CN114934672A - Novel formwork method for gutter in pitched roof house - Google Patents

Novel formwork method for gutter in pitched roof house Download PDF

Info

Publication number
CN114934672A
CN114934672A CN202210226407.0A CN202210226407A CN114934672A CN 114934672 A CN114934672 A CN 114934672A CN 202210226407 A CN202210226407 A CN 202210226407A CN 114934672 A CN114934672 A CN 114934672A
Authority
CN
China
Prior art keywords
gutter
finished product
mold
mould
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210226407.0A
Other languages
Chinese (zh)
Inventor
陈敬宇
黄飞祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN202210226407.0A priority Critical patent/CN114934672A/en
Publication of CN114934672A publication Critical patent/CN114934672A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/064Gutters
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/04Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements

Abstract

A novel formwork method for a gutter in a pitched roof house is characterized by comprising the following steps: a. finishing the reinforcement binding of a bottom plate and a side plate of the gutter, b, formwork supporting of a side wall of the gutter, c, formwork supporting of a bottom plate of the gutter, d, fixing the mold in the designed width direction of the gutter by using a plurality of water stop bolts, e, pouring concrete, dismounting the mold, and f, recycling the finished product mold of the gutter at the positions of other gutters. The novel formwork erecting method for the gutter in the pitched roof house has the advantages that the formwork erecting method is formed by machining finished product aluminum moulds, adverse effects caused by traditional formwork erecting and hanging can be well avoided, the engineering quality is safe and reliable, the construction progress is fast, the mould is repeatedly utilized, and the engineering cost is reduced.

Description

Novel formwork method for gutter in pitched roof house
Technical Field
The invention relates to a method for erecting a concrete template, in particular to a novel formwork method for a gutter in a pitched roof house.
Background
In modern house construction, a mode of erecting hanging molds on two sides of a side plate of a gutter is often adopted for the gutter part in a sloping roof, concrete of a bottom plate of the gutter needs to be poured in advance in the pouring process, the side plate needs to be poured after the concrete is initially solidified, if time control is not good, a cold joint is generated, water seepage risks easily occur at a joint part of the side plate and the bottom plate of the gutter in the later period, the pouring time is too long, and the labor cost is increased. Because the thickness of the bottom plate concrete is not controlled by the template in the concrete pouring process, the side form is reinforced under the influence of factors such as infirm, the forming quality effect of the gutter is poor, the bottom plate of the gutter is uneven, a large amount of manpower and material resources are needed to be secondarily repaired and leveled in the later period, and the defects that the whole forming quality effect is poor and the like exist.
The known methods of erecting a formwork sling for a gutter thus present the inconveniences and problems described above.
Disclosure of Invention
The invention aims to provide a novel safe and reliable formwork method for a gutter in a pitched roof house.
In order to achieve the purpose, the technical solution of the invention is as follows:
a novel formwork method for a gutter in a pitched roof house is characterized by comprising the following steps:
a. finishing the binding of reinforcing steel bars of the bottom plate and the side plates of the gutter;
b. side wall formwork of gutter
According to the design specification of a gutter node in a structural construction drawing, a mode of erecting a formwork on the side wall of a gutter is a 1 st finished product aluminum mold, the 1 st finished product aluminum mold is 500mm multiplied by 100mm multiplied by 200mm to be matched with a 2 nd finished product aluminum mold, the 2 nd finished product aluminum mold is 500mm multiplied by 200mm, and the finished product aluminum molds are spliced in a U-shaped buckle mode; the 1 st finished product aluminum mould and the 2 nd finished product aluminum mould are respectively provided with matched through holes;
c. bottom plate formwork of gutter
The mode of erecting the gutter bottom plate is that a 1 st finished product aluminum mould is matched with a 3 rd finished product aluminum mould, the specification of the 3 rd finished product aluminum mould is 500mm multiplied by 100mm, and the finished product aluminum mould is assembled in a U-shaped buckle mode;
d. fixing the mold in the designed width direction of the gutter by using a plurality of water stop bolts
Fixing the mould at a certain interval in the designed width direction of the gutter through a plurality of water stop bolts so as to prevent the mould from deviating due to the lateral pressure of concrete in the pouring process; the end parts of the two sides of the water stop bolt are respectively provided with a water stop sheet;
e. pouring concrete and dismantling the mould
After the concrete pouring is finished and a certain strength is reached, after the water stopping screw rod is cut off, the mould is integrally hoisted and dismantled through the lug plate fixed at the upper part of the mould by adopting a tower crane or other hoisting facilities;
f. reuse of gutter finished product mold in other gutter parts
And after the gutter finished product mold is disassembled, the gutter finished product mold is repeatedly used for construction of other gutter parts according to simple assembly.
The novel formwork method for the gutter in the pitched roof house can be further realized by adopting the following technical measures.
In the method, the thickness of the aluminum mold wall of the 1 st finished product is greater than or equal to 3 mm.
In the method, the thickness of the aluminum mold wall of the No. 2 finished product is more than or equal to 3 mm.
In the method, the thickness of the aluminum mold wall of the 3 rd finished product is more than or equal to 3 mm.
In the method, the diameter of the through hole is more than or equal to 14 mm.
The foregoing method, wherein the water stop bolts set the molds at a pitch of one per 500 mm.
After the technical scheme is adopted, the novel formwork method for the gutter in the pitched roof house has the following advantages:
1. the product is processed by a finished product aluminum mould, so that adverse effects caused by traditional supporting of a hanging mould can be better avoided;
2. the engineering quality is safe and reliable, and the construction progress is fast;
3. the mold can be reused, and the engineering cost is reduced.
Drawings
FIG. 1 is a schematic view of a gutter structure in a pitched roof house according to an embodiment of the present invention;
FIG. 2 is a cross-sectional view A-A of FIG. 1;
FIG. 3 is an enlarged view of the portion P in FIG. 2;
FIG. 4 is an enlarged view of the portion Q of FIG. 2;
fig. 5 is an enlarged view of a portion M in fig. 2.
In the figure: 1 roof boarding base rib, 2 otic placodes, 3 gutter finished product moulds, 4 gutter curb plate reinforcing bars, 5 stagnant water piece 50mm, 6M12 stagnant water bolt, 7 gutter design length, 8 gutter design width, 9 gutter bottom plate reinforcing bars.
Detailed Description
The present invention will be further described with reference to the following examples and the accompanying drawings.
Example 1
The novel formwork erecting method for the gutter in the pitched roof house is completed after the steel bars of the bottom plate and the side plates of the gutter are bound in the construction process of the gutter. Referring now to fig. 1 and 2, fig. 1 is a schematic view of a gutter structure in a pitched roof house according to an embodiment of the present invention, and fig. 2 is a cross-sectional view a-a in fig. 1.
According to the design specification of a gutter node in a structural construction drawing, a side wall formwork supporting mode of a gutter is that a No. I finished aluminum mould (the thickness of 3mm is 500mmX100mmX200 mm) and a No. II finished aluminum mould (the thickness of 3mm is 500mmX200 mm) are assembled in a U-shaped buckle mode. Fig. 3 is an enlarged view of a portion P in fig. 2, where P is a structure of a finished aluminum mold of (r). FIG. 4 is an enlarged view of the portion Q in FIG. 2, wherein Q is the structure of the finished aluminum mold.
The mode of formwork support of the gutter bottom plate in the embodiment is that a No. finished product mould and a No. three finished product mould (the wall thickness is 3mm, the specification is 500mmX100 mm) are assembled in a U-shaped buckle mode. FIG. 5 is an enlarged view of the portion M in FIG. 2, where M is a third aluminum mold structure. Holes with the diameter of 14mm are reserved on the first die and the second die respectively, and the dies are fixed at intervals of 500mm by water stop bolts, so that the die is prevented from deviating due to lateral pressure of concrete in the pouring process. The length of the water stop screw is formed by welding according to the actual gutter size, the specification of the water stop screw is M12 type, and the size of the water stop sheet is 50mmX50 mm.
After concrete pouring is finished and certain strength is achieved, after the water stopping screw is cut off, the mould can be integrally hoisted and dismantled through the lug plates fixed on the upper part of the mould by adopting a tower crane or other hoisting facilities. After the assembly is disassembled, the assembly can be applied to construction of other gutter parts according to simple assembly.
Compared with the traditional mode (namely, the side wall of the gutter is hung to finish the fabrication of the gutter), the novel formwork method for the gutter in the pitched roof house has the advantages that the flatness forming effect of the bottom and the side wall of the gutter is good after the concrete pouring is finished, the pouring time is saved in the pouring process, the side plate concrete does not need to be poured after the bottom plate concrete is initially set, and the one-step forming waterproof quality effect is good. The finished product die can be repeatedly utilized, and accords with the green construction idea.
The above embodiments are provided only for illustrating the present invention and not for limiting the present invention, and those skilled in the art can make various changes or modifications without departing from the spirit and scope of the present invention. Accordingly, all equivalents are intended to fall within the scope of the invention, which is defined in the claims.

Claims (6)

1. A novel formwork method for a gutter in a pitched roof house is characterized by comprising the following steps:
a. finishing the binding of reinforcing steel bars of the bottom plate and the side plates of the gutter;
b. side wall formwork of gutter
According to the design specification of a gutter node in a structural construction drawing, a mode of erecting a formwork on the side wall of a gutter is a 1 st finished product aluminum mold, the 1 st finished product aluminum mold is 500mm multiplied by 100mm multiplied by 200mm to be matched with a 2 nd finished product aluminum mold, the 2 nd finished product aluminum mold is 500mm multiplied by 200mm, and the finished product aluminum molds are spliced in a U-shaped buckle mode; the 1 st finished product aluminum mold and the 2 nd finished product aluminum mold are respectively provided with matched through holes;
c. bottom plate formwork of gutter
The mode of formwork support of the gutter bottom plate is that a 1 st finished product aluminum mould is matched with a 3 rd finished product aluminum mould, the 3 rd finished product aluminum mould is 500mm multiplied by 100mm in specification, and the finished product aluminum mould is assembled in a U-shaped buckle mode;
d. fixing the mold in the designed width direction of the gutter by using a plurality of water stop bolts
Fixing the mould at a certain interval in the designed width direction of the gutter through a plurality of water stop bolts so as to prevent the mould from deviating due to the lateral pressure of concrete in the pouring process; the end parts of the two sides of the water stopping bolt are respectively provided with a water stopping sheet;
e. pouring concrete and dismantling the mould
After the concrete pouring is finished and a certain strength is reached, after the water stopping screw rod is cut off, the mould is integrally hoisted and dismantled through the lug plate fixed at the upper part of the mould by adopting a tower crane or other hoisting facilities;
f. recycle of gutter finished product mold at other gutter parts
And after the gutter finished product mold is disassembled, the gutter finished product mold is repeatedly used for construction of other gutter parts according to simple assembly.
2. The novel formwork method for the gutter in the pitched roof house as claimed in claim 1, wherein the thickness of the 1 st finished aluminum mold is more than or equal to 3 mm.
3. The novel formwork method for the gutter in the pitched roof house as claimed in claim 1, wherein the thickness of the 2 nd finished aluminum mold is more than or equal to 3 mm.
4. The novel formwork method for the gutter in the pitched roof house as claimed in claim 1, wherein the thickness of the 3 rd finished aluminum mold is more than or equal to 3 mm.
5. The method for erecting a new type of gutter in a pitched roof house as claimed in claim 1, characterized in that the diameter of said through hole is 14mm or more.
6. A novel formwork method for a gutter in a pitched roof house as claimed in claim 1, characterized in that said water stop bolts set the moulds at a pitch of one per 500 mm.
CN202210226407.0A 2022-03-09 2022-03-09 Novel formwork method for gutter in pitched roof house Pending CN114934672A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210226407.0A CN114934672A (en) 2022-03-09 2022-03-09 Novel formwork method for gutter in pitched roof house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210226407.0A CN114934672A (en) 2022-03-09 2022-03-09 Novel formwork method for gutter in pitched roof house

Publications (1)

Publication Number Publication Date
CN114934672A true CN114934672A (en) 2022-08-23

Family

ID=82862857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210226407.0A Pending CN114934672A (en) 2022-03-09 2022-03-09 Novel formwork method for gutter in pitched roof house

Country Status (1)

Country Link
CN (1) CN114934672A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674999A (en) * 2013-11-27 2015-06-03 五冶集团上海有限公司 Spaced formwork supporting and concrete pouring method for pitched roof
CN105269662A (en) * 2014-07-11 2016-01-27 任丘市永基建筑安装工程有限公司 Production process for overhanging eave gutter plate
CN106401041A (en) * 2016-08-31 2017-02-15 陕西建工第六建设集团有限公司 Cast-in-situ concrete construction method for pseudo-classic architecture slope roof
WO2021023245A1 (en) * 2019-08-07 2021-02-11 上海建工二建集团有限公司 Pile slab-type soil retaining wall integral casting formwork structure and construction method therefor
CN112412015A (en) * 2020-12-03 2021-02-26 四川省第六建筑有限公司 Formwork-supporting-free system construction method for irregular concrete gutter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674999A (en) * 2013-11-27 2015-06-03 五冶集团上海有限公司 Spaced formwork supporting and concrete pouring method for pitched roof
CN105269662A (en) * 2014-07-11 2016-01-27 任丘市永基建筑安装工程有限公司 Production process for overhanging eave gutter plate
CN106401041A (en) * 2016-08-31 2017-02-15 陕西建工第六建设集团有限公司 Cast-in-situ concrete construction method for pseudo-classic architecture slope roof
WO2021023245A1 (en) * 2019-08-07 2021-02-11 上海建工二建集团有限公司 Pile slab-type soil retaining wall integral casting formwork structure and construction method therefor
CN112412015A (en) * 2020-12-03 2021-02-26 四川省第六建筑有限公司 Formwork-supporting-free system construction method for irregular concrete gutter

Similar Documents

Publication Publication Date Title
CN208072950U (en) A kind of combination set shaped steel formwork
CN105952148A (en) Easy-to-demount inner aluminum form support system for narrow deformation joint and construction method
CN110005200B (en) Construction process for concrete pouring compaction of horizontal hidden beam
CN110130271B (en) Construction method for reinforcing side wall concrete single-face formwork
CN209874483U (en) Detachable fixing die for reserved air conditioner hole of shear wall
CN114934672A (en) Novel formwork method for gutter in pitched roof house
CN217079684U (en) Split type form removal-free concrete hollow structure
CN114892811A (en) Construction method for connecting node of core tube and outer frame steel bar truss floor bearing plate
CN217079659U (en) Aluminum alloy template for narrow building construction joint
CN210562953U (en) Prefabricated plate and coincide floor
CN109914571B (en) Basement drainage ditch formwork system, pouring system and construction method
CN209798958U (en) Pouring system for drainage ditch of bottom plate post-cast strip and shaping hanging die for drainage ditch
CN113997391A (en) A no inside and outside support integral formwork for prefabricating assembled box culvert
CN108867373B (en) Template system for reinforced concrete bridge deck and construction method
CN110965766A (en) Template for construction of deformation joint of shear wall structure, construction structure and construction method
CN110761323A (en) Underground comprehensive pipe gallery sliding formwork construction method
CN217652327U (en) Quick plugging device of concrete post-cast strip
CN218952803U (en) Plain type cast in situ concrete collar tie beam formwork device
CN114351943B (en) Shaped steel mould large-section stiff fair-faced concrete column structure and construction method
CN218149754U (en) Variable cross-section column steel template reinforcing system
CN204728698U (en) The closed formwork structure of a kind of concrete suspension bridging piece
CN113430941B (en) Construction method for prefabricating inclined beam end single-line box beam on standard single-line box beam template
CN219887552U (en) Integral reinforcing fixture for constructional engineering framework and frame shear structure column head template
CN112012365B (en) Pouring forming construction process for large-scale sewage pool supporting arm rib beam type wall body
CN219365465U (en) Floor thickness control device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220823