CN114959164B - Quick slag discharging method for double-slag smelting of converter - Google Patents

Quick slag discharging method for double-slag smelting of converter Download PDF

Info

Publication number
CN114959164B
CN114959164B CN202210808821.2A CN202210808821A CN114959164B CN 114959164 B CN114959164 B CN 114959164B CN 202210808821 A CN202210808821 A CN 202210808821A CN 114959164 B CN114959164 B CN 114959164B
Authority
CN
China
Prior art keywords
slag
converter
furnace
iron
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210808821.2A
Other languages
Chinese (zh)
Other versions
CN114959164A (en
Inventor
李超
陈晨
王富亮
许营
赵自鑫
马宁
尹宏军
崔福祥
苏小利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN202210808821.2A priority Critical patent/CN114959164B/en
Publication of CN114959164A publication Critical patent/CN114959164A/en
Application granted granted Critical
Publication of CN114959164B publication Critical patent/CN114959164B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/36Processes yielding slags of special composition
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The invention relates to a quick slag discharging method for double slag smelting of a converter, which comprises the following steps: 1) Slag-retaining operation: the end point oxygen value of the previous converter is controlled below 800ppm, slag splashing furnace protection is carried out, and the slag pouring angle is controlled between 165 and 175 degrees; 2) Reducing the addition amount of scrap steel, adding more than 3.8 kg/ton iron-carbon balls into the scrap steel, wherein the scrap steel does not contain steel slag, and the corresponding temperature drop is less than 20 ℃; shaking the furnace for more than two times; the speed is less than 5t/s in the process of iron charging, the furnace is rocked back and forth after the iron charging is finished, iron ore is added into the furnace, the furnace is rocked back and forth, and the oxygen lance is used for converting; 3) Smelting before slag discharge: the addition amount of the flux before slag discharge accounts for 25% -35% of the total flux amount of the whole furnace, and the flux before slag discharge is added in two times; 4) And after the gun is lifted, immediately feeding iron-carbon spheres and iron ore into the furnace, and operating the furnace by shaking. The advantages are that: the method realizes rapid slag formation and the purpose of separating the iron slag rapidly by a simple and efficient method.

Description

Quick slag discharging method for double-slag smelting of converter
Technical Field
The invention belongs to the field of ferrous metallurgy, and relates to a quick slag discharging method for double slag smelting of a converter.
Background
The double slag smelting of the converter is one of the production methods of the converter, is more commonly used in high-silicon molten iron smelting and low-phosphorus steel smelting, has the slag-discharging and iron-carrying condition during double slag smelting, causes the loss of steel materials, and can not achieve the purpose of slag discharging and dephosphorization, especially when the low-silicon molten iron needs double slag smelting, the slag-discharging and iron-carrying difficulty condition is more common because slag is difficult to form slag with better fluidity before slag discharging, and the problems of difficult slag discharging caused by slag separation and steel during the low-silicon molten iron are solved.
In the prior art, for example: chinese patent application No.: 200910243175.4 an automatic control method for double slag operation of a converter is disclosed, and automatic control of the converter for producing low-P molten steel by using high-Si molten iron is realized; chinese patent application No.: 201410277535.3A method for converter double slag steelmaking is disclosed, which can reduce the phosphorus content in semisteel to a very low level; the technical scheme does not provide a related solution to the problems of poor separation of slag and iron and slower slag formation in the production of low-silicon molten iron.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention aims to provide a quick slag discharging method for double-slag smelting of a converter, which realizes quick slag formation and quick separation of slag and iron, can effectively reduce slag discharging and iron carrying, realizes quick slag discharging and improves economic indexes in converter production.
In order to achieve the above purpose, the present invention is realized by the following technical scheme:
a method for rapidly discharging slag in double slag smelting of a converter comprises the following steps:
1) Slag-retaining operation: the oxygen value of the end point of the previous converter is controlled below 800ppm, slag splashing is carried out for protecting the converter, the slag splashing time is controlled between 3 and 4 minutes, the slag pouring angle for slag pouring operation is controlled between 165 and 175 degrees, and the slag remaining amount is controlled between 7.6 kg/ton steel and 15.2 kg/ton steel;
2) Reducing the addition amount of the scrap steel, wherein the corresponding temperature drop is less than 20 ℃, and the scrap steel does not contain steel slag; after the scrap steel is added into the converter, the converter is rocked back and forth for more than two times, and slag left in the converter is evenly paved on the surface of the scrap steel; the speed is less than 5t/s in the process of iron charging, the furnace is rocked back and forth after the iron charging is finished, 1.5-2.5 kg/ton of iron ore of steel is added into the furnace, the furnace is rocked back and forth, and the oxygen lance is used for converting after no flame in the furnace is calm;
3) Smelting before slag discharge: the addition amount of the flux before slag discharge is 25-35% of the total flux amount of the whole furnace, the flux before slag discharge is added in two times, the first flux and 1-3 kg/ton iron carbon ball of steel are added after the oxygen lance is put down to the lance for striking fire, and the second flux is added between 60s and 120s after smelting begins;
the oxygen lance position before slag discharge adopts a low-high-low principle, the blowing lance position is lowered to 220-230 cm, the lance position is firstly raised to 250-260 cm after successful ignition, and the lance position is lowered to 220-230 cm until slag discharge after stable reaction in the furnace; when converting for 200-300 s, raising a gun and discharging slag;
4) Slag discharge operation: after gun lifting, 1.2-1.4 kg/ton iron-carbon balls are immediately put into the furnace, 0.5-1.5/ton iron ore of steel is added into the furnace, and then-30-DEG shaking operation is carried out.
The iron-carbon ball comprises the following components in percentage by mass: fe:60% -65%, C:10% -20%, wherein the iron ore comprises the following components in percentage by mass: fe is more than or equal to 60%, siO 2 ≥1%,Al 2 O 3 More than or equal to 1 percent, and the balance of impurities.
In the step 4), if foam slag in the converter is found not to overflow from the converter mouth in a violent reaction manner in the pouring process, the converter shakes to a zero position, iron carbon balls of 1.2-1.4 kg/ton of steel are continuously added into the converter once, and then iron ores of 0.5-1.5 kg/ton of steel are added.
Compared with the prior art, the invention has the beneficial effects that:
when low-silicon molten iron with Si content less than 0.3% needs double slag smelting, the slag before slag tapping is difficult to form, so that the slag tapping difficulty is more common, and slag tapping after reblowing is forced to be needed. The method provided by the invention realizes rapid slag formation by a simple and efficient method, realizes the purpose of separating quicker slag and iron, can effectively reduce slag discharge with iron, does not see smoke dust in a slag pot for holding slag below the converter, and shortens the slag discharge time by 1-5 min.
Detailed Description
The present invention will be described in detail below, but it should be noted that the practice of the present invention is not limited to the following embodiments.
The quick slag discharging method for double slag smelting of the converter comprises the following steps:
1) Slag-retaining operation: the slag-retaining operation means that after the slag-splashing protection of the converter is finished, all or part of slag used in the previous smelting is actively retained in the converter during the slag-pouring operation, the slag-retaining operation can play a role in rapid melting, and the melting of materials in the converter such as active lime and the like is accelerated, so that foam slag is rapidly formed. However, in order to prevent the high oxygen value of the final slag of the converter from causing the splashing of the added iron, the oxygen value of the final point of the converter of the previous converter is controlled below 800ppm, slag splashing is carried out to ensure a certain slag splashing time, the slag splashing time is controlled to be 3-4 min, proper slag needs to be reserved, excessive smelting of the converter is not easy to control to cause the splashing, too little slag splashing can not be accelerated, the slag reserving quantity is controlled by controlling the slag pouring angle, the slag pouring angle of the slag pouring operation is controlled to be 165-175 degrees, and the slag reserving quantity is controlled to be 7.6 kg/ton steel-15.2 kg/ton steel;
2) Calculating the heat balance of the converter according to the tapping temperature requirement, the raw material condition and the system temperature condition, and reducing the adding amount of the scrap steel, wherein the principle is that the corresponding temperature drop is less than 20 ℃, the actual adding amount of the scrap steel is reduced by more than 15 kg/ton steel compared with the design amount, and the scrap steel is free of steel slag in order to prevent the splashing of the added iron; after the scrap steel is added into the converter, the converter is rocked back and forth for more than two times, so that slag remained in the converter is uniformly paved on the surface of the scrap steel; the speed is less than 5t/s in the process of iron charging, the furnace is rocked back and forth after the iron charging is finished, 1.5-2.5 kg/ton of iron ore of steel is added into the furnace, the furnace is rocked back and forth, and the oxygen lance is used for converting after no flame in the furnace is calm;
3) Smelting before slag discharge: the addition amount of the flux before slag discharge is 25-35% of the total flux amount of the whole furnace, the flux before slag discharge is added in two times, the first flux and 1-3 kg/ton iron carbon ball of steel are added after the oxygen lance is put down to the lance for striking fire, and the second flux is added between 60s and 120s after smelting begins;
the oxygen lance position before slag discharge adopts a low-high-low principle, the blowing lance position is lowered to 220-230 cm, the lance position is firstly raised to 250-260 cm after successful ignition, and the lance position is lowered to 220-230 cm until slag discharge after stable reaction in the furnace; when converting for 200-300 s, raising a gun and discharging slag;
4) Slag discharge operation: after gun lifting, 1.2-1.4 kg/ton iron-carbon balls are immediately put into the furnace, then 0.5-1.5 kg/ton iron ore is added into the furnace, and then-30-DEG shaking furnace operation is carried out. If foam slag in the converter is found not to overflow from the converter mouth in a violent reaction manner in the pouring process, the converter shakes to a zero position, iron-carbon balls of 1.2-1.4 kg/ton of steel are continuously added into the converter once, and then iron ore of 0.5-1.5 kg/ton of steel is added.
The iron-carbon sphere comprises the following components in percentage by mass: fe:60% -65%, C:10% -20%, wherein the iron ore comprises the following components in percentage by mass: fe is more than or equal to 60%, siO 2 ≥1%,Al 2 O 3 More than or equal to 1 percent, the rest isAnd (5) impurities.
Example 1
The quick slag discharging method for double slag smelting of the converter comprises the following steps:
1) 260 ton converter, molten iron silicon content 0.2%, scrap 35 ton, iron-carbon ball total 2 ton.
2) Slag-retaining operation: the end point oxygen value of the converter is controlled at 500ppm, slag splashing is carried out, the slag splashing time is controlled at 3.5min, the slag splashing angle for slag splashing operation stays at 170 DEG, and the slag remaining amount is controlled at 3 tons;
3) The high-level bin of the converter prepares iron-carbon spheres and iron ore in advance, wherein the iron-carbon spheres comprise the following components in percentage by mass: fe:63%, C:15 percent and the rest are impurities, wherein Fe in the iron ore is more than or equal to 60 percent, siO 2 ≥1%,Al 2 O 3 More than or equal to 1 percent, and the balance of impurities.
The steel scraps are free of sealing objects, steel slag and the like, and are dried; adding iron after adding the scrap steel, and shaking the converter for 3 times after adding the scrap steel; the speed is 4t/s in the process of iron charging, the furnace is rocked back and forth after the iron charging is finished, 500kg of iron ore is added into the furnace, the furnace is rocked back and forth, and the oxygen lance is used for converting after no flame in the furnace is calm;
4) Smelting before slag discharge: before slag discharge, 3 tons of flux is added, the flux is added in two times, 1.5 tons of flux and 1 ton of iron-carbon ball are added after the oxygen lance is fired, the residual flux is added in 90 seconds, and the residual iron-carbon ball of 1.5 tons is added in the slag discharge process; the oxygen lance position before slag discharge adopts a low-high-low principle, the blowing lance position is lowered to 220cm, the lance position is firstly raised to 250cm after successful ignition, and the lance position is lowered to 220cm until slag discharge after stable reaction in the furnace; raising a gun and discharging slag when converting for 250 s;
5) Slag discharge operation: after gun lifting, 300kg of iron-carbon balls and 250kg of iron ore are immediately put into the converter, and then-30-degree shaking operation is carried out, for example, the foaming slag degree in the converter is found to be poor in the process of pouring the converter or the converter is found to be inactive in the converter, the shaking value of the converter is zero, and 300kg of iron-carbon balls are continuously put into the converter once until the foaming slag can react violently and continuously overflow from the mouth of the converter.
6) After the gun is lifted, active foam slag of slag in the converter can overflow out of a furnace mouth, no smoke dust is seen in a slag tank under the converter in the process of pouring and discharging slag, 1098kg/t of steel materials is obtained, and the slag discharging time is 4.3min.
Comparative example 1
The quick slag discharging method for double slag smelting of the converter comprises the following steps:
1) 260 ton converter, molten iron silicon content 0.21%, scrap steel 38 ton.
2) Smelting before slag discharge: 3 tons of flux is added before slag discharge, the flux is added after a gun is fired, and the residual flux is added at 96 s; the oxygen lance position before slag discharge adopts a low-high principle, the blowing lance position is lowered to 221cm, the lance position is firstly lifted to 252cm after successful ignition, and the lance position is lifted to 283cm until slag discharge after stable reaction in the furnace; gun lifting and slag discharging are carried out when 220s of blowing is carried out;
3) Slag discharge operation: after gun lifting, slag in the converter is inactive, foam slag is not seen to overflow the mouth of the converter, a large amount of smoke dust is seen in a slag pot which is arranged below the converter and holds slag in the slag discharging process of the converter, the serious iron carrying is indicated, and the slag discharging time is 9.3min after 1102kg/t of steel materials are counted.
Example 2
The quick slag discharging method for double slag smelting of the converter comprises the following steps:
1) 260 ton converter, molten iron silicon content 0.1%, scrap 25 ton, iron-carbon ball total 3 ton.
2) Slag-retaining operation: the end point oxygen value of the converter is controlled at 600ppm, slag splashing is carried out, the slag splashing time is controlled at 3.7min, the slag splashing angle for slag splashing operation stays at 165 DEG, and the slag remaining amount is controlled at 4 tons;
3) The high-level bin of the converter prepares iron-carbon spheres and iron ore in advance, wherein the iron-carbon spheres comprise the following components in percentage by mass: fe:63%, C:15 percent and the rest are impurities, wherein Fe in the iron ore is more than or equal to 60 percent, siO 2 ≥1%,Al 2 O 3 More than or equal to 1 percent, and the balance of impurities.
The steel scraps are free of sealing objects, steel slag and the like, and are dried; adding iron after adding the scrap steel, and shaking the converter for 3 times after adding the scrap steel; the speed is 4t/s in the process of iron charging, the furnace is rocked back and forth after the iron charging is finished, 750kg of iron ore is added into the furnace, the furnace is rocked back and forth, and the oxygen lance is used for converting after no flame in the furnace is calm;
4) Smelting before slag discharge: before slag discharge, 3 tons of flux is added, the flux is added in two times, 1.5 tons of flux and 2 tons of iron-carbon balls are added after the oxygen lance is used for discharging the oxygen lance and the rest flux is added in 85 seconds, and the rest 1 ton of iron-carbon balls are added in the slag discharge process; the oxygen lance position before slag discharge adopts a low-high-low principle, the blowing lance position is lowered to 230cm, the lance position is lifted to 265cm after successful ignition, and the lance position is lowered to 230cm until slag discharge after stable reaction in the furnace; gun lifting and slag discharging are carried out when blowing is carried out for 240 s;
5) Slag discharge operation: after gun lifting, 330kg of iron-carbon balls and 500kg of iron ore are immediately put into the converter, and then-30-degree shaking operation is carried out, for example, the foaming slag degree in the converter is found to be poor in the process of pouring the converter or the converter is found to be inactive in the converter, the shaking value of the converter is zero, and 330kg of iron-carbon balls are continuously put into the converter once until the foaming slag can react violently and continuously overflow from the mouth of the converter.
6) After the gun is lifted, active foam slag of slag in the converter can overflow out of a furnace mouth, no smoke dust is seen in a slag tank under the converter in the process of pouring and discharging slag, 1099kg/t of steel is used, and the slag discharging time is 4.6min.
Comparative example 2
The quick slag discharging method for double slag smelting of the converter comprises the following steps:
1) 260 ton converter, molten iron silicon content 0.12%, scrap 30 ton.
2) Smelting before slag discharge: the addition amount of the flux is 3 tons before slag discharge, and the flux is added once after blowing and firing; the oxygen lance position before slag discharge adopts the principle of high-low-high-low, the lance position is opened for 260cm, then the lance position is reduced to 220cm, the reaction is calm and firstly carried to 265cm, the flame in the furnace is contracted into the furnace mouth, and the lance position is reduced to 230cm until slag discharge; raising a gun and discharging slag when converting for 250 s;
3) Slag discharge operation: after gun lifting, foam slag is not found in the converter, a large amount of smoke dust is visible in a slag pot under the converter in the slag discharging process of the converter, 1106kg/t of steel materials is obtained, and the slag discharging time is 9.5min.

Claims (2)

1. The quick slag discharging method for double slag smelting of the converter is characterized by comprising the following steps of:
1) Slag-retaining operation: the oxygen value of the end point of the previous converter is controlled below 800ppm, slag splashing is carried out for protecting the converter, the slag splashing time is controlled between 3 and 4 minutes, the slag pouring angle for slag pouring operation is controlled between 165 and 175 degrees, and the slag remaining amount is controlled between 7.6 kg/ton steel and 15.2 kg/ton steel;
2) Reducing the addition amount of the scrap steel, wherein the corresponding temperature drop is less than 20 ℃, and the scrap steel does not contain steel slag; after the scrap steel is added into the converter, the converter is rocked back and forth for more than two times, and slag left in the converter is evenly paved on the surface of the scrap steel; the speed is less than 5t/s in the process of iron charging, the furnace is rocked back and forth after the iron charging is finished, 1.5-2.5 kg/ton of iron ore of steel is added into the furnace, the furnace is rocked back and forth, and the oxygen lance is used for converting after no flame in the furnace is calm;
3) Smelting before slag discharge: the addition amount of the flux before slag discharge is 25-35% of the total flux amount of the whole furnace, the flux before slag discharge is added in two times, the first flux and 1-3 kg/ton iron carbon ball of steel are added after the oxygen lance is put down to the lance for striking fire, and the second flux is added between 60s and 120s after smelting begins;
the oxygen lance position before slag discharge adopts a low-high-low principle, the blowing lance position is lowered to 220-230 cm, the lance position is firstly raised to 250-260 cm after successful ignition, and the lance position is lowered to 220-230 cm until slag discharge after stable reaction in the furnace; when converting for 200-300 s, raising a gun and discharging slag;
4) Slag discharge operation: immediately feeding 1.2-1.4 kg of iron-carbon balls per ton of steel into the furnace after gun lifting, adding 0.5-1.5 per ton of iron ore per ton of steel into the furnace, and then performing-30-DEG shaking operation;
the iron-carbon ball comprises the following components in percentage by mass: fe:60% -65%, C:10% -20%, wherein the iron ore comprises the following components in percentage by mass: fe is more than or equal to 60%, siO 2 ≥1%,Al 2 O 3 More than or equal to 1 percent, and the balance of impurities.
2. The method for rapidly discharging slag in double slag smelting of a converter according to claim 1, wherein in the step 4), if foam slag in the converter is found not to overflow from the mouth of the converter in a violent reaction during the pouring process, the converter shakes to a zero position, iron-carbon balls of 1.2-1.4 kg/ton of steel are continuously added into the converter once, and then iron ore of 0.5-1.5 kg/ton of steel is added.
CN202210808821.2A 2022-07-11 2022-07-11 Quick slag discharging method for double-slag smelting of converter Active CN114959164B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210808821.2A CN114959164B (en) 2022-07-11 2022-07-11 Quick slag discharging method for double-slag smelting of converter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210808821.2A CN114959164B (en) 2022-07-11 2022-07-11 Quick slag discharging method for double-slag smelting of converter

Publications (2)

Publication Number Publication Date
CN114959164A CN114959164A (en) 2022-08-30
CN114959164B true CN114959164B (en) 2023-11-10

Family

ID=82969923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210808821.2A Active CN114959164B (en) 2022-07-11 2022-07-11 Quick slag discharging method for double-slag smelting of converter

Country Status (1)

Country Link
CN (1) CN114959164B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888487A (en) * 2012-10-12 2013-01-23 武汉钢铁(集团)公司 High-efficiency remaining slag smelting method of converters
CN107034334A (en) * 2017-05-10 2017-08-11 攀钢集团攀枝花钢铁研究院有限公司 The double slag melting methods of half steel of the quick slagging of falling stove
CN108893574A (en) * 2018-06-20 2018-11-27 山东钢铁股份有限公司 One kind being used for molten iron [Si]<0.50% converter steel making method
CN111719032A (en) * 2019-03-21 2020-09-29 本钢板材股份有限公司 Converter less-slag smelting method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888487A (en) * 2012-10-12 2013-01-23 武汉钢铁(集团)公司 High-efficiency remaining slag smelting method of converters
CN107034334A (en) * 2017-05-10 2017-08-11 攀钢集团攀枝花钢铁研究院有限公司 The double slag melting methods of half steel of the quick slagging of falling stove
CN108893574A (en) * 2018-06-20 2018-11-27 山东钢铁股份有限公司 One kind being used for molten iron [Si]<0.50% converter steel making method
CN111719032A (en) * 2019-03-21 2020-09-29 本钢板材股份有限公司 Converter less-slag smelting method

Also Published As

Publication number Publication date
CN114959164A (en) 2022-08-30

Similar Documents

Publication Publication Date Title
CN111363889B (en) Efficient phosphorus removal method for combined blown converter
CN108330245A (en) A kind of high-purity smelting process of stainless steel
CN109055649B (en) Preparation method for extracting carbon and preserving manganese by converter smelting high-manganese high-silicon high-phosphorus iron water
CN113774277B (en) Ultra-low carbon and ultra-low manganese industrial pure iron and preparation method thereof
CN113512619B (en) Production method of industrial pure iron
CN110616290B (en) Converter single slag remaining smelting method capable of reducing final slag height
CN115323099A (en) Steelmaking method for recycling magnetic separation steel slag by converter
CN108998614A (en) Smelting method of ultra-low manganese steel
CN114606357A (en) Method for removing phosphorus and leaving carbon in medium-high carbon steel by converter
CN111286577A (en) Smelting method of ultra-low titanium steel
CN114717375A (en) Method for converter-rotating smelting of high-temperature molten iron under slag-remaining and dry-method dedusting conditions
CN111748670B (en) Method for improving chromium ore reduction by bottom blowing oxygen-lime powder
CN113388710A (en) Smelting control method of ultrahigh-strength cord steel
CN114959164B (en) Quick slag discharging method for double-slag smelting of converter
CN114317871B (en) Method for reducing TFe content in converter final slag
CN104109727A (en) Method for smelting low-phosphorous steel by using semisteel through converter
CN111270041A (en) Method for reducing phosphorus content in low-phosphorus steel production tapping process of dephosphorization furnace
CN114657312B (en) Method for smelting high-silicon molten iron by converter under dry dedusting condition
CN114535555B (en) Method for reducing erosion rate of ladle slag line in production of deformed steel bar
CN113088617B (en) Converter steelmaking method
CN111926137B (en) Preparation method for producing ship plate by adopting high-phosphorus, high-arsenic and high-sulfur molten iron
CN101538638A (en) Refining method of reducing slag made by CAS refining furnace for desulfurization
CN110699594B (en) Method for smelting IF steel from semisteel at low cost
CN114438277A (en) Converter low slag charge steelmaking process
CN113278760A (en) Method for defoaming converter double-slag smelting steel slag

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant