CN115018456A - Data fusion system and method for tracing and auditing hidden projects - Google Patents

Data fusion system and method for tracing and auditing hidden projects Download PDF

Info

Publication number
CN115018456A
CN115018456A CN202210616960.5A CN202210616960A CN115018456A CN 115018456 A CN115018456 A CN 115018456A CN 202210616960 A CN202210616960 A CN 202210616960A CN 115018456 A CN115018456 A CN 115018456A
Authority
CN
China
Prior art keywords
data
audit
project
fusion
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210616960.5A
Other languages
Chinese (zh)
Other versions
CN115018456B (en
Inventor
戴悦
赵阳
蒋智慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Vocational Institute of Mechatronic Technology
Original Assignee
Changzhou Vocational Institute of Mechatronic Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Vocational Institute of Mechatronic Technology filed Critical Changzhou Vocational Institute of Mechatronic Technology
Priority to CN202210616960.5A priority Critical patent/CN115018456B/en
Publication of CN115018456A publication Critical patent/CN115018456A/en
Application granted granted Critical
Publication of CN115018456B publication Critical patent/CN115018456B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/265Personal security, identity or safety

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Computer Security & Cryptography (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

The invention relates to the technical field of data processing, and discloses a data fusion system for covert project tracking audit and a method thereof, which comprises a covert project acquisition unit, a tracking voucher code generation unit, a fusion frame arrangement unit, a fusion path analysis unit, a sensing detection device monitoring unit, a sensor data transmission unit, an audit evidence generation unit, a fusion data unit, a covert project traceability recording unit and a report generation unit, wherein the system can monitor and fuse the evidence of the current progress of a project in real time by utilizing the acquisition of a project end sensing device, without going to the covert project of on-site review, so that the efficiency and safety of audit work are improved, the project audit is facilitated, and the project has a good traceability function, the safety of engineering audit is improved, and the subjectivity of manual operation is reduced.

Description

Data fusion system and method for tracing and auditing hidden projects
Technical Field
The invention relates to the technical field of data processing, in particular to a data fusion system and a data fusion method for tracing and auditing in covert engineering.
Background
The hidden project is the foundation and the important component of the whole public project, the importance of the public project audit is increasingly highlighted, the hidden project is the difficulty of the public project accurate tracking audit, the internal state of the hidden project is difficult to be systematically revealed by a single sensing detection means, and the tracking of the internal state of the hidden project in all directions, all weather and all day by networking of multiple sensing detection devices is the direction of the future hidden project audit.
The audit evidence is the evidence obtained by the auditors in the process of executing the audit business, is the basis of the development of the audit work and is a bridge and a link which are connected with the audit conclusion. In the engineering project auditing process, some hidden engineering projects which cannot be rechecked on site afterwards are often encountered, for the auditing of the hidden projects, the collection of the auditing evidence in advance is critical, the preparation work of the engineering project auditing is well done to collect the sufficient and accurate auditing evidence, and the construction site is often known by the auditing staff when the time is taken out from the beginning of the engineering project construction, so that the engineering project is familiar with the engineering construction process and commonly used construction machinery is known; on the other hand, preparation is made for project audit later, and it is necessary to record actual changes of the engineering construction process.
To the above-mentioned narration to many sensing detection equipment of covert engineering and audit evidence, traditional system is difficult to obtain real-time covert engineering audit evidence information and fusion information, can know that the present stage lacks one kind and generates the fusion information of corresponding current progress according to covert engineering progress, it is especially audit evidence information to fuse information, be unfavorable for developing of audit work, do not have fine traceability function to engineering project simultaneously, mostly carry out the project and begin to count audit work in the manual operation, the adverse effect takes place easily when engineering project goes on.
Disclosure of Invention
This section is for the purpose of summarizing some aspects of embodiments of the invention and to briefly introduce some preferred embodiments. In this section, as well as in the abstract and title of the application, simplifications or omissions may be made to avoid obscuring the purpose of the section, the abstract and the title, and such simplifications or omissions are not intended to limit the scope of the invention.
The invention is provided in view of the problems in the prior engineering audit data processing.
Therefore, one of the purposes of the present invention is to provide a data fusion system for hidden project tracking audit, which utilizes the acquisition of the engineering project end sensing device to perform the functions of frame arrangement, fusion path, audit evidence generation and fusion on the data of the sensing device, so that the system can monitor and fuse the audit evidence of the current progress of the engineering project in real time, and simultaneously, the engineering project has a good traceability function, and the safety of the engineering audit and the subjectivity of manual operation are improved.
In order to solve the technical problems, the invention provides the following technical scheme: the method comprises the following steps:
the hidden project acquisition unit is used for acquiring hidden project information;
the tracking voucher code generating unit is used for generating a corresponding tracking voucher code according to the obtained concealed engineering information;
the fusion frame arranging unit is used for acquiring a tracking certificate code of the hidden project and arranging a data fusion frame according to the tracking certificate code;
the fusion path analysis unit is used for carrying out fusion path analysis on the data fusion frame and generating a plurality of data fusion paths;
the sensor detection equipment monitoring unit is used for acquiring audit task information and corresponding audit information when the covert engineering is implemented, and carrying out sensor real-time monitoring on the covert engineering to generate corresponding sensor data;
the sensor data transmission unit is used for transmitting the data acquired by the sensing detection equipment monitoring unit to a corresponding data fusion path in the data fusion frame according to the identity code on the sensing detection equipment monitoring unit;
the audit evidence generating unit is used for screening and post-processing the data in the data fusion path after the corresponding sensor data transmission of the data fusion path is completed, so as to obtain audit evidence information of the current progress of the covert project;
the fusion data unit is used for fusing the audit evidence information of the current progress of the hidden project to obtain audit evidence fusion data of the current progress;
the covert engineering tracing recording unit is used for recording the covert engineering information obtained by the covert engineering obtaining module and used for obtaining the initial covert engineering information of the covert engineering project;
and the report generating unit is used for generating a data report integrating the concealed engineering data and the audit evidence of the current progress.
The invention is a preferable scheme of a data fusion system for covert engineering tracking and auditing, wherein: the fusion data unit comprises an analysis module, a setting module and a judgment module;
the analysis module calculates the similarity between two data, the first similarity of the characteristic data of two different original audit evidence information in different data fusion paths is used as a processed original audit evidence information data source, and the processed original audit evidence information data source is constructed as the original characteristic of the audit evidence;
the analysis module calculates a second similarity of the feature data of the audit evidence information of two different current schedules in the different data fusion paths, and the second similarity is a processed audit evidence change feature;
the setting module sets a fusion coefficient threshold value of the audit evidence information of the current progress according to the first similarity of the audit evidence body;
and the judging module judges whether the audit evidence change characteristics are fused into the audit evidence original characteristics through the Pearson correlation coefficient.
The invention is a preferable scheme of a data fusion system for covert engineering tracking and auditing, wherein: the two different original audit evidence information are initial audit evidence information and audit evidence information of the next similar time;
the two different pieces of audit evidence information of the current progress are the audit evidence information of the current progress and the audit evidence information of the last similar time.
The invention is a preferable scheme of a data fusion system for covert engineering tracking and auditing, wherein: if the similarity meets the fusion coefficient threshold value in the setting module, the judging module judges that the similarity of the audit evidence change characteristics is close to that of the audit evidence change characteristics, the audit evidence change characteristics have correlation, and the audit evidence change characteristics are removed; otherwise, if the audit evidence change feature is not satisfied, the judgment module judges that the audit evidence change feature has larger similarity and no correlation, and reserves and stores the audit evidence change feature.
The invention is a preferable scheme of a data fusion system for covert engineering tracking and auditing, wherein: the analysis module calculates the similarity between the two data, and the first similarity and the second similarity are calculated by using a cosine similarity algorithm to obtain a first similarity value and a second similarity value.
The invention is a preferable scheme of a data fusion system for covert engineering tracking and auditing, wherein: the Pearson correlation coefficient is as shown in formula (1):
Figure BDA0003674737380000031
wherein X is a first similarity value in the formula (1),
Figure BDA0003674737380000032
is the mean value of the first similarity, Y is the second similarity value,
Figure BDA0003674737380000033
and r is the fusion coefficient of the first similarity and the second similarity.
The invention is a preferable scheme of a data fusion system for covert engineering tracking and auditing, wherein: the audit evidence generating unit comprises a data preprocessing module, wherein the data preprocessing module is used for receiving sensor data input by different data fusion paths, and performing data cleaning, data standardization processing and feature screening according to the sensor data of the different data fusion paths; the data cleaning is used for processing null values in the sensor data and deleting more than 15% of sample features missing; the data standardization processing is to adopt the same normalization on data and cancel errors caused by different dimensions; and the characteristic screening is auditing evidence information in a data fusion path to obtain the auditing evidence information of the current progress of the hidden project.
The invention is a preferable scheme of a data fusion system for covert engineering tracking and auditing, wherein: the hidden project information comprises audit task information and corresponding hidden project audit information; the hidden project audit information comprises project background data, project measurement data, project geological data, project construction image data and other sensing data.
A method of a data fusion system for covert engineering tracking audit comprises the following steps:
s1, acquiring the hidden project information through the hidden project acquisition unit, and generating a corresponding tracking voucher code according to the acquired hidden project information;
s2, arranging a data fusion frame according to the corresponding tracking voucher code, acquiring the tracking voucher code of the hidden project through a fusion frame arranging unit, arranging the data fusion frame according to the tracking voucher code, analyzing a fusion path of the data fusion frame, and generating a plurality of data fusion paths;
s3, acquiring audit task information and corresponding audit information when the covert project is implemented, monitoring the covert project in real time by a sensor, generating corresponding sensor data and transmitting the sensor data to a corresponding data fusion path in the data fusion frame, and simultaneously recording the covert project information of the initial covert project acquisition module of the covert project by a covert project tracing recording unit;
s4, processing audit evidence information, screening and post-processing based on the data in the data fusion path to obtain the audit evidence information of the current progress of the hidden project, and then fusing to obtain audit evidence fusion data of the current progress;
and S5, generating an audit evidence fusion data report of the concealed engineering data and the current progress.
The invention is a preferable scheme of the method of the data fusion system for the blind engineering tracking and auditing, wherein: the specific steps of step S3 are as follows:
s301, an analysis module calculates first similarity of feature data of two different original audit evidence information in different data fusion paths and the first similarity is a processed original audit evidence information data source which is constructed into original features of audit evidence;
s302, calculating a second similarity of the feature data of the audit evidence information of two different current schedules in different data fusion paths by an analysis module, wherein the second similarity is a change feature of the processed audit evidence;
s303, a setting module sets a fusion coefficient threshold value of audit evidence information of the current progress according to the first similarity of the audit evidence body;
and S304, the judging module judges whether the audit evidence change characteristics are fused into the audit evidence original characteristics through the Pearson correlation coefficient so as to complete the operation of fusing the audit evidence information of the current progress of the covert project.
The invention has the beneficial effects that: according to the invention, the functions of frame arrangement, path fusion, audit evidence generation and fusion are carried out on the data of the sensing equipment by utilizing the acquisition of the sensing equipment at the engineering project end, so that the system can monitor and fuse the audit evidence of the current progress of the engineering project in real time, a hidden engineering project for on-site review is not required, the efficiency and the safety of audit work are improved, the implementation of the engineering project audit is facilitated, the real-time, sufficient and accurate audit evidence can be collected, meanwhile, the engineering project has a good traceability function, the safety of the engineering audit is improved, and the subjectivity of manual operation is reduced.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the description below are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without inventive labor. Wherein:
FIG. 1 is a schematic diagram of a modular configuration of a data fusion system for blind engineering audit trail according to the present invention;
FIG. 2 is a diagram of an application scenario of the data fusion system for covert engineering audit trail.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention more comprehensible, embodiments accompanying figures of the present invention are described in detail below.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, but the present invention may be practiced in other ways than those specifically described and will be readily apparent to those of ordinary skill in the art without departing from the spirit of the present invention, and therefore the present invention is not limited to the specific embodiments disclosed below.
Furthermore, the references herein to "one embodiment" or "an embodiment" refer to a particular feature, structure, or characteristic that may be included in at least one implementation of the present invention. The appearances of the phrase "in one embodiment" in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments.
Referring to fig. 1 and 2, a data fusion system for covert engineering tracking audit is provided as an embodiment of the present invention, and the embodiment includes a covert engineering end as follows:
the sensor detection equipment monitoring unit is used for acquiring audit task information and corresponding audit information when the covert engineering is implemented, and carrying out sensor real-time monitoring on the covert engineering to generate corresponding sensor data;
the sensor data transmission unit is used for transmitting the data acquired by the sensing detection equipment monitoring unit to a corresponding data fusion path in the data fusion frame according to the identity code on the sensing detection equipment monitoring unit; the sensor detection equipment monitoring unit and the sensor data transmission unit form a hidden engineering end.
Still include the collection server of covert engineering, specifically as follows:
the hidden project acquisition unit is used for acquiring hidden project information;
the tracking voucher code generating unit is used for generating a corresponding tracking voucher code according to the obtained concealed engineering information;
the fusion frame arranging unit is used for acquiring the tracking voucher codes of the hidden project and arranging the data fusion frame according to the tracking voucher codes;
the fusion path analysis unit is used for carrying out fusion path analysis on the data fusion frame and generating a plurality of data fusion paths;
the audit evidence generating unit is used for screening and post-processing the data in the data fusion path after the corresponding sensor data transmission of the data fusion path is completed, so as to obtain audit evidence information of the current progress of the covert project;
the fusion data unit is used for fusing the audit evidence information of the current progress of the hidden project to obtain audit evidence fusion data of the current progress;
the hidden project tracing recording unit is used for recording the hidden project information obtained by the hidden project obtaining module;
and the report generating unit is used for generating an audit evidence fusion data report of the concealed engineering data and the current progress.
Specifically, the fusion data unit of the embodiment includes an analysis module, a setting module and a judgment module;
the analysis module calculates the similarity between the two data, the first similarity of the characteristic data of two different original audit evidence information in different data fusion paths is calculated and is a processed original audit evidence information data source, and the processed original audit evidence information data source is constructed into the original characteristics of the audit evidence;
the analysis module calculates second similarity of the feature data of the audit evidence information of two different current schedules in different data fusion paths, and the second similarity is the change feature of the processed audit evidence;
the setting module sets a fusion coefficient threshold of the audit evidence information of the current progress according to the first similarity of the audit evidence body;
the judging module judges whether the audit evidence change characteristics are fused into the audit evidence original characteristics or not through the Pearson correlation coefficient, further, if the fusion coefficient threshold value in the setting module is met, the judging module judges that the audit evidence change characteristics are close in similarity and have correlation, and the audit evidence change characteristics are removed; otherwise, if the audit evidence change feature similarity does not meet the requirement, the judgment module judges that the audit evidence change feature similarity is large and does not have correlation, and the audit evidence change feature is reserved and stored.
The analysis module calculates the similarity between the two data, and the first similarity and the second similarity are calculated by using a cosine similarity algorithm to obtain a first similarity value and a second similarity value.
The Pearson correlation coefficient is represented by the formula (1):
Figure BDA0003674737380000071
wherein X is a first similarity value in the formula (1),
Figure BDA0003674737380000072
is the mean value of the first similarity, Y is the second similarity value,
Figure BDA0003674737380000073
and r is the fusion coefficient of the first similarity and the second similarity.
It should be noted that the two different original audit evidence information are the initial audit evidence information and the audit evidence information of the next similar time; the two different pieces of audit evidence information of the current progress are the audit evidence information of the current progress and the audit evidence information of the last similar time.
The audit evidence generating unit of the embodiment comprises a data preprocessing module, wherein the data preprocessing module is used for receiving sensor data input by different data fusion paths, and performing data cleaning, data standardization processing and feature screening according to the sensor data of the different data fusion paths; the data cleaning processes null values in the sensor data, and deletes more than 15% of sample features missing; the data standardization processing is to adopt the same normalization on data and cancel errors caused by different dimensions; and the characteristic screening is to obtain the audit evidence information of the current progress of the hidden project according to the audit evidence information in the data fusion path.
Based on the above, the hidden project information of the invention includes audit task information and corresponding hidden project audit information; the concealed project audit information comprises project background data, project measurement data, project geological data, project construction image data and other sensing data.
The embodiment also provides a method of a data fusion system for covert engineering tracking and auditing, which comprises the following steps:
s1, acquiring the hidden project information through the hidden project acquisition unit, and generating a corresponding tracking voucher code according to the acquired hidden project information;
s2, arranging a data fusion frame according to the corresponding tracking voucher code, acquiring the tracking voucher code of the hidden project through a fusion frame arranging unit, arranging the data fusion frame according to the tracking voucher code, performing fusion path analysis on the data fusion frame, and generating a plurality of data fusion paths;
s3, acquiring audit task information and corresponding audit information when the covert project is implemented, monitoring the covert project in real time by a sensor, generating corresponding sensor data, transmitting the sensor data to a corresponding data fusion path in a data fusion frame, and simultaneously recording covert project initial covert project information acquired by a covert project acquisition module through a covert project source tracing recording unit; the concrete steps are as follows:
s301, an analysis module calculates first similarity of feature data of two different original audit evidence information in different data fusion paths and establishes the first similarity as an audit evidence original feature for a processed original audit evidence information data source;
s302, calculating a second similarity of the feature data of the audit evidence information of two different current schedules in different data fusion paths by an analysis module, wherein the second similarity is a change feature of the processed audit evidence;
s303, a setting module sets a fusion coefficient threshold value of the audit evidence information of the current progress according to the first similarity of the audit evidence body;
s304, the judging module judges whether the audit evidence change characteristics are fused into the audit evidence original characteristics through the Pearson correlation coefficient so as to complete the operation of fusing the audit evidence information of the current progress of the hidden project;
s4, processing the audit evidence information, screening and post-processing based on the data in the data fusion path to obtain the audit evidence information of the current progress of the concealed project, and then fusing to obtain the audit evidence fusion data of the current progress;
and S5, generating an audit evidence fusion data report of the concealed engineering data and the current progress.
In conclusion, the invention utilizes the acquisition of the sensing equipment at the engineering project end to perform the functions of frame arrangement, path fusion, audit evidence generation and fusion on the data of the sensing equipment, so that the system can monitor and fuse the audit evidence of the current progress of the engineering project in real time without going to the hidden engineering project of on-site review, thereby improving the efficiency and safety of the audit work, being beneficial to the execution of the engineering project audit, collecting the real-time, sufficient and accurate audit evidence, simultaneously ensuring that the engineering project has good traceability function, improving the safety of the engineering audit and reducing the subjectivity of manual operation.
The above-described embodiments of the apparatus are merely illustrative, and the units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of the present embodiment. One of ordinary skill in the art can understand and implement it without inventive effort.
Through the above description of the embodiments, those skilled in the art will clearly understand that each embodiment can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware. With this understanding in mind, the above-described technical solutions may be embodied in the form of a software product, which can be stored in a computer-readable storage medium such as ROM/RAM, magnetic disk, optical disk, etc., and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the methods described in the embodiments or some parts of the embodiments.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (8)

1. A data fusion system for covert engineering tracking audit, comprising:
the hidden project acquisition unit is used for acquiring hidden project information;
the tracking voucher code generating unit is used for generating a corresponding tracking voucher code according to the obtained concealed engineering information;
the fusion frame arranging unit is used for acquiring a tracking certificate code of the hidden project and arranging a data fusion frame according to the tracking certificate code;
the fusion path analysis unit is used for carrying out fusion path analysis on the data fusion frame and generating a plurality of data fusion paths;
the sensor detection equipment monitoring unit is used for acquiring audit task information and corresponding audit information when the hidden project is implemented, and carrying out sensor real-time monitoring on the hidden project to generate corresponding sensor data;
the sensor data transmission unit is used for transmitting the data acquired by the sensing detection equipment monitoring unit to a corresponding data fusion path in the data fusion frame according to the identity code on the sensing detection equipment monitoring unit;
the audit evidence generating unit is used for screening and post-processing the data in the data fusion path after the corresponding sensor data transmission of the data fusion path is completed, so as to obtain audit evidence information of the current progress of the covert project;
the fusion data unit is used for fusing the audit evidence information of the current progress of the hidden project to obtain audit evidence fusion data of the current progress;
the covert engineering tracing recording unit is used for recording the covert engineering information obtained by the covert engineering obtaining module and used for obtaining the initial covert engineering information of the covert engineering project;
and the report generating unit is used for generating a data report integrating the concealed engineering data and the audit evidence of the current progress.
2. The data fusion system for covert engineering tracking audit of claim 1 wherein said fused data unit comprises an analysis module, a setting module and a judgment module;
the analysis module calculates the similarity between two data, the first similarity of the characteristic data of two different original audit evidence information in different data fusion paths is used as a processed original audit evidence information data source, and the processed original audit evidence information data source is constructed as the original characteristic of the audit evidence;
the analysis module calculates a second similarity of the feature data of the audit evidence information of two different current schedules in the different data fusion paths, and the second similarity is a processed audit evidence change feature;
the setting module sets a fusion coefficient threshold value of the audit evidence information of the current progress according to the first similarity of the audit evidence body;
the judging module judges whether the audit evidence change characteristics are fused into the audit evidence original characteristics through the Pearson correlation coefficient;
the two different original audit evidence information are initial audit evidence information and audit evidence information of the next similar time;
the audit evidence information of the two different current schedules is the audit evidence information of the current schedule and the audit evidence information of the previous similar time;
if the fusion coefficient threshold in the setting module is met, the judging module judges that the similarity of the change characteristics of the audit evidence is close to the similarity and has correlation, and removes the change characteristics of the audit evidence; otherwise, if the audit evidence change feature is not satisfied, the judgment module judges that the audit evidence change feature has larger similarity and no correlation, and reserves and stores the audit evidence change feature.
3. The data fusion system of claim 2, wherein the analysis module calculates a similarity between two data, and the first similarity and the second similarity are calculated using a cosine similarity algorithm to obtain a first similarity value and a second similarity value.
4. The data fusion system of blind engineering trail audit according to claim 3, wherein said Pearson correlation coefficient is formulated as:
Figure FDA0003674737370000021
wherein X is a first similarity value in the formula (1),
Figure FDA0003674737370000022
is the mean value of the first similarity, Y is the second similarity value,
Figure FDA0003674737370000023
and r is the fusion coefficient of the first similarity and the second similarity.
5. The data fusion system for blind engineering tracking audit as claimed in claim 1, wherein said audit evidence generating unit includes a data preprocessing module, said data preprocessing module is used for receiving sensor data inputted by different data fusion paths, and performing data cleaning, data standardization processing and feature screening according to the sensor data of different data fusion paths; the data cleaning is used for processing null values in the sensor data and deleting more than 15% of sample features missing; the data standardization processing is to adopt the same normalization on data and cancel errors caused by different dimensions; and the characteristic screening is audit evidence information in the data fusion path to obtain the audit evidence information of the current progress of the hidden project.
6. The data fusion system of claim 1, in which the covert engineering information includes audit task information and corresponding covert engineering audit information; the hidden project audit information comprises project background data, project measurement data, project geological data, project construction image data and other sensing data.
7. The method of the data fusion system for covert engineering tracking audit according to any one of claims 1 to 8, comprising the steps of:
s1, acquiring the hidden project information through the hidden project acquisition unit, and generating a corresponding tracking voucher code according to the acquired hidden project information;
s2, arranging a data fusion frame according to the corresponding tracking voucher code, acquiring the tracking voucher code of the hidden project through a fusion frame arranging unit, arranging the data fusion frame according to the tracking voucher code, analyzing a fusion path of the data fusion frame, and generating a plurality of data fusion paths;
s3, acquiring audit task information and corresponding audit information when the covert project is implemented, monitoring the covert project in real time by a sensor, generating corresponding sensor data and transmitting the sensor data to a corresponding data fusion path in the data fusion frame, and simultaneously recording the covert project information of the initial covert project acquisition module of the covert project by a covert project tracing recording unit;
s4, processing audit evidence information, screening and post-processing based on the data in the data fusion path to obtain the audit evidence information of the current progress of the hidden project, and then fusing to obtain audit evidence fusion data of the current progress;
and S5, generating an audit evidence fusion data report of the concealed engineering data and the current progress.
8. The data fusion system for covert engineering tracking audit as claimed in claim 7, wherein the specific steps of step S3 are as follows:
s301, an analysis module calculates first similarity of feature data of two different original audit evidence information in different data fusion paths and the first similarity is a processed original audit evidence information data source which is constructed into original features of audit evidence;
s302, calculating a second similarity of the feature data of the audit evidence information of two different current schedules in different data fusion paths by an analysis module, wherein the second similarity is a change feature of the processed audit evidence;
s303, a setting module sets a fusion coefficient threshold of audit evidence information of the current progress according to the first similarity of the audit evidence body;
and S304, the judging module judges whether the audit evidence change characteristics are fused into the audit evidence original characteristics through the Pearson correlation coefficient so as to complete the operation of fusing the audit evidence information of the current progress of the covert project.
CN202210616960.5A 2022-06-01 2022-06-01 Data fusion system and method for hidden engineering tracking audit Active CN115018456B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210616960.5A CN115018456B (en) 2022-06-01 2022-06-01 Data fusion system and method for hidden engineering tracking audit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210616960.5A CN115018456B (en) 2022-06-01 2022-06-01 Data fusion system and method for hidden engineering tracking audit

Publications (2)

Publication Number Publication Date
CN115018456A true CN115018456A (en) 2022-09-06
CN115018456B CN115018456B (en) 2023-06-20

Family

ID=83073340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210616960.5A Active CN115018456B (en) 2022-06-01 2022-06-01 Data fusion system and method for hidden engineering tracking audit

Country Status (1)

Country Link
CN (1) CN115018456B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115571290A (en) * 2022-11-09 2023-01-06 传仁信息科技(南京)有限公司 Automatic detection system and method for ship draught
CN117333141A (en) * 2023-11-27 2024-01-02 国网浙江省电力有限公司 Automatic auditing method, system, equipment and medium for engineering quantity of electric power engineering
CN118296559A (en) * 2024-06-06 2024-07-05 太行城乡建设集团有限公司 Data fusion system and method for hidden engineering tracking audit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017011033A1 (en) * 2015-07-14 2017-01-19 Taser International, Inc. Systems and methods for generating an audit trail for auditable devices
CN109994200A (en) * 2019-03-08 2019-07-09 华南理工大学 A kind of multiple groups cancer data confluence analysis method based on similarity fusion
CN110275919A (en) * 2019-06-18 2019-09-24 合肥工业大学 Data integrating method and device
CN112836274A (en) * 2021-02-02 2021-05-25 南京审计大学 Data fusion method for tracing and auditing hidden engineering
CN114140090A (en) * 2020-12-18 2022-03-04 国网江苏省电力有限公司检修分公司 Engineering project full-process tracking and monitoring system
CN114219035A (en) * 2021-12-17 2022-03-22 南京应道科技有限公司 Multi-sensor data fusion method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017011033A1 (en) * 2015-07-14 2017-01-19 Taser International, Inc. Systems and methods for generating an audit trail for auditable devices
CN109994200A (en) * 2019-03-08 2019-07-09 华南理工大学 A kind of multiple groups cancer data confluence analysis method based on similarity fusion
CN110275919A (en) * 2019-06-18 2019-09-24 合肥工业大学 Data integrating method and device
CN114140090A (en) * 2020-12-18 2022-03-04 国网江苏省电力有限公司检修分公司 Engineering project full-process tracking and monitoring system
CN112836274A (en) * 2021-02-02 2021-05-25 南京审计大学 Data fusion method for tracing and auditing hidden engineering
CN114219035A (en) * 2021-12-17 2022-03-22 南京应道科技有限公司 Multi-sensor data fusion method and device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
陈荣: "隐蔽工程复合内窥数据融合技术框架研究", 《计算机工程与应用》 *
陈荣: "隐蔽工程复合内窥数据融合技术框架研究", 《计算机工程与应用》, 21 October 2016 (2016-10-21) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115571290A (en) * 2022-11-09 2023-01-06 传仁信息科技(南京)有限公司 Automatic detection system and method for ship draught
CN117333141A (en) * 2023-11-27 2024-01-02 国网浙江省电力有限公司 Automatic auditing method, system, equipment and medium for engineering quantity of electric power engineering
CN117333141B (en) * 2023-11-27 2024-02-06 国网浙江省电力有限公司 Automatic auditing method, system, equipment and medium for engineering quantity of electric power engineering
CN118296559A (en) * 2024-06-06 2024-07-05 太行城乡建设集团有限公司 Data fusion system and method for hidden engineering tracking audit
CN118296559B (en) * 2024-06-06 2024-08-13 太行城乡建设集团有限公司 Data fusion system and method for hidden engineering tracking audit

Also Published As

Publication number Publication date
CN115018456B (en) 2023-06-20

Similar Documents

Publication Publication Date Title
CN115018456A (en) Data fusion system and method for tracing and auditing hidden projects
Rashid et al. Activity identification in modular construction using audio signals and machine learning
CN104461896B (en) Aerospace system key software evaluation method based on credible attribute
DE112016005143T5 (en) Periodicity analysis on heterogeneous protocols
CN105893208A (en) Cloud computing platform system fault prediction method based on hidden semi-Markov models
CN112367273B (en) Flow classification method and device of deep neural network model based on knowledge distillation
WO2015131558A1 (en) Alarm correlation data mining method and device
Zonno et al. Automated long-term dynamic monitoring using hierarchical clustering and adaptive modal tracking: validation and applications
CN115062675A (en) Full-spectrum pollution tracing method based on neural network and cloud system
CN117172556B (en) Construction risk early warning method and system for bridge engineering
CN116662184B (en) Industrial control protocol fuzzy test case screening method and system based on Bert
CN106201887B (en) A kind of verification method and device of off-line data task
CN110674534A (en) Remote quality detection technology based on Internet of things electronic evidence chain
CN117093822B (en) Industrial brain data analysis platform based on industrial knowledge graph
CN113505980A (en) Reliability evaluation method, device and system for intelligent traffic management system
CN117240522A (en) Vulnerability intelligent mining method based on attack event model
CN110796336B (en) Audit project implementation quality monitoring method and equipment based on data analysis
CN105373473B (en) CDR accuracys method of testing and test system based on original signaling decoding
Catbas et al. Challenges in structural health monitoring
CN114647582B (en) Automatic driving scene generation method
CN115641003A (en) Method for hierarchical management and control of associated risks and troubleshooting and treatment of hidden dangers
CN108427837A (en) A kind of assembly rough error determination method and system
JP2008257482A (en) Visualizing method for computer operation
CN107330103A (en) A kind of Geotechnical Engineering drilling information collection and processing method and system
Lenart et al. Real-time monitoring and analyses of sensory data integrated into the BIM platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant