CN114991753A - Target point prediction method for horizontal well geosteering under variable azimuth condition - Google Patents

Target point prediction method for horizontal well geosteering under variable azimuth condition Download PDF

Info

Publication number
CN114991753A
CN114991753A CN202210770947.5A CN202210770947A CN114991753A CN 114991753 A CN114991753 A CN 114991753A CN 202210770947 A CN202210770947 A CN 202210770947A CN 114991753 A CN114991753 A CN 114991753A
Authority
CN
China
Prior art keywords
point
target point
target
layers
marker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210770947.5A
Other languages
Chinese (zh)
Inventor
杨加祥
冯之红
邹顺良
倪方杰
胡中桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Jianghan Petroleum Engineering Co ltd Shale Gas Extraction Technology Service Co
Sinopec Oilfield Service Corp
Sinopec Jianghan Petroleum Engineering Co Ltd
Original Assignee
Sinopec Jianghan Petroleum Engineering Co ltd Shale Gas Extraction Technology Service Co
Sinopec Oilfield Service Corp
Sinopec Jianghan Petroleum Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Jianghan Petroleum Engineering Co ltd Shale Gas Extraction Technology Service Co, Sinopec Oilfield Service Corp, Sinopec Jianghan Petroleum Engineering Co Ltd filed Critical Sinopec Jianghan Petroleum Engineering Co ltd Shale Gas Extraction Technology Service Co
Priority to CN202210770947.5A priority Critical patent/CN114991753A/en
Publication of CN114991753A publication Critical patent/CN114991753A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells

Abstract

The invention discloses a target point prediction method under a horizontal well geosteering azimuth changing condition, which comprises the steps of respectively calculating the vertical distance between each marker layer and the central line of a target window of a horizontal section by identifying a rock electric marker layer before target entering; calculating a stratum view dip angle according to the vertical depth difference of the two actually drilled marker layers, the plane distance and the vertical thickness between the two marker layers of the adjacent well or the pilot hole well; reading the plane position points of any two mark layers, connecting and extending the plane position points of the two mark layers, intersecting an isoline constructed by the position of the target point as the equivalent position of the target point, and measuring the linear distance between the plane position point of one mark layer and the equivalent target point; and based on the equal-thickness geological model, the sag of the selected mark layer plane position point, the formation dip angle, and the plane distance between the intersection point and the selected plane position point are utilized to complete the prediction of the sag of the target point. According to the method, the target prediction precision can be improved, the well bore smoothness of the horizontal well is effectively improved, and the subsequent accurate landing and horizontal section control of the horizontal well are guaranteed.

Description

Target point prediction method for horizontal well geosteering under variable azimuth condition
Technical Field
The invention belongs to the technical field of oil-gas exploration and development, and particularly relates to a target point prediction method under a horizontal well geosteering azimuth-varying condition.
Background
In an area with relatively low exploration degree, the depth of a designed target point has certain error due to the complex underground geological conditions and the limitation of seismic data interpretation precision, and the target point needs to be timely adjusted according to real drilling data in the real drilling process. Due to the successful application of a high build-up rate tool, most of the existing horizontal wells finish the torsion azimuth work when drilling to the vicinity of a target point, namely the track azimuth is continuously changed before entering the target, so that the target point vertical depth cannot be accurately predicted according to actual drilling data in the actual drilling process.
At present, two methods are generally adopted at home and abroad aiming at target point prediction under the condition of variable azimuth in the drilling process. One method comprises the steps of obtaining a single-well average speed curve through fine well seismic calibration, establishing a three-dimensional space average speed field, obtaining a target layer depth structural diagram through time-depth conversion, and predicting the vertical depth of a target point; and the other method is that before drilling, the rock electric marker layer of the adjacent well or the pilot hole well before entering the target is identified, and then the well deviation range of each rock electric marker layer during drilling is calculated by combining the design of the well track and the deviation capability of the directional tool. In the actual drilling process, the track is controlled in a segmented mode according to the well inclination range of each rock electric marker layer calculated in advance, and the aim of target centering is achieved. Both of the above two methods have certain limitations in the practical application process. The former has higher requirements on the curve quality and the seismic data quality, the target point prediction precision is difficult to meet the production requirement, and the latter inevitably causes poor smoothness of a borehole trajectory due to sectional control, thereby causing certain risks for later engineering construction.
Disclosure of Invention
The invention relates to a target point prediction method under a variable azimuth condition in horizontal well geosteering. The target point prediction method can effectively predict the target point under the variable azimuth condition in the drilling process of the horizontal well, improve the target point prediction precision, effectively improve the well smoothness of the horizontal well and provide guarantee for subsequent accurate landing and horizontal segment control of the horizontal well.
The invention adopts the following technical scheme: a target point prediction method for horizontal well geosteering under variable azimuth conditions comprises the following steps:
s1, identifying rock electric marker layers before entering the target based on analysis and comparison of adjacent wells or pilot wells, and respectively calculating the vertical distance between each marker layer and the central line of the target window of the horizontal section;
s2, calculating the formation dip angle according to the vertical depth difference and the plane distance of the two actually drilled marker layers and the vertical thickness between the two marker layers of the adjacent well or the pilot hole well;
s3, reading the plane position points of any two marker layers, connecting and extending the plane position points of the two marker layers, intersecting with the contour line constructed by the target point position, and measuring the linear distance between the plane position point of one marker layer and the intersecting intersection point;
and S4, based on the equal-thickness geological model, the sag of the selected mark layer plane position point, the formation dip angle, and the plane distance between the intersection point and the selected plane position point are utilized to complete the prediction of the sag of the target point.
And further, repeating the first step, the second step, the third step and the fourth step according to the drilling meeting mark layer in sequence, and predicting the depth of the target point in a rolling mode.
Further, the formula for calculating the formation apparent dip angle is as follows:
a=argtan[|h-h 1 |/L]
wherein h is the vertical thickness between two mark layers of the pilot hole well or the adjacent well; h1 is the vertical depth difference of the two mark layers of the real diamond; l is the plane distance of the two mark layers of the actual drill.
Further, the target point vertical depth formula is expressed as:
H=H1+h+S*tan(a)
h1 is the vertical depth of the plane position point of one selected marker layer in the two selected marker layers, H is the vertical distance between the adjacent well or pilot hole and the target center, and S is the plane distance between the intersection point and the selected plane position point.
The invention has the beneficial effects that: the target prediction precision can be improved, the well smoothness of the horizontal well can be effectively improved, and the follow-up accurate landing and horizontal segment control of the horizontal well are guaranteed.
Drawings
FIG. 1 is a schematic flow diagram of a target point prediction method under a variable azimuth condition in horizontal well geosteering provided by the invention.
FIG. 2 is a schematic diagram of the position of a well rock electrical marker layer and the distance from a target center in the target prediction method under the variable azimuth condition in horizontal well geosteering provided by the invention.
FIG. 3 is a schematic diagram of the apparent dip angle of the stratum calculated by different stratum attitude in the target prediction method under the variable azimuth condition in horizontal well geosteering provided by the invention.
FIG. 4 is a schematic diagram of the position settings of the plane position points, the intersection points and the target points of two marker layers selected in the target point prediction method under the condition of variable azimuth in horizontal well geosteering provided by the invention.
Detailed Description
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 shows a target prediction method for horizontal well geosteering under variable azimuth conditions, which comprises the following steps:
identifying rock electric marker layers before entering the target based on analysis and comparison of adjacent wells or pilot wells, and respectively calculating the vertical distance between each marker layer and the central line of the target window of the horizontal section; as shown in FIG. 2, the positions of the electrical marker layers of the downhole rock and the distance from the target center are given according to different stratum pay states. In the subsequent calculation process, the numerical values can be directly adopted for calculation.
Calculating a stratum view dip angle according to the vertical depth difference of the two actually drilled marker layers, the plane distance and the vertical thickness between the two marker layers of the adjacent well or the pilot hole well;
reading the plane position points of any two marker layers, connecting and extending the plane position points of the two marker layers, intersecting with an isoline constructed by the target point position, and measuring the linear distance between the plane position point of one marker layer and the intersected intersection point;
and based on the equal-thickness geological model, the sag of the selected mark layer plane position point, the formation dip angle, and the plane distance between the intersection point and the selected plane position point are utilized to complete the prediction of the sag of the target point.
The pilot hole well is a well which is drilled for taking accurate data, determining an accurate layer and serving as a foundation for horizontal section construction under the condition that the geological conditions of the well position are not known, and aims to know the lithology, physical property, electrical property, oil-bearing property, oil-water relation of an oil-gas reservoir, structural condition and changes of the oil-water relation so as to determine target point parameters of horizontal wells such as A and B … and the like and play a role in correcting and designing target points. But its main role is to correct the location of target a (which is the starting point of the horizontal section of the horizontal well). The pilot borehole can be a straight pilot borehole or an inclined pilot borehole. The straight pilot hole is far away from the target A, and the straight pilot hole cannot meet the requirement under the condition of relatively complex geological conditions and needs to be inclined.
And further, repeating the first step, the second step, the third step and the fourth step according to the drilling encounter mark layer in sequence, and predicting the depth of the target point in a rolling mode.
Further, the formula for calculating the formation apparent dip angle is as follows:
a=argtan[|h-h 1 |/L]
wherein h is the vertical thickness between two mark layers of the pilot hole well or the adjacent well; h1 is the vertical depth difference of the two mark layers of the real diamond; l is the plane distance of the two mark layers of the actual drill.
As shown in fig. 3, under an actual formation attitude, the thickness of the vertical thickness between any two marker layers of the pilot hole well or the adjacent well and the vertical depth of the two actually drilled marker layers are uncertain, as shown in the landform on the left and right sides in fig. 3, the vertical thickness between any two marker layers of the pilot hole well or the adjacent well in the left side diagram is greater than the vertical depth of the two actually drilled marker layers, while in the right side diagram, the vertical thickness between any two marker layers of the pilot hole well or the adjacent well in the left side diagram is less than the vertical depth of the two actually drilled marker layers, and when the formation dip angle is actually calculated, the absolute value of the difference between the vertical thickness between any two marker layers of the pilot hole well or the adjacent well and the vertical depth of the two actually drilled marker layers is taken for calculation.
As shown in fig. 4, the two selected plane position points of the two marker layers are represented as B1 and B2, which connect B1 and B2, and after the connecting line is extended, the connecting line intersects with the contour line of the target point position structure, the intersection point is set as a ', and the linear distance between the marker layer where the measurement plane position point B2 is located and the intersection point a' is set as S. And based on the equal-thickness geological model, the vertical depth of the target point A is predicted by utilizing the vertical depth of the point B2, the apparent dip angle of the stratum, and the plane distance between the intersection point A' and the point B2.
Further, the target point vertical depth formula is expressed as:
H=H1+h+S*tan(a)
h1 is the vertical depth of the plane position point of one selected marker layer in the two selected marker layers, H is the vertical distance between the adjacent well or pilot hole and the target center, and S is the plane distance between the intersection point and the selected plane position point.
The above embodiments are only used for illustrating the design idea and features of the present invention, and the purpose of the present invention is to enable those skilled in the art to understand the content of the present invention and implement it accordingly, and the protection scope of the present invention is not limited to the above embodiments. Therefore, all equivalent changes and modifications made in accordance with the principles and concepts disclosed herein are intended to be included within the scope of the present invention.

Claims (4)

1. A target point prediction method for horizontal well geosteering under variable azimuth conditions is characterized by comprising the following steps:
s1, identifying rock electric marker layers before entering the target based on analysis and comparison of adjacent wells or pilot wells, and respectively calculating the vertical distance between each marker layer and the central line of the target window of the horizontal section;
s2, calculating the formation dip angle according to the vertical depth difference and the plane distance of the two actually drilled marker layers and the vertical thickness between the two marker layers of the adjacent well or the pilot hole well;
s3, reading the plane position points of any two marker layers, connecting and extending the plane position points of the two marker layers, intersecting with the contour line constructed by the target point position as an equivalent target point, and measuring the linear distance between the plane position point of one marker layer and the equivalent target point;
and S4, based on the equal-thickness geological model, the sag depth of the selected plane position point of the mark layer, the dip angle of the stratum, and the plane distance between the intersection point and the selected plane position point are utilized to complete the prediction of the sag depth of the target point.
2. The target point prediction method for the horizontal well geosteering in the variable azimuth condition according to claim 1, wherein the first step, the second step, the third step, the fourth step and the target point depth prediction are repeated in sequence according to drilling and encountering mark layers, and target point depth is predicted in a rolling mode.
3. The method for predicting the target point under the variable azimuth condition in the horizontal well geosteering according to claim 1, wherein the calculation formula of the formation apparent dip angle is as follows:
a=argtan[|h-h 1 |/L]
wherein h is the vertical thickness between two mark layers of the pilot hole well or the adjacent well; h1 is the vertical depth difference of the two mark layers of the real diamond; l is the plane distance of the two mark layers of the actual drill.
4. The method for predicting the target point under the variable azimuth condition in the horizontal well geosteering according to claim 1, wherein the target point vertical depth formula is as follows:
H=H1+h+S*tan(a)
h1 is the vertical depth of the plane position point of one selected marker layer in the two selected marker layers, H is the vertical distance between the adjacent well or pilot hole and the target center, and S is the plane distance between the intersection point and the selected plane position point.
CN202210770947.5A 2022-06-30 2022-06-30 Target point prediction method for horizontal well geosteering under variable azimuth condition Pending CN114991753A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210770947.5A CN114991753A (en) 2022-06-30 2022-06-30 Target point prediction method for horizontal well geosteering under variable azimuth condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210770947.5A CN114991753A (en) 2022-06-30 2022-06-30 Target point prediction method for horizontal well geosteering under variable azimuth condition

Publications (1)

Publication Number Publication Date
CN114991753A true CN114991753A (en) 2022-09-02

Family

ID=83019895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210770947.5A Pending CN114991753A (en) 2022-06-30 2022-06-30 Target point prediction method for horizontal well geosteering under variable azimuth condition

Country Status (1)

Country Link
CN (1) CN114991753A (en)

Similar Documents

Publication Publication Date Title
CN106437512B (en) A kind of shale gas horizontal well landing path drilling tracking regulation and control method
CN106285476B (en) A kind of horizontal drilling Real-time Seismic geological syntheses guidance method
CN105114059B (en) A kind of three-dimensional orientation well Trajectory Design and control parameter method of discrimination
CN104481398B (en) A kind of three-dimensional horizontal well drilling construction method
CN104481400A (en) Three-dimensional (3D) horizontal well borehole track controlling method
CN103643945B (en) Thin layer lithology RESERVOIR RECOGNITION and horizontal well drilling tracking
CN108442882B (en) Shale gas large-displacement horizontal well while-drilling geosteering method based on two-dimensional seismic data
CN104975808A (en) Deep horizontal well drilling track regulating method
CN107676038B (en) While-drilling geosteering method for horizontal well trajectory in inclined thin reservoir
CN109557584A (en) A kind of horizontal drilling Real-time Seismic geological syntheses guidance method
CN108625782A (en) A kind of horizontal well inclination section geosteering method
CN103321629A (en) Method for predicting coal mine underground directional drilling trajectory
CN109915018B (en) Method for determining tool face angle in three-dimensional borehole trajectory control
CN103774989A (en) Horizontal well geosteering analysis method for designing track of well to be drilled through dynamic modeling during drilling
CN110147588A (en) One kind is based on the shortest three-dimensional Study on Optimum Design of Horizontal Well Path of drilling time
CN107060642B (en) Wellbore trajectory control method for natural alkali deep thin layer multi-connected horizontal well
US6073079A (en) Method of maintaining a borehole within a multidimensional target zone during drilling
CN104251135B (en) Highly-deviated well space in-place method
CN108756745A (en) Platform cluster well boring method
CN104314560A (en) Comparing method and comparing device for non-proportional stratum before window entering of horizontal well
CN103967480A (en) Slide-and-guide drilling based target-entering situation predicting method
CN114991753A (en) Target point prediction method for horizontal well geosteering under variable azimuth condition
CN112901070B (en) Method for tracking horizontal well while drilling and control method for controlling drilling direction of drill bit
CN110656886B (en) Horizontal well landing segment geosteering method
CN114764844B (en) Shale gas drilling optimization design method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination