with first moving runners, and the rear side of the bottom end of the positioning base plate is also provided with a second propulsion plate. The two ends on the outer side of the propulsion support are provided with second moving runners.
本发明的有益效果:Beneficial effects of the present invention:
1、本发明通过采用双向的控制机构,可在双方向的配合下进行角度的调节,在施工的复杂环境下能够防止紧急情况造成的完全无法使用;1. By adopting a two-way control mechanism, the present invention can adjust the angle under the cooperation of two directions, and can prevent the complete unusability caused by emergency situations in the complex environment of construction;
2、本发明在使用时,可以更加灵活地进行钢板桩的施工定位,减少了人力成本,且提高了工作效率。2. When the present invention is used, the construction positioning of the steel sheet pile can be performed more flexibly, the labor cost is reduced, and the work efficiency is improved.
附图说明Description of drawings
下面结合附图对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings.
图1是本发明整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of the present invention;
图2是本发明部分结构示意图;Fig. 2 is a schematic diagram of part of the structure of the present invention;
图3是本发明部分结构示意图;Fig. 3 is a schematic diagram of part of the structure of the present invention;
图4是本发明部分结构示意图;Fig. 4 is a schematic diagram of part of the structure of the present invention;
图5是本发明部分结构示意图。Fig. 5 is a schematic diagram of part of the structure of the present invention.
图中:1、定位基础盘;11、定位底盘;12、固定引导盘;13、转向固定底盘;14、转向控制孔;2、推进固定机构;21、固定推进槽;22、固定推动块;23、限位弹簧;24、推动限位转向机构;25、转轮驱动机构;3、转向机构;31、转向引导环;32、钢板桩定位基板;33、控制基座;34、控制推架;35、限位控制轮;36、限位引导槽;37、钢板桩引导槽;38、钢板桩引导孔;4、转向控制机构;41、转向控制支座;42、驱动基板支座;43、驱动控制基盘;44、驱动转向杆;45、驱动转向机构;46、转向控制核心;47、转向连接支板;48、控制轮支架;49、转向控制核心轮;5、移动机构;51、第一推进板;52、第一推进支座;53、第一移动转轮;54、第二推进板;55、第二推进支座;56、第二移动转轮。In the figure: 1. Positioning base plate; 11. Positioning chassis; 12. Fixed guide plate; 13. Steering fixed chassis; 14. Steering control hole; 2. Pushing and fixing mechanism; 23. Limit spring; 24. Push limit steering mechanism; 25. Wheel drive mechanism; 3. Steering mechanism; 31. Steering guide ring; 32. Steel sheet pile positioning base plate; 33. Control base; 34. Control push frame ;35, limit control wheel; 36, limit guide groove; 37, steel sheet pile guide groove; 38, steel sheet pile guide hole; 4, steering control mechanism; 41, steering control support; 42, drive substrate support; 43 . Drive control base plate; 44. Drive steering rod; 45. Drive steering mechanism; 46. Steering control core; 47. Steering connection support plate; 48. Control wheel bracket; 49. Steering control core wheel; 5. Moving mechanism; 51 , the first propulsion plate; 52, the first propulsion support; 53, the first mobile runner; 54, the second propulsion plate; 55, the second propulsion support; 56, the second mobile runner.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
在本发明的描述中,需要理解的是,术语“开孔”、“上”、“下”、“厚度”、“顶”、“中”、“长度”、“内”、“四周”等指示方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的组件或元件必须具有特定的方位,以特定的方位构造和操作,因此不能理解为对本发明的限制。In describing the present invention, it is to be understood that the terms "opening", "upper", "lower", "thickness", "top", "middle", "length", "inner", "surrounding" etc. Indicating orientation or positional relationship is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the components or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be construed as limiting the present invention .
一种钢板桩施工用定位装置,如图1所示,定位基础盘1的后端顶部设置有推进固定机构2,推进固定机构2的前端设置有转向机构3,转向机构3的远离推进固定机构2的一端设置有转向控制机构4,定位基础盘1的底端设置有移动机构5。A positioning device for steel sheet pile construction, as shown in Figure 1, the top of the rear end of the positioning foundation plate 1 is provided with a propulsion and fixing
如图2所示,推进固定机构2包括固定推进槽21,固定推进槽21内侧后端固定连接有固定推动块22,固定推动块22朝向转向机构3的一端设置有限位弹簧23,限位弹簧23远离固定推动块22的一端连接有推动限位转向机构24,推动限位转向机构24外侧设置有转轮驱动机构25。As shown in Figure 2, the advancing
如图3所示,定位基础盘1包括定位底盘11,定位底盘11后端顶部固定连接有固定引导盘12,定位底盘11前端顶部固定连接有转向固定底盘13,定位底盘11中部顶端开设有转向控制孔14。As shown in Figure 3, the positioning base plate 1 includes a positioning chassis 11, the top of the rear end of the positioning chassis 11 is fixedly connected with a fixed
转向机构3包括转向引导环31,转向引导环31内侧设置有钢板桩定位基板32,钢板桩定位基板32顶端固定连接有控制基座33,控制基座33远离钢板桩定位基板32的一端连接有控制推架34,控制推架34朝向内侧的一端活动连接有限位控制轮35,钢板桩定位基板32朝向内侧的一端固定连接有限位引导槽36,限位引导槽36顶端固定连接有钢板桩引导槽37,钢板桩引导槽37顶端开设有钢板桩引导孔38。The
如图4所示,转向控制机构4包括转向控制支座41,转向控制支座41固定连接于定位基础盘1的后端顶部,转向控制支座41顶端后侧固定连接有驱动基板支座42,驱动基板支座42朝向前端的一侧固定连接有驱动控制基盘43,驱动控制基盘43朝向前端的一侧固定连接有驱动转向杆44,驱动转向杆44远离驱动控制基盘43的一端连接有驱动转向机构45,驱动转向机构45远离驱动转向杆44的一端连接有转向控制核心46,转向控制核心46远离转向控制核心46的一端固定连接有转向连接支板47,转向连接支板47远离转向控制核心46的一端两侧设置有控制轮支架48,控制轮支架48远离转向连接支板47的一端设置有转向控制核心轮49。As shown in Figure 4, the steering control mechanism 4 includes a
如图5所示,移动机构5包括第一推进板51,第一推进板51顶端固定连接于定位基础盘1的底端,第一推进板51远离定位基础盘1的一端固定连接有第一推进支座52,第一推进支座52外侧两端设置有第一移动转轮53,定位基础盘1的底端后侧还设置有第二推进板54,第二推进板54远离定位基础盘1的一端固定连接有第二推进支座55,第二推进支座55外侧两端设置有第二移动转轮56。As shown in Figure 5, the moving
在使用时,首先控制定位底盘11顶端的推进固定机构2,让转轮驱动机构25能够驱动推动限位转向机构24前端的轮转动,带动转向机构3转动,让钢板桩定位基板32顶端的限位控制轮35能够带动限位引导槽36,从而通过限位引导槽36的转动,带动钢板桩引导槽37顶端的钢板桩引导孔38进行转动,进而让转向控制核心轮49辅助,实现角度的调节,让钢板桩引导孔38的口确定转动的角度,让钢板桩在安装的过程中能够实现定位安装。When in use, firstly control the advancing
或者,让驱动控制基盘43驱动转向连接支板47外侧的控制轮支架48,让控制轮支架48能够带动转向控制核心轮49进行转动,进而实现带动限位引导槽36的转动,让限位控制轮35能够转动,进而在限位引导槽36的底端让控制推架34带动转向引导环31转动,在推进固定机构2的配合下,让固定推动块22与限位弹簧23一起带动推动限位转向机构24,进行对转向机构3的限位,从而实现确定转动的角度,进而辅助钢板桩的定位安装。Or, let the drive
可通过确定第二移动转轮56和第一移动转轮53转动,进而实现让整个机构的移动,可配合另外配置好的引导轨道实用,让第一移动转轮53和第二移动转轮56在引导轨道外侧移动。The movement of the entire mechanism can be achieved by determining the rotation of the second moving
在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, descriptions with reference to the terms "one embodiment", "example", "specific example" and the like mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment of the present invention. In an embodiment or example. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。The basic principles, main features and advantages of the present invention have been shown and described above. Those skilled in the industry should understand that the present invention is not limited by the above-mentioned embodiments. What are described in the above-mentioned embodiments and the description only illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention will also have Variations and improvements are possible, which fall within the scope of the claimed invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210692437.0A CN115030161B (en) | 2022-06-17 | 2022-06-17 | Positioning device for steel sheet pile construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210692437.0A CN115030161B (en) | 2022-06-17 | 2022-06-17 | Positioning device for steel sheet pile construction |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN115030161A CN115030161A (en) | 2022-09-09 |
| CN115030161B true CN115030161B (en) | 2023-04-07 |
Family
ID=83124200
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210692437.0A Expired - Fee Related CN115030161B (en) | 2022-06-17 | 2022-06-17 | Positioning device for steel sheet pile construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115030161B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116657926B (en) * | 2023-06-12 | 2025-08-05 | 山东建筑大学 | Device and method for spatial positioning of square steel pipes |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109056727A (en) * | 2018-09-10 | 2018-12-21 | 时光 | A kind of bridge cofferdam construction special-purpose steel sheet pile removes the working method of device |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002129562A (en) * | 2000-10-26 | 2002-05-09 | Nishimatsu Constr Co Ltd | Construction method of trussed pillar |
| CN108005075A (en) * | 2018-01-15 | 2018-05-08 | 胡红建 | Steel sheet pile can efficiently be mounted to the municipal works drainage system construction machine of steel structure body |
| CN208328923U (en) * | 2018-03-28 | 2019-01-04 | 张茂排 | A kind of cofferdam steel sheet pile water conservancy construction machine |
| CN109024595A (en) * | 2018-09-21 | 2018-12-18 | 青岛理工大学 | Rapid sheet pile sinking device and method |
| JP7178316B2 (en) * | 2019-04-03 | 2022-11-25 | 日本車輌製造株式会社 | Pile driver controller |
| CN210684705U (en) * | 2019-09-30 | 2020-06-05 | 高碑店市铁岩钢板桩有限公司 | Positioning device for steel sheet pile construction |
| CN214219715U (en) * | 2020-12-18 | 2021-09-17 | 中建二局第二建筑工程有限公司 | Pile foundation construction device capable of preventing deviation |
-
2022
- 2022-06-17 CN CN202210692437.0A patent/CN115030161B/en not_active Expired - Fee Related
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109056727A (en) * | 2018-09-10 | 2018-12-21 | 时光 | A kind of bridge cofferdam construction special-purpose steel sheet pile removes the working method of device |
Also Published As
| Publication number | Publication date |
|---|---|
| CN115030161A (en) | 2022-09-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101063319A (en) | Node component used for connecting steel tube concrete column with building roof beam | |
| CN115030161B (en) | Positioning device for steel sheet pile construction | |
| CN209354165U (en) | The walking portal frame system and Tunnel Second Lining concrete trolley of trolley | |
| CN113290332A (en) | Manufacturing method of multi-angle complex bracket cross-shaped column | |
| CN214460376U (en) | Novel building engineering pile device | |
| CN203755625U (en) | Concrete pouring platform for use in rotary drilling pile with reversed steel pipe column | |
| CN218265127U (en) | Reinforcing device for a steel structure workshop | |
| CN209618732U (en) | Light and heavy tower crane conversion section | |
| CN217150262U (en) | Be applied to assembled shaped steel bracket structure in foundation ditch | |
| CN217811090U (en) | Foundation pit supporting structure | |
| CN107254890B (en) | A limiting device for truncation and rectification of prefabricated square piles | |
| CN215168227U (en) | Prefabricated post positioner | |
| CN214883822U (en) | A lattice column base | |
| CN222414086U (en) | A prefabricated concrete composite panel installation positioning tool | |
| CN209053103U (en) | Facilitate the assembled steel sheet pile purlin connection structure removed | |
| CN211735427U (en) | Adjustable forming lattice column jig frame | |
| CN220813814U (en) | Rotary digging pile steel pile casing | |
| CN211114808U (en) | A shear side wall formwork | |
| CN209353482U (en) | A kind of steel construction embedding anchor bolts fixing device for installing | |
| CN218492521U (en) | Oblique supporting construction of H shaped steel | |
| CN108915606B (en) | A full-rotation casing drilling rig driving device mounting base | |
| CN222499916U (en) | Quick template of highway construction | |
| CN208183728U (en) | A kind of positioning device of subway station underwater cast-in-place pile lattice column | |
| CN223867242U (en) | Pile foundation reinforcement cage temporary fixing device with buckle | |
| CN223330260U (en) | A positioning device for connecting core tube shear wall and outer frame with stubble steel bars |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230407 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |