CN115012537A - Construction method of settlement-spanning post-cast strip of stiffened steel transfer beam - Google Patents

Construction method of settlement-spanning post-cast strip of stiffened steel transfer beam Download PDF

Info

Publication number
CN115012537A
CN115012537A CN202210758491.0A CN202210758491A CN115012537A CN 115012537 A CN115012537 A CN 115012537A CN 202210758491 A CN202210758491 A CN 202210758491A CN 115012537 A CN115012537 A CN 115012537A
Authority
CN
China
Prior art keywords
beam section
section
settlement
building
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210758491.0A
Other languages
Chinese (zh)
Other versions
CN115012537B (en
Inventor
罗鸿翔
杨勇
李泽彪
赵艳波
张廷安
张德洋
张亚鑫
唐子森
亢雄
郑雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202210758491.0A priority Critical patent/CN115012537B/en
Publication of CN115012537A publication Critical patent/CN115012537A/en
Application granted granted Critical
Publication of CN115012537B publication Critical patent/CN115012537B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/43Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2406Connection nodes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T30/00Transportation of goods or passengers via railways, e.g. energy recovery or reducing air resistance

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a construction method of a cross-settlement post-cast strip of a stiffened steel section conversion beam, wherein a cross-settlement post-cast strip section is positioned at the joint of a main building and an apron building, the main building is correspondingly provided with a main building steel beam section, the apron building is provided with an apron building steel beam section, a height difference exists between the main building steel beam section and the apron building steel beam section in settlement, a transition beam section is arranged at the joint of the main building steel beam section and the apron building steel beam section, and the transition beam section, a main building side broken joint and an apron building side broken joint are positioned at the cross-settlement post-cast strip section. According to the invention, through the arrangement of the main building side broken joint and the skirt building side broken joint, double matching under large settlement difference is facilitated, and transition and butt joint are facilitated; through the arrangement of the arc transition area and the butt joint area, the convenient construction of the transition beam section is ensured, and the smooth butt joint of the transition beam section and the main building steel beam section is facilitated; through the arrangement and adjustment of the local expansion post-cast strip and the gap distance, the better release of the settlement stress and deformation is ensured, and the more gentle butt joint of the transition area is ensured.

Description

Construction method of settlement-spanning post-cast strip of stiffened steel transfer beam
Technical Field
The invention belongs to the technical field of steel beam construction, and particularly relates to a construction method of a settlement post-cast strip of a stiffened steel transfer beam.
Background
The post-cast strip is a concrete strip which is reserved for post-casting after stress release and deformation stability in order to prevent harmful cracks possibly generated by uneven settlement, temperature and shrinkage of a cast-in-place reinforced concrete structure in building construction. In a section steel concrete structure (a stiffened section steel conversion beam), the treatment of a post-cast strip is to disconnect section steel beams in concrete at the post-cast strip, release stress in the construction process and settlement of different parts at two sides of the post-cast strip, connect the steel beams after the settlement is stable, and cast the concrete of the post-cast strip. The following problems thus arise: 1) breaking the stiff steel beam at the post-cast strip; 2) the technical requirements of the post-cast strip steel beam joint; 3) technical precautions in construction; 4) handling of special cases.
The post-cast strip of the concrete structure requires the beam steel bars to be communicated and the concrete is post-cast. However, the section steel in the section steel concrete beam is required to be broken at the post-cast strip to release the uneven settlement, and the conventional technical scheme is that a broken joint is arranged near the center line of the post-cast strip, and the post-cast strip is butted before concrete is filled. The prior art has the defect that only the post-cast strip with small sedimentation is suitable. In the construction of high-rise and super high-rise buildings, the settlement difference between the two sides of the post-cast strip of the main building and the podium building is very large, so that the broken joints and the staggered joints of steel beams are large, the butt joint of the steel beams cannot be aligned, the strength loss is large, and the design requirements are difficult to meet. The invention aims to solve the problem and ensure the strength of the steel beam after butt joint.
Disclosure of Invention
The invention provides a construction method of a settlement-spanning post-cast strip of a stiffness section steel conversion beam, which is used for solving the technical problems of the setting of broken joints, transition connection, circular transition, butt joint and the like of stiffness section steel at the settlement-spanning post-cast strip under different settlement differences.
In order to achieve the purpose, the invention adopts the following technical scheme:
a construction method of a cross-settlement post-cast strip of a stiffened steel section conversion beam is characterized in that a cross-settlement post-cast strip section is positioned at the joint of a main building and an apron building, the main building is correspondingly provided with a main building steel beam section, the apron building is provided with an apron building steel beam section, a height difference exists between the main building steel beam section and the apron building steel beam section in settlement, a transition beam section is arranged at the joint of the main building steel beam section and the apron building steel beam section, and the transition beam section, a main building side broken joint and an apron building side broken joint are positioned at the cross-settlement post-cast strip section; the main building steel beam section, the skirt building steel beam section and the transition beam section are all I-shaped steel beams;
the construction method of the settlement-spanning post-cast strip of the stiffened steel transfer beam comprises the following specific steps:
deepening a connecting node of a main building steel beam section and an apron building steel beam section, respectively measuring and calculating the settlement of the main building steel beam section and the apron building steel beam section according to the settlement of the main building and the settlement of the apron building, and obtaining the crack settlement difference of the main building steel beam section and the apron building steel beam section;
determining the length of a transition beam section between a main building steel beam section and a skirt building steel beam section according to the settlement difference value, and further determining the width of a post-settlement-spanning casting belt section;
thirdly, determining the positions of the main building side broken joint and the skirt building side broken joint according to the position of the side line of the post-settlement-spanning casting belt section;
constructing a main building steel beam section and arranging a main building side broken joint, constructing a skirt building steel beam section after the main building settlement meets the design requirement, integrally manufacturing the skirt building steel beam section and a transition beam section, and marking the skirt building side broken joint;
constructing the side seam-broken part of the skirt building, only cutting off the web plate and the upper flange plate of the beam body at the steel beam section and the transition beam section of the skirt building, and bending the lower flange plate in place without cutting off;
and step six, bending the transition beam sections to form arc transition areas, butting the transition beam sections and the main building steel beam sections to form butting areas, wherein skirt side broken joints are arranged between the upper arc transition areas and the lower arc transition areas, and main building side broken joints are arranged between the upper butting areas and the lower butting areas, so that the construction of the transition beam sections of the settlement-spanning post-cast strip is completed.
Furthermore, the beam bodies on the two sides of the main building side broken joint and the skirt building side broken joint increase the thickness of the steel beam plate, and the strength of the increased thickness offsets the strength loss of the broken joint butt joint construction.
Furthermore, the section of the cross-settlement post-pouring strip with larger settlement difference is also provided with a local enlarged post-pouring strip, and the distance of the local enlarged post-pouring strip is increased according to the main building side broken joint and the skirt building side broken joint, so that the length of the transition beam section is increased.
Furthermore, the local enlarged post-cast strip is trapezoidal, the long bottom edge of the trapezoidal shape is arranged corresponding to the settlement-spanning post-cast strip section, and the short top edge is arranged corresponding to the skirt building steel beam section.
Furthermore, the height of main building girder steel section is less than the height of undaria beam section, and the transition beam section is buckled downwards and transition beam section top surface and main building girder steel section top surface still are connected with the elastic connection board.
Furthermore, the height of main building girder steel section is higher than the height of undaria beam section, and the transition beam section is upwards buckled and transition beam section top surface and main building girder steel section top surface still are connected with the elastic connection board.
Furthermore, the arc transition area is divided into an upper arc transition area and a lower arc transition area, at least one of the upper arc transition area and the lower arc transition area is an arc notch area, and the other one is an arc bending area; the arc-shaped notch area is fixedly connected with a steel plate correspondingly, and the arc-shaped bending area is correspondingly connected with an elastic damping piece at the bending starting point.
Further, when the height of the main building steel beam section is smaller than that of the skirt building steel beam section, the transition beam section is bent downwards, the upper arc-shaped transition area is an arc-shaped notch area, and the lower arc-shaped transition area is an arc-shaped bending area; when the height of main building girder steel section is higher than the skirt building girder steel section height, the transition beam section upwards buckles, and lower arc transition district is the arc breach district, goes up the arc transition district and is the arc district that bends.
Furthermore, the side seam allowance of the main building of the butt joint area is not less than 100mm from the adjacent side edge of the section of the post-settlement-spanning casting belt; the side seam of the skirt building is not less than 100mm from the adjacent side line of the section of the post-settlement casting belt; the skirt building side broken joint enables the staggered joint butt joint of the main building side broken joint to be converted into a gentle fold, so that smooth transition is realized, the butt joint strength of the corresponding beam body is ensured, and stress concentration is avoided.
Furthermore, the main-floor steel beam section, the apron-floor steel beam section and the transition beam section are also T-shaped beams or H-shaped beams, wherein the T-shaped beams separate the upper flange plate and the web plate and keep the joint of the web plate and the upper flange plate, and the H-shaped beams only vertically cut the side plates to the web plate.
The invention has the beneficial effects that:
1) according to the invention, through the arrangement of the main building side broken joint and the skirt building side broken joint, settlement adaptation of the beam body passing through the settlement-spanning post-pouring belt section is carried out through the two broken joints, so that on one hand, double adaptation under a large settlement difference is facilitated, and on the other hand, transition and butt joint with steel beams of the main building and the skirt building are facilitated respectively;
2) according to the invention, through the arrangement of the arc transition area and the butt joint area, the convenient construction of the transition beam section is ensured, the transition beam section is more beneficial to the smooth butt joint with the main building steel beam section, and the stress concentration cannot be formed due to the arrangement of the arc transition area;
3) the invention is beneficial to ensuring better release of settlement stress and deformation and ensuring more smooth butt joint connection of a transition area by locally enlarging the arrangement and adjustment of the distance between the post-cast strip and the broken joint.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention; the primary objects and other advantages of the invention may be realized and attained by the instrumentalities particularly pointed out in the specification.
Drawings
FIG. 1 is a schematic view of a conventional gap-breaking structure of a post-cast strip section spanning settlement;
FIG. 2 is a schematic view of a design of two break joints across a settled post-cast strip section;
FIG. 3 is a schematic structural view of two broken joints of a bending span settlement post-cast strip section for construction;
FIG. 4 is a partial schematic view of a cross-settled post-cast strip segment structure;
fig. 5 is a schematic view of a partially enlarged post-cast strip structure.
Reference numerals: 1-main building steel beam section, 2-skirt building steel beam section, 3-main building side broken joint, 4-skirt building side broken joint, 5-transition beam section, 6-broken joint settlement difference, 7-span settlement post-cast strip section, 8-arc transition zone, 9-butt joint zone and 10-local expansion post-cast strip.
Detailed Description
Take the construction of a city traffic commercial complex as an example, which comprises commercial, office, residential and public transportation hub sites as a whole. The middle part of the tower is provided with a tower main building, and the lower part of the tower is provided with a commercial undaria. In order to ensure that the settlement of the main tower and the commercial group of the tower meets the design requirements, the post-cast strip is set in a targeted manner.
As shown in fig. 1 to 5, in the construction method of the settlement-spanning post-cast strip of the stiffened steel section conversion beam, a settlement-spanning post-cast strip section 7 is positioned at the joint of a main building and an apron building, the main building is correspondingly provided with a main building steel beam section 1, the apron building is provided with an apron building steel beam section 2, the settlement between the main building steel beam section 1 and the apron building steel beam section 2 has a height difference, a transition beam section 5 is arranged at the joint of the main building steel beam section 1 and the apron building steel beam section 2, and the transition beam section 5, a main building side broken joint 3 and an apron building side broken joint 4 are positioned at the settlement-spanning post-cast strip section 7; the main building steel beam section 1, the skirt building steel beam section 2 and the transition beam section 5 are all I-shaped steel beams;
the construction method of the settlement-spanning post-cast strip of the stiffened steel transfer beam comprises the following specific steps:
deepening a connection node of a main building steel beam section 1 and an apron building steel beam section 2, respectively measuring and calculating the settlement of the main building steel beam section 1 and the apron building steel beam section 2 according to the settlement of the main building and the apron building, and obtaining the fracture settlement difference 6 of the main building steel beam section 1 and the apron building steel beam section 2;
and step two, determining the length of a transition beam section 5 between the main building steel beam section 1 and the skirt building steel beam section 2 according to the settlement difference, and further determining the width of a post-settlement-spanning casting belt section 7.
During construction, the settlement-spanning post-cast strip section 7 with larger settlement difference is also provided with a local enlarged post-cast strip 10, and the distance of the local enlarged post-cast strip 10 is increased according to the main building side broken joint 3 and the skirt building side broken joint 4, so that the length of the transition beam section 5 is increased. As shown in fig. 5, the partially enlarged post-cast strip 10 has a trapezoidal shape, the long bottom side of the trapezoidal shape is disposed corresponding to the post-cast strip section 7, and the short top side is disposed corresponding to the skirt tower beam section 2.
Thirdly, determining the positions of the main building side broken joint 3 and the skirt building side broken joint 4 according to the position of the side line of the post-settlement-spanning casting belt section 7; during construction, the beam bodies on the two sides of the main building side broken joint 3 and the skirt building side broken joint 4 increase the thickness of a steel beam plate, and the strength of the increased thickness offsets the strength loss of the broken joint butt joint construction; the width of being no less than 20cm to main building side crack 3 and skirt building side crack 4 both sides is thickened, and the thickening adopts the gradual change formula, avoids local stress concentration.
Constructing a main building steel beam section 1 and arranging a main building side broken joint 3, constructing a skirt building steel beam section 2 after the main building settlement meets the design requirement, integrally manufacturing the skirt building steel beam section 2 and a transition beam section 5, and marking the skirt building side broken joint 4;
and fifthly, constructing the side broken joint 4 of the skirting building, only cutting off the web and the upper flange plate of the beam body at the steel beam section 2 and the transition beam section 5 of the skirting building, and bending the lower flange plate in place without cutting off. When the main building steel beam section 1, the skirt building steel beam section 2 and the transition beam section 5 are also T-shaped beams or H-shaped beams, wherein the T-shaped beams separate the upper flange plate and the web plate and keep the joint of the web plate and the upper flange plate, and the H-shaped beams only vertically cut the side plates to the web plate.
During specific construction, when the height of main building girder section 1 is less than the height of skirt building girder section 2, transition girder section 5 is buckled downwards and the top surface of transition girder section 5 and the top surface of main building girder section 1 are still connected with the elastic connection board. Or when the height of the main building steel beam section 1 is higher than that of the skirt building steel beam section 2, the transition beam section 5 is bent upwards, and the top surfaces of the transition beam section 5 and the main building steel beam section 1 are also connected with an elastic connecting plate.
And sixthly, bending the skirt building steel beam section 2 and the transition beam section 5 to form an arc-shaped transition area 8, butting the transition beam section 5 and the main building steel beam section 1 to form a butt joint area 9, wherein a skirt building side seam 4 is arranged between the upper arc-shaped transition area 8 and the lower arc-shaped transition area 8, and a main building side seam 3 is arranged between the upper butt joint area 9 and the lower butt joint area 9, so that the construction of the transition beam section 5 spanning the subsidence post-pouring zone is completed.
In specific implementation, the arc transition area 8 is divided into an upper arc transition area 8 and a lower arc transition area 8, at least one of the upper arc transition area 8 and the lower arc transition area 8 is an arc notch area, and the other is an arc bending area; the arc-shaped notch area is fixedly connected with a steel plate correspondingly, and the arc-shaped bending area is correspondingly connected with an elastic damping piece at the bending starting point. When the height of the main building steel beam section 1 is smaller than that of the skirt building steel beam section 2, the transition beam section 5 is bent downwards, the upper arc transition area 8 is an arc-shaped notch area, and the lower arc transition area 8 is an arc-shaped bending area; when the height of the main building steel beam section 1 is higher than that of the skirt building steel beam section 2, the transition beam section 5 is bent upwards, the lower arc-shaped transition area 8 is an arc-shaped notch area, and the upper arc-shaped transition area 8 is an arc-shaped bending area;
in specific implementation, the distance between the main building side broken joint 3 of the butt joint area 9 and the adjacent 7 side line of the post-settlement-spanning casting belt section is not less than 100 mm; the distance between the skirt building side broken seam 4 and the adjacent 7 side lines of the post-settlement-spanning casting belt section is not less than 100 mm; the skirt building side broken joint 4 enables the butt joint of the main building side broken joint 3 to be converted into a gentle fold, so that smooth transition is realized, the butt joint strength of the corresponding beam body is ensured, and stress concentration is avoided.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that may be considered by those skilled in the art within the technical scope of the present invention disclosed herein should be covered within the scope of the present invention.

Claims (10)

1. A construction method of a settlement-spanning post-cast strip of a stiffened steel section conversion beam is characterized in that a settlement-spanning post-cast strip section (7) is located at the joint of a main building and a skirt building, the main building is correspondingly provided with a main building steel beam section (1), the skirt building is provided with a skirt building steel beam section (2), a height difference exists between the main building steel beam section (1) and the skirt building steel beam section (2) in settlement, a transition beam section (5) is arranged at the joint of the main building steel beam section (1) and the skirt building steel beam section (2), and the transition beam section (5), a main building side broken joint (3) and a skirt building side broken joint (4) are located at the settlement-spanning post-cast strip section (7); the main building steel beam section (1), the skirt building steel beam section (2) and the transition beam section (5) are all I-shaped steel beams;
the construction method of the cross-settlement post-cast strip of the stiffened steel transfer beam comprises the following specific steps:
step one, deepening a connecting node of a main building steel beam section (1) and an apron building steel beam section (2), respectively measuring and calculating the settlement of the main building steel beam section (1) and the apron building steel beam section (2) according to the settlement of the main building and the apron building, and obtaining the fracture settlement difference (6) of the main building steel beam section (1) and the apron building steel beam section (2);
secondly, determining the length of a transition beam section (5) between a main building steel beam section (1) and a skirt building steel beam section (2) according to the settlement difference, and further determining the width of a post-settlement-spanning casting belt section (7);
thirdly, determining the positions of the main building side broken joint (3) and the skirt building side broken joint (4) according to the position of a sideline of the post-cast strip section (7) crossing the settlement;
constructing a main building steel beam section (1) and arranging a main building side broken joint (3), constructing a skirt building steel beam section (2) after the main building settlement meets the design requirement, integrally manufacturing the skirt building steel beam section (2) and a transition beam section (5) and marking the skirt building side broken joint (4);
constructing the side broken seam (4) of the skirt building, only cutting off the web plate and the upper flange plate of the beam body at the steel beam section (2) and the transition beam section (5) of the skirt building, and bending the lower flange plate in place without cutting off;
and sixthly, bending the skirt building steel beam section (2) and the transition beam section (5) to form an arc-shaped transition area (8), butting the transition beam section (5) and the main building steel beam section (1) to form a butt joint area (9), wherein a skirt building side broken joint (4) is arranged between the upper arc-shaped transition area (8) and the lower arc-shaped transition area (8), and a main building side broken joint (3) is arranged between the upper butt joint area and the lower butt joint area (9), so that construction of the transition beam section (5) crossing the subsidence post-cast strip is completed.
2. The construction method of the settlement post-cast strip spanning a stiffened steel section conversion beam according to claim 1, wherein the beam bodies on both sides of the main building side broken joint (3) and the skirt building side broken joint (4) increase the thickness of steel beam plates, and the strength of the increased thickness offsets the strength loss of the broken joint butt joint construction.
3. The construction method of the settlement-spanning post-cast strip of the stiffened steel section transfer beam according to claim 1, wherein the settlement-spanning post-cast strip section (7) with larger settlement difference is further provided with a local enlarged post-cast strip (10), and the distance of the local enlarged post-cast strip (10) is increased corresponding to the main building side broken joint (3) and the skirt building side broken joint (4), so that the length of the transition beam section (5) is increased.
4. The construction method of the settlement-spanning post-cast strip of the stiffened steel section transfer beam according to claim 1, wherein the local enlarged post-cast strip (10) is in a trapezoid shape, the long bottom edge of the trapezoid shape is arranged corresponding to the settlement-spanning post-cast strip section (7), and the short top edge is arranged corresponding to the skirt building steel beam section (2).
5. A construction method of a settlement post-cast strip of a stiffened steel section transfer beam according to claim 1, wherein the height of the main floor steel beam section (1) is less than that of the skirt floor steel beam section (2), the transition beam section (5) is bent downwards, and the top surfaces of the transition beam section (5) and the main floor steel beam section (1) are further connected with an elastic connecting plate.
6. A construction method of a settlement post-cast strip of a stiffened steel section transfer beam according to claim 1, wherein the height of the main floor steel beam section (1) is higher than that of the skirt floor steel beam section (2), the transition beam section (5) is bent upwards, and the top surfaces of the transition beam section (5) and the main floor steel beam section (1) are further connected with an elastic connecting plate.
7. The construction method of the settlement post-cast strip spanning a stiffened steel transfer beam according to claim 1, wherein the arc transition area (8) is divided into an upper arc transition area (8) and a lower arc transition area (8), at least one of the upper arc transition area (8) and the lower arc transition area (8) is an arc gap area, and one is an arc bending area; the arc-shaped notch area is fixedly connected with a steel plate correspondingly, and the arc-shaped bending area is correspondingly connected with an elastic damping piece at the bending starting point.
8. The construction method of the settlement post-cast strip of the stiffened steel transfer beam span of claim 1, wherein when the height of the main floor steel beam section (1) is less than the height of the skirt floor steel beam section (2), the transition beam section (5) is bent downwards, the upper arc transition area (8) is an arc-shaped gap area, and the lower arc transition area (8) is an arc-shaped bending area; when the height of main building girder section (1) is higher than the height of skirt building girder section (2), transition girder section (5) is buckled upwards, lower arc transition district (8) is arc breach district, goes up arc transition district (8) and is the arc district that bends.
9. The construction method of the settlement-spanning post-cast strip of the stiffened steel section conversion beam according to claim 1, wherein the side broken joint (3) of the main floor of the butt joint area (9) is not less than 100mm from the side line of the adjacent settlement-spanning post-cast strip section (7); the distance between the lateral broken joint (4) of the undaria pinnatifida and the side line of the adjacent sedimentation-spanning post-pouring belt section (7) is not less than 100 mm; the butt joint of the staggered joints of the main building side broken joints (3) is converted into a gentle fold by the skirt building side broken joints (4), so that smooth transition is realized, the butt joint strength of the corresponding beam body is ensured, and stress concentration is avoided.
10. A construction method of a settlement post-cast strip of a stiff section steel conversion beam span as claimed in claim 1, characterized in that the main floor steel beam section (1), the skirt building steel beam section (2) and the transition beam section (5) are also T-shaped beams or H-shaped beams, wherein the T-shaped beams separate the upper flange plate and the web plate and keep the connection part of the web plate and the upper flange plate, and the H-shaped beams only vertically cut the side plates to the web plate.
CN202210758491.0A 2022-06-30 2022-06-30 Construction method of settlement-spanning post-cast strip of stiffened steel transfer beam Active CN115012537B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210758491.0A CN115012537B (en) 2022-06-30 2022-06-30 Construction method of settlement-spanning post-cast strip of stiffened steel transfer beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210758491.0A CN115012537B (en) 2022-06-30 2022-06-30 Construction method of settlement-spanning post-cast strip of stiffened steel transfer beam

Publications (2)

Publication Number Publication Date
CN115012537A true CN115012537A (en) 2022-09-06
CN115012537B CN115012537B (en) 2023-02-03

Family

ID=83079070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210758491.0A Active CN115012537B (en) 2022-06-30 2022-06-30 Construction method of settlement-spanning post-cast strip of stiffened steel transfer beam

Country Status (1)

Country Link
CN (1) CN115012537B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115467534A (en) * 2022-10-19 2022-12-13 中国建筑一局(集团)有限公司 Method for constructing steel beams and floor slabs at positions of all-steel ultra-high-rise structure across post-cast strip in advance

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0586674A (en) * 1991-09-30 1993-04-06 Asahi Chem Ind Co Ltd Composite floor slab construction and execution method thereof
JP2003041577A (en) * 2001-08-01 2003-02-13 Ohbayashi Corp Placing joint part forming tool for underground wall, construction method of placing joint part for underground wall, and removing device for placing joint part forming tool for underground wall
CN201588318U (en) * 2009-11-11 2010-09-22 中国建筑第八工程局有限公司 Late poured band structure
RU125216U1 (en) * 2012-06-13 2013-02-27 Общество с ограниченной ответственностью "Центр Многофункционального Каркасного Строительства" CONSTRUCTED CONCRETE FRAME OF THE BUILDING, STRUCTURES WITH STRONG MONOSE JOINTS "ISS-XXI CENTURY", PERFORMED BY THE TECHNOLOGY OF CONTINUOUS FORMATION
RU140555U1 (en) * 2014-01-09 2014-05-10 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" COMBINED MONOLITHIC REINFORCED CONCRETE COVERING
CN105863089A (en) * 2015-12-31 2016-08-17 上海建工五建集团有限公司 Post-cast strip water-proof structure and treatment method
CN206174148U (en) * 2016-09-29 2017-05-17 中建二局第三建筑工程有限公司 It subsides post -cast strip structure system to transfinite on ground
CN110318543A (en) * 2019-07-11 2019-10-11 甘肃路桥宏盛房屋建筑安装工程有限公司 The building construction method that integration pours
US20210348354A1 (en) * 2020-05-06 2021-11-11 Qingdao Tianyuan Weiye Thermal Insulation and Waterproof Engineering Co.,Ltd. Method for sealing post-cast strip in foundation with no gap
WO2021228189A1 (en) * 2020-05-15 2021-11-18 中建三局第三建设工程有限责任公司 Reusable post-cast strip support replacement force transfer device and construction method therefor
WO2022036806A1 (en) * 2020-08-21 2022-02-24 广东美景环境科技有限公司 Seepage and leakage prevention structure for post-cast strip of basement floor

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0586674A (en) * 1991-09-30 1993-04-06 Asahi Chem Ind Co Ltd Composite floor slab construction and execution method thereof
JP2003041577A (en) * 2001-08-01 2003-02-13 Ohbayashi Corp Placing joint part forming tool for underground wall, construction method of placing joint part for underground wall, and removing device for placing joint part forming tool for underground wall
CN201588318U (en) * 2009-11-11 2010-09-22 中国建筑第八工程局有限公司 Late poured band structure
RU125216U1 (en) * 2012-06-13 2013-02-27 Общество с ограниченной ответственностью "Центр Многофункционального Каркасного Строительства" CONSTRUCTED CONCRETE FRAME OF THE BUILDING, STRUCTURES WITH STRONG MONOSE JOINTS "ISS-XXI CENTURY", PERFORMED BY THE TECHNOLOGY OF CONTINUOUS FORMATION
RU140555U1 (en) * 2014-01-09 2014-05-10 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" COMBINED MONOLITHIC REINFORCED CONCRETE COVERING
CN105863089A (en) * 2015-12-31 2016-08-17 上海建工五建集团有限公司 Post-cast strip water-proof structure and treatment method
CN206174148U (en) * 2016-09-29 2017-05-17 中建二局第三建筑工程有限公司 It subsides post -cast strip structure system to transfinite on ground
CN110318543A (en) * 2019-07-11 2019-10-11 甘肃路桥宏盛房屋建筑安装工程有限公司 The building construction method that integration pours
US20210348354A1 (en) * 2020-05-06 2021-11-11 Qingdao Tianyuan Weiye Thermal Insulation and Waterproof Engineering Co.,Ltd. Method for sealing post-cast strip in foundation with no gap
WO2021228189A1 (en) * 2020-05-15 2021-11-18 中建三局第三建设工程有限责任公司 Reusable post-cast strip support replacement force transfer device and construction method therefor
WO2022036806A1 (en) * 2020-08-21 2022-02-24 广东美景环境科技有限公司 Seepage and leakage prevention structure for post-cast strip of basement floor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115467534A (en) * 2022-10-19 2022-12-13 中国建筑一局(集团)有限公司 Method for constructing steel beams and floor slabs at positions of all-steel ultra-high-rise structure across post-cast strip in advance

Also Published As

Publication number Publication date
CN115012537B (en) 2023-02-03

Similar Documents

Publication Publication Date Title
CN100507150C (en) Corrugated steel web box girder with steel-concrete combined board lower wing edges
CN107245934A (en) A kind of assembled steel profiled sheet concrete combined board small box girder
CN106400666A (en) Prestressed concrete-corrugated web steel box connecting beam hybrid beam structural system
CN115012537B (en) Construction method of settlement-spanning post-cast strip of stiffened steel transfer beam
CN110331664B (en) Steel-concrete mixed continuous box girder bridge deck joint structure and construction method thereof
CN211522899U (en) Long-span steel-concrete composite beam convenient to erect by bridge girder erection machine
CN216108020U (en) Light steel-concrete combined beam structure
CN210086022U (en) Assembled single-box multi-chamber corrugated steel web box girder
CN115262834A (en) A steel bar truss floor carrier plate integrated configuration for LOFT apartment interlayer is built
CN111893859B (en) Combined T-shaped bridge deck continuous structure and construction method
CN211006301U (en) Width-variable prefabricated segment assembling box beam bridge structure
CN112982189A (en) Steel plate girder wide hollow slab girder structure
CN216865985U (en) Template structure of concrete cantilever beam
CN111172855A (en) Upper bearing type longitudinal block prefabricated box girder
CN113403932B (en) Light steel-concrete combination beam structure and construction method thereof
CN110700079A (en) Wave-shaped steel plate combination beam without upper flange and manufacturing method thereof
CN220364819U (en) Temporary road structure for subway upper cover building construction
CN218758194U (en) A integrated configuration for LOFT apartment interlayer is built
CN213805869U (en) Steel beam and prefabricated floor connecting structure
CN218405026U (en) Section steel combined bridge
US11732428B2 (en) System for construction of double u and single u steel concrete composite structure for bridges
CN114541249B (en) Steel-concrete combined beam crossing railway business line and construction method
CN214459543U (en) Take backbone girder bridge of bracing to adorn back cantilever rib board hybrid connection structure
CN213061649U (en) Combined bridge structure
CN220035171U (en) Simply supported T-beam bridge deck continuous structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant