CN115000924B - Line admittance protection criterion construction method and device for high-proportion new energy system - Google Patents
Line admittance protection criterion construction method and device for high-proportion new energy system Download PDFInfo
- Publication number
- CN115000924B CN115000924B CN202210828518.9A CN202210828518A CN115000924B CN 115000924 B CN115000924 B CN 115000924B CN 202210828518 A CN202210828518 A CN 202210828518A CN 115000924 B CN115000924 B CN 115000924B
- Authority
- CN
- China
- Prior art keywords
- line
- admittance
- current
- criterion
- voltage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H1/00—Details of emergency protective circuit arrangements
- H02H1/0007—Details of emergency protective circuit arrangements concerning the detecting means
Landscapes
- Emergency Protection Circuit Devices (AREA)
Abstract
The invention discloses a method and a device for constructing a line admittance protection criterion for a high-proportion new energy system, wherein the method comprises the following steps: acquiring voltage phasor and current phasor at two sides of a line; determining differential current of the line based on current phasors at two sides of the line; determining the sum of the voltage phasors of the line based on the voltage phasors at the two sides of the line; calculating the ground admittance of the line according to the relation between the differential current and the sum of the voltage phasors; and constructing a line admittance protection action criterion according to the amplitude and phase change characteristics of the line to ground admittance before and after the line fails. The technical problem that fault identification sensitivity is insufficient due to the fact that short-circuit current is limited after new energy is accessed is solved, and the reliability of protection and response to access of novel equipment such as controllable parallel reactance or series compensation capacitor is improved.
Description
Technical Field
The invention relates to the field of relay protection of power systems, in particular to a method and a device for constructing a line admittance protection criterion for a high-proportion new energy system.
Background
With the access of large-scale new energy and power electronics to a power grid, the existing protection faces two problems of sensitivity reduction and insufficient protection adaptability of novel power equipment after the access.
The line protection in the existing ac system is widely adopted in a configuration scheme in which current differential protection is used as main protection and distance protection is used as backup protection.
Aiming at current differential protection, with the large-scale access of new energy in a novel power system, under the influence of a control system strategy after a new energy power supply fault, a fault current shows the characteristic of limited amplitude, the fault characteristic of a new energy side is weakened, and the sensitivity of the current differential protection principle for identifying faults through the fault current characteristic is greatly reduced. In addition, for a scene that new energy is sent out through a flexible direct current and alternating current collecting line, an alternating current outlet fault has a drawing-out characteristic, and currents on two sides of the line show an outside fault characteristic when an inside fault occurs, so that the action performance of current differential protection is seriously influenced.
For distance protection, the action characteristics of the distance protection are affected by a control strategy of a new energy power supply and a flexible and straight system, so that the existing distance protection may have operation failure or misoperation.
The existing protection can not be adapted due to the above conditions, even incorrect protection action can occur, and faults can not be timely removed, so that the stability of the system is influenced. At present, the problem that the sensitivity of a relay protection device of a plurality of alternating current collecting lines is reduced already occurs when large-scale new energy is sent out of a power grid in a centralized mode. Aiming at the problem of insufficient protection sensitivity and reliability, the line protection principle adapting to high-proportion new energy access needs to be researched urgently, and the fault of a novel power system is rapidly and accurately identified.
Disclosure of Invention
In order to solve the technical problem, the invention provides a line admittance protection criterion construction method for a high-proportion new energy system, which comprises the following steps:
acquiring voltage phasor and current phasor at two sides of a line;
determining differential current of the line based on current phasors at two sides of the line; determining the sum of the voltage phasors of the line based on the voltage phasors at the two sides of the line;
calculating the ground admittance of the line according to the relation between the differential current and the sum of the voltage phasors;
and constructing a line admittance protection action criterion according to the amplitude and phase change characteristics of the line admittance to the ground before and after the line fails.
Further, before the step of obtaining the voltage phasor and the current phasor at two sides of the line, the method further comprises the following steps:
three-phase voltage sampling values of two sides of the measuring line are、、,、、(ii) a Three-phase current sampling values on two sides of the circuit are、、,、、。
Further, obtaining voltage phasor and current phasor at two sides of the line includes:
based on Fourier recursion algorithm, calculating voltage phasor at two sides of the line as、、,、、(ii) a The current phasor is、、,、、。
Further, based on the current phasors at both sides of the line, the differential current of the line is determined, and the expression of the differential current is as follows:
in the formula (I), the compound is shown in the specification,in order to be a differential current flow,。
further, calculating the line-to-ground admittance according to the relationship between the differential current and the sum of the voltage phasors, comprising:
transforming the expression of the differential current to obtain the following expression of the differential current:
according to the relation between the differential current and the sum of the voltage phasors, determining a line-to-ground admittance expression as follows:
in the formula:,in order to allow the line to be conducted to ground,in order to conduct the electricity of the line to ground,is the line-to-ground susceptance.
Further, according to the amplitude and phase variation characteristics of the line admittance to ground before and after the line fails, a line admittance protection action criterion is constructed, which comprises:
the line admittance protection criterion is constructed as follows:
in the formula:the value of the susceptance is fixed,determining a value for the electrical conductance;
criterionReflecting the increase of admittance magnitude, criterionReflecting the change in admittance phase.
Further, after the step of constructing the line admittance protection action criterion, the method further comprises:
substituting the variable quantity of the amplitude or the phase of the ground admittance of the line to be judged into a line admittance protection action criterion, and when any one line admittance protection action criterion is satisfied, carrying out admittance protection action, specifically:
when in useOrThen determineAnd (4) judging the fault in the line generation area to be judged, and carrying out admittance protection action.
The invention also provides a line admittance protection criterion construction device for the high-proportion new energy system, which comprises the following steps:
the phasor value acquisition unit is used for acquiring voltage phasor and current phasor at two sides of the line;
a differential current and voltage phasor sum determination unit for determining a differential current of the line based on the current phasors at both sides of the line; determining the sum of the voltage phasors of the line based on the voltage phasors at the two sides of the line;
the admittance calculating unit is used for calculating the admittance of the line to the ground according to the relation between the differential current and the sum of the voltage phasors;
and the criterion construction unit is used for constructing a line admittance protection action criterion according to the amplitude and phase change characteristics of the line admittance to the ground before and after the line fails.
Further, the method also comprises the following steps:
a measuring unit for measuring three-phase voltage sampling values of two sides of the line、、,、、(ii) a Three-phase current sampling values on two sides of the line are、、,、、。
Further, the method also comprises the following steps:
the protection action unit is used for substituting the variable quantity of the amplitude or the phase of the ground admittance of the line to be judged into a line admittance protection action criterion, and when any one line admittance protection action criterion is satisfied, admittance protection action is performed, specifically:
when in useOrThen, the fault in the line generation area to be judged is determined and judged, and the protection action is admitted.
The invention provides a line admittance protection criterion construction method and device for a high-proportion new energy system, and provides a line admittance protection principle for identifying faults by using changes of line admittance parameters aiming at the problem that the line protection sensitivity and adaptability of the high-proportion new energy access system are reduced. As the admittance parameters are inherent parameters of the equipment, the protection principle is not influenced by the operation mode of a system and the power failure characteristics, and when the amplitude of the failure current is limited or the phase is changed, the failure can still be identified through the change of the property of the admittance parameters when the fault occurs inside and outside the area, thereby solving the problem that the sensitivity of the existing current differential protection is influenced by the power failure characteristics.
Drawings
Fig. 1 is a schematic flow chart of a method for constructing a line admittance protection criterion for a high-proportion new energy system according to an embodiment of the present invention;
FIG. 2 is a line admittance model according to an embodiment of the present invention;
fig. 3 is an admittance protection action zone according to an embodiment of the present invention;
FIG. 4 is a logic diagram of admittance protection actions according to an embodiment of the present invention;
fig. 5 is a high-scale new energy access scenario according to an embodiment of the present invention;
fig. 6 shows the admittance protection action result of the high-scale new energy access scenario according to the embodiment of the present invention;
fig. 7 is a scene in which new energy is sent out through a soft route according to an embodiment of the present invention;
fig. 8 shows the result of the ac line fault line admittance protection action of the new energy sent out via the flexible direct island mode according to the embodiment of the present invention;
FIG. 9 is a circuit diagram of a controllable shunt reactor and series compensation capacitor according to an embodiment of the present invention;
fig. 10 shows the result of the fault line admittance protection operation in the 100% input area of the controllable reactor according to the embodiment of the present invention;
fig. 11 shows the result of the admittance protection action of the fault line in the area where 67% of the controllable reactor according to the embodiment of the present invention is put into;
fig. 12 shows the result of the fault line admittance protection in the line area with the series compensation capacitors according to the embodiment of the present invention;
fig. 13 is a system diagram of a conventional power access scenario according to an embodiment of the present invention;
fig. 14 shows the result of the intra-area fault line admittance protection action according to the embodiment of the present invention;
fig. 15 shows the result of the admittance protection action of the out-of-area faulty line according to an embodiment of the present invention;
FIG. 16 shows the result of normal operation line admittance protection actions according to an embodiment of the present invention;
fig. 17 is a schematic structural diagram of a line admittance protection criterion construction for a high-scale new energy system according to an embodiment of the present invention.
Detailed Description
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. This invention may be embodied in many different forms than those herein set forth and should be readily appreciated by those skilled in the art without departing from the spirit and scope of the invention as defined by the appended claims.
Example 1
Fig. 1 is a schematic flow chart of a method for constructing a line admittance protection criterion for a high-proportion new energy system according to an embodiment of the present invention, and the method provided by the present invention is described in detail below with reference to fig. 1.
And step S101, acquiring voltage phasor and current phasor at two sides of the line.
And voltage phasor values and current phasor values at two sides of the line are obtained by measuring voltage and current sampling values at two sides of the line. The three-phase voltage on both sides of the line is sampled as、、,、、(ii) a Three-phase current sampling values on two sides of the line are、、,、、。
Based on Fourier recursion algorithm, calculating voltage phase values at two sides of a line as、、,、、(ii) a The current phasor value is、、,、、。
Step S102, determining differential current of the line based on current phasor values at two sides of the line; the sum of the voltage phasors for the line is determined based on the voltage phasors across the line.
The expression for the differential current of the line is:
in the formula (I), the compound is shown in the specification,in order to be a differential current flow,。
and step S103, calculating the admittance to the ground of the line according to the relation between the differential current and the sum of the voltage phasors.
Converting the expression of the differential current according to the relationship between the differential current of the line and the phasor sum of the voltages at two sides of the line to obtain the following expression of the differential current:
as shown in fig. 2, according to the relationship between the differential current and the sum of the voltage phasors, determining a line-to-ground admittance expression as:
in the formula:,in order to allow the line to be admittance to ground,in order to conduct the electricity of the line to ground,is the line-to-ground susceptance.
And step S104, constructing a line admittance protection action criterion according to the amplitude and phase change characteristics of the line admittance to the ground before and after the line fails.
And constructing a line admittance protection action criterion by using the obvious difference of the amplitude and the phase of the line admittance to the ground when the line fails in the region and the region.
When the system normally operates or an out-of-area fault occurs, the line-to-ground admittance reflects the line-to-ground capacitance, the amplitude is less than 1mS, and the phase is capacitive.
When an internal fault occurs, the admittance of the line to the ground reflects the parallel connection of the conductance (the reciprocal of the transition resistance) and the susceptance (the reciprocal of the capacitive reactance to the ground), the amplitude is greater than 100mS, and the phase presents the inductive or the resistance-capacitance property.
I.e. both the amplitude and phase of the admittance to ground change significantly before and after a line fault.
The line admittance protection criterion is constructed as follows:
criterion for a userReflecting the increase of admittance magnitude, criterionReflecting the change in admittance phase.
Substituting the ground admittance of the line to be judged into a line admittance protection action criterion, and when any line admittance protection action criterion is satisfied, carrying out admittance protection action, specifically:
when the temperature is higher than the set temperatureOrThen, the fault in the line generation area to be judged is determined and judged, and the protection action is admitted.
The line admittance protection does not need manual setting, and the fixed value in the protection criterion can be solidified in the protection device. The key constant value setting method comprises the following steps:
The setting principle is that the maximum capacitance of the line is set, i.e. the line is setAvoiding the setting of the maximum setting capacitance current, wherein the setting principle is as follows:
in the formula:line-to-ground susceptance per kilometer;the longest AC line without parallel reactance compensation;is the setting margin.
The setting principle is to set according to the maximum transition resistance, i.e. according toThe sensitivity is set, and the setting principle is as follows:
in the formula:a minimum short circuit current identifiable for admittance protection;is the rated voltage.
Through the key constant value setting method, the shaded portion in fig. 3 is an out-of-area fault, and the remaining portion is an in-area fault.
And after the fault occurs, the admittance of the line to the ground enters an action area, and the admittance protection acts. Admittance protection action logic is shown in fig. 4.
Example 2
The following scenarios are selected below to verify the reliability of the line admittance protection.
1. High-proportion new energy access scene
The high-proportion new energy access scene is that offshore wind power is sent out through a submarine cable, CN single-phase earth fault occurs in a submarine cable generation area, and the system voltage level is 220kV. The system diagram is shown in fig. 5, the result of the admittance protection action is shown in fig. 6, the unshaded part in the diagram is the action zone, a is relatively admittance and B are relatively admittance not to enter the action zone, and C is relatively admittance to enter the action zone in 5 ms. The line admittance protection acts reliably.
2. New energy direct-sending scene through soft
The new energy is sent out through a flexible direct-out scene in a flexible direct island mode, namely the new energy access proportion is 100%, and AB interphase faults in an alternating-current outgoing line generation area are avoided. The system diagram is shown in fig. 7, the result of the admittance protection action is shown in fig. 8, the unshaded part in the diagram is the action zone, a relatively admittance enters the action zone at 3.33ms, B relatively admittance enters the action zone at 2.5ms, and C relatively admittance does not enter the action zone. The line admittance protection operates reliably.
3. Power electronic device access scene
(1) AC line with controllable shunt reactance
A system diagram of a circuit provided with a controllable shunt reactor is shown in fig. 9, a series compensation capacitor is not put into the system diagram, when the controllable reactor is put into the circuit diagram at 100%, AN AN single-phase earth fault occurs in a circuit area, as shown in fig. 10, a non-shaded part in the diagram is AN action area, a relative ground admittance enters the action area within 1.67ms, and B relative ground admittance and C relative ground admittance do not enter the action area.
When the controllable reactor is switched in 67%, AN single-phase ground fault in a circuit area occurs, as shown in fig. 11, a non-shaded part in the figure is AN action area, and the ground admittance enters the action area in 1.67 ms.
(2) AC circuit with series compensation capacitor
In a system diagram of a circuit with a series compensation capacitor installed, as shown in fig. 9, the series compensation capacitor is put into, and AN single-phase ground fault occurs in a circuit area, as shown in fig. 12, a non-shaded portion in the diagram is AN action area, a relative ground admittance enters the action area at 1.67ms, and B relative ground admittance and C relative ground admittance do not enter the action area.
4. Conventional power access scenarios
The conventional power source access scenario is that the power sources on both sides of the line are conventional power sources, and a system diagram is shown in fig. 13, which discusses the conditions of the line in-zone fault, the out-of-zone fault and the normal operation respectively.
(1) In-zone fault
AN single-phase ground fault occurs in the line area, and the action condition of the line admittance protection is shown in fig. 14. The unshaded part of the figure is the action zone, A relatively admits into the action zone at 1.67ms, B relatively admits and C relatively admits into the action zone.
(2) Out of area fault
When a line external fault occurs on the line, the operation of the line admittance protection is as shown in fig. 15, in which the non-shaded part is the operation area, the ground admittance is always shaded, and the protection does not operate.
(3) Normal operation
When the conventional transmission line normally operates, the action condition of the line admittance protection is shown in fig. 16, wherein a non-shaded part is an action area, the ground admittance is always in a shaded part, and the protection does not act.
Example 3
Based on the same inventive concept, the present invention also provides a line admittance protection criterion construction apparatus 17 for a high-proportion new energy system, as shown in fig. 17, including:
a phasor value acquisition unit 170 for acquiring voltage phasor and current phasor values at both sides of the line;
a differential current and voltage phasor sum determination unit 171 for determining a differential current of the line based on the current phasors at both sides of the line; determining the sum of the voltage phasors of the line based on the voltage phasors at the two sides of the line;
the admittance calculating unit 172 is used for calculating the wire admittance to the ground according to the relation between the differential current and the sum of the voltage phasors;
the criterion constructing unit 173 is configured to construct a criterion of line admittance protection action according to the amplitude and phase variation characteristics of the line admittance to ground before and after a fault occurs in the line.
Further, the method also comprises the following steps:
a measuring unit for measuring three-phase voltage sampling values of two sides of the line、、,、、(ii) a Three-phase current sampling values on two sides of the circuit are、、,、、。
Further, the method also comprises the following steps:
the protection action unit is used for substituting the variable quantity of the amplitude or the phase of the ground admittance of the line to be judged into a line admittance protection action criterion, and when any one line admittance protection action criterion is satisfied, admittance protection action is performed, specifically:
when in useOrAnd determining to judge the fault in the line generation area to be judged, and carrying out admittance protection action.
The invention provides a line admittance protection criterion construction method and a line admittance protection criterion construction device for a high-proportion new energy system, which have the advantages of strong protection fault identification capability, high action speed, no need of manual setting of fixed values, convenient device realization, application to lines of different voltage levels, no need of compensating capacitance current, no influence of a drawing-out characteristic, no influence of a system operation mode and a power failure characteristic, and adaptation to the condition of access of a large amount of new energy and power electronic equipment of a power system. The technical problem that fault identification sensitivity is insufficient due to the fact that short-circuit current is limited after new energy is connected is solved, the reliability of protection response on connection of novel equipment such as controllable parallel reactance or series compensation capacitor is improved, support is provided for stability of a novel power system, conditions are created for large-scale clean energy consumption, and the method has high practical value and wide application prospect.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and so forth) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the spirit and scope of the invention.
Claims (9)
1. A line admittance protection criterion construction method for a high-proportion new energy system is characterized by comprising the following steps:
acquiring voltage phasor and current phasor at two sides of a line;
determining differential current of the line based on current phasors at two sides of the line; determining the sum of the voltage phasors of the line based on the voltage phasors at the two sides of the line;
calculating the ground admittance of the line according to the relation between the differential current and the sum of the voltage phasors;
according to the change characteristics of the amplitude and the phase of the line admittance to the ground before and after the line fails, a line admittance protection action criterion is constructed, and comprises the following steps:
the line admittance protection criterion is constructed as follows:
in the formula:the value of the susceptance is fixed,determining a value for the electrical conductance;
5. the method of claim 1, wherein calculating a line-to-ground admittance from the differential current versus sum of voltage phasors comprises:
transforming the expression of the differential current to obtain the following expression of the differential current:
according to the relation between the differential current and the sum of the voltage phasors, determining a line-to-ground admittance expression as follows:
6. The method of claim 1, wherein after the step of constructing the line admittance protection action criterion, further comprising:
substituting the variable quantity of the amplitude or the phase of the ground admittance of the line to be judged into the line admittance protection action criterion, and when any one line admittance protection action criterion is satisfied, carrying out admittance protection action, specifically:
7. A line admittance protection criterion construction device for a high-proportion new energy system is characterized by comprising the following steps:
the phasor value acquisition unit is used for acquiring voltage phasor and current phasor at two sides of the line;
a differential current and voltage phasor sum determination unit for determining a differential current of the line based on the current phasors at both sides of the line; determining the sum of the voltage phasors of the line based on the voltage phasors at the two sides of the line;
the admittance calculating unit is used for calculating the admittance of the line to the ground according to the relation between the differential current and the sum of the voltage phasors;
the criterion construction unit is used for constructing a line admittance protection action criterion according to the amplitude and phase change characteristics of the line admittance to the ground before and after a line fault, and comprises the following steps:
the line admittance protection criterion is constructed as follows:
in the formula:the value of the susceptance is fixed,determining a value for the electrical conductance;
9. The apparatus of claim 7, further comprising:
the protection action unit is used for substituting the variable quantity of the amplitude or the phase of the ground admittance of the line to be judged into a line admittance protection action criterion, and when any one line admittance protection action criterion is satisfied, admittance protection action is performed, specifically:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210828518.9A CN115000924B (en) | 2022-07-15 | 2022-07-15 | Line admittance protection criterion construction method and device for high-proportion new energy system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210828518.9A CN115000924B (en) | 2022-07-15 | 2022-07-15 | Line admittance protection criterion construction method and device for high-proportion new energy system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115000924A CN115000924A (en) | 2022-09-02 |
CN115000924B true CN115000924B (en) | 2022-10-28 |
Family
ID=83021804
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210828518.9A Active CN115000924B (en) | 2022-07-15 | 2022-07-15 | Line admittance protection criterion construction method and device for high-proportion new energy system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115000924B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101106266A (en) * | 2007-06-18 | 2008-01-16 | 北京交通大学 | A method for realizing transformer protection based on guiding nano principle |
CN101136549A (en) * | 2007-10-12 | 2008-03-05 | 清华大学 | Power system separation decision space screening method |
CN111682546A (en) * | 2020-06-01 | 2020-09-18 | 国网河北省电力有限公司石家庄供电分公司 | DC power flow improvement algorithm based on sensitivity analysis |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2765907B2 (en) * | 1989-01-20 | 1998-06-18 | 株式会社日立製作所 | Transformer fault detection method and device |
CN100492802C (en) * | 2007-06-18 | 2009-05-27 | 北京交通大学 | Method for realizing transmission line protection based on admittance principle |
CA2776261A1 (en) * | 2009-09-30 | 2011-04-07 | Alstom Grid Uk Limited | Method of high impedance groundfault detection for differential protection of overhead transmission lines |
CN105244860B (en) * | 2015-10-10 | 2018-02-16 | 国家电网公司 | A kind of differential protecting method based on positive sequence admittance |
CN112713576A (en) * | 2020-12-21 | 2021-04-27 | 西安理工大学 | Short-circuit protection method for radiation direct-current micro-grid |
CN114204525B (en) * | 2021-11-10 | 2022-08-16 | 华中科技大学 | Pilot protection method for direct-current transmission line and application thereof |
-
2022
- 2022-07-15 CN CN202210828518.9A patent/CN115000924B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101106266A (en) * | 2007-06-18 | 2008-01-16 | 北京交通大学 | A method for realizing transformer protection based on guiding nano principle |
CN101136549A (en) * | 2007-10-12 | 2008-03-05 | 清华大学 | Power system separation decision space screening method |
CN111682546A (en) * | 2020-06-01 | 2020-09-18 | 国网河北省电力有限公司石家庄供电分公司 | DC power flow improvement algorithm based on sensitivity analysis |
Also Published As
Publication number | Publication date |
---|---|
CN115000924A (en) | 2022-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ghorbani et al. | A PMU-based LOE protection of synchronous generator in the presence of GIPFC | |
CN105375532B (en) | A kind of fault phase-selecting method suitable for double-fed fan motor field interconnection | |
CN113437734B (en) | Fault protection method and device suitable for wind power plant output line | |
CN103855720A (en) | Low voltage ride through protection method for doubly fed induction generator | |
Kamel et al. | Effect of load type on standalone micro grid fault performance | |
Bataglioli et al. | Differential protection for stator ground faults in a full-converter wind turbine generator | |
Lertwanitrot et al. | Discriminating between capacitor bank faults and external faults for an unbalanced current protection relay using DWT | |
CN111562464A (en) | Parameter online testing method, storage medium and device of neutral point ungrounded system | |
Lu et al. | A wavelet/PSO based voltage regulation scheme and suitability analysis of copper-and aluminum-rotor induction machines for distributed wind power generation | |
CN115270597A (en) | Simulation test method, simulation model and device for relay protection adaptability of power distribution network | |
CN112671042B (en) | Virtual impedance access method and device based on short-circuit ratio and electronic equipment | |
CN115000924B (en) | Line admittance protection criterion construction method and device for high-proportion new energy system | |
Tariq et al. | Investigation of the Effects of Distributed Generation on Protection Coordination in a Power System | |
CN115085164B (en) | Wind field outbound interactive protection method and system | |
CN113437732B (en) | Pilot protection method and system for photovoltaic power generation grid-connected tie line | |
CN115825641A (en) | Power distribution network single-phase earth fault line selection method and system based on electrical break variable | |
ZhuoLin et al. | Analysis of Single-phase Grounding Fault with Distributed Generation in Distribution Network | |
Gao et al. | Improved extended kalman filter based dynamic equivalent method of DFIG wind farm cluster | |
Bimenyimana et al. | Fault Ride-Through (FRT) Behavior in VSC-HVDC as Key Enabler of Transmission Systems Using SCADA Viewer Software | |
Khan et al. | Investigation on resonating behaviour of a self excited induction generator | |
Calik et al. | Investigation of Dynamic Behaviour of Double Feed Induction Generator and Permanent Magnet Synchronous Generator Wind Turbines in Failure Conditions | |
Zheng et al. | Improved time-domain distance protection based on fault active control for long transmission lines of PV/BES hybrid power generation system | |
CN113363948B (en) | Active power distribution network current differential protection method based on positive sequence fault component | |
CN116054279B (en) | Multi-node power network transient stability method and system containing variable speed pumping and storage machine unit | |
CN112865048B (en) | Protection method and device for alternating current-direct current series-parallel power transmission system and terminal equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |