CN114961630B - Sand prevention method for oil well filled with foaming material - Google Patents

Sand prevention method for oil well filled with foaming material Download PDF

Info

Publication number
CN114961630B
CN114961630B CN202110195235.0A CN202110195235A CN114961630B CN 114961630 B CN114961630 B CN 114961630B CN 202110195235 A CN202110195235 A CN 202110195235A CN 114961630 B CN114961630 B CN 114961630B
Authority
CN
China
Prior art keywords
sand
foaming
resin
sand control
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110195235.0A
Other languages
Chinese (zh)
Other versions
CN114961630A (en
Inventor
匡韶华
王宝权
吕民
岳志强
佟珊珊
严蕾
柳燕丽
陈大钊
韩宗正
田富
于丽宏
王萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN202110195235.0A priority Critical patent/CN114961630B/en
Publication of CN114961630A publication Critical patent/CN114961630A/en
Application granted granted Critical
Publication of CN114961630B publication Critical patent/CN114961630B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/261Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses an oil well sand prevention method filled with foaming materials. The sand control method for the oil well comprises the following steps: filling sand-preventing bodies into perforation tunnels by using sand-carrying fluid, foaming and expanding the sand-preventing bodies under the excitation of external conditions, and solidifying and filling the perforation tunnels so as to play a role in sand prevention; the sand control body is processed by solid foaming resin materials, and is foamed and expanded under the action of formation temperature; or the sand control body is formed by encapsulating a liquid foaming resin material in a hollow soluble shell and processing, at the moment, under the action of formation temperature or injected chemical reagent, the soluble shell is dissolved, and the foaming resin material is foamed and expanded. The invention not only maintains the sand blocking performance of the foam material, but also can reduce the consumption of the foam material entering into stratum, thereby reducing the cost and the damage of the reservoir and meeting the requirements of oil field development and production.

Description

Sand prevention method for oil well filled with foaming material
Technical Field
The invention relates to the technical field of oil well sand prevention, in particular to an oil well sand prevention method filled with foaming materials.
Background
The sand production of an oil-gas well refers to a process or a phenomenon that rock structure of a stratum nearby a well bottom is changed due to various comprehensive factors such as geological conditions, exploitation modes, measure operation and the like in the production process of the oil-gas well, so that scattered sand or shed sand of the stratum is carried into a shaft or the ground by produced fluid of the stratum, and a series of adverse effects are caused on normal production of the oil-gas well.
The main way to solve the sand production problem of oil and gas well is to adopt sand control technology to prevent the sand produced by stratum from entering the well bore or to artificially strengthen the consolidation degree of nearby stratum rock so as to control the sand production of stratum. The existing sand control technology is mainly divided into two major categories of mechanical sand control and chemical sand control, and concretely can be divided into screen pipe sand control technology, gravel packing sand control technology, fracturing sand control technology, artificial well wall sand control technology, chemical sand fixation technology and the like.
The chemical sand fixing technology is to squeeze chemical sand fixing agent into oil layer to glue loose sand grains together to prevent sand from being produced in the layer. The sand control technology has the advantages of simple construction process, no pipe column left in the shaft, and the like, and is widely applied. However, the chemical sand fixation technology has the problems of short sand prevention effective period, high operation cost, large reservoir damage and the like in the practical application process. In order to improve the application effect of the chemical sand fixation technology, scientific researchers sequentially research and improve the chemical sand prevention technology, wherein the filling of the foaming material for sand prevention is an important research direction.
Chinese patent (CN 1168407A) discloses a formula process of a high-temperature foam resin sand prevention and fixation agent, which comprises modified phenolic resin, heat-resistant auxiliary agent, mutual-dissolving diluent, coupling agent and foaming agent, wherein the foaming agent is aluminum powder. After sand prevention and fixation agent is injected into stratum, the curing agent (acid liquor) is injected to react with foaming agent to generate bubbles, foam is generated, and the foaming agent reacts with modified phenolic resin to cure the phenolic resin. On one hand, loose sand grains can be cemented and solidified, and on the other hand, a solid foam sand blocking layer can be formed on the well wall. However, this process is not ideal in field effect, and mainly has the following problems: (1) The injected sand fixing agent is still a solution system, foam can be generated only by injecting the initiating curing agent after injection, the consumption of resin is not reduced, and the operation cost is high; (2) As with conventional chemical sand consolidation, the sand consolidation agent can enter stratum rock pores, causing reservoir damage; (3) Because the aluminum powder is dispersed and wrapped in the phenolic resin, the initiating curing agent (acid liquor) injected in the later stage is difficult to contact with the aluminum powder, the reaction is insufficient, and the foaming effect is poor.
Chinese patent (CN 106634920 a) discloses a low density foam resin sand control agent suitable for sand production horizontal well of loose sandstone reservoir and its preparation method. The foam resin sand control agent consists of cementing agent, foaming agent, foam stabilizer, curing agent and coupling agent. Wherein the cementing agent is an emulsion of a resin and water. The resin sand control agent is prepared into foam on the ground and is directly injected into an oil well, the foam can be uniformly injected into a heterogeneous oil reservoir, and meanwhile, the foaming technology is utilized, so that the volume of the sand control agent is increased, and the resin consumption and cost are reduced. However, this technique has some disadvantages: (1) The sand prevention principle is still the same as that of the conventional chemical sand fixation technology, loose sandstone is cemented and solidified by using a resin material, and due to the underground complex condition, partial sand grains cannot be contacted and adsorbed with resin, so that the cemented and solidified effect is poor, and the sand prevention effective period is influenced; (2) Most of the components of the sand control agent are water, and the resin is dispersed in the water, so that a solidified foam sand control layer cannot be formed at the well wall after solidification.
Chinese patent (CN 111810097 a) discloses a particulate matter filled completion string and a particulate matter filled completion method, in which a dissolvable pipe is used to fill dry particulate matter that swells with water on the outer layer of an outer pipe string, after the well is run in, a dissolving liquid is injected to dissolve out the dissolvable pipe, so that the particulate matter contacts with fluid, swelling occurs, and the space between the outer pipe string and the wall of the well bore of the development well is gradually filled. The dry particles are polyurethane polymer or foamed styrene polymer. The two materials can be expanded through water absorption, have poor hydrolysis resistance, are easy to hydrolyze after being soaked in water for a long time, and have greatly reduced strength; in addition, the two materials have poor temperature resistance and are not suitable for sand prevention of high-temperature oil wells.
Disclosure of Invention
In order to make up for the defects of the existing chemical sand fixation technology, the invention provides the oil well sand prevention method filled with the foaming material, which not only maintains the sand blocking performance of the foaming material, but also can reduce the consumption of the foaming material entering into stratum, thereby reducing the cost and the damage of a reservoir stratum and meeting the requirements of development and production of oil fields.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
an oil well sand control method filled with foaming materials comprises the following steps:
Filling sand-preventing bodies into perforation tunnels by using sand-carrying fluid, foaming and expanding the sand-preventing bodies under the excitation of external conditions, and solidifying and filling the perforation tunnels so as to play a role in sand prevention;
The sand control body is processed by solid foaming resin materials, and is foamed and expanded under the action of formation temperature;
Or the sand control body is formed by encapsulating a liquid foaming resin material in a hollow soluble shell and processing, at the moment, under the action of formation temperature or injected chemical reagent, the soluble shell is dissolved, and the foaming resin material is foamed and expanded.
After entering the perforation tunnel along with sand-carrying fluid, the sand-preventing body used in the invention foams and expands under the excitation of external conditions, is solidified and filled in the perforation tunnel, and the expanded sand-preventing body adapts to the perforation tunnel structure, keeps good fit with the tunnel wall, forms a sand-blocking barrier with open holes and permeability, can block the passage of stratum sand and allows the passage of stratum fluid, thereby playing a role in sand prevention.
According to the oil well sand control method filled with the foaming material of the invention, preferably, the sand control body is processed by solid foaming resin material, and comprises the following steps:
Heating the resin to a temperature above the softening point, or adding a solvent to dissolve the resin into liquid, and then adding an additive to mix the liquid to obtain foaming resin liquid; then soaking the open-cell foam material in the water, taking out and cooling or after the solvent volatilizes, and processing the sand control body.
According to the oil well sand control method filled with the foaming material of the present invention, preferably, the open-cell foam material is a foam material having an open-cell structure and a certain strength, and comprises one or a combination of more than two of metal foam, styrene foam, high-density polyethylene foam, polyurethane foam and melamine foam. The material is processed into spheres and the like by turning, milling and grinding.
The sand control body is formed by encapsulating a liquid foaming resin material in a hollow soluble shell, and the process comprises the following steps:
Heating the resin to a temperature above the softening point, or adding a solvent to dissolve the resin into liquid, and then adding an additive to mix the liquid to obtain foaming resin liquid;
And (3) packaging the foaming resin liquid in a hollow soluble shell, and processing the hollow soluble shell into sand prevention balls.
According to the oil well sand control method filled with the foaming material, preferably, the step of packaging the foaming resin liquid in the hollow soluble shell and processing the foaming resin liquid into sand control balls specifically comprises the following steps of:
taking a metal aluminum or magnesium aluminum alloy material, processing the metal aluminum or magnesium aluminum alloy material into semicircle by a stamping mode, and bonding the two semicircle together to obtain a hollow soluble shell;
drilling small holes on the hollow soluble shell, and injecting foaming resin liquid from the small holes; and plugging the small holes by using metal aluminum wires or magnesium aluminum wires after the injection is finished, and reinforcing the small holes by using an adhesive. Preferably, the small holes have a diameter of 1mm to 2mm.
According to the oil well sand control method filled with the foaming material of the present invention, preferably, the chemical agent is one or a combination of two of hydrochloric acid and acetic acid.
According to the oil well sand control method of the present invention filled with a foaming material, preferably, the resin is selected from at least one of phenolic resin, urea resin and furan resin;
When the resin is thermoplastic phenolic resin, the additive comprises a foaming agent, a curing agent, a surfactant and a toughening agent;
When the resin is thermosetting phenolic resin, urea resin or furan resin, the additive comprises a foaming agent, a surfactant and a toughening agent; at this time, curing agent is not added, and the formation temperature is utilized for curing;
the foaming agent is at least one selected from fluorochlorohydrocarbon, n-hexane and cyclopentane;
the curing agent is at least one selected from hexamethylene tetramine, hydrochloric acid, acetic acid, ammonium chloride and epoxy resin curing agent;
the surfactant is at least one selected from sodium dodecyl benzene sulfonate, sodium fatty alcohol polyvinyl ether sulfate and organic silicon polyether;
the toughening agent is at least one selected from polyvinyl alcohol and polyethylene glycol;
the solvent is at least one selected from ethanol and acetone.
According to the oil well sand prevention method filled with the foaming material, preferably, when the resin is heated to above the softening point, the weight ratio of the resin to the foaming agent to the surfactant to the toughening agent is 100:1-5:0.5-1.5:2-10;
When the solvent is used for dissolving the resin, the weight ratio of the resin, the solvent, the foaming agent, the surfactant and the toughening agent is 100:10-30:1-5:0.5-1.5:2-10.
According to the oil well sand control method filled with the foaming material, the sand control body is preferably in the shape of a sphere or a cylinder and the like.
According to the oil well sand control method filled with the foaming material, preferably, the size of the sand control body is smaller than the diameter of the perforation tunnel, and the sand control body can smoothly enter the perforation tunnel under the pushing of sand-carrying fluid.
According to the oil well sand control method filled with the foaming material, the density of the sand control body before expansion is similar to that of the sand-carrying fluid, preferably, the density of the sand control body is 1.0g/cm 3-1.5g/cm3, and the sand control method is beneficial to carrying of the sand-carrying fluid.
According to the oil well sand control method filled with the foaming material, preferably, the sand control body is provided with open pores after foaming and expansion, and the diameter of the pores is 0.05mm-0.30mm.
According to the method for sand control of an oil well filled with a foaming material of the present invention, preferably, the sand control body has permeability after foaming and expansion, and the permeability is preferably more than 5 darcy.
According to the oil well sand control method filled with the foaming material, preferably, the sand control body has certain compressive strength after foaming and expansion, and the compressive strength is required to be larger than production pressure difference, preferably, larger than 2MPa.
According to the oil well sand control method filled with the foaming material, the sand control body has certain temperature resistance after foaming expansion, and the temperature resistance is preferably higher than 60 ℃.
The concrete site construction method of the oil well sand control method filled with the foaming material comprises the following steps:
(1) The construction pipe column is put into an oil well, and the lower end of the pipe column is positioned at the bottom boundary of the perforating section; the construction pipe column is mainly formed by connecting oil pipes;
(2) Injecting well flushing liquid into the oil pipe, circularly flushing for one week, closing a sleeve valve, and extruding the front liquid into the stratum;
(3) A sand control body is thrown into sand-carrying fluid from a wellhead by using a ground ball throwing device;
(4) The sand control body enters the perforation tunnels along with sand carrying fluid and is gradually filled into the perforation tunnels, when the ground construction pressure has obvious increasing trend, the perforation tunnels are completely filled, and the pumping construction is stopped;
(5) If the sand control body is formed by encapsulating liquid foaming resin material in a hollow soluble shell, injecting chemical reagent (acid liquor) into a shaft according to the requirement, and dissolving the hollow soluble shell; in the oil well with high temperature, high water content and high mineralization degree, the soluble shell can be slowly dissolved, and acid liquid can not be injected at the moment;
(6) Closing the well for more than 12 hours, and after the stratum temperature is recovered, foaming, expanding and solidifying the sand prevention body;
(7) And (5) lifting out the construction pipe column, and putting into the production pipe column to put into production.
The beneficial effects of the invention include:
1) The invention is a single well sand control operation construction, only needs to fill the sand control body into the perforation tunnel, compared with the prior sand control technology that a large amount of sand control materials are filled into the stratum and the shaft, the sand control body is greatly reduced, thereby reducing the sand control cost; and the site operation is simple, the operation is easy, special equipment such as a fracturing truck set is not needed, and the site operation cost is greatly reduced. The sand control body used in the invention has the advantages of easy acquisition of material sources, low price, simple processing technology and low overall manufacturing cost. The invention comprehensively reduces the cost of sand prevention measures from the aspects of sand prevention material consumption, material cost and construction operation.
2) After the sand control measures are taken, no tool is left in the shaft, so that other operations in the later period are convenient, and the shaft pipe column is not required to be salvaged in the later period.
3) The sand control material of the invention does not penetrate into the stratum pores, thus not causing reservoir damage.
4) The sand control method for the oil well has wide application range and good sand control effect, and is not influenced by the water content of the stratum and the length of the well section.
5) The sand control body formed after expansion directly plays a supporting role on the rock on the wall surface of the pore canal of the injection hole, and the peeling and the damage of stratum rock are prevented from the source.
Drawings
FIG. 1 is a schematic representation of a sand control body of the present invention prior to expansion into a perforation tunnel.
FIG. 2 is a schematic representation of a sand control body of the present invention after expansion into a perforation tunnel.
FIG. 3 is a schematic view of a sand control body of the present invention formed by encapsulating a liquid foamable resin material in a hollow dissolvable casing.
Fig. 4 is a schematic view of a construction string according to an embodiment of the present invention.
Reference numerals illustrate:
1-sand control body, 2-perforation tunnel, 3-sand blocking barrier, 51-hollow soluble shell, 52-foaming resin liquid, 11-construction pipe column and 12-ball injector.
Detailed Description
In order to more clearly illustrate the present invention, the present invention will be further described with reference to preferred embodiments. It is to be understood by persons skilled in the art that the following detailed description is illustrative and not restrictive, and that this invention is not limited to the details given herein.
Example 1
In the embodiment, a solid foaming resin material is adopted to process into a sand prevention body, and the sand prevention body is adopted to perform oil well sand prevention operation; the method comprises the following steps:
100g of solid thermoplastic phenolic resin is put into a container, 10g of ethanol is added for dissolution, then 5g of normal hexane, 1g of fatty alcohol polyvinyl ether sodium sulfate and 10g of polyethylene are added for uniform stirring and mixing, and foaming resin liquid is obtained.
Soaking the open-cell foam material in foaming resin liquid, fishing out, putting into a 40 ℃ oven for drying, and processing the open-cell foam material into the sand prevention body. The open-cell foam material is processed into spheres by adopting foam metal (Changsha Yuan New Material Co., ltd.) through turning, milling and grinding.
The sand control body at this time did not foam and cross-linked to cure. The sand control body prepared by the embodiment is a perforation tunnel with the sphere size of 8mm and is suitable for more than 10mm, and can smoothly enter the perforation tunnel under the pushing of sand-carrying fluid.
The density of the sand prevention body before expansion is similar to that of the sand-carrying fluid and is 1.2g/cm 3, so that the sand-carrying fluid is facilitated to carry.
Sand-carrying fluid is used to fill sand-preventing body into perforation channel, and the sand-carrying fluid can be clear water, saline water and guanidine gum solution. When the formation temperature is above the foaming temperature of the foaming agent, the sand control body foams, the volume expansion becomes large, and the perforation tunnels are filled. The expanded sand control body has open pores and permeability, can block formation sand from passing through, and allows formation fluid to pass through, thereby playing a role in sand control.
The expanded sand control body forms uniform open pores with the diameter of 0.05mm-0.30mm.
Sand control body experimental test: the sand control body is put into a glass tube, put into dilute hydrochloric acid with the concentration of 10 percent, put into water bath with the temperature of 60 ℃ and foamed and solidified for 48 hours. And injecting clear water to test the permeability to reach 5 darcy. 50g of mixed quartz sand with the particle size ranging from 0.05 to 0.30mm is added, then water is introduced to test the sand blocking performance, the sand output is only 0.056g, and the injection pressure difference is more than 2MPa. Experiments show that the sand control body has good sand blocking performance after expansion.
Example 2
In the embodiment, a solid foaming resin material is adopted to process into a sand prevention body, and the sand prevention body is adopted to perform oil well sand prevention operation; the method comprises the following steps:
The thermoplastic phenolic resin is used as a resin matrix, the foaming agent is fluorine-chlorine hydrocarbon, the curing agent is hexamethylene tetramine, the surfactant is sodium dodecyl benzene sulfonate, and the toughening agent is polyvinyl alcohol.
100G of thermoplastic phenolic resin matrix of tree is put into a container, diluted into liquid state by 10g of acetone, and then 10g foaming agent, 2g of curing agent, 1g of surfactant and 15g of toughening agent are added and evenly mixed.
Soaking the open-cell foam material in the mixed foaming resin material, fishing out, putting into a baking oven at 40 ℃ for baking, and processing the open-cell foam material into the sand-preventing body. The open cell foam material is formed into spheres by turning, milling and grinding through an open cell polyethylene foam (Shijia King macronew material products Co., ltd.).
The sand control body at this time did not foam and cross-linked to cure. The sand control body prepared by the embodiment is a perforation tunnel with the sphere size of 10 mm and is suitable for more than 12mm, and can smoothly enter the perforation tunnel under the pushing of sand-carrying fluid.
The density of the sand prevention body before expansion is similar to that of the sand-carrying fluid and is 1.1g/cm 3, so that the sand-carrying fluid is facilitated to carry.
And filling the sand control body into the perforation tunnels by using sand-carrying fluid. The sand-carrying liquid can be clear water, salt water, guanidine gum solution, etc. When the formation temperature is above the foaming temperature of the foaming agent, the sand control body foams, the volume expansion becomes large, and the perforation tunnels are filled. The expanded sand control body has open pores and permeability, can block formation sand from passing through, and allows formation fluid to pass through, thereby playing a role in sand control.
Sand control body experimental test: the sand control body is put into a glass tube, put into dilute hydrochloric acid with the concentration of 10 percent, put into water bath with the temperature of 60 ℃ and foamed and solidified for 48 hours. The permeability is up to 4.5 darcy when the clean water is injected. 50g of mixed quartz sand with the particle size ranging from 0.05 to 0.30mm is added, then water is introduced to test the sand blocking performance, the sand output is only 0.047g, and the injection pressure difference is more than 2.3MPa. Experiments show that the sand control body has good sand blocking performance after expansion.
Example 3
In the embodiment, a solid foaming resin material is adopted to process into a sand prevention body, and the sand prevention body is adopted to perform oil well sand prevention operation; the method comprises the following steps:
the thermosetting phenolic resin is used as a resin matrix, the foaming agent is fluorine-chlorine hydrocarbon, a curing agent is not required to be added, the surfactant is sodium dodecyl benzene sulfonate, and the toughening agent is polyvinyl alcohol.
100G of resin matrix is placed into a container to be heated to a temperature above the softening point, and then 15g of foaming agent, 2g of surfactant and 6g of toughening agent are added to be uniformly mixed.
Soaking the open-cell foam material in the mixed foaming resin material, fishing out, putting into a baking oven at 40 ℃ for baking, and processing the open-cell foam material into the sand-preventing body. The open cell foam material is formed into spheres by turning, milling and grinding through an open cell polyethylene foam (Shijia King macronew material products Co., ltd.).
The sand control body at this time did not foam and cross-linked to cure. The sand control body prepared by the embodiment is a perforation tunnel with the sphere size of 8mm and is suitable for more than 10mm, and can smoothly enter the perforation tunnel under the pushing of sand-carrying fluid.
The density of the sand prevention body before expansion is similar to that of the sand-carrying fluid and is 1.25g/cm 3, so that the sand-carrying fluid is facilitated to carry.
And filling the sand control body into the perforation tunnels by using sand-carrying fluid. The sand-carrying liquid can be clear water, salt water, guanidine gum solution, etc. When the formation temperature is above the foaming temperature of the foaming agent, the sand control body foams, the volume expansion becomes large, and the perforation tunnels are filled. The expanded sand control body has open pores and permeability, can block formation sand from passing through, and allows formation fluid to pass through, thereby playing a role in sand control.
Sand control body experimental test: the sand control body is put into a glass tube, put into dilute hydrochloric acid with the concentration of 10 percent, put into water bath with the temperature of 60 ℃ and foamed and solidified for 48 hours. The permeability is up to 6.5 darcy when the clean water is injected. 50g of mixed quartz sand with the particle size ranging from 0.05 to 0.30mm is added, then water is introduced to test the sand blocking performance, the sand output is only 0.076g, and the injection pressure difference is more than 2.7MPa. Experiments show that the sand control body has good sand blocking performance after expansion.
Example 4
In the embodiment, the liquid foaming resin material is encapsulated in the hollow soluble shell to be processed into a sand prevention body, and the sand prevention body is adopted to perform oil well sand prevention operation; the method comprises the following steps:
the furan resin is used as a resin matrix, the fluorocarbon is used as a foaming agent, the sodium dodecyl benzene sulfonate is used as a surfactant, and the polyvinyl alcohol is used as a toughening agent.
100G of resin matrix is placed into a container (without solvent), 10g of foaming agent, 2g of surfactant and 10g of toughening agent are added and uniformly stirred and mixed, and foaming resin liquid is obtained.
As shown in fig. 3, the mixed foamed resin liquid seal 52 is enclosed in a hollow soluble shell 51, and processed into sand control balls. The hollow soluble shell 51 is a hollow aluminum sphere with a diameter of 8-10mm and a wall thickness of 1-2 mm.
The hollow aluminum spheres are prepared by the following process:
Processing metal aluminum into semicircle by stamping, and bonding the two semicircle together to obtain hollow aluminum ball; drilling a small hole with the diameter of 1mm-2mm on the hollow aluminum ball, and injecting foaming resin liquid from the small hole; after the injection is completed, the small holes are plugged by metal aluminum wires and reinforced by adhesives.
When the sand control body of the embodiment is used according to the method of the embodiment, acid liquid is required to be injected into a shaft, the hollow soluble shell is dissolved, the foaming resin solution is foamed and expanded at the stratum temperature, and the acid liquid contacts and is subjected to a curing reaction, so that the foam sand control layer with an open-cell structure is formed.
Example 5
In the embodiment, the liquid foaming resin material is encapsulated in the hollow soluble shell to be processed into a sand prevention body, and the sand prevention body is adopted to perform oil well sand prevention operation; the method comprises the following steps:
The urea-formaldehyde resin is used as a resin matrix, the foaming agent is fluorine-chlorine hydrocarbon, the surfactant is sodium dodecyl benzene sulfonate, and the toughening agent is polyvinyl alcohol.
100G of resin matrix is placed into a container (without solvent), 10g of foaming agent, 4g of surfactant and 10g of toughening agent are added and uniformly stirred and mixed, and foaming resin liquid is obtained.
As shown in fig. 3, the mixed foamed resin liquid seal 52 is enclosed in a hollow soluble shell 51, and processed into sand control balls. The hollow soluble shell 51 is a hollow aluminum sphere with a diameter of 8-10mm and a wall thickness of 1-2 mm.
The hollow aluminum spheres are prepared by the following process:
Processing metal aluminum into semicircle by stamping, and bonding the two semicircle together to obtain hollow aluminum ball; drilling a small hole with the diameter of 1mm-2mm on the hollow aluminum ball, and injecting foaming resin liquid from the small hole; after the injection is completed, the small holes are plugged by metal aluminum wires and reinforced by adhesives.
When the sand control body of the embodiment is used according to the method of the embodiment, acid liquid is required to be injected into a shaft, the hollow soluble shell is dissolved, the foaming resin solution is foamed and expanded at the stratum temperature, and the acid liquid contacts and is subjected to a curing reaction, so that the foam sand control layer with an open-cell structure is formed.
Example 6
The embodiment adopts the sand control body processed by the solid foaming resin material for site construction, and comprises the following steps:
(1) As shown in fig. 4, the construction string 11 is run into the well, and the lower end of the string is positioned at the bottom boundary of the perforating section; the construction string 11 is mainly formed by connecting oil pipes.
(2) Injecting well flushing liquid into the oil pipe by using the cement truck, circularly flushing the well for a week, closing the sleeve valve, and extruding the front liquid into the stratum.
(3) The sand control body is put into the sand-carrying fluid from the wellhead by using the ground ball injector 12.
(4) As shown in fig. 1, the sand control body 1 enters the perforation tunnels 2 along with sand-carrying fluid and is gradually filled into the perforation tunnels 2, and when the ground construction pressure has a remarkable increasing trend, the perforation tunnels are completely filled, and pumping construction is stopped.
(5) Closing the well for more than 12 hours, recovering the stratum temperature, and foaming, expanding and solidifying the sand control body to form the sand blocking barrier 3 as shown in figure 2.
(6) And (5) lifting out the construction pipe column, and putting into the production pipe column to put into production.
Example 7
The embodiment adopts the sand control body formed by processing the liquid foaming resin material packaged in the hollow soluble shell for site construction, and comprises the following steps:
(1) And (3) placing the construction pipe column into the oil well, wherein the lower end of the pipe column is positioned at the bottom boundary of the perforating section, and the construction pipe column is mainly formed by connecting oil pipes.
(2) Injecting well flushing liquid into the oil pipe by using the cement truck, circularly flushing the well for a week, closing the sleeve valve, and extruding the front liquid into the stratum.
(3) And (3) throwing sand control balls into sand-carrying fluid from a wellhead by using a ground ball throwing device.
(4) The sand control ball enters the perforation tunnels along with sand-carrying fluid and is gradually filled into the perforation tunnels, and when the ground construction pressure has obvious increasing trend, the sand control ball indicates that the perforation tunnels are completely filled, and pumping construction is stopped.
(5) And extruding a certain amount of hydrochloric acid to dissolve the sand prevention ball shell.
(6) Closing the well for more than 12 hours, and after the stratum temperature is recovered, foaming, expanding and solidifying the foaming resin liquid.
(7) And (5) lifting out the construction pipe column, and putting into the production pipe column to put into production.
It should be understood that the foregoing examples of the present invention are provided merely for clearly illustrating the present invention and are not intended to limit the embodiments of the present invention, and that various other changes and modifications may be made therein by one skilled in the art without departing from the spirit and scope of the present invention as defined by the appended claims.

Claims (10)

1. An oil well sand control method filled with foaming materials is characterized by comprising the following steps:
filling sand-preventing bodies into perforation tunnels by using sand-carrying fluid, foaming and expanding the sand-preventing bodies under the excitation of external conditions, solidifying and filling the perforation tunnels, and enabling the expanded sand-preventing bodies to adapt to the perforation tunnel structure, keep fit with the tunnel walls to form a sand-blocking barrier with perforated holes and permeability, so that stratum sand can be blocked from passing through, stratum fluid is allowed to pass through, and a sand-preventing effect is achieved;
The sand control body is processed by solid foaming resin materials, and is foamed and expanded under the action of formation temperature;
Or the sand control body is formed by encapsulating a liquid foaming resin material in a hollow soluble shell for processing, at the moment, the soluble shell is dissolved under the action of formation temperature or injected chemical reagent, and the liquid foaming resin material is foamed and expanded;
The process for processing the sand control body by the solid foaming resin material comprises the following steps:
Heating the resin to a temperature above the softening point, or adding a solvent to dissolve the resin into liquid, and then adding an additive to mix the liquid to obtain foaming resin liquid; then soaking the open-cell foam material in the water, and fishing out and cooling or processing the water into a sand control body after the solvent volatilizes;
The open-cell foam material is a foam material with an open-cell structure and a certain strength, and comprises one or more than two of foam metal, styrene foam, high-density polyethylene foam, polyurethane foam and melamine foam;
The sand control body is formed by encapsulating a liquid foaming resin material in a hollow soluble shell, and the process comprises the following steps:
Heating the resin to a temperature above the softening point, or adding a solvent to dissolve the resin into liquid, and then adding an additive to mix the liquid to obtain foaming resin liquid;
Packaging the foaming resin liquid in a hollow soluble shell, and processing the foaming resin liquid into a sand prevention body;
The resin is at least one selected from phenolic resin, urea resin and furan resin;
When the resin is thermoplastic phenolic resin, the additive comprises a foaming agent, a curing agent, a surfactant and a toughening agent;
when the resin is thermosetting phenolic resin, urea resin or furan resin, the additive comprises a foaming agent, a surfactant and a toughening agent;
The sand control body is provided with open pores after foaming and expansion, and the diameter of the pores is 0.05 mm-0.30 mm.
2. The method for sand control of an oil well filled with a foaming material according to claim 1, wherein the step of packing the foaming resin liquid in a hollow soluble casing and processing the foaming resin liquid into a sand control body specifically comprises the following steps:
taking a metal aluminum or magnesium aluminum alloy material, processing the metal aluminum or magnesium aluminum alloy material into semicircle by a stamping mode, and bonding the two semicircle together to obtain a hollow soluble shell;
Drilling small holes on the hollow soluble shell, and injecting foaming resin liquid from the small holes; and plugging the small holes by using metal aluminum wires or magnesium aluminum wires after the injection is finished, and reinforcing the small holes by using an adhesive.
3. The foam-filled oil well sand control method of claim 2 wherein said small bore diameter is 1 mm-2 mm.
4. The foam-filled oil well sand control method of claim 2 wherein the chemical agent is one or a combination of two of hydrochloric acid and acetic acid.
5. The method for sand control in a foamed material filled well of claim 1,
The foaming agent is at least one selected from fluorochlorohydrocarbon, n-hexane and cyclopentane;
the curing agent is at least one selected from hexamethylene tetramine, hydrochloric acid, acetic acid, ammonium chloride and epoxy resin curing agent;
the surfactant is at least one selected from sodium dodecyl benzene sulfonate, sodium fatty alcohol polyvinyl ether sulfate and organic silicon polyether;
the toughening agent is at least one selected from polyvinyl alcohol and polyethylene glycol;
the solvent is at least one selected from ethanol and acetone.
6. The sand control method for oil well filled with foaming material according to claim 1 or 5, wherein when the resin is heated to above the softening point, the weight ratio of the resin, the foaming agent, the surfactant and the toughening agent is 100:1-5:0.5-1.5:2-10;
When the resin is added with the solvent to be dissolved into liquid, the weight ratio of the resin to the solvent to the foaming agent to the surfactant to the toughening agent is 100:10-30:1-5:0.5-1.5:2-10.
7. The foam-filled oil well sand control method of claim 1 wherein the sand control body is a sphere or cylinder.
8. The foam filled oil well sand control method of claim 1 wherein the sand control body has a size less than the perforation tunnel diameter.
9. The foam-filled oil well sand control method of claim 1 wherein the sand control body has a density of 1.0 g/cm 3-1.5g/cm3.
10. The method for sand control in a well filled with a foamed material of claim 1, wherein the sand control body has a permeability after expansion of greater than 5 darcy;
the compressive strength of the sand control body after foaming expansion is larger than the production pressure difference;
the temperature resistance of the sand control body after foaming expansion is more than 60 ℃.
CN202110195235.0A 2021-02-20 2021-02-20 Sand prevention method for oil well filled with foaming material Active CN114961630B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110195235.0A CN114961630B (en) 2021-02-20 2021-02-20 Sand prevention method for oil well filled with foaming material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110195235.0A CN114961630B (en) 2021-02-20 2021-02-20 Sand prevention method for oil well filled with foaming material

Publications (2)

Publication Number Publication Date
CN114961630A CN114961630A (en) 2022-08-30
CN114961630B true CN114961630B (en) 2024-04-30

Family

ID=82971552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110195235.0A Active CN114961630B (en) 2021-02-20 2021-02-20 Sand prevention method for oil well filled with foaming material

Country Status (1)

Country Link
CN (1) CN114961630B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961663B (en) * 2021-02-19 2024-06-25 中国石油天然气股份有限公司 Sand prevention method for filling expandable permeable material
CN117551440B (en) * 2024-01-10 2024-03-26 东营煜煌能源技术有限公司 Foamed resin sand-fixing agent and preparation method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1403532A (en) * 2002-10-01 2003-03-19 胜利油田方圆科工贸有限责任公司化工分公司 Composite sand-proof material for oil-water well and its preparation
CN102558763A (en) * 2012-01-04 2012-07-11 山西兆信生物科技有限公司 Foamable phenolic resin strengthening and filling material for coal mine

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6705400B1 (en) * 2002-08-28 2004-03-16 Halliburton Energy Services, Inc. Methods and compositions for forming subterranean fractures containing resilient proppant packs
US8276664B2 (en) * 2007-08-13 2012-10-02 Baker Hughes Incorporated Well treatment operations using spherical cellulosic particulates
WO2015126419A1 (en) * 2014-02-24 2015-08-27 Halliburton Energy Services, Inc. Propping subterranean formation fractures using memory particulates
US11155751B2 (en) * 2019-01-22 2021-10-26 Baker Hughes Holdings Llc Method of treating subterranean formations with composites having enhanced strength

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1403532A (en) * 2002-10-01 2003-03-19 胜利油田方圆科工贸有限责任公司化工分公司 Composite sand-proof material for oil-water well and its preparation
CN102558763A (en) * 2012-01-04 2012-07-11 山西兆信生物科技有限公司 Foamable phenolic resin strengthening and filling material for coal mine

Also Published As

Publication number Publication date
CN114961630A (en) 2022-08-30

Similar Documents

Publication Publication Date Title
CN114961630B (en) Sand prevention method for oil well filled with foaming material
US5358047A (en) Fracturing with foamed cement
CN103965844B (en) Low-density micro-bubble workover fluid
US4875525A (en) Consolidated proppant pack for producing formations
AU2011263547B2 (en) Far field diversion technique for treating subterranean formation
CN110318674B (en) Method for preventing outburst caused by cracking of roadway roof
CN109097011B (en) Capsule type expansion body based on ground temperature heating and method for blocking formation leakage and improving formation bearing capacity of capsule type expansion body
US20140290943A1 (en) Stabilized Fluids In Well Treatment
CN111315957A (en) Pulsed hydraulic fracturing with nanosilicon dioxide carrier fluid
CN105257272A (en) High-flow-conductivity acid fracturing method for carbonate rock reservoirs
CA2801374C (en) Swellable/degradable "sand" plug system for horizontal wells
CN110552656B (en) Method for fixed-point crack initiation of low-permeability layer of water flooded well
CN104428388A (en) Methods and compositions for enhancing well productivity in weakly consolidated or unconsolidated formations
US9366125B2 (en) Carbonate based slurry fracturing using solid acid for unconventional reservoirs
US2959223A (en) Method of facilitating production of oil or gas from a well penetrating a petroleum-bearing stratum contiguous to a water-bearing zone
CN118462130A (en) Method for improving yield of tight reservoir through water lock release and seam promotion and permeability increase
CN108625836B (en) Water control and yield increase method for low-permeability bottom water reservoir high-water-content oil well
CN113565483B (en) Expansion body and conglomerate reservoir reconstruction method
CN110454120B (en) Construction method for self-gathering sand prevention of oil-water well
MXPA06007671A (en) Method of consolidating an underground formation.
CN113356820A (en) Fracturing method
CN114961663B (en) Sand prevention method for filling expandable permeable material
CN109339762B (en) Novel method for reforming dense sandstone reservoir seam net support
CN103910501B (en) A kind of water glass solution type injection material and grouting method thereof
CN112962577A (en) Water-carrying grouting plugging structure and plugging method for large-flow leakage stratum

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant