CN115021175B - 密封接线箱及舱壁、船舶 - Google Patents
密封接线箱及舱壁、船舶 Download PDFInfo
- Publication number
- CN115021175B CN115021175B CN202210804734.XA CN202210804734A CN115021175B CN 115021175 B CN115021175 B CN 115021175B CN 202210804734 A CN202210804734 A CN 202210804734A CN 115021175 B CN115021175 B CN 115021175B
- Authority
- CN
- China
- Prior art keywords
- cable
- junction box
- sealed junction
- cavity
- matching part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007789 sealing Methods 0.000 claims abstract description 9
- 239000011159 matrix material Substances 0.000 claims description 5
- 230000000694 effects Effects 0.000 abstract description 9
- 230000013011 mating Effects 0.000 description 11
- 230000000903 blocking effect Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
- H02G3/08—Distribution boxes; Connection or junction boxes
- H02G3/088—Dustproof, splashproof, drip-proof, waterproof, or flameproof casings or inlets
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
- H02G3/08—Distribution boxes; Connection or junction boxes
- H02G3/18—Distribution boxes; Connection or junction boxes providing line outlets
Abstract
本发明公开了一种密封接线箱及舱壁、船舶,用于连接电缆并密封壁面的电缆通孔,所述密封接线箱包括腔室和电缆配合部,所述腔室的一端为开口,所述开口用于接收所述电缆,所述腔室的另一端设置有所述电缆配合部,所述开口所在的平面与所述电缆配合部所在的平面之间呈夹角。由于电缆配合部与壁面之间呈夹角,可以根据由电缆通孔伸出的电缆的角度使电缆配合部与其垂直相交,达到良好的密封效果。
Description
技术领域
本发明涉及船舶制造领域,尤其涉及一种密封接线箱及舱壁、船舶。
背景技术
在船舶制造过程中,由于设备线缆众多,且需要通过的电流较大,导致线缆直径大,因此其转弯半径有严格要求。但由于空间所限,会出现在线缆的转弯半径内无法回避有水密、气密要求的舱壁。而对于此类舱壁的穿舱件,一般采用带填料函的电缆框进行封堵,而封堵要求需要线缆与电缆框垂直,导致无法直接在气密仓壁上进行电缆框的开孔及安装。
发明内容
本发明要解决的技术问题是为了克服现有技术中线缆在转弯半径内穿过舱壁时无法与电缆框垂直的缺陷,提供一种密封接线箱及舱壁、船舶。
本发明是通过下述技术方案来解决上述技术问题:
一种密封接线箱,用于连接电缆并密封壁面的电缆通孔,所述密封接线箱包括腔室和电缆配合部,所述腔室的一端为开口,所述开口用于接收所述电缆,所述腔室的另一端设置有所述电缆配合部,所述开口所在的平面与所述电缆配合部所在的平面之间呈夹角。
在本方案中,采用上述结构形式,开口的端壁连接在壁面上,从而接收由壁面向外伸出的电缆。由此可见,开口所在的平面也即壁面,因此,电缆配合部所在的平面与壁面呈夹角。当电缆在转弯半径内穿过壁面但无法与壁面相垂直时,由于电缆配合部与壁面之间呈夹角,可以根据由电缆通孔伸出的电缆的角度匹配从而与其垂直相交,达到良好的密封效果。
较佳地,所述密封接线箱包括转向部,所述转向部和所述电缆配合部分别固定设置在所述壁面上,所述转向部与所述电缆配合部相连接并形成所述腔室,所述腔室用于容纳所述电缆。
在本方案中,采用上述结构形式,转向部与电缆配合部相连接形成腔室,结构简单。转向部可以根据电缆由壁面伸出的方向进行设置,使腔室内的空间能够顺着电缆的延伸方向,更好地容纳电缆。
较佳地,所述电缆配合部包括电缆框和填料函,所述填料函设置在所述电缆框上,所述电缆通过所述填料函与所述密封接线箱连接。
在本方案中,采用上述结构形式,电缆通过填料函穿过电缆配合部,填料函可以更好的封闭电缆与电缆配合部之间的间隙,密封效果好。
较佳地,所述填料函的数量为2个及以上。
在本方案中,采用上述结构形式,密封接线盒可以连接2个及以上的电缆,使用范围更广。
较佳地,多个所述填料函呈矩阵设置在所述电缆框上。
在本方案中,采用上述结构形式,由于连接电缆的多个填料函呈矩阵设置,电缆之间的距离较为平均,不会发生因为电缆聚集在一起导电生热导致火灾发生。
较佳地,所述电缆框垂直设置在所述壁面上。
在本方案中,采用上述结构形式,由密封接线盒伸出的电缆与壁面平行,占用空间较小,减少对其他物件的布置的影响。
较佳地,所述转向部相对于所述腔室向外凸起。
在本方案中,采用上述结构形式,腔室内空间更大,可以容纳更多的电缆。
一种舱壁,所述舱壁设置有上述的密封接线箱。
在本方案中,采用上述结构形式,由于电缆配合部与壁面之间呈夹角,舱壁可以根据由电缆通孔伸出的电缆的角度使电缆配合部与其垂直相交,达到良好的密封效果。
一种船舶,所述船舶设置有上述的密封接线箱。
在本方案中,采用上述结构形式,由于电缆配合部与壁面之间呈夹角,船舶可以根据由电缆通孔伸出的电缆的角度使电缆配合部与其垂直相交,达到良好的密封效果。
本发明的积极进步效果在于:由于电缆配合部与壁面之间呈夹角,可以根据由电缆通孔伸出的电缆的角度使电缆配合部与其垂直相交,达到良好的密封效果。
附图说明
图1为本发明一实施例的密封接线箱的结构示意图。
附图标记说明
腔室1
开口11
电缆配合部2
电缆框21
填料函22
转向部3
电缆4
壁面5
电缆通孔51
具体实施方式
下面通过实施例的方式进一步说明本发明,但并不因此将本发明限制在所述的实施例范围之中。
如图1所示,一种密封接线箱,用于连接电缆4并密封壁面5的电缆通孔51,密封接线箱包括腔室1和电缆配合部2,腔室1的一端为开口11,开口11用于接收电缆4,腔室1的另一端设置有电缆配合部2,开口11所在的平面与电缆配合部2所在的平面之间呈夹角。
在本方案中,采用上述结构形式,开口11的端壁连接在壁面5上,从而接收由壁面5向外伸出的电缆4。由此可见,开口11所在的平面也即壁面5,因此,电缆配合部2所在的平面与壁面5呈夹角。当电缆4在转弯半径内穿过壁面5但无法与壁面5相垂直时,由于电缆配合部2与壁面5之间呈夹角,可以根据由电缆通孔51伸出的电缆4的角度匹配从而与其垂直相交,达到良好的密封效果。
作为一种较佳的实施方式,密封接线箱包括转向部3,转向部3的延伸方向根据电缆的伸出方向一致,转向部3的一端和电缆配合部2的一端分别固定设置在壁面5上,转向部3与电缆配合部2的另一端互相连接并形成腔室1,腔室1用于容纳电缆4。
在本方案中,采用上述结构形式,转向部3与电缆配合部2相连接形成腔室1,结构简单。转向部3可以根据电缆4由壁面5伸出的方向进行设置,使腔室1内的空间能够顺着电缆4的延伸方向,更好地容纳电缆4。
作为一种较佳的实施方式,电缆配合部2包括电缆框21和填料函22,电缆框21的一端固定设置在壁面5上,另一端与转向部3连接,填料函22设置在电缆框21上,电缆4通过填料函22与密封接线箱连接。
在本方案中,采用上述结构形式,电缆4通过填料函22穿过电缆配合部2,填料函22可以更好的封闭电缆4与电缆配合部2之间的间隙,密封效果好。
作为一种较佳的实施方式,填料函22的数量为3个。
在本方案中,采用上述结构形式,密封接线盒可以连接3根电缆4,使用范围更广。当然在其他实施例中,填料函22的数量也可以是2个或者4个以上。
作为一种较佳的实施方式,多个填料函22呈矩阵设置在电缆框21上。
在本方案中,采用上述结构形式,由于连接电缆4的多个填料函22呈矩阵设置,电缆4之间的距离较为平均,不会发生因为电缆4聚集在一起导电生热导致火灾发生。
作为一种较佳的实施方式,电缆框21垂直设置在壁面5上。
在本方案中,采用上述结构形式,由密封接线盒伸出的电缆4与壁面5平行,占用空间较小,减少对其他物件的布置的影响。当然在其他实施例中,电缆框21也可以不与壁面5垂直,只要能与穿过的电缆4相垂直即可实现密封的效果。
作为一种较佳的实施方式,转向部3相对于腔室1向外凸起,转向部3弯曲的弧度与电缆4的转弯半径相匹配,转向部3与电缆配合部围成的腔室1成扇形。
在本方案中,采用上述结构形式,腔室1内空间更大,与电缆4弯曲的形状匹配更好,可以容纳更多的电缆4。
本实施例还提供一种舱壁,舱壁设置有上述的密封接线箱。
在本方案中,采用上述结构形式,由于电缆配合部2与壁面5之间呈夹角,舱壁可以根据由电缆通孔51伸出的电缆4的角度使电缆配合部2与其垂直相交,达到良好的密封效果。
本实施例还提供一种船舶,船舶设置有上述的密封接线箱。
在本方案中,采用上述结构形式,由于电缆配合部2与壁面5之间呈夹角,船舶可以根据由电缆通孔51伸出的电缆4的角度使电缆配合部2与其垂直相交,达到良好的密封效果。
虽然以上描述了本发明的具体实施方式,但是本领域的技术人员应当理解,这仅是举例说明,本发明的保护范围是由所附权利要求书限定的。本领域的技术人员在不背离本发明的原理和实质的前提下,可以对这些实施方式做出多种变更或修改,但这些变更和修改均落入本发明的保护范围。
Claims (5)
1.一种密封接线箱,用于连接电缆并密封壁面的电缆通孔,其特征在于,所述密封接线箱包括腔室和电缆配合部,所述腔室的一端为开口,所述开口用于接收所述电缆,所述腔室的另一端设置有所述电缆配合部,所述开口所在的平面与所述电缆配合部所在的平面之间呈夹角;
所述密封接线箱包括转向部,所述转向部和所述电缆配合部分别固定设置在所述壁面上,所述转向部与所述电缆配合部相连接并形成所述腔室,所述腔室用于容纳所述电缆;
所述电缆配合部包括电缆框和填料函,所述填料函设置在所述电缆框上,所述电缆通过所述填料函与所述密封接线箱连接;
所述填料函的数量为2个及以上;
多个所述填料函呈矩阵设置在所述电缆框上。
2.如权利要求1所述的密封接线箱,其特征在于,所述电缆框垂直设置在所述壁面上。
3.如权利要求1所述的密封接线箱,其特征在于,所述转向部相对于所述腔室向外凸起。
4.一种舱壁,其特征在于,所述舱壁设置有如权利要求1-3任一项所述的密封接线箱。
5.一种船舶,其特征在于,所述船舶设置有如权利要求1-3任一项所述的密封接线箱。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210804734.XA CN115021175B (zh) | 2022-07-08 | 2022-07-08 | 密封接线箱及舱壁、船舶 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210804734.XA CN115021175B (zh) | 2022-07-08 | 2022-07-08 | 密封接线箱及舱壁、船舶 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115021175A CN115021175A (zh) | 2022-09-06 |
CN115021175B true CN115021175B (zh) | 2024-03-15 |
Family
ID=83082087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210804734.XA Active CN115021175B (zh) | 2022-07-08 | 2022-07-08 | 密封接线箱及舱壁、船舶 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115021175B (zh) |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191216622A (en) * | 1912-07-16 | 1913-01-09 | Thomas Benjamin Farmer | Improvements in and relating to Cable Terminal or Junction Boxes. |
GB638909A (en) * | 1945-10-15 | 1950-06-21 | Frank Edward Payne | Improvements in or relating to fluid tight joints |
US4724281A (en) * | 1986-06-16 | 1988-02-09 | Nix Alfred L | Electrical junction or outlet box |
US7115822B1 (en) * | 2006-02-21 | 2006-10-03 | Joy Mm Delaware, Inc. | Indirect entry cable gland assembly |
DE102006039648B3 (de) * | 2006-08-24 | 2008-03-27 | Lisa Dräxlmaier GmbH | Kabeldurchführung |
US8124873B1 (en) * | 2009-06-18 | 2012-02-28 | Arlington Industries, Inc. | Cable routing assembly including protective cable frame |
CN205221000U (zh) * | 2015-11-02 | 2016-05-11 | 珠海太平洋粤新海洋工程有限公司 | 一种新型船用设备电缆进线方向转变装置 |
CN206422478U (zh) * | 2017-01-20 | 2017-08-18 | 江南造船(集团)有限责任公司 | 船用岸电电缆穿线装置 |
EP3207605A2 (de) * | 2014-10-14 | 2017-08-23 | VEM Sachsenwerk GmbH | Klemmenkasten mit erhöhter kurzschlussfestigkeit für elektrische maschinen |
CN107202202A (zh) * | 2017-06-29 | 2017-09-26 | 广船国际有限公司 | 一种冷库舱壁电缆密封组件 |
CN207442373U (zh) * | 2017-12-01 | 2018-06-01 | 中航威海船厂有限公司 | 一种船用侧面开孔电缆穿舱件 |
CN110492412A (zh) * | 2019-09-04 | 2019-11-22 | 中船黄埔文冲船舶有限公司 | 一种船用冷库电缆贯通装置及制作方法 |
CN209860526U (zh) * | 2019-07-10 | 2019-12-27 | 葫芦岛瑞海机械设备制造有限公司 | 一种电缆密封接线盒装置 |
CN210350179U (zh) * | 2019-10-23 | 2020-04-17 | 廊坊市海洋升帆科技有限公司 | 一种扁平转向水密连接器 |
CN210985534U (zh) * | 2019-12-06 | 2020-07-10 | 南通诺德瑞海洋工程研究院有限公司 | 一种冷箱接线结构 |
CN211908278U (zh) * | 2020-05-27 | 2020-11-10 | 招商局金陵船舶(威海)有限公司 | 一种船舶岸电电缆穿舱装置 |
CN213753886U (zh) * | 2020-11-04 | 2021-07-20 | 上海科海华泰船舶电气有限公司 | 一种接线盒 |
CN216056277U (zh) * | 2021-07-16 | 2022-03-15 | 山西华鑫电气有限公司 | 矿用干式变压器两种进线形式的接线腔 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6768057B2 (en) * | 2001-03-12 | 2004-07-27 | Ibc Corporation | Connector for flexible electrical conduit |
-
2022
- 2022-07-08 CN CN202210804734.XA patent/CN115021175B/zh active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191216622A (en) * | 1912-07-16 | 1913-01-09 | Thomas Benjamin Farmer | Improvements in and relating to Cable Terminal or Junction Boxes. |
GB638909A (en) * | 1945-10-15 | 1950-06-21 | Frank Edward Payne | Improvements in or relating to fluid tight joints |
US4724281A (en) * | 1986-06-16 | 1988-02-09 | Nix Alfred L | Electrical junction or outlet box |
US7115822B1 (en) * | 2006-02-21 | 2006-10-03 | Joy Mm Delaware, Inc. | Indirect entry cable gland assembly |
DE102006039648B3 (de) * | 2006-08-24 | 2008-03-27 | Lisa Dräxlmaier GmbH | Kabeldurchführung |
US8124873B1 (en) * | 2009-06-18 | 2012-02-28 | Arlington Industries, Inc. | Cable routing assembly including protective cable frame |
EP3207605A2 (de) * | 2014-10-14 | 2017-08-23 | VEM Sachsenwerk GmbH | Klemmenkasten mit erhöhter kurzschlussfestigkeit für elektrische maschinen |
CN205221000U (zh) * | 2015-11-02 | 2016-05-11 | 珠海太平洋粤新海洋工程有限公司 | 一种新型船用设备电缆进线方向转变装置 |
CN206422478U (zh) * | 2017-01-20 | 2017-08-18 | 江南造船(集团)有限责任公司 | 船用岸电电缆穿线装置 |
CN107202202A (zh) * | 2017-06-29 | 2017-09-26 | 广船国际有限公司 | 一种冷库舱壁电缆密封组件 |
CN207442373U (zh) * | 2017-12-01 | 2018-06-01 | 中航威海船厂有限公司 | 一种船用侧面开孔电缆穿舱件 |
CN209860526U (zh) * | 2019-07-10 | 2019-12-27 | 葫芦岛瑞海机械设备制造有限公司 | 一种电缆密封接线盒装置 |
CN110492412A (zh) * | 2019-09-04 | 2019-11-22 | 中船黄埔文冲船舶有限公司 | 一种船用冷库电缆贯通装置及制作方法 |
CN210350179U (zh) * | 2019-10-23 | 2020-04-17 | 廊坊市海洋升帆科技有限公司 | 一种扁平转向水密连接器 |
CN210985534U (zh) * | 2019-12-06 | 2020-07-10 | 南通诺德瑞海洋工程研究院有限公司 | 一种冷箱接线结构 |
CN211908278U (zh) * | 2020-05-27 | 2020-11-10 | 招商局金陵船舶(威海)有限公司 | 一种船舶岸电电缆穿舱装置 |
CN213753886U (zh) * | 2020-11-04 | 2021-07-20 | 上海科海华泰船舶电气有限公司 | 一种接线盒 |
CN216056277U (zh) * | 2021-07-16 | 2022-03-15 | 山西华鑫电气有限公司 | 矿用干式变压器两种进线形式的接线腔 |
Also Published As
Publication number | Publication date |
---|---|
CN115021175A (zh) | 2022-09-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10218091B2 (en) | Protector and wire harness | |
US6372993B1 (en) | Sealed terminal assembly for hermetic compressor | |
US20160036155A1 (en) | Connector | |
JP5660148B2 (ja) | 端子台及びそれを含む電子機器 | |
CN206685565U (zh) | 电连接器 | |
KR102629391B1 (ko) | 부싱 하우징 | |
US10027077B2 (en) | Contact point for connecting a flat conductor to a conductor element | |
DE102005035210A1 (de) | Kabeldurchführung mit Membranventil | |
CN115021175B (zh) | 密封接线箱及舱壁、船舶 | |
US4364624A (en) | Adapter assembly for electrical leads | |
CN211296416U (zh) | 一种电机的接线结构 | |
US20080020644A1 (en) | Universal housing for a plug-type connector | |
CN206206364U (zh) | 螺柱过孔密封接头 | |
DE102017116819A1 (de) | Energieverteilungsanordnung für die elektrische Versorgung von Kühlcontainern | |
US6196864B1 (en) | Shell for an electrical or an optical connector | |
JP2001515697A (ja) | ケーブル接続部クロージャー用外部接地絶縁コネクタ | |
US20030181087A1 (en) | Electrical connector | |
CN204304096U (zh) | 一种防水线束连接头 | |
CN213073393U (zh) | 水上平台电器仓的布线结构 | |
CN220021855U (zh) | 一种铜线与铝棒线转接结构 | |
CN213602349U (zh) | 一种室外防水接线盒 | |
CN212406249U (zh) | 消防炮屏蔽箱及屏蔽室 | |
CN211508009U (zh) | 电缆组件和具有其的轨道车辆 | |
CN209283180U (zh) | 光伏组件接线盒 | |
CN207624969U (zh) | 一种拖链功能端子线 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |