CN115030161B - Positioning device for steel sheet pile construction - Google Patents

Positioning device for steel sheet pile construction Download PDF

Info

Publication number
CN115030161B
CN115030161B CN202210692437.0A CN202210692437A CN115030161B CN 115030161 B CN115030161 B CN 115030161B CN 202210692437 A CN202210692437 A CN 202210692437A CN 115030161 B CN115030161 B CN 115030161B
Authority
CN
China
Prior art keywords
steering
positioning
base plate
steel sheet
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202210692437.0A
Other languages
Chinese (zh)
Other versions
CN115030161A (en
Inventor
黄茂兴
谢志杰
陆金伦
罗海腾
刘忠干
张丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yuantian Engineering Co Ltd
Original Assignee
Guangdong Yuantian Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yuantian Engineering Co Ltd filed Critical Guangdong Yuantian Engineering Co Ltd
Priority to CN202210692437.0A priority Critical patent/CN115030161B/en
Publication of CN115030161A publication Critical patent/CN115030161A/en
Application granted granted Critical
Publication of CN115030161B publication Critical patent/CN115030161B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本发明公开一种钢板桩施工用定位装置,涉及工程施工领域,包括定位基础盘,所述定位基础盘的后端顶部设置有推进固定机构,推进固定机构的前端设置有转向机构,转向机构的远离推进固定机构的一端设置有转向控制机构,定位基础盘的底端设置有移动机构,所述定位基础盘包括定位底盘,定位底盘后端顶部固定连接有固定引导盘,定位底盘前端顶部固定连接有转向固定底盘,定位底盘中部顶端开设有转向控制孔;同时,本发明在使用时,通过采用双向的控制机构,可在双方向的配合下进行角度的调节,在施工的复杂环境下能够防止紧急情况造成的完全无法使用,可以更加灵活地进行钢板桩的施工定位,减少了人力成本,且提高了工作效率。

Figure 202210692437

The invention discloses a positioning device for steel sheet pile construction, which relates to the field of engineering construction. A steering control mechanism is provided at the end away from the propulsion and fixing mechanism, and a moving mechanism is provided at the bottom of the positioning base plate. The positioning base plate includes a positioning chassis. There is a steering fixed chassis, and a steering control hole is opened at the top of the middle part of the positioning chassis; at the same time, when the present invention is in use, by adopting a two-way control mechanism, the angle can be adjusted under the cooperation of two directions, which can prevent the Completely unusable due to emergencies, the construction positioning of steel sheet piles can be performed more flexibly, labor costs are reduced, and work efficiency is improved.

Figure 202210692437

Description

一种钢板桩施工用定位装置A positioning device for steel sheet pile construction

技术领域technical field

本发明涉及工程施工领域,具体的是一种钢板桩施工用定位装置。The invention relates to the field of engineering construction, in particular to a positioning device for steel sheet pile construction.

背景技术Background technique

钢板桩是带有锁口的一种型钢,其截面有直板形、槽形及Z形等,有各种大小尺寸及联锁形式。常见的有拉尔森式,拉克万纳式等。其优点为:强度高,容易打入坚硬土层;可在深水中施工,必要时加斜支撑成为一个围笼。防水性能好;能按需要组成各种外形的围堰,并可多次重复使用,因此,它的用途广泛。Steel sheet pile is a kind of section steel with lock. Its section has straight plate shape, groove shape and Z shape, etc., and there are various sizes and interlocking forms. The common ones are Larson type, Lackawanna type and so on. Its advantages are: high strength, easy to drive into hard soil layer; it can be constructed in deep water, and if necessary, it can be added with oblique support to form a cage. Good waterproof performance; cofferdams of various shapes can be formed according to needs, and can be reused many times, so it has a wide range of uses.

钢板桩是一种边缘带有联动装置,且这种联动装置可以自由组合以便形成一种连续紧密的挡土或者挡水墙的钢结构体,在相邻两组钢板桩安装时,通常是由工人手扶两组钢板桩,使得两组钢板桩的螺孔部位交叠,再由另一个工人拧紧螺栓,完成安装,但是螺孔的交叠需要工人多次手动校准,安装时间长,降低施工效率,且安装定位的过程必须要两个人同时完成,人力成本耗费大,使用不方便,而不校准的安装定位方式又容易导致相邻两组钢板桩安装位置不均匀,造成结构体受力不均坍塌,实用性差,在对钢板桩进行打桩作业时,一般都会采用施工人员将桩扶好,然后将其打入地下的方法,这种方法不仅定位效果差,还存在一定的危险系数,而且现有的定位装置由于部件繁多,在进行组装和拆卸时特别的麻烦,严重影响工作效率。The steel sheet pile is a kind of steel structure with a linkage device on the edge, and the linkage device can be freely combined to form a continuous and compact retaining wall or water retaining wall. When two adjacent sets of steel sheet piles are installed, usually by Workers hold two groups of steel sheet piles by hand, so that the screw holes of the two groups of steel sheet piles overlap, and then another worker tightens the bolts to complete the installation. However, the overlapping of screw holes requires manual calibration by workers many times, which takes a long time to install and reduces construction costs. efficiency, and the process of installation and positioning must be completed by two people at the same time, the labor cost is high, and it is inconvenient to use, and the installation and positioning method without calibration will easily lead to uneven installation positions of two adjacent groups of steel sheet piles, resulting in uneven force on the structure All collapsed and poor practicability. When piling the steel sheet piles, the construction personnel will generally use the method of supporting the piles and then driving them into the ground. This method not only has poor positioning effect, but also has a certain risk factor. Due to the large number of components in the existing positioning device, it is particularly troublesome to assemble and disassemble, which seriously affects the work efficiency.

发明内容Contents of the invention

为解决上述背景技术中提到的不足,本发明的目的在于提供一种钢板桩施工用定位装置,本发明旨在实用过程中,能够更加便捷地进行钢板桩的定位和角度调整。In order to solve the shortcomings mentioned in the above background technology, the purpose of the present invention is to provide a positioning device for steel sheet pile construction. The purpose of the present invention is to more conveniently perform positioning and angle adjustment of steel sheet piles in the practical process.

本发明的目的可以通过以下技术方案实现:The purpose of the present invention can be achieved through the following technical solutions:

一种钢板桩施工用定位装置,包括定位基础盘,所述定位基础盘的后端顶部设置有推进固定机构,推进固定机构的前端设置有转向机构,转向机构的远离推进固定机构的一端设置有转向控制机构,定位基础盘的底端设置有移动机构。A positioning device for steel sheet pile construction, comprising a positioning foundation plate, a propulsion and fixing mechanism is arranged on the top of the rear end of the positioning foundation plate, a steering mechanism is arranged at the front end of the pushing and fixing mechanism, and the end of the steering mechanism far away from the advancing and fixing mechanism is provided with a For the steering control mechanism, the bottom end of the positioning base plate is provided with a moving mechanism.

进一步地,所述定位基础盘包括定位底盘,定位底盘后端顶部固定连接有固定引导盘,定位底盘前端顶部固定连接有转向固定底盘,定位底盘中部顶端开设有转向控制孔。Further, the positioning base plate includes a positioning chassis, a fixed guide plate is fixedly connected to the top of the rear end of the positioning chassis, a steering fixed chassis is fixedly connected to the top of the front end of the positioning chassis, and a steering control hole is opened at the top of the middle part of the positioning chassis.

进一步地,所述推进固定机构包括固定推进槽,固定推进槽内侧后端固定连接有固定推动块,固定推动块朝向转向机构的一端设置有限位弹簧,限位弹簧远离固定推动块的一端连接有推动限位转向机构,推动限位转向机构外侧设置有转轮驱动机构。Further, the pushing and fixing mechanism includes a fixed pushing slot, and a fixed pushing block is fixedly connected to the rear end of the inside of the fixed pushing slot, and a limit spring is arranged on one end of the fixed pushing block facing the steering mechanism, and a limit spring is connected to an end of the limiting spring far away from the fixed pushing block. Push the limit steering mechanism, and the outside of the limit steering mechanism is provided with a wheel drive mechanism.

进一步地,所述转向机构包括转向引导环,转向引导环内侧设置有钢板桩定位基板,钢板桩定位基板顶端固定连接有控制基座,控制基座远离钢板桩定位基板的一端连接有控制推架,控制推架朝向内侧的一端活动连接有限位控制轮,钢板桩定位基板朝向内侧的一端固定连接有限位引导槽,限位引导槽顶端固定连接有钢板桩引导槽,钢板桩引导槽顶端开设有钢板桩引导孔。Further, the steering mechanism includes a steering guide ring, a steel sheet pile positioning base is arranged inside the steering guide ring, a control base is fixedly connected to the top of the steel sheet pile positioning base, and a control push frame is connected to the end of the control base away from the steel sheet pile positioning base The end of the control push frame facing inward is movably connected to the limit control wheel, the end of the steel sheet pile positioning base facing inward is fixedly connected to the limit guide groove, the top of the limit guide groove is fixedly connected to the steel sheet pile guide groove, and the top of the steel sheet pile guide groove is provided with a Pilot holes for sheet piles.

进一步地,所述转向控制机构包括转向控制支座,转向控制支座固定连接于定位基础盘的后端顶部,转向控制支座顶端后侧固定连接有驱动基板支座,驱动基板支座朝向前端的一侧固定连接有驱动控制基盘,驱动控制基盘朝向前端的一侧固定连接有驱动转向杆,驱动转向杆远离驱动控制基盘的一端连接有驱动转向机构,驱动转向机构远离驱动转向杆的一端连接有转向控制核心,转向控制核心远离转向控制核心的一端固定连接有转向连接支板,转向连接支板远离转向控制核心的一端两侧设置有控制轮支架,控制轮支架远离转向连接支板的一端设置有转向控制核心轮。Further, the steering control mechanism includes a steering control support, the steering control support is fixedly connected to the top of the rear end of the positioning base plate, the rear side of the top end of the steering control support is fixedly connected to the driving substrate support, and the driving substrate support faces the front end One side of the drive control base plate is fixedly connected with a drive control base plate, and the side of the drive control base plate facing the front end is fixedly connected with a drive steering rod. One end of the steering control core is connected with the steering control core, and the end of the steering control core away from the steering control core is fixedly connected with a steering connection support plate, and the side of the end of the steering connection support plate away from the steering control core is provided with a control wheel bracket on both sides, and the control wheel support is far away from the steering connection support. One end of the board is provided with a steering control core wheel.

进一步地,所述移动机构包括第一推进板,第一推进板顶端固定连接于定位基础盘的底端,第一推进板远离定位基础盘的一端固定连接有第一推进支座,第一推进支座外侧两端设置有第一移动转轮,定位基础盘的底端后侧还设置有第二推进板,第二推进板远离定位基础盘的一端固定连接有第二推进支座,第二推进支座外侧两端设置有第二移动转轮。Further, the moving mechanism includes a first push plate, the top end of the first push plate is fixedly connected to the bottom end of the positioning base plate, and the end of the first push plate away from the positioning base plate is fixedly connected with a first propulsion support, and the first push plate The two ends on the outer side of the support are provided with first moving runners, and the rear side of the bottom end of the positioning base plate is also provided with a second propulsion plate. The two ends on the outer side of the propulsion support are provided with second moving runners.

本发明的有益效果:Beneficial effects of the present invention:

1、本发明通过采用双向的控制机构,可在双方向的配合下进行角度的调节,在施工的复杂环境下能够防止紧急情况造成的完全无法使用;1. By adopting a two-way control mechanism, the present invention can adjust the angle under the cooperation of two directions, and can prevent the complete unusability caused by emergency situations in the complex environment of construction;

2、本发明在使用时,可以更加灵活地进行钢板桩的施工定位,减少了人力成本,且提高了工作效率。2. When the present invention is used, the construction positioning of the steel sheet pile can be performed more flexibly, the labor cost is reduced, and the work efficiency is improved.

附图说明Description of drawings

下面结合附图对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings.

图1是本发明整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of the present invention;

图2是本发明部分结构示意图;Fig. 2 is a schematic diagram of part of the structure of the present invention;

图3是本发明部分结构示意图;Fig. 3 is a schematic diagram of part of the structure of the present invention;

图4是本发明部分结构示意图;Fig. 4 is a schematic diagram of part of the structure of the present invention;

图5是本发明部分结构示意图。Fig. 5 is a schematic diagram of part of the structure of the present invention.

图中:1、定位基础盘;11、定位底盘;12、固定引导盘;13、转向固定底盘;14、转向控制孔;2、推进固定机构;21、固定推进槽;22、固定推动块;23、限位弹簧;24、推动限位转向机构;25、转轮驱动机构;3、转向机构;31、转向引导环;32、钢板桩定位基板;33、控制基座;34、控制推架;35、限位控制轮;36、限位引导槽;37、钢板桩引导槽;38、钢板桩引导孔;4、转向控制机构;41、转向控制支座;42、驱动基板支座;43、驱动控制基盘;44、驱动转向杆;45、驱动转向机构;46、转向控制核心;47、转向连接支板;48、控制轮支架;49、转向控制核心轮;5、移动机构;51、第一推进板;52、第一推进支座;53、第一移动转轮;54、第二推进板;55、第二推进支座;56、第二移动转轮。In the figure: 1. Positioning base plate; 11. Positioning chassis; 12. Fixed guide plate; 13. Steering fixed chassis; 14. Steering control hole; 2. Pushing and fixing mechanism; 23. Limit spring; 24. Push limit steering mechanism; 25. Wheel drive mechanism; 3. Steering mechanism; 31. Steering guide ring; 32. Steel sheet pile positioning base plate; 33. Control base; 34. Control push frame ;35, limit control wheel; 36, limit guide groove; 37, steel sheet pile guide groove; 38, steel sheet pile guide hole; 4, steering control mechanism; 41, steering control support; 42, drive substrate support; 43 . Drive control base plate; 44. Drive steering rod; 45. Drive steering mechanism; 46. Steering control core; 47. Steering connection support plate; 48. Control wheel bracket; 49. Steering control core wheel; 5. Moving mechanism; 51 , the first propulsion plate; 52, the first propulsion support; 53, the first mobile runner; 54, the second propulsion plate; 55, the second propulsion support; 56, the second mobile runner.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

在本发明的描述中,需要理解的是,术语“开孔”、“上”、“下”、“厚度”、“顶”、“中”、“长度”、“内”、“四周”等指示方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的组件或元件必须具有特定的方位,以特定的方位构造和操作,因此不能理解为对本发明的限制。In describing the present invention, it is to be understood that the terms "opening", "upper", "lower", "thickness", "top", "middle", "length", "inner", "surrounding" etc. Indicating orientation or positional relationship is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the components or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be construed as limiting the present invention .

一种钢板桩施工用定位装置,如图1所示,定位基础盘1的后端顶部设置有推进固定机构2,推进固定机构2的前端设置有转向机构3,转向机构3的远离推进固定机构2的一端设置有转向控制机构4,定位基础盘1的底端设置有移动机构5。A positioning device for steel sheet pile construction, as shown in Figure 1, the top of the rear end of the positioning foundation plate 1 is provided with a propulsion and fixing mechanism 2, and the front end of the propulsion and fixing mechanism 2 is provided with a steering mechanism 3, and the steering mechanism 3 is far away from the propulsion and fixing mechanism One end of 2 is provided with a steering control mechanism 4, and the bottom end of the positioning base plate 1 is provided with a moving mechanism 5.

如图2所示,推进固定机构2包括固定推进槽21,固定推进槽21内侧后端固定连接有固定推动块22,固定推动块22朝向转向机构3的一端设置有限位弹簧23,限位弹簧23远离固定推动块22的一端连接有推动限位转向机构24,推动限位转向机构24外侧设置有转轮驱动机构25。As shown in Figure 2, the advancing fixing mechanism 2 comprises a fixed advancing groove 21, and the inner rear end of the fixed advancing groove 21 is fixedly connected with a fixed pushing block 22. 23 is connected with a push limit steering mechanism 24 at one end away from the fixed push block 22 , and a runner drive mechanism 25 is arranged outside the push limit steering mechanism 24 .

如图3所示,定位基础盘1包括定位底盘11,定位底盘11后端顶部固定连接有固定引导盘12,定位底盘11前端顶部固定连接有转向固定底盘13,定位底盘11中部顶端开设有转向控制孔14。As shown in Figure 3, the positioning base plate 1 includes a positioning chassis 11, the top of the rear end of the positioning chassis 11 is fixedly connected with a fixed guide plate 12, the top of the front end of the positioning chassis 11 is fixedly connected with a steering fixed chassis 13, and the top of the middle part of the positioning chassis 11 is provided with a steering wheel. control hole 14.

转向机构3包括转向引导环31,转向引导环31内侧设置有钢板桩定位基板32,钢板桩定位基板32顶端固定连接有控制基座33,控制基座33远离钢板桩定位基板32的一端连接有控制推架34,控制推架34朝向内侧的一端活动连接有限位控制轮35,钢板桩定位基板32朝向内侧的一端固定连接有限位引导槽36,限位引导槽36顶端固定连接有钢板桩引导槽37,钢板桩引导槽37顶端开设有钢板桩引导孔38。The steering mechanism 3 includes a steering guide ring 31, a steel sheet pile positioning base 32 is arranged inside the steering guide ring 31, a control base 33 is fixedly connected to the top of the steel sheet pile positioning base 32, and an end of the control base 33 away from the steel sheet pile positioning base 32 is connected to a Control the push frame 34, the inner end of the control push frame 34 is movably connected with the limit control wheel 35, the end of the steel sheet pile positioning base plate 32 facing the inner is fixedly connected with the limit guide groove 36, and the top of the limit guide groove 36 is fixedly connected with the steel sheet pile guide Groove 37, the top of the steel sheet pile guide groove 37 is provided with a steel sheet pile guide hole 38.

如图4所示,转向控制机构4包括转向控制支座41,转向控制支座41固定连接于定位基础盘1的后端顶部,转向控制支座41顶端后侧固定连接有驱动基板支座42,驱动基板支座42朝向前端的一侧固定连接有驱动控制基盘43,驱动控制基盘43朝向前端的一侧固定连接有驱动转向杆44,驱动转向杆44远离驱动控制基盘43的一端连接有驱动转向机构45,驱动转向机构45远离驱动转向杆44的一端连接有转向控制核心46,转向控制核心46远离转向控制核心46的一端固定连接有转向连接支板47,转向连接支板47远离转向控制核心46的一端两侧设置有控制轮支架48,控制轮支架48远离转向连接支板47的一端设置有转向控制核心轮49。As shown in Figure 4, the steering control mechanism 4 includes a steering control support 41, the steering control support 41 is fixedly connected to the top of the rear end of the positioning base plate 1, and the rear side of the top of the steering control support 41 is fixedly connected to a driving substrate support 42. The side of the drive substrate support 42 facing the front end is fixedly connected with a drive control substrate 43, and the side of the drive control substrate 43 facing the front end is fixedly connected with a drive steering rod 44, and the drive steering rod 44 is far away from one end of the drive control substrate 43. Connected with a drive steering mechanism 45, the end of the drive steering mechanism 45 away from the drive steering rod 44 is connected with a steering control core 46, and the end of the steering control core 46 away from the steering control core 46 is fixedly connected with a steering connection support plate 47, and the steering connection support plate 47 A control wheel bracket 48 is arranged on both sides of an end away from the steering control core 46 , and a steering control core wheel 49 is arranged on an end of the control wheel bracket 48 away from the steering connecting support plate 47 .

如图5所示,移动机构5包括第一推进板51,第一推进板51顶端固定连接于定位基础盘1的底端,第一推进板51远离定位基础盘1的一端固定连接有第一推进支座52,第一推进支座52外侧两端设置有第一移动转轮53,定位基础盘1的底端后侧还设置有第二推进板54,第二推进板54远离定位基础盘1的一端固定连接有第二推进支座55,第二推进支座55外侧两端设置有第二移动转轮56。As shown in Figure 5, the moving mechanism 5 includes a first push plate 51, the top of the first push plate 51 is fixedly connected to the bottom end of the positioning base plate 1, and the end of the first push plate 51 away from the positioning base plate 1 is fixedly connected with a first Propelling support 52, the first moving runner 53 is arranged on both ends of the outer side of the first propelling support 52, and the bottom rear side of the positioning base plate 1 is also provided with a second propelling plate 54, the second propelling plate 54 is far away from the positioning base plate One end of 1 is fixedly connected with a second propulsion support 55, and the two outer ends of the second propulsion support 55 are provided with second moving runners 56.

在使用时,首先控制定位底盘11顶端的推进固定机构2,让转轮驱动机构25能够驱动推动限位转向机构24前端的轮转动,带动转向机构3转动,让钢板桩定位基板32顶端的限位控制轮35能够带动限位引导槽36,从而通过限位引导槽36的转动,带动钢板桩引导槽37顶端的钢板桩引导孔38进行转动,进而让转向控制核心轮49辅助,实现角度的调节,让钢板桩引导孔38的口确定转动的角度,让钢板桩在安装的过程中能够实现定位安装。When in use, firstly control the advancing fixing mechanism 2 at the top of the positioning chassis 11, so that the runner driving mechanism 25 can drive the wheel at the front end of the pushing limit steering mechanism 24 to rotate, and drive the steering mechanism 3 to rotate, allowing the steel sheet pile to position the limit at the top of the base plate 32. The position control wheel 35 can drive the limit guide groove 36, thereby through the rotation of the limit guide groove 36, the steel sheet pile guide hole 38 at the top of the steel sheet pile guide groove 37 is driven to rotate, and then the steering control core wheel 49 is assisted to realize the adjustment of the angle. Adjust, let the opening of the steel sheet pile guide hole 38 determine the angle of rotation, so that the steel sheet pile can be positioned and installed during installation.

或者,让驱动控制基盘43驱动转向连接支板47外侧的控制轮支架48,让控制轮支架48能够带动转向控制核心轮49进行转动,进而实现带动限位引导槽36的转动,让限位控制轮35能够转动,进而在限位引导槽36的底端让控制推架34带动转向引导环31转动,在推进固定机构2的配合下,让固定推动块22与限位弹簧23一起带动推动限位转向机构24,进行对转向机构3的限位,从而实现确定转动的角度,进而辅助钢板桩的定位安装。Or, let the drive control base plate 43 drive the control wheel bracket 48 on the outside of the connecting support plate 47, so that the control wheel bracket 48 can drive the steering control core wheel 49 to rotate, and then realize the rotation of the driving limit guide groove 36, allowing the limit The control wheel 35 can rotate, and then at the bottom of the limit guide groove 36, the control push frame 34 is allowed to drive the steering guide ring 31 to rotate, and under the cooperation of the advancing fixing mechanism 2, the fixed push block 22 and the limit spring 23 are allowed to drive and push together. The limit steering mechanism 24 is used to limit the position of the steering mechanism 3, so as to determine the angle of rotation, and then assist the positioning and installation of the steel sheet pile.

可通过确定第二移动转轮56和第一移动转轮53转动,进而实现让整个机构的移动,可配合另外配置好的引导轨道实用,让第一移动转轮53和第二移动转轮56在引导轨道外侧移动。The movement of the entire mechanism can be achieved by determining the rotation of the second moving wheel 56 and the first moving wheel 53, and it can be used in conjunction with the additionally configured guide rails to make the first moving wheel 53 and the second moving wheel 56 Move outside the guide track.

在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, descriptions with reference to the terms "one embodiment", "example", "specific example" and the like mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment of the present invention. In an embodiment or example. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。The basic principles, main features and advantages of the present invention have been shown and described above. Those skilled in the industry should understand that the present invention is not limited by the above-mentioned embodiments. What are described in the above-mentioned embodiments and the description only illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention will also have Variations and improvements are possible, which fall within the scope of the claimed invention.

Claims (3)

1.一种钢板桩施工用定位装置,包括定位基础盘(1),其特征在于,所述定位基础盘(1)的后端顶部设置有推进固定机构(2),推进固定机构(2)的前端设置有转向机构(3),转向机构(3)的远离推进固定机构(2)的一端设置有转向控制机构(4),定位基础盘(1)的底端设置有移动机构(5);1. A positioning device for steel sheet pile construction, comprising a positioning base plate (1), characterized in that, the rear end top of the positioning base plate (1) is provided with an advancing fixing mechanism (2), and the advancing fixing mechanism (2) The front end of the steering mechanism (3) is provided with a steering mechanism (3), and the end of the steering mechanism (3) away from the advancing and fixing mechanism (2) is provided with a steering control mechanism (4), and the bottom end of the positioning base plate (1) is provided with a moving mechanism (5). ; 所述推进固定机构(2)包括固定推进槽(21),固定推进槽(21)内侧后端固定连接有固定推动块(22),固定推动块(22)朝向转向机构(3)的一端设置有限位弹簧(23),限位弹簧(23)远离固定推动块(22)的一端连接有推动限位转向机构(24),推动限位转向机构(24)外侧设置有转轮驱动机构(25);The push-and-fix mechanism (2) includes a fixed push groove (21), the inner rear end of the fixed push groove (21) is fixedly connected with a fixed push block (22), and the fixed push block (22) is arranged toward one end of the steering mechanism (3) Limit spring (23), limit spring (23) is connected with pushing limit steering mechanism (24) far away from one end of fixed push block (22), and pushes limit steering mechanism (24) outside and is provided with runner drive mechanism (25 ); 所述转向机构(3)包括转向引导环(31),转向引导环(31)内侧设置有钢板桩定位基板(32),钢板桩定位基板(32)顶端固定连接有控制基座(33),控制基座(33)远离钢板桩定位基板(32)的一端连接有控制推架(34),控制推架(34)朝向内侧的一端活动连接有限位控制轮(35),钢板桩定位基板(32)朝向内侧的一端固定连接有限位引导槽(36),限位引导槽(36)顶端固定连接有钢板桩引导槽(37),钢板桩引导槽(37)顶端开设有钢板桩引导孔(38);The steering mechanism (3) includes a steering guide ring (31), a steel sheet pile positioning base plate (32) is arranged inside the steering guide ring (31), and a control base (33) is fixedly connected to the top of the steel sheet pile positioning base plate (32), The end of the control base (33) away from the steel sheet pile positioning base plate (32) is connected with a control push frame (34), and the end of the control push frame (34) towards the inside is movably connected with a limit control wheel (35), and the steel sheet pile positioning base plate ( 32) One end towards the inside is fixedly connected with a limit guide groove (36), the top of the limit guide groove (36) is fixedly connected with a steel sheet pile guide groove (37), and the top of the steel sheet pile guide groove (37) is provided with a steel sheet pile guide hole ( 38); 所述转向控制机构(4)包括转向控制支座(41),转向控制支座(41)固定连接于定位基础盘(1)的前端顶部,转向控制支座(41)顶端前侧固定连接有驱动基板支座(42),驱动基板支座(42)朝向后端的一侧固定连接有驱动控制基盘(43),驱动控制基盘(43)朝向后端的一侧固定连接有驱动转向杆(44),驱动转向杆(44)远离驱动控制基盘(43)的一端连接有驱动转向机构(45),驱动转向机构(45)远离驱动转向杆(44)的一端连接有转向控制核心(46),转向控制核心(46)远离转向控制核心(46)的一端固定连接有转向连接支板(47),转向连接支板(47)远离转向控制核心(46)的一端两侧设置有控制轮支架(48),控制轮支架(48)远离转向连接支板(47)的一端设置有转向控制核心轮(49)。The steering control mechanism (4) includes a steering control support (41), the steering control support (41) is fixedly connected to the top of the front end of the positioning base plate (1), and the front end of the steering control support (41) is fixedly connected to a The drive substrate support (42), the drive control base plate (43) is fixedly connected to the side of the rear end of the drive base support (42), and the drive control base plate (43) is fixedly connected to the drive steering rod (43) towards the rear end. 44), the driving steering rod (44) is connected with a driving steering mechanism (45) at one end far away from the driving control substrate (43), and the driving steering mechanism (45) is connected with a steering control core (46) at an end far away from the driving steering rod (44). ), the end of the steering control core (46) away from the steering control core (46) is fixedly connected with a steering connection support plate (47), and the steering connection support plate (47) is provided with control wheels on both sides of the end of the steering control core (46). Bracket (48), control wheel bracket (48) is provided with steering control core wheel (49) at one end away from steering connecting support plate (47). 2.根据权利要求1所述的一种钢板桩施工用定位装置,其特征在于,所述定位基础盘(1)包括定位底盘(11),定位底盘(11)后端顶部固定连接有固定引导盘(12),定位底盘(11)前端顶部固定连接有转向固定底盘(13),定位底盘(11)中部顶端开设有转向控制孔(14)。2. A positioning device for steel sheet pile construction according to claim 1, characterized in that the positioning base plate (1) includes a positioning chassis (11), and the top of the rear end of the positioning chassis (11) is fixedly connected with a fixed guide Plate (12), the top of the front end of the positioning chassis (11) is fixedly connected with a steering fixed chassis (13), and the top of the positioning chassis (11) middle part is provided with a steering control hole (14). 3.根据权利要求1所述的一种钢板桩施工用定位装置,其特征在于,所述移动机构(5)包括第一推进板(51),第一推进板(51)顶端固定连接于定位基础盘(1)的底端,第一推进板(51)远离定位基础盘(1)的一端固定连接有第一推进支座(52),第一推进支座(52)外侧两端设置有第一移动转轮(53),定位基础盘(1)的底端后侧还设置有第二推进板(54),第二推进板(54)远离定位基础盘(1)的一端固定连接有第二推进支座(55),第二推进支座(55)外侧两端设置有第二移动转轮(56)。3. A positioning device for steel sheet pile construction according to claim 1, characterized in that the moving mechanism (5) includes a first push plate (51), and the top end of the first push plate (51) is fixedly connected to the positioning The bottom end of the base plate (1), the end of the first push plate (51) away from the positioning base plate (1) is fixedly connected with a first propulsion support (52), and the outer two ends of the first propulsion support (52) are provided with The first mobile runner (53), the bottom rear side of the positioning base plate (1) is also provided with a second push plate (54), and the second push plate (54) is fixedly connected with an end away from the positioning base plate (1). The second propulsion support (55), and the two outer ends of the second propulsion support (55) are provided with second moving runners (56).
CN202210692437.0A 2022-06-17 2022-06-17 Positioning device for steel sheet pile construction Expired - Fee Related CN115030161B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210692437.0A CN115030161B (en) 2022-06-17 2022-06-17 Positioning device for steel sheet pile construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210692437.0A CN115030161B (en) 2022-06-17 2022-06-17 Positioning device for steel sheet pile construction

Publications (2)

Publication Number Publication Date
CN115030161A CN115030161A (en) 2022-09-09
CN115030161B true CN115030161B (en) 2023-04-07

Family

ID=83124200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210692437.0A Expired - Fee Related CN115030161B (en) 2022-06-17 2022-06-17 Positioning device for steel sheet pile construction

Country Status (1)

Country Link
CN (1) CN115030161B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116657926B (en) * 2023-06-12 2025-08-05 山东建筑大学 Device and method for spatial positioning of square steel pipes

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056727A (en) * 2018-09-10 2018-12-21 时光 A kind of bridge cofferdam construction special-purpose steel sheet pile removes the working method of device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002129562A (en) * 2000-10-26 2002-05-09 Nishimatsu Constr Co Ltd Construction method of trussed pillar
CN108005075A (en) * 2018-01-15 2018-05-08 胡红建 Steel sheet pile can efficiently be mounted to the municipal works drainage system construction machine of steel structure body
CN208328923U (en) * 2018-03-28 2019-01-04 张茂排 A kind of cofferdam steel sheet pile water conservancy construction machine
CN109024595A (en) * 2018-09-21 2018-12-18 青岛理工大学 Rapid sheet pile sinking device and method
JP7178316B2 (en) * 2019-04-03 2022-11-25 日本車輌製造株式会社 Pile driver controller
CN210684705U (en) * 2019-09-30 2020-06-05 高碑店市铁岩钢板桩有限公司 Positioning device for steel sheet pile construction
CN214219715U (en) * 2020-12-18 2021-09-17 中建二局第二建筑工程有限公司 Pile foundation construction device capable of preventing deviation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056727A (en) * 2018-09-10 2018-12-21 时光 A kind of bridge cofferdam construction special-purpose steel sheet pile removes the working method of device

Also Published As

Publication number Publication date
CN115030161A (en) 2022-09-09

Similar Documents

Publication Publication Date Title
CN101063319A (en) Node component used for connecting steel tube concrete column with building roof beam
CN115030161B (en) Positioning device for steel sheet pile construction
CN209354165U (en) The walking portal frame system and Tunnel Second Lining concrete trolley of trolley
CN113290332A (en) Manufacturing method of multi-angle complex bracket cross-shaped column
CN214460376U (en) Novel building engineering pile device
CN203755625U (en) Concrete pouring platform for use in rotary drilling pile with reversed steel pipe column
CN218265127U (en) Reinforcing device for a steel structure workshop
CN209618732U (en) Light and heavy tower crane conversion section
CN217150262U (en) Be applied to assembled shaped steel bracket structure in foundation ditch
CN217811090U (en) Foundation pit supporting structure
CN107254890B (en) A limiting device for truncation and rectification of prefabricated square piles
CN215168227U (en) Prefabricated post positioner
CN214883822U (en) A lattice column base
CN222414086U (en) A prefabricated concrete composite panel installation positioning tool
CN209053103U (en) Facilitate the assembled steel sheet pile purlin connection structure removed
CN211735427U (en) Adjustable forming lattice column jig frame
CN220813814U (en) Rotary digging pile steel pile casing
CN211114808U (en) A shear side wall formwork
CN209353482U (en) A kind of steel construction embedding anchor bolts fixing device for installing
CN218492521U (en) Oblique supporting construction of H shaped steel
CN108915606B (en) A full-rotation casing drilling rig driving device mounting base
CN222499916U (en) Quick template of highway construction
CN208183728U (en) A kind of positioning device of subway station underwater cast-in-place pile lattice column
CN223867242U (en) Pile foundation reinforcement cage temporary fixing device with buckle
CN223330260U (en) A positioning device for connecting core tube shear wall and outer frame with stubble steel bars

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230407