CN114973600A - Geological disaster detection and early warning system - Google Patents

Geological disaster detection and early warning system Download PDF

Info

Publication number
CN114973600A
CN114973600A CN202210443602.9A CN202210443602A CN114973600A CN 114973600 A CN114973600 A CN 114973600A CN 202210443602 A CN202210443602 A CN 202210443602A CN 114973600 A CN114973600 A CN 114973600A
Authority
CN
China
Prior art keywords
culvert pipe
rod
vertical
horizontal
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210443602.9A
Other languages
Chinese (zh)
Other versions
CN114973600B (en
Inventor
李莎
胡自远
尹俊凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 7 Geology Group Shandong Provincial Bureau Of Geology & Mineral Resources 7th Institute Of Geology & Mineral Exploration Of Shandong Province
Original Assignee
No 7 Geology Group Shandong Provincial Bureau Of Geology & Mineral Resources 7th Institute Of Geology & Mineral Exploration Of Shandong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 7 Geology Group Shandong Provincial Bureau Of Geology & Mineral Resources 7th Institute Of Geology & Mineral Exploration Of Shandong Province filed Critical No 7 Geology Group Shandong Provincial Bureau Of Geology & Mineral Resources 7th Institute Of Geology & Mineral Exploration Of Shandong Province
Priority to CN202210443602.9A priority Critical patent/CN114973600B/en
Publication of CN114973600A publication Critical patent/CN114973600A/en
Application granted granted Critical
Publication of CN114973600B publication Critical patent/CN114973600B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/10Alarms for ensuring the safety of persons responsive to calamitous events, e.g. tornados or earthquakes
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B5/00Visible signalling systems, e.g. personal calling systems, remote indication of seats occupied
    • G08B5/06Visible signalling systems, e.g. personal calling systems, remote indication of seats occupied using hydraulic transmission; using pneumatic transmission
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention relates to a geological disaster detection early warning system, which relates to the technical field of geological disaster detection and comprises a horizontal pre-embedded culvert pipe and a vertical pre-embedded culvert pipe, wherein the horizontal pre-embedded culvert pipe and the vertical pre-embedded culvert pipe are pre-embedded in the lower part of a building at the early stage, the vertical pre-embedded culvert pipe is symmetrically arranged at the two ends of the horizontal pre-embedded culvert pipe and vertically extends upwards, the horizontal pre-embedded culvert pipe is mutually communicated with the vertical pre-embedded culvert pipe, settlement inclination detectors are arranged at the two ends of the pre-embedded culvert pipe and are connected with the lower surface of a bearing pile of a building to be detected, the vertical pre-embedded culvert pipe vertically extends upwards to the ground, and an inclination amplifier which is connected with the settlement inclination detectors and amplifies the inclination is arranged in the vertical pre-embedded culvert pipe.

Description

Geological disaster detection early warning system
Technical Field
The application relates to the technical field of geological disaster detection, in particular to a geological disaster detection early warning system.
Background
China is a mountainous country, mountain lands, plateaus and hills account for 69% of the territory area of China, and a large amount of geological disaster phenomena such as large-scale collapse, landslide, debris flow, earthquakes in Chongqing areas and the like can be generated every year, so that great threats are brought to the life and property safety of the masses of people; although the early warning device has a certain early warning function for natural phenomena such as earthquakes and weather, the time period from the early warning to the arrival of a disaster is very short, the early warning is generally sent out and indicates that the disaster is coming, the time for people to take treatment or prevention is short, and good protective evacuation measures are difficult to achieve.
In addition, most of the existing earthquake disaster prevention systems perform detection and early warning on a large-scale area, such as a large mountain area, but for residents living near the mountain area, no corresponding device for performing geological disaster early warning on areas near single or connected houses is disclosed, such as early warning on the slope degree, the gradient, the settlement degree and the like near the houses, so as to obtain geological information near the houses in advance, and then the damage caused by geological disasters can be prevented more comprehensively by matching the early warning information according to the large-scale geological disaster.
For example, chinese patent publication No. CN108109344A discloses a geological disaster early warning device, which specifically discloses a geological disaster early warning device including a first support rod, a first baffle, a second support rod, a first bracket, a second bracket, a first hammer head, etc.; the mountain body is fixedly connected with a first supporting rod, a first baffle is fixedly connected above the right side of the first supporting rod, a second supporting rod is fixedly connected to the mountain body and located below the first supporting rod, a third supporting rod is rotatably connected to the second supporting rod, and a first rope is fixedly connected to the third supporting rod. Through the disclosure of the geological disaster early warning equipment, the phenomena of debris flow and landslide of a mountain can be effectively prevented, and valuable time is brought to protection and evacuation.
Similarly, the prior art still aims at large-scale geological disaster prevention and early warning, and the individual protection and early warning, such as geological disaster early warning of house buildings, hydro junction projects, stations, highways and the like, has no better prevention effect, so that on the basis of the existing prevention and early warning, an improved space is provided for the protection.
Disclosure of Invention
In order to make can carry out geological disaster early warning protection to solitary miniature building etc, this application provides a geological disaster detection early warning system.
The application provides a geological disaster detection early warning system adopts following technical scheme:
the utility model provides a geological disaster detects early warning system, includes pre-buried culvert pipe of level and vertical pre-buried culvert pipe of pre-buried in building body below earlier stage, the pre-buried culvert pipe both ends of level and the vertical extension that upwards extend are located to vertical pre-buried culvert pipe symmetry, just the pre-buried culvert pipe of level communicates with vertical pre-buried culvert pipe each other, the both ends of pre-buried culvert pipe are provided with and subside the gradient detector, subside the gradient detector and be connected with the building bearing pile lower surface that awaits measuring, vertical pre-buried culvert pipe is vertical upwards extends to ground, just be provided with in the vertical pre-buried culvert pipe and subside the gradient amplifier that the gradient detector is connected and amplify the gradient:
the settlement inclination detector comprises a settlement isolator, an extension rod, a horizontal retainer and an inclined stress rod, wherein the settlement isolator is arranged between a horizontal embedded culvert pipe and a building load-bearing pile, and an isolation cavity is formed in the settlement isolator, the extension rod passes through the side wall of the horizontal embedded culvert pipe and extends towards the direction of the building bearing pile, and is connected with a building load-bearing pile, one end of the extension rod, which is far away from the building load-bearing pile, is matched with an inclination amplifier to amplify the inclination of the building, the horizontal retainers are arranged at two ends of the horizontal embedded culvert pipe symmetrically, the inclined stress rods are arranged on the horizontal retainers and realize horizontal extension in the horizontal embedded culvert pipe, and the slope atress pole carries out the activity to extending to the intraductal extension rod of the pre-buried culvert of level and accepts, sets up on the pre-buried culvert of level and supplies the extension rod to wear to establish the groove of wearing to establish that slides and communicate each other with isolated chamber.
Through adopting above-mentioned technical scheme, through the pre-buried culvert pipe of level in this application mutually support with subsiding the inclination detector, when the settlement depth and the inclination of building or other objects that await measuring change, can be through subsiding inclination detector automated inspection to when subsiding and incline and taking place, can enlarge through vertical pre-buried culvert pipe and the inclination amplifier that is located vertical pre-buried culvert pipe inside, make testing personnel can realize detecting and early warning operation, guarantee safety.
Preferably, subside the isolator including isolated baffle, isolated apron, hanging gasbag and suspension rope, isolated baffle symmetry is located between the pre-buried culvert pipe of level and the building bearing pile that awaits measuring, isolated apron covers on the isolated baffle, it is formed with to subside the space of stepping down to set up between isolated apron and the isolated baffle, the suspension gasbag is located and wears to establish in order to supply the extension rod between the isolated baffle, suspension rope one end and isolated cover connection, the other end with hang the gasbag and be connected in order to hang the gasbag.
Through adopting above-mentioned technical scheme, when actual building takes place to subside and incline, can drive the extension rod and take place the motion together, and subside the space of stepping down that the isolator can provide the extension rod removal, can understand that the extension rod can not receive the restriction at the in-process of motion, for example can not receive the restriction that earth, stone blockked, guarantee actual measurement's accuracy.
Preferably, the horizontal retainer comprises a lifting pressure spring, a bearing cylinder, bearing water, isolated oil, a buoyancy block, a mounting cover, a balancing weight and a vertical rod, the bearing cylinders are symmetrically arranged at two ends of the horizontal embedded culvert pipe, the lifting pressure spring is arranged between the horizontal embedded culvert pipe and the bearing cylinder to lift and install the bearing cylinder, the bearing water is arranged in the bearing cylinder, the isolation oil is positioned above the bearing water to isolate and seal the bearing water, the buoyancy block floats above the mounting frame, the mounting cover covers the bearing cylinder, the balancing weight is hung on the buoyancy block through a rope and extends downwards, the vertical rod is integrally arranged above the buoyancy block and vertically and upwardly extends through the mounting cover, a through hole for the vertical rod to pass through and slide is arranged on the mounting cover, and the penetrating hole and the vertical rod are sealed by being oiled with closed lubricating oil, and one end of the vertical rod, which is far away from the buoyancy block, is rotatably connected with the middle part of the inclined stress rod.
Through adopting above-mentioned technical scheme, the setting of level holder can guarantee that the pre-buried culvert pipe of level probably can not guarantee absolute level at the in-process of installation, so bring certain experiment detection error, and the level holds the setting of ware, can guarantee that the fulcrum of slope atress pole can guarantee absolute level to can accomplish accurate detection effect still in the phenomenon of taking place geological disasters, further reduce the existence of error.
Preferably, the gradient amplifier comprises a driving rod, a weighted spring rod, an irradiating ring-shaped lamp, fan-shaped baffles, an extrusion ring and an extrusion switch, wherein the driving rod is arranged in the vertical pre-embedded culvert and extends upwards, the weighted spring rod is arranged in the vertical pre-embedded culvert, one end of the weighted spring rod is rotatably connected with the inner side wall of the vertical pre-embedded culvert, the other end of the weighted spring rod is rotatably connected with the side wall of the driving rod, the irradiating ring-shaped lamp is arranged in the vertical pre-embedded culvert and faces to the emission light source and is used for the penetration of the driving rod, the irradiating ring-shaped lamp is provided with a sliding hole for the penetration and sliding of the driving rod, the fan-shaped baffles are rotatably arranged on the inner side wall of the upper part of the vertical pre-embedded culvert, the side edges of the fan-shaped baffles are mutually abutted so as to isolate the inner cavity of the vertical pre-embedded culvert into an upper inner cavity and a lower inner cavity, and the extrusion ring is symmetrically arranged on the driving rod and abutted to the upper side surface and the lower side surface of the fan-shaped baffles, the extrusion switch is located in the upper inner cavity and electrically connected with the irradiation annular lamp, one end of the extrusion switch is rotatably connected with the fan-shaped baffle, and the other end of the extrusion switch is rotatably connected with the inner side wall of the vertical embedded culvert pipe.
Through adopting above-mentioned technical scheme, when the building is carried or the body to be measured takes place the slope, can order about the actuating lever of both sides and take place the removal of different amplitude, thereby inevitable can lead to the actuating lever to drive extrusion ring and take place to remove and order about sector baffle upwards or expand downwards, the decline that the building body that explains this one side takes place when sector baffle of one side upwards expands, otherwise then opposite, can order about the gap size that shines the illumination that shines the annular lamp simultaneously again and can observe sector baffle, and the size in accessible gap obtains inclination's size.
Preferably, the extrusion switch includes an installation section of thick bamboo, a lower installation section of thick bamboo, goes up contact point and lower contact point, go up the installation section of thick bamboo and rotate and install to vertical pre-buried culvert pipe inside wall, an installation section of thick bamboo rotates down and installs the side wall on the sector baffle and insert and establish and slide in last installation section of thick bamboo, goes up the contact point and locates that the installation section of thick bamboo is inside and be connected with the installation section of thick bamboo through the torsional spring, lower contact point installation is to the one end that the installation section of thick bamboo stretched to last installation section of thick bamboo down.
Through adopting above-mentioned technical scheme, through the setting of extrusion switch, rapid emergence according to inclination and automatic electric quantity to can set up the light time according to the angle size, for example, light automatically after removing certain angle, further improve the actual practicality of device.
Preferably, the upper end of the vertical embedded culvert pipe is covered with a transparent cover, and the upper end of the transparent cover is provided with angle scale lines corresponding to the fan-shaped baffles.
Through adopting above-mentioned technical scheme, after the emergence slope of building or the body of awaiting measuring, can through the automatic observation of transparent lid to, shine the annular lamp and can see through fan-shaped baffle and shine to transparent covering on, the accessible shines the position that light on transparent covering covered and carries out the acquisition of angle, further improves the convenience of actual detection early warning.
Preferably, still including setting up the absolute limit reminding device between last installation section of thick bamboo and the lower installation section of thick bamboo, absolute limit reminding device is including setting up the drive needle on last contact point, set up the hole of wearing to establish that supplies the drive needle to wear to establish on going up the installation section of thick bamboo, the lateral surface that lies in the installation section of thick bamboo is provided with the warning rubber gas ring of mutually supporting with the drive needle, remind the inside display pigment that is provided with of rubber gas ring.
Through adopting above-mentioned technical scheme, when inclination reaches serious degree, the degree of depth that the installation section of thick bamboo inserted supreme installation section of thick bamboo inside down increases, when inclination reaches serious harm building, the degree of depth that the installation section of thick bamboo inserted supreme installation section of thick bamboo inside down this moment also reaches the limit, the driving needle can remind rubber gas ring to prick at this moment, thereby be located and remind the inside display pigment of rubber gas ring can fly away along with reminding the burst of rubber gas ring, the testing personnel see after the display pigment just can foresee this moment take place great inclination angle so can make a quick response.
Preferably, the two ends of the upper side of the horizontal pre-buried culvert pipe are provided with inclined self-detectors, specifically, each inclined self-detector comprises a balance plate, a connecting cylinder, a balance rod, a connecting cable and an indicating block, the balance plate is horizontally installed on the ground, the connecting cylinders are symmetrically and vertically installed on the lower side of the balance plate and extend towards the two ends of the horizontal pre-buried culvert pipe, the lower end of the connecting cylinder is provided with a rubber extending cylinder elastically connected with the horizontal pre-buried culvert pipe, the balance rod is arranged in the balance plate, a mounting groove for the balance rod to penetrate is formed in the balance plate, the side wall in the middle of the mounting groove is provided with a mounting block for the balance rod to rotate, one end of the connecting cable is connected with the end part of the balance rod, the other end of the connecting cable penetrates through the connecting cylinder and the rubber extending cylinder to be connected with the end part of the horizontal pre-buried culvert pipe, the indicating blocks are fixedly installed at the two ends of the balance rod and point to the side wall of the balance plate, and display scales are arranged on the side wall of the mounting groove.
Through adopting above-mentioned technical scheme, through the setting of slope self-checking ware, can learn the pre-buried culvert pipe of level self and whether take place the slope, so on the basis of the building body slope of surveying, get rid of the angle of inclination of the pre-buried culvert pipe of level self to can detect and early warning to more accurate data.
Preferably, the balance plate is provided with an observation groove communicated with the mounting groove and an observation window covering the observation groove.
Through adopting above-mentioned technical scheme, the mutual cooperation of observation groove and observation window can more audio-visual concrete data of learning, improves the efficiency that detects the early warning.
In summary, the present application includes at least one of the following beneficial technical effects:
1. through the pre-buried culvert pipe of level in this application and subside the inclination detector and mutually support, when the settlement degree of depth and the inclination of building or other objects that await measuring change, can be through subsiding inclination detector automated inspection to when subsiding and incline and taking place, can enlarge through vertical pre-buried culvert pipe and the inclination amplifier that is located vertical pre-buried culvert intraduct, make the measurement personnel can realize detecting and early warning operation, guarantee safety.
2. When actual building takes place to subside and incline, can drive the extension rod and take place the motion together, and subside the space of stepping down that isolator can provide the extension rod removal, can understand that the extension rod can not receive the restriction at the in-process of motion, for example can not receive the restriction that earth, stone blockked, guarantee actual measurement's accuracy.
3. After the emergence slope of building or the body of awaiting measuring, can be through the automatic observation of transparent lid to, shine the annular lamp and can shine to transparent covering through fan-shaped baffle on, the accessible shines the position that the light on transparent covering covered and carries out the acquisition of angle, further improves the convenience of actual detection early warning.
Drawings
Fig. 1 is a schematic view of the overall structure of the present application.
Fig. 2 is a schematic structural diagram of the settlement inclination detector.
Fig. 3 is an enlarged schematic view of a portion a in fig. 2.
Fig. 4 is a schematic structural view of the horizontal holder.
Fig. 5 is a schematic diagram of the structure of the inclination amplifier.
Fig. 6 is a schematic view of the structure of the press switch.
Fig. 7 is an enlarged schematic view of a portion B in fig. 6.
Fig. 8 is a first structural diagram of the inclined self-detector.
Fig. 9 is a schematic structural diagram of a tilt self-detector.
Description of reference numerals: 1. horizontally embedding culvert pipes; 2. vertically embedding culvert pipes; 3. a settlement inclination detector; 4. a gradient amplifier; 31. a settlement isolator; 32. an extension rod; 33. a horizontal holder; 34. a tilting force-bearing lever; 35. an isolation chamber; 11. a groove is arranged in a penetrating way; 311. an isolation baffle; 312. isolating the cover plate; 313. suspending an air bag; 314. a suspension rope; 315. a space of abdicating; 331. lifting the pressure spring; 332. a loading cylinder; 333. carrying water; 334. isolating oil; 335. a buoyancy block; 336. installing a cover; 337. a counterweight block; 338. a vertical rod; 3361. perforating holes; 41. a drive rod; 42. a weighted spring rod; 43. illuminating the ring lamp; 44. a fan-shaped baffle plate; 45. an extrusion ring; 46. a squeezing switch; 431. a sliding hole; 47. an upper inner cavity; 48. a lower inner cavity; 461. an upper mounting cylinder; 462. a lower mounting cylinder; 463. an upper contact point; 464. a lower contact point; 5. a transparent cover; 51. angle scale lines; 6. a deadline prompting device; 61. a drive pin; 62. a through hole; 63. reminding the rubber air ring; 7. inclining the self-checking device; 71. a balance plate; 72. a connecting cylinder; 73. a balancing pole; 74. a connecting cable; 75. an indication block; 711. mounting grooves; 76. mounting blocks; 77. displaying scales; 712. an observation tank; 713. and (4) an observation window.
Detailed Description
The present application is described in further detail below with reference to figures 1-9.
The embodiment of the application discloses geological disaster detection early warning system is mainly applied to building, station, railway system and highway etc. if have the area of taking place the landslide, the calamity phenomenon of slope appears subsiding easily, detection and early warning that can be by oneself improve the security when in actual use.
The first embodiment is as follows:
referring to fig. 1 and 2, the geological disaster detection and early warning system comprises a horizontal embedded culvert 1 and a vertical embedded culvert 2, wherein the horizontal embedded culvert 1 and the vertical embedded culvert 2 are pre-embedded in the lower part of a building in the early stage, the vertical embedded culvert 2 is symmetrically arranged at two ends of the horizontal embedded culvert 1 and extends vertically upwards, and the horizontal embedded culvert 1 is communicated with the vertical embedded culvert 2; in order to detect objects needing detection and early warning, such as buildings and the like, a settlement inclination detector 3 is arranged at two ends of the pre-buried culvert pipe, and the settlement inclination detector 3 is connected with the lower surface of a bearing pile of the building to be detected; an inclination amplifier 4 which is connected with the settlement inclination detector 3 and amplifies the inclination is arranged in the vertical pre-buried culvert pipe 2; through the pre-buried culvert pipe of level 1 in this application and subside inclination detector 3 and mutually support, when the settlement degree of depth and the inclination of building or other objects that await measuring change, can be through subsiding 3 automated inspection of inclination detector, and when subsiding and incline and take place, can enlarge through vertical pre-buried culvert pipe 2 and the inclination amplifier 4 that is located vertical pre-buried culvert pipe 2 inside, make testing personnel can realize detecting and early warning operation, guarantee safety.
Referring to fig. 3, which is a structural schematic diagram of the settlement inclination detector 3 in the present embodiment, the settlement inclination detector 3 in the present embodiment includes a settlement isolator 31, an extension rod 32, a horizontal holder 33, and an inclined force-bearing rod 34; specifically, subside isolator 31 and locate between the pre-buried culvert pipe of level 1 and the building body bearing pile, and subside and be formed with isolated chamber 35 in the isolator 31, subside isolator 31's setting mainly be in order to guarantee that building body etc. takes place not to influence the pre-buried culvert pipe of level 1 when subsiding with the angle slope, guarantee the accuracy of actual detection and early warning. Extension rod 32 passes the direction extension of the pre-buried culvert pipe 1 lateral wall of level and isolated chamber 35 to building bearing pile to be connected with building bearing pile, set up on the pre-buried culvert pipe of level 1 and supply extension rod 32 to wear to establish the groove 11 of wearing to establish that slides and communicate each other with isolated chamber 35. The extension rod 32 in this embodiment may be made of metal or plastic with certain rigidity and hardness, and the end connected with the building load-bearing pile ascends and descends along with the building load-bearing pile.
One end of the extension rod 32, which is far away from the building bearing pile, is matched with the inclination amplifier 4 to amplify the inclination of the building, the horizontal holders 33 are arranged at two ends of the horizontal embedded culvert 1 and are symmetrically arranged, the inclined stress rods 34 are arranged on the horizontal holders 33 to realize horizontal extension in the horizontal embedded culvert 1, one end of each inclined stress rod 34 movably supports the extension rod 32 extending into the horizontal embedded culvert 1, and the other end of each inclined stress rod 34 is connected with the inclination amplifier 4; so in the actual in-process of measuring, when building I waited for the body survey because geological disasters or naturally took place to subside with the slope of angle, can drive extension rod 32 and move to the slope atress pole 34 that drives be connected with extension rod 32 takes place the motion together, and then forces the inclination amplifier 4 of slope atress pole 34 other end to move and obtains the time situation of building with the quick detection of high quality testing personnel, and then makes corresponding prevention or rescue measure.
Referring to fig. 3, a concrete structure of the settlement insulator 31 is shown, in this embodiment, the settlement insulator 31 includes an insulating barrier 311, an insulating cover 312, a hanging airbag 313 and a hanging rope 314; specifically, the isolation baffles 311 are symmetrically arranged between the horizontal embedded culvert 1 and the bearing pile of the building to be tested, the isolation baffles 311 are made of plastic materials, soil between the isolation baffles 311 is taken away to form a channel, the isolation cover plate 312 covers the isolation baffles 311, the isolation cover plate 312 is also made of rigid plastic materials, and a settlement abdicating space 315 is formed between the isolation cover plate 312 and the isolation baffles 311; the hanging airbag 313 is disposed in the subsidence space 315 formed by the isolation baffle 311 and the isolation cover plate 312 for the extension rod 32 to penetrate through, one end of the hanging rope 314 is connected with the isolation cover plate 312, and the other end is connected with the hanging airbag 313 to hang the hanging airbag 313. Subside the setting of isolated ware 31 through this embodiment, at first can completely cut off pre-buried culvert pipe 1 of level and building bearing pile, can not bring the influence to pre-buried culvert pipe 1 of level when the building takes place to subside and incline, on the other hand can drive extension rod 32 and together remove after the slope of angle takes place to subside or the building, and subside the setting up of isolated ware 31 and make extension rod 32's motion not influenced and interfere, further improve the accuracy that the actual test detected the early warning.
Referring to fig. 4, the horizontal holder 33 in this embodiment includes a lifting pressure spring 331, a containing cylinder 332, containing water 333, insulating oil 334, a buoyancy block 335, a mounting cover 336, a weight block 337, and a vertical rod 338; specifically, the bearing cylinders 332 are symmetrically arranged at two ends of the horizontal embedded culvert 1, the lifting pressure springs 331 are arranged between the horizontal embedded culvert 1 and the bearing cylinders 332 to lift and mount the bearing cylinders 332, the same bearing cylinders 332 are also made of plastic materials, and the bearing cylinders 332 are lifted and mounted by the lifting pressure springs 331, so that the bearing cylinders 332 are prevented from interfering under the condition of external vibration; in the dress water 333 locates the dress section of thick bamboo 332, isolated oil 334 is located dress water 333 top and carries out isolated sealing in order to hold dress water 333, buoyancy piece 335 floats in the top of mounting bracket, the installation is covered 336 lid and is fitted on dress section of thick bamboo 332, balancing weight 337 passes through the rope hoist and mount on buoyancy piece 335 and extend down, buoyancy piece 335 top is located to vertical pole 338 an organic whole and pass the vertical upwards extension of installation lid 336, set up on the installation lid 336 and supply vertical pole 338 to wear to establish the through-hole 3361 that slides, and wear to establish between hole 3361 and the vertical pole 338 the airtight lubricating oil of fat liquoring and form sealed, the one end that buoyancy piece 335 was kept away from to vertical pole 338 is connected with slope atress pole 34 middle part rotation. Can guarantee that pre-buried culvert pipe 1 of level probably can not guarantee absolute level at the in-process of installation, so bring certain experiment detection error, and the level keeps the setting of ware 33, can guarantee that the fulcrum of slope atress pole 34 can guarantee absolute level to the detection effect that still can accomplish accurately taking place the phenomenon of geological disasters, further reduce the existence of error.
Referring to fig. 5, it has been described above that when the building container is settled or the inclination angle is changed, the extension rod 32 can be driven to move, and the movement of the extension rod 32 will synchronously drive the inclination amplifier 4 at the other end of the inclined force-bearing rod 34 to work, so as to amplify the phenomenon of the angle or settlement; the tilt amplifier 4 in the present embodiment includes a driving rod 41, a weighted spring rod 42, an illuminating ring lamp 43, a sector baffle 44, a pressing ring 45, and a pressing switch 46; the specific driving rod 41 is arranged in the vertical embedded culvert 2, extends upwards and is rotatably connected with the inclined stress rod 34, the weighted spring rod 42 is arranged in the vertical embedded culvert 2, one end of the weighted spring rod 42 is rotatably connected with the inner side wall of the vertical embedded culvert 2, the other end of the weighted spring rod 42 is rotatably connected with the side wall of the driving rod 41, the gravity of the driving rod 41 can be counteracted through the arrangement of the weighted spring rod 42, so the driving rod 41 can be driven to ascend and descend under the action of slight external force, and on the other hand, the arrangement of the weighted spring rod 42 ensures that the driving rod 41 can not deviate at the position in the middle of the vertical embedded culvert 2; therefore, when the extension rod 32 drives the tilt lever 34 to move, the driving rod 41 at the other end of the tilt lever 34 moves in the opposite direction.
The irradiation annular lamp 43 is installed inside the vertical pre-buried culvert 2 and emits light upwards, the driving rod 41 is provided for penetrating, a sliding hole 431 for allowing the driving rod 41 to slide is formed in the irradiation annular lamp 43, the fan-shaped baffles 44 are rotatably installed on the inner side wall of the upper portion of the vertical pre-buried culvert 2, the side edges of the fan-shaped baffles 44 are mutually abutted to isolate the inner cavity of the vertical pre-buried culvert 2 into an upper inner cavity 47 and a lower inner cavity 48, the irradiation annular lamp 43 is located in the lower inner cavity 48, and the extrusion rings 45 are symmetrically arranged on the driving rod 41 and abutted to the upper side surface and the lower side surface of the fan-shaped baffles 44 (the extrusion rings 45 located below the fan-shaped baffles 44 are not shown in the drawing); therefore, in the process of the movement of the actual driving rod 41, the extrusion ring 45 can be driven to move upwards or downwards, so as to drive the fan-shaped baffles 44 to be unfolded upwards or downwards, after the fan-shaped baffles 44 are unfolded, the size of the inclination angle of the building can be judged through the size of the gap formed by the unfolding of the adjacent fan-shaped baffles 44, and the irradiation ring-shaped lamp 43 can provide a light source to realize more convenient observation.
It should be noted that, in this embodiment, the extrusion rings 45 located at the upper and lower sides of the sector-shaped baffle 44 have a certain distance (not shown in the figure) from the sector-shaped baffle 44, so that no interference is formed no matter the sector-shaped baffle 44 moves upwards or downwards, that is, the situation that the sector-shaped baffle cannot turn upwards or downwards does not occur, and the distance does not affect the accuracy of the overall detection within the measurement operation range.
Through the mutual matching of the structures, whether the building descends or inclines at an angle or not or whether the building inclines after settlement occurs or not can be judged; on the first hand, when the falling occurs, the driving rods 41 at both ends will move and rise, so the fan-shaped baffles 44 at both ends are unfolded on the same line; in the second aspect, when the angle is inclined, the unfolding is carried out upwards and downwards at the same time, and the unfolding amplitudes are the same; the third aspect and when the settlement has the angle inclination, the two sides are different in expansion amplitude, and the more serious angle inclination of which side is judged after the settlement is generated can be judged according to the expansion amplitude.
With continued reference to fig. 5, the pressing switch 46 is located in the upper cavity 47 and electrically connected to the annular illuminating lamp 43, and one end of the pressing switch 46 is rotatably connected to a sector baffle 44, and the other end of the pressing switch 46 is rotatably connected to the inner sidewall of the vertical pre-buried culvert 2. When the fan-shaped baffle 44 is unfolded upwards, the pressing switch 46 can be automatically driven to be opened, so that the irradiation ring-shaped lamp 43 is lighted.
Referring to fig. 6 and 7, the extruding switch 46 in this embodiment includes an upper mounting cylinder 461, a lower mounting cylinder 462, an upper contact point 463 and a lower contact point 464, the upper mounting cylinder 461 is rotatably mounted on the inner side wall of the vertical embedded culvert 2, the lower mounting cylinder 462 is rotatably mounted on the upper side wall of the segmental baffle 44 and is inserted and slid in the upper mounting cylinder 461, the upper contact point 463 is arranged inside the upper mounting cylinder 461 and is connected with the upper mounting cylinder 461 through a torsion spring, and the lower contact point 464 is mounted on one end of the lower mounting cylinder 462 extending to the upper mounting cylinder 461. When the sectorial baffles 44 are spread upward, the lower mounting cylinder 462 is driven to extend into the upper mounting cylinder 461, so that the lower contact point 464 is driven to contact the upper contact point 463, thereby ensuring that the irradiation ring lamp 43 emits light.
Example two:
referring back to fig. 5, on the basis of the first embodiment, in order to more conveniently detect the expansion angle of the fan-shaped baffle 44 and further more conveniently obtain the inclination angle of the building, the upper end of the vertical embedded culvert 2 is covered with the transparent cover 5, and the upper end of the transparent cover 5 is provided with angle scale lines 51 corresponding to the fan-shaped baffle 44. After the irradiation annular lamp 43 emits light through the fan-shaped baffle 44, light can be irradiated on the transparent cover 5, light spots are formed on the transparent cover 5 to be aligned with the angle scale lines 51, and a detection person only needs to read the angle quickly according to the angle scale lines 51.
As shown in fig. 7, in addition, in order to ensure that the measurer can be reminded of quickly knowing when the building body reaches a safe inclination angle after being inclined, the embodiment further discloses an absolute reminding device 6 arranged between the upper mounting cylinder 461 and the lower mounting cylinder 462; specifically, the absolute limit reminding device 6 includes the driving pin 61 arranged on the upper contact point 463, the through hole 62 for the driving pin 61 to penetrate through is formed in the upper mounting tube 461, the reminding rubber air ring 63 mutually matched with the driving pin 61 is arranged on the outer side surface of the upper mounting tube 461, and the display pigment is arranged inside the reminding rubber air ring 63. When inclination reaches serious degree, the depth of the lower installation cylinder 462 inserted into the upper installation cylinder 461 is increased, when inclination reaches serious harm to the building, the depth of the lower installation cylinder 462 inserted into the upper installation cylinder 461 also reaches the limit, the driving needle 61 punctures the reminding rubber air ring 63 at the moment, so that the display pigment positioned inside the reminding rubber air ring 63 scatters along with the burst of the reminding rubber air ring 63, and a detector can predict that a larger inclination angle is generated at the moment after seeing the display pigment, so that the detector can quickly respond.
Example three:
on the basis of the combination of the first embodiment or the first embodiment and the second embodiment, the horizontal embedded culvert 1 is further provided with an inclined self-checking device 7 for ensuring whether the horizontal embedded culvert is horizontal, so that the existence of experimental errors caused by the inclination of the horizontal embedded culvert 1 can be eliminated, and the specific inclined self-checking device 7 has the following structure:
referring to fig. 8 and 9, the tilt self-detector 7 includes a balance plate 71, a connecting cylinder 72, the balance bar 73, the connecting cable 74 and the indicating block 75, the balance plate 71 is horizontally installed to the ground, the connecting cylinder 72 is symmetrically and vertically installed at the lower side of the balance plate 71 and extends towards the two ends of the horizontal embedded culvert 1, the lower end of the connecting cylinder 72 is provided with a rubber extending cylinder elastically connected with the horizontal embedded culvert 1, the balance bar 73 is arranged in the balance plate 71, an installation groove 711 for the balance bar 73 to penetrate through is formed in the balance plate 71, the side wall in the middle of the installation groove 711 is provided with an installation block 76 for the balance bar 73 to rotate and install, one end of the connecting cable 74 is connected with the end of the balance bar 73, the other end of the connecting cable 74 penetrates through the connecting cylinder 72 and the rubber extending cylinder to be connected with the end of the horizontal embedded culvert 1, the indicating block 75 is fixedly installed at the two ends of the balance bar 73 and points to the side wall of the balance plate 71, and a display scale 77 is arranged on the side wall of the installation groove 711.
Therefore, in the actual operation process, the level of the balance plate 71 is ensured through the level gauge, and after the horizontal embedded culvert 1 is inclined, the connecting cables 74 on the two sides are driven to respectively ascend or descend, so that the balance rod 73 is driven to incline, the indication block 75 can be observed to be matched with the actual scales, and whether the horizontal embedded culvert 1 is inclined or not can be obtained.
As shown in fig. 9, the balance plate 71 has an observation groove 712 communicating with the mounting groove 711, and an observation window 713 covering the observation groove 712. The observation groove 712 and the observation window 713 are matched with each other, so that specific data can be more visually known, and the detection and early warning efficiency is improved.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (9)

1. The utility model provides a geological disaster detects early warning system, includes pre-buried in building body below and vertical pre-buried culvert pipe (2) in earlier stage, horizontal pre-buried culvert pipe (1) both ends and vertical upwards extension are located to vertical pre-buried culvert pipe (2) symmetry, just horizontal pre-buried culvert pipe (1) communicates with vertical pre-buried culvert pipe (2) each other, the both ends of horizontal pre-buried culvert pipe (1) are provided with subsides gradient detector (3), subside gradient detector (3) and await measuring building bearing pile lower surface connection, just be provided with in vertical pre-buried culvert pipe (2) with subside gradient detector (3) and be connected and with gradient amplifier (4) that the gradient is enlargied, its characterized in that:
the settlement inclination detector (3) comprises a settlement isolator (31), an extension rod (32), a horizontal retainer (33) and an inclined stress rod (34), wherein the settlement isolator (31) is arranged between a horizontal embedded culvert (1) and a building bearing pile, an isolation cavity (35) is formed in the settlement isolator (31), the extension rod (32) penetrates through the side wall of the horizontal embedded culvert (1) and the isolation cavity (35) to extend towards the building bearing pile and is connected with the building bearing pile, one end, far away from the building bearing pile, of the extension rod (32) is matched with an inclination amplifier (4) to amplify the inclination of the building, the horizontal retainer (33) is arranged at two ends of the horizontal embedded culvert (1) and is symmetrically arranged, the inclined stress rod (34) is arranged on the horizontal retainer (33) to horizontally extend in the horizontal embedded culvert (1), and slope atress pole (34) one end is carried out the activity to extension rod (32) that extend to in the pre-buried culvert pipe of level (1) and is accepted, and slope atress pole (34) other end is connected with gradient amplifier (4), sets up on the pre-buried culvert pipe of level (1) and supplies extension rod (32) to wear to establish to slide and with the wear-to-establish groove (11) that isolated chamber (35) communicate each other.
2. The geological disaster detection and early warning system as claimed in claim 1, wherein: subside isolator (31) including isolated baffle (311), isolated apron (312), hang gasbag (313) and suspension rope (314), between level pre-buried culvert pipe (1) and the building bearing pile that awaits measuring is located to isolated baffle (311) symmetry, isolated apron (312) are covered on isolated baffle (311), it is formed with subsides and gives way space (315) to set up between isolated apron (312) and isolated baffle (311), suspension rope (313) are located and are worn to establish in order to supply extension rod (32) between isolated baffle (311), suspension rope (314) one end is connected with isolated apron (312), and the other end is connected with suspension gasbag (313) and hangs gasbag (313) in order to hang.
3. The geological disaster detection and early warning system as claimed in claim 1, wherein: the horizontal retainer (33) comprises a lifting pressure spring (331), a bearing cylinder (332), bearing water (333), isolated oil (334), a buoyancy block (335), an installation cover (336), a balancing weight (337) and a vertical rod (338), wherein the bearing cylinder (332) is symmetrically arranged at two ends of a horizontal embedded culvert pipe (1), the lifting pressure spring (331) is arranged between the horizontal embedded culvert pipe (1) and the bearing cylinder (332) to lift and install the bearing cylinder (332), the bearing water (333) is arranged in the bearing cylinder (332), the isolated oil (334) is arranged above the bearing water (333) to isolate and seal the bearing water (333), the buoyancy block (335) floats above the installation frame, the installation cover (336) is covered on the bearing cylinder (332), the balancing weight (337) is hung on the buoyancy block (335) through a rope and extends downwards, the vertical rod (338) is integrally arranged above the buoyancy block (335) and penetrates through the installation cover (336) to vertically extend upwards, the mounting cover (336) is provided with a through hole (3361) for the vertical rod (338) to slide in a penetrating way, sealed lubricating oil is coated between the through hole (3361) and the vertical rod (338) to form sealing, and one end, away from the buoyancy block (335), of the vertical rod (338) is rotatably connected with the middle of the inclined stress rod (34).
4. A geological disaster detection and early warning system according to claim 3, characterized in that: the inclination amplifier (4) comprises a driving rod (41), a weighted spring rod (42), an irradiating annular lamp (43), a fan-shaped baffle (44), an extrusion ring (45) and an extrusion switch (46), wherein the driving rod (41) is arranged in the vertical pre-buried culvert pipe (2) and extends upwards, the weighted spring rod (42) is arranged in the vertical pre-buried culvert pipe (2) and is rotatably connected with the inclined weighted rod (34), one end of the weighted spring rod (42) is rotatably connected with the inner side wall of the vertical pre-buried culvert pipe (2), the other end of the weighted spring rod (42) is rotatably connected with the side wall of the driving rod (41), the irradiating annular lamp (43) is arranged in the vertical pre-buried culvert pipe (2) and emits light towards the upper part and is used for the driving rod (41) to penetrate through, a sliding hole (431) for the driving rod (41) to penetrate and slide is formed in the irradiating annular lamp (43), fan-shaped baffle (44) rotate to be installed on the inside wall on vertical pre-buried culvert pipe (2) upper portion, and a plurality of fan-shaped baffle (44) side contradict each other in order to isolate into inner chamber (47) and lower inner chamber (48) with vertical pre-buried culvert pipe (2) inner chamber, extrusion ring (45) symmetry is located on actuating lever (41) and contradicts with fan-shaped baffle (44) side from top to bottom, extrusion switch (46) are located in last inner chamber (47) and with shine annular lamp (43) electricity and be connected, and extrusion switch (46) one end rotates with a fan-shaped baffle (44) to be connected, extrusion switch (46) other end rotates with vertical pre-buried culvert pipe (2) inside wall to be connected.
5. The geological disaster detection and early warning system as claimed in claim 4, wherein: extrusion switch (46) are including last installation section of thick bamboo (461), lower installation section of thick bamboo (462), go up contact point (463) and lower contact point (464), go up installation section of thick bamboo (461) and rotate and install to vertical pre-buried culvert pipe (2) inside wall on, installation section of thick bamboo (462) rotate down install in sector baffle (44) side wall and insert establish and slide in last installation section of thick bamboo (461), go up contact point (463) locate installation section of thick bamboo (461) inside and be connected with last installation section of thick bamboo (461) through the torsional spring, lower contact point (464) are installed to the one end that installation section of thick bamboo (462) stretched to last installation section of thick bamboo (461) down.
6. The geological disaster detection and early warning system as claimed in claim 4, wherein: the upper end of the vertical embedded culvert pipe (2) is covered with a transparent cover (5), and the upper end of the transparent cover (5) is provided with angle scale lines (51) which correspond to the fan-shaped baffles (44).
7. The geological disaster detection and early warning system as claimed in claim 5, wherein: still including setting up absolute limit reminding device (6) between last installation section of thick bamboo (461) and lower installation section of thick bamboo (462), absolute limit reminding device (6) is including setting up drive needle (61) on last contact point (463), set up on last installation section of thick bamboo (461) and supply through hole (62) that drive needle (61) wore to establish, the lateral surface that is located installation section of thick bamboo (461) is provided with warning rubber gas ring (63) of mutually supporting with drive needle (61), remind inside being provided with of rubber gas ring (63) and showing pigment.
8. The geological disaster detection and early warning system as claimed in claim 1, wherein: the horizontal pre-buried culvert pipe comprises a horizontal pre-buried culvert pipe (1), wherein two ends of the upper side of the horizontal pre-buried culvert pipe (1) are provided with inclined self-checking devices (7), specifically, each inclined self-checking device (7) comprises a balance plate (71), a connecting cylinder (72), a balance rod (73), a connecting cable (74) and an indicating block (75), the balance plate (71) is horizontally installed on the ground, the connecting cylinders (72) are symmetrically and vertically installed on the lower side of the balance plate (71) and extend towards two ends of the horizontal pre-buried culvert pipe (1), the lower end of each connecting cylinder (72) is provided with a rubber extending cylinder which is elastically connected with the horizontal pre-buried culvert pipe (1), the balance rod (73) is arranged in the balance plate (71), a mounting groove (711) for the balance rod (73) to penetrate through is formed in the balance plate (71), an installation block (76) for the balance rod (73) to be rotatably installed is arranged on the side wall in the middle of the mounting groove (711), one end of the connecting cable (74) is connected with the end of the balance rod (73), the other end of the connecting cable (74) penetrates through the connecting cylinder (72) and the rubber extending cylinder to be connected with the end of the horizontal embedded culvert pipe (1), the indicating block (75) is fixedly installed at the two ends of the balance rod (73) and points to the side wall of the balance plate (71), and display scales (77) are arranged on the side wall of the installing groove (711).
9. The geological disaster detection and early warning system as claimed in claim 8, wherein: the balance plate (71) is provided with an observation groove (712) communicated with the mounting groove (711) and an observation window (713) covering the observation groove (712).
CN202210443602.9A 2022-04-26 2022-04-26 Geological disaster detection and early warning system Active CN114973600B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210443602.9A CN114973600B (en) 2022-04-26 2022-04-26 Geological disaster detection and early warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210443602.9A CN114973600B (en) 2022-04-26 2022-04-26 Geological disaster detection and early warning system

Publications (2)

Publication Number Publication Date
CN114973600A true CN114973600A (en) 2022-08-30
CN114973600B CN114973600B (en) 2023-06-16

Family

ID=82979570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210443602.9A Active CN114973600B (en) 2022-04-26 2022-04-26 Geological disaster detection and early warning system

Country Status (1)

Country Link
CN (1) CN114973600B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2275642A1 (en) * 2009-07-17 2011-01-19 Agisco S.r.l. System for detection and monitoring of deep land subsidence
CN107424389A (en) * 2017-09-19 2017-12-01 成都微鑫通时代科技有限公司 The Multifunctional pre-warning device of Landslide Hazards
CN209589032U (en) * 2019-03-04 2019-11-05 陕西长地建设工程质量检测有限公司 A kind of built-in type settlement of foundation detector
CN112382047A (en) * 2020-11-16 2021-02-19 成都中科大旗软件股份有限公司 Geological disaster monitoring and early warning system
JP2021038624A (en) * 2019-09-05 2021-03-11 株式会社Ask Disaster prediction device, and disaster prediction system utilizing disaster prediction device
CN215623823U (en) * 2021-01-24 2022-01-25 广东邦盛北斗产业研究院有限公司 High-rise building gradient early warning device
CN114234912A (en) * 2021-12-13 2022-03-25 广东洪实建设技术开发工程有限公司 Building slope settlement monitoring, acquisition and early warning equipment system based on Internet of things

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2275642A1 (en) * 2009-07-17 2011-01-19 Agisco S.r.l. System for detection and monitoring of deep land subsidence
CN107424389A (en) * 2017-09-19 2017-12-01 成都微鑫通时代科技有限公司 The Multifunctional pre-warning device of Landslide Hazards
CN209589032U (en) * 2019-03-04 2019-11-05 陕西长地建设工程质量检测有限公司 A kind of built-in type settlement of foundation detector
JP2021038624A (en) * 2019-09-05 2021-03-11 株式会社Ask Disaster prediction device, and disaster prediction system utilizing disaster prediction device
CN112382047A (en) * 2020-11-16 2021-02-19 成都中科大旗软件股份有限公司 Geological disaster monitoring and early warning system
CN215623823U (en) * 2021-01-24 2022-01-25 广东邦盛北斗产业研究院有限公司 High-rise building gradient early warning device
CN114234912A (en) * 2021-12-13 2022-03-25 广东洪实建设技术开发工程有限公司 Building slope settlement monitoring, acquisition and early warning equipment system based on Internet of things

Also Published As

Publication number Publication date
CN114973600B (en) 2023-06-16

Similar Documents

Publication Publication Date Title
JP6386653B2 (en) Submarine station multi-point long-term observation system
CN111220089B (en) Pile foundation pore-forming shape and perpendicularity detection device and detection method thereof
CN208887681U (en) A kind of automation Soil K+adsorption instrument
CN211291830U (en) High-efficient safe earth's surface settlement monitoring devices
CN112747793A (en) Mine surface subsidence rock movement observation device
CN113074693B (en) Deep basal pit deformation monitoring alarm device
CN211600027U (en) Hydraulic ring geological crack measuring device
CN114973600A (en) Geological disaster detection and early warning system
CN103760591A (en) Seismic detection system of detecting underground water level
JP2019078534A (en) Method of logging in borehole and underwater floating type capsule probe used for the logging
CN201884021U (en) Sliding type pipe orifice auxiliary device of borehole inclinometer
CN215639651U (en) Device for quickly measuring height of underground water level
CN112924070B (en) Soil pressure monitoring station and ground disaster detection early warning system
CN115389279A (en) Gas probe device and underground shallow layer gas exploration equipment
CN211061226U (en) Soil collection system
CN113568035A (en) Earthquake prediction method and three-dimensional ground stress and ground inclination comprehensive detection body
CN209858292U (en) Soil gas layering sampling device
CN207937441U (en) Water quality detecting device and the hidden water danger source positioning system of coal mine
Kostak Instability detection in rock
CN116679030B (en) System and method for measuring field characteristic adsorption rate of soil gas passive sampler
CN212389329U (en) Pile foundation pore-forming quality inspection device
CN217212045U (en) Soil softness degree detection device used in geotechnical engineering
CN213576611U (en) Positioning equipment support for mineral geology reconnaissance
SU1305763A1 (en) Bench for modelling pressure on structre members of underground ways and workings
CN213580923U (en) High-precision intelligent underground water environment detection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant