CN114991452A - Nonstandard cable-stayed hanging basket support and installation method - Google Patents

Nonstandard cable-stayed hanging basket support and installation method Download PDF

Info

Publication number
CN114991452A
CN114991452A CN202210612821.5A CN202210612821A CN114991452A CN 114991452 A CN114991452 A CN 114991452A CN 202210612821 A CN202210612821 A CN 202210612821A CN 114991452 A CN114991452 A CN 114991452A
Authority
CN
China
Prior art keywords
supporting
rope
support
lug plate
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210612821.5A
Other languages
Chinese (zh)
Inventor
乔建文
刘德兵
赵红喜
段锋
徐继光
薛晓宏
刘浩泉
古刚
彭烜
李建洲
张秀发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 20th Bureau Group Corp
Sixth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Original Assignee
China Railway 20th Bureau Group Corp
Sixth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 20th Bureau Group Corp, Sixth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd filed Critical China Railway 20th Bureau Group Corp
Priority to CN202210612821.5A priority Critical patent/CN114991452A/en
Publication of CN114991452A publication Critical patent/CN114991452A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/34Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The invention discloses a nonstandard cable-stayed hanging basket support and an installation method thereof, wherein the nonstandard cable-stayed hanging basket support is installed on a wall body and comprises the following components: the hanging basket is positioned on one side of the wall body; the middle part of the supporting beam is connected with a supporting column, and one end of the supporting column, which is far away from the supporting beam, is connected with the wall body; one end of the lifting rope is connected with one end of the supporting beam, and the other end of the lifting rope is connected with the hanging basket; the supporting rope is positioned above the supporting beam, two ends of the supporting rope are respectively connected with a first lug plate and a second lug plate, the first lug plate is connected with one end, close to the hanging basket, of the supporting beam, and the second lug plate is connected with one end, far away from the hanging basket, of the supporting beam; an upright rod is connected above the supporting cross beam, a rope wheel is arranged at one end of the upright rod, which is far away from the supporting cross beam, and the rope wheel is connected with the supporting rope; and one end of the pull rope is connected with one end of the supporting beam far away from the lifting rope, and the other end of the pull rope is fixed on the building. By adopting the technical scheme of the invention, the installation efficiency of the hanging basket support can be improved.

Description

Nonstandard cable-stayed hanging basket support and installation method
Technical Field
The invention relates to the technical field of building construction, in particular to a nonstandard cable-stayed hanging basket support and an installation method.
Background
The hanging basket is a building tool for high-altitude operation in building engineering, and is generally used for high-altitude operation of buildings such as curtain wall installation, outer wall cleaning and the like. The hanging basket support is erected on a building or a structure, the lifting mechanism can be used for driving the hanging basket to lift, the hanging basket is moved to a corresponding height, and workers can conveniently operate.
The hanging flower basket generally hangs through the hanging flower basket support, and the hanging flower basket support generally includes wire rope and balancing weight to the realization is to hanging of hanging flower basket, nevertheless because balancing weight and volume are great, balancing weight transportation, installation are loaded down with trivial details, have reduced the installation effectiveness of hanging flower basket support.
Disclosure of Invention
The invention mainly aims to provide a nonstandard cable-stayed hanging basket support, aiming at improving the installation efficiency of the hanging basket support.
In order to achieve the above object, the present invention provides a non-standard cable-stayed cradle support, which is installed on a wall body, and comprises:
the hanging basket is positioned on one side of the wall body;
the middle part of the supporting beam is connected with a supporting column, and one end of the supporting column, which is far away from the supporting beam, is connected with the wall body;
one end of the lifting rope is connected with one end of the supporting beam, and the other end of the lifting rope is connected with the hanging basket;
the supporting rope is positioned above the supporting beam, two ends of the supporting rope are respectively connected with a first lug plate and a second lug plate, the first lug plate is connected with one end, close to the hanging basket, of the supporting beam, and the second lug plate is connected with one end, far away from the hanging basket, of the supporting beam; an upright rod is connected above the supporting cross beam, the upright rod is positioned between the first lug plate and the second lug plate, one end of the upright rod, which is far away from the supporting cross beam, is provided with a rope wheel, and the rope wheel is connected with the supporting rope;
and one end of the pull rope is connected with one end of the supporting beam far away from the lifting rope, and the other end of the pull rope is fixed on the building.
Optionally, the nonstandard cable-stayed hanging basket support further comprises a supporting rod, one end of the supporting rod is connected with the second lug plate, the other end of the supporting rod is connected with a third lug plate, and the third lug plate is connected with one side, far away from the hanging basket, of the wall body; the third ear plate is provided with a first fastener connected with the wall body.
Optionally, a second fastener is connected to one end of the pull rope, which is far away from the supporting cross beam; the second fastener is an anchor bolt.
Optionally, the supporting column is disposed on the top of the wall, and the supporting column is provided with a third fastener connected to the top of the wall.
Optionally, a protruding portion is arranged on a side wall of the wall body far away from the hanging basket, and the protruding portion extends in a direction far away from the hanging basket; the support column set up in the bulge, just the support column be equipped with the third fastener that the bulge is connected.
Optionally, the support column is provided with an angle steel connected with the wall side wall, and the angle steel is provided with a fourth fastener connected with the wall side wall.
Optionally, the hanging basket is provided with a safety rope, one end of the safety rope is connected with a human body, and the other end of the safety rope is fixed on a building.
Optionally, the supporting beam comprises a connecting part and a supporting part, the connecting part is connected with the hanging basket, and the supporting part is connected with the pull rope; the supporting beam is provided with a connecting sleeve, one end of the connecting sleeve is connected with the connecting part, and the other end of the connecting sleeve is connected with the supporting part; the top of the connecting sleeve is connected with the vertical rod, the bottom of the connecting sleeve is connected with the supporting column, and the vertical rod and the supporting column are located on the same axis.
Optionally, the nonstandard cable-stayed basket support further comprises a limit stop, and the limit stop is positioned above the basket to limit the displacement stroke of the basket.
The invention also provides an installation method, which is used for installing the nonstandard cable-stayed hanging basket support, and the installation method comprises the following steps:
arranging a corresponding number of mounting holes on the wall body;
mounting the support columns and the support cross beams to proper positions of the wall body according to the condition of the wall body;
the upright stanchions are installed on the supporting cross beam, and the first lug plate and the second lug plate are respectively installed at two ends of the supporting cross beam;
connecting the support rope with the rope wheel on the vertical rod, then respectively connecting two ends of the support rope with the first lug plate and the second lug plate, and finally tightening the support rope;
respectively installing the lifting rope and the pull rope at two ends of the supporting cross beam, then installing one end of the pull rope, which is far away from the supporting cross beam, at a proper position of a building, installing the hanging basket at one end of the pull rope, which is far away from the supporting cross beam, and finally clamping the lifting rope and the pull rope.
According to the technical scheme, one end of the pull rope is connected with one end, far away from the lifting rope, of the supporting cross beam, the other end of the pull rope is fixed to the building, the lifting rope is connected with the hanging basket, namely the stress of the hanging basket can be transmitted to the pull rope through the supporting cross beam, the pull rope transmits the force to the building, the stress balance of the two ends of the supporting cross beam is achieved, the final stress point is the building, and therefore the hanging basket is hung; on the one hand, owing to need not the installation and transport the balancing weight, and the gravity and the volume of balancing weight are generally bigger, consequently can improve the installation effectiveness of hanging flower basket support, on the other hand, because the stay cord is connected with the building, sets up the one end of keeping away from supporting beam with the stay cord to the suitable position of building, can provide suitable power for supporting beam to the realization is pulled up the hanging flower basket, has improved the structural stability of hanging flower basket.
Drawings
In order to more clearly illustrate the embodiments or technical solutions of the present invention, the drawings used in the embodiments or technical solutions of the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the structures shown in the drawings without creative efforts.
FIG. 1 is a schematic structural diagram of an embodiment of a non-standard cable-stayed basket support according to the present invention.
FIG. 2 is a schematic structural diagram of another embodiment of a nonstandard cable-stayed basket support according to the invention.
The reference numbers indicate:
Figure BDA0003671370340000031
Figure BDA0003671370340000041
the implementation, functional features and advantages of the objects of the present invention will be further explained with reference to the accompanying drawings.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without inventive step based on the embodiments of the present invention, are within the scope of protection of the present invention.
It should be noted that if directional indications (such as up, down, left, right, front, and back … …) are involved in the embodiment of the present invention, the directional indications are only used to explain the relative positional relationship between the components, the movement situation, and the like in a specific posture, and if the specific posture is changed, the directional indications are changed accordingly.
In addition, if there is a description of "first", "second", etc. in an embodiment of the present invention, the description of "first", "second", etc. is for descriptive purposes only and is not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In addition, if the meaning of "and/or" and/or "appears throughout, the meaning includes three parallel schemes, for example," A and/or B "includes scheme A, or scheme B, or a scheme satisfying both schemes A and B. In addition, technical solutions between various embodiments may be combined with each other, but must be realized by a person skilled in the art, and when the technical solutions are contradictory or cannot be realized, such a combination should not be considered to exist, and is not within the protection scope of the present invention.
The invention provides a nonstandard cable-stayed hanging basket support.
In an embodiment of the present invention, referring to fig. 1, the non-standard cable-stayed basket support is installed on a wall 1, and the non-standard cable-stayed basket support includes:
the hanging basket 2 is positioned on one side of the wall body 1;
the supporting beam 10 is connected with a supporting column 101 in the middle of the supporting beam 10, and one end, far away from the supporting beam 10, of the supporting column 101 is connected with the wall 1;
one end of the lifting rope 20 is connected with one end of the supporting beam 10, and the other end of the lifting rope 20 is connected with the hanging basket 2;
the supporting rope 30 is positioned above the supporting beam 10, two ends of the supporting rope 30 are respectively connected with a first lug plate 301 and a second lug plate 302, the first lug plate 301 is connected with one end of the supporting beam 10 close to the hanging basket 2, and the second lug plate 302 is connected with one end of the supporting beam 10 far away from the hanging basket 2; an upright rod 102 is connected above the supporting cross beam 10, the upright rod 102 is positioned between the first lug plate 301 and the second lug plate 302, one end of the upright rod 102, which is far away from the supporting cross beam 10, is provided with a rope wheel 103, and the rope wheel 103 is connected with the supporting rope 30;
one end of the pull rope 40 is connected with one end of the supporting beam 10 far away from the lifting rope 20, and the other end of the pull rope 40 is fixed on the building;
according to the technical scheme, one end of the pull rope 40 is connected with one end, far away from the pull rope 20, of the supporting beam 10, the other end of the pull rope is fixed to the building, the pull rope 20 is connected with the hanging basket 2, namely the stress of the hanging basket 2 can be transmitted to the pull rope 40 through the supporting beam 10, the pull rope 40 transmits the force to the building, the two ends of the supporting beam 10 are balanced in stress, the final stress point is the building, and therefore the hanging of the hanging basket 2 is achieved; on the one hand, owing to need not the installation and transport the balancing weight, and the gravity and the volume of balancing weight are generally bigger, consequently can improve the installation effectiveness of hanging flower basket support, on the other hand, because stay cord 40 is connected with the building, set up the one end that supporting beam 10 was kept away from to stay cord 40 to the suitable position of building, can provide suitable power for supporting beam 10 to the realization is pulled up hanging flower basket 2, has improved the structural stability of hanging flower basket 2.
Specifically, please refer to fig. 1 and fig. 2 together, the cradle 2 is provided with a safety rope 21, one end of the safety rope 21 is connected with the human body, and the other end is fixed on the building, when the non-standard inclined-pulling cradle support is damaged and failed, the safety rope 21 can provide safety guarantee for the human body, guarantee the life safety of the worker, and improve the safety of the cradle support.
Specifically, referring to fig. 1 and 2, the supporting beam 10 includes a connecting portion and a supporting portion, the connecting portion is connected to the basket 2, and the supporting portion is connected to the pulling rope 40; a connecting sleeve 107 is arranged on the supporting beam 10, one end of the connecting sleeve 107 is connected with the connecting part, and the other end of the connecting sleeve 107 is connected with the supporting part; connecting sleeve 107's top is connected with pole setting 102, and connecting sleeve 107's bottom is connected with support column 101, and pole setting 102 is located same axis with support column 101, when installing supporting beam 10, can install the relevant position of wall body 1 with support column 101 earlier, installs connecting sleeve 107 again, inserts connecting sleeve 107 with connecting portion and supporting part at last, can accomplish the installation to supporting beam 10, and easy operation can improve hanging flower basket support's installation effectiveness.
Specifically, please refer to fig. 1 and fig. 2 together, the non-standard cable-stayed cradle support further includes a limit stop 60, the limit stop 60 is located above the cradle 2 to limit the displacement stroke of the cradle 2, the limit stop 60 can be installed at a corresponding height position of the wall 1 according to a corresponding requirement, when the cradle 2 rises to a position abutting against the limit stop 60, the cradle 2 can be prevented from exceeding the displacement stroke, thereby improving the structural stability of the cradle 2.
In an embodiment, please refer to fig. 1, the non-standard cable-stayed cradle support further includes a support rod 50, one end of the support rod 50 is connected to the second ear plate 302, the other end is connected to a third ear plate 501, and the third ear plate 501 is connected to a side of the wall 1 away from the cradle 2; the third ear plate 501 is provided with a first fastener 502 connected with the wall body 1, the first fastener 502 is a chemical bolt, the support rod 50 can support the support beam 10, one end of the support rod 50 is connected with the second ear plate 302, the other end of the support rod 50 is connected with the third ear plate 501, and the third ear plate 501 is connected with one side of the wall body 1 away from the hanging basket 2, namely, the placing position of the support rod 50 can be adjusted according to the stress condition of the support beam 10, so that the support rod 50 can better play a role, and the structural stability of the hanging basket support is improved;
wherein, the supporting column 101 is disposed on the top of the wall 1, and the supporting column 101 is provided with a third fastening member 104 connected to the top of the wall 1, the third fastening member 104 is generally an expansion bolt, and most preferably an expansion bolt of M16, because the supporting column 101 is disposed on the top of the wall 1, and the supporting beam 10 is disposed on the supporting column 101, the structural stability of the supporting beam 10 can be improved.
In another embodiment, referring to fig. 2, the end of the pulling rope 40 away from the supporting beam 10 is connected with a second fastener 401; the second fastener 401 is an anchor bolt, and the pull rope 40 can be connected to a proper position of the building through the anchor bolt so as to fix the pull rope 40, thereby ensuring that the supporting beam 10 is stressed evenly;
wherein, a bulge is arranged on one side wall of the wall body 1 far away from the hanging basket 2 and extends towards the direction far away from the hanging basket 2; the supporting column 101 is arranged on the bulge, and the supporting column 101 is provided with a third fastener 104 connected with the bulge, wherein the third fastener 104 is a chemical anchor bolt, preferably a chemical anchor bolt of M16; the support column 101 is equipped with the angle steel 105 of being connected with wall 1 lateral wall, and angle steel 105 is equipped with the fourth fastener 106 of being connected with wall 1 lateral wall, and fourth fastener 106 is the chemical anchor, and the best is M12's chemical anchor, because support column 101 is connected with bulge and wall 1 lateral wall respectively, has two tie points, can improve the structural stability of support column 101, and support column 101 is as hanging flower basket support's keystone, can improve hanging flower basket support's structural stability.
The invention also provides an installation method, which is used for installing the non-standard cable-stayed hanging basket support and comprises the following steps:
arranging a corresponding number of mounting holes on the wall body 1;
mounting the support columns 101 and the support beams 10 to appropriate positions of the wall body 1 according to the condition of the wall body 1;
installing upright rods 102 on a supporting cross beam 10, and respectively installing a first lug plate 301 and a second lug plate 302 at two ends of the supporting cross beam 10;
connecting the support rope 30 with the rope wheel 103 on the vertical rod 102, then connecting the two ends of the support rope 30 with the first lug plate 301 and the second lug plate 302 respectively, and finally tightening the support rope 30;
the lifting rope 20 and the pulling rope 40 are respectively arranged at two ends of the supporting beam 10, then one end of the pulling rope 40 far away from the supporting beam 10 is arranged at a proper position of the building, meanwhile, the hanging basket 2 is arranged at one end of the pulling rope 40 far away from the supporting beam 10, and finally, the lifting rope 20 and the pulling rope 40 are clamped.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention, and all modifications and equivalents of the present invention, which are made by the contents of the present specification and the accompanying drawings, or directly/indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (10)

1. The utility model provides a non-standard draws hanging flower basket support to one side installs in the wall body, its characterized in that includes:
the hanging basket is positioned on one side of the wall body;
the middle part of the supporting beam is connected with a supporting column, and one end of the supporting column, which is far away from the supporting beam, is connected with the wall body;
one end of the lifting rope is connected with one end of the supporting beam, and the other end of the lifting rope is connected with the hanging basket;
the supporting rope is positioned above the supporting beam, two ends of the supporting rope are respectively connected with a first lug plate and a second lug plate, the first lug plate is connected with one end, close to the hanging basket, of the supporting beam, and the second lug plate is connected with one end, far away from the hanging basket, of the supporting beam; an upright rod is connected above the supporting cross beam, the upright rod is positioned between the first lug plate and the second lug plate, one end of the upright rod, which is far away from the supporting cross beam, is provided with a rope wheel, and the rope wheel is connected with the supporting rope;
and one end of the pull rope is connected with one end of the supporting beam far away from the lifting rope, and the other end of the pull rope is fixed on the building.
2. The non-standard cable-stayed cradle support according to claim 1, further comprising a support rod, wherein one end of the support rod is connected with the second lug plate, the other end of the support rod is connected with a third lug plate, and the third lug plate is connected with one side of the wall body, which is far away from the cradle; the third ear plate is provided with a first fastener connected with the wall body.
3. The non-standard cable-stayed cradle support according to claim 1, wherein one end of the pull rope, which is far away from the supporting cross beam, is connected with a second fastener; the second fastener is an anchor bolt.
4. The non-standard cable-stayed cradle support according to claim 1, wherein the support column is arranged at the top of the wall body, and the support column is provided with a third fastener connected with the top of the wall body.
5. The non-standard cable-stayed cradle bracket according to claim 1, wherein a protrusion is arranged on one side wall of the wall body away from the cradle, and the protrusion extends in a direction away from the cradle; the support column set up in the bulge, just the support column be equipped with the third fastener that the bulge is connected.
6. The non-standard cable-stayed cradle support according to claim 5, wherein the support column is provided with an angle steel connected with the side wall of the wall body, and the angle steel is provided with a fourth fastening piece connected with the side wall of the wall body.
7. The non-standard inclined-pulling hanging basket bracket as claimed in claim 1, wherein the hanging basket is provided with a safety rope, one end of the safety rope is connected with a human body, and the other end of the safety rope is fixed on a building.
8. The non-standard cable-stayed cradle bracket according to claim 1, wherein the support beam comprises a connecting part and a supporting part, the connecting part is connected with the cradle, and the supporting part is connected with the pull rope; a connecting sleeve is arranged on the supporting cross beam, one end of the connecting sleeve is connected with the connecting part, and the other end of the connecting sleeve is connected with the supporting part; the top of the connecting sleeve is connected with the vertical rod, the bottom of the connecting sleeve is connected with the supporting column, and the vertical rod and the supporting column are located on the same axis.
9. The non-standard cable-stayed basket support according to claim 1, wherein the non-standard cable-stayed basket support further comprises a limit stop, and the limit stop is positioned above the basket to limit the displacement stroke of the basket.
10. A method of mounting a non-standard cable-stayed basket support according to any one of claims 1 to 9, comprising the steps of:
arranging a corresponding number of mounting holes on the wall body;
mounting the support columns and the support cross beams to proper positions of the wall body according to the condition of the wall body;
the upright rods are arranged on the supporting cross beam, and the first lug plate and the second lug plate are respectively arranged at two ends of the supporting cross beam;
connecting the support rope with the rope wheel on the vertical rod, then respectively connecting two ends of the support rope with the first lug plate and the second lug plate, and finally tightening the support rope;
and respectively installing the lifting rope and the pull rope at two ends of the supporting cross beam, then installing one end of the pull rope far away from the supporting cross beam at a proper position of a building, simultaneously installing the hanging basket at one end of the pull rope far away from the supporting cross beam, and finally clamping the lifting rope and the pull rope.
CN202210612821.5A 2022-05-31 2022-05-31 Nonstandard cable-stayed hanging basket support and installation method Pending CN114991452A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210612821.5A CN114991452A (en) 2022-05-31 2022-05-31 Nonstandard cable-stayed hanging basket support and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210612821.5A CN114991452A (en) 2022-05-31 2022-05-31 Nonstandard cable-stayed hanging basket support and installation method

Publications (1)

Publication Number Publication Date
CN114991452A true CN114991452A (en) 2022-09-02

Family

ID=83031035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210612821.5A Pending CN114991452A (en) 2022-05-31 2022-05-31 Nonstandard cable-stayed hanging basket support and installation method

Country Status (1)

Country Link
CN (1) CN114991452A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07229285A (en) * 1994-02-18 1995-08-29 Nippon Bisoo Kk Projecting beam for suspending gondola and fixed rope arranging structure of gondola suspending rope member using projecting beam thereof
CN110029808A (en) * 2019-04-11 2019-07-19 中建四局第六建筑工程有限公司 A kind of gondola-hanging mechanism and its construction method on steel construction cant beam
CN212105075U (en) * 2020-03-27 2020-12-08 中国建筑一局(集团)有限公司 Fixture type parapet beam riding hanging basket device and parapet hanging basket system
CN214462437U (en) * 2021-03-10 2021-10-22 中国新兴建设开发有限责任公司 Hanging basket wall-riding adjustable suspension bracket
CN215055170U (en) * 2021-07-19 2021-12-07 中国建筑土木建设有限公司 Hanging basket system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07229285A (en) * 1994-02-18 1995-08-29 Nippon Bisoo Kk Projecting beam for suspending gondola and fixed rope arranging structure of gondola suspending rope member using projecting beam thereof
CN110029808A (en) * 2019-04-11 2019-07-19 中建四局第六建筑工程有限公司 A kind of gondola-hanging mechanism and its construction method on steel construction cant beam
CN212105075U (en) * 2020-03-27 2020-12-08 中国建筑一局(集团)有限公司 Fixture type parapet beam riding hanging basket device and parapet hanging basket system
CN214462437U (en) * 2021-03-10 2021-10-22 中国新兴建设开发有限责任公司 Hanging basket wall-riding adjustable suspension bracket
CN215055170U (en) * 2021-07-19 2021-12-07 中国建筑土木建设有限公司 Hanging basket system

Similar Documents

Publication Publication Date Title
CN215803108U (en) Attached beam type hanging basket
CN114991452A (en) Nonstandard cable-stayed hanging basket support and installation method
CN114892947A (en) Non-standard hanging basket support and mounting method
CN216196494U (en) Climb a bracing piece and climb frame
JP5192444B2 (en) Wall panel fixing structure
CN212775988U (en) Pipeline gallows installation device
CN211951703U (en) Anti-seismic support and hanger for building
CN212317547U (en) Novel shear force wall reinforcing and supporting system
CN212154222U (en) Safety belt fixing device for steel structure construction
CN210713748U (en) Fixed construction hanging basket
CN114892948A (en) Hanging basket support and mounting method
CN216552987U (en) Hanging basket for outer decoration of framework layer building
CN220336208U (en) Connecting hanger for curtain wall upright post and wall body
KR200388764Y1 (en) coupling board for tower crane wall fixing
CN218668470U (en) Wall-attached seat for attached lifting scaffold
CN214990093U (en) Suspension bracket and suspension system
CN215631517U (en) Self-stabilizing hanging basket suspension mechanism
CN219411759U (en) Assembled lower hanging operation platform based on sliding mode lifting system
CN214498357U (en) Overhanging type hanging basket support
CN216340087U (en) Assembled light steel structure with antidetonation function
CN218933802U (en) Attached scaffold
CN217175641U (en) Electric hanging basket suspension mechanism
CN216379950U (en) Novel house steel structural member convenient to assemble and disassemble
CN217732472U (en) Municipal administration bridge construction hoisting accessory
CN219489328U (en) Buckling restrained brace member lifting device

Legal Events