CN114911751A - Method, device and equipment for building coal preparation plant management platform and readable storage medium - Google Patents

Method, device and equipment for building coal preparation plant management platform and readable storage medium Download PDF

Info

Publication number
CN114911751A
CN114911751A CN202210308782.XA CN202210308782A CN114911751A CN 114911751 A CN114911751 A CN 114911751A CN 202210308782 A CN202210308782 A CN 202210308782A CN 114911751 A CN114911751 A CN 114911751A
Authority
CN
China
Prior art keywords
file
library
coal preparation
preparation plant
management platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210308782.XA
Other languages
Chinese (zh)
Inventor
龚萍
卫中宽
张树森
乔莎
王际伟
付默予
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Tianjin Underground Engineering Intelligent Research Institute Co ltd
Original Assignee
China Coal Tianjin Underground Engineering Intelligent Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Tianjin Underground Engineering Intelligent Research Institute Co ltd filed Critical China Coal Tianjin Underground Engineering Intelligent Research Institute Co ltd
Priority to CN202210308782.XA priority Critical patent/CN114911751A/en
Publication of CN114911751A publication Critical patent/CN114911751A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/11File system administration, e.g. details of archiving or snapshots
    • G06F16/122File system administration, e.g. details of archiving or snapshots using management policies
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/13File access structures, e.g. distributed indices
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/901Indexing; Data structures therefor; Storage structures
    • G06F16/9017Indexing; Data structures therefor; Storage structures using directory or table look-up
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/903Querying
    • G06F16/90335Query processing
    • G06F16/90344Query processing by using string matching techniques
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computational Linguistics (AREA)
  • Software Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method, a device, equipment and a readable storage medium for constructing a management platform of a coal preparation plant, wherein the method comprises the following steps: acquiring a management file of a coal preparation plant, wherein the management file comprises a first file, a second file and a third file; obtaining an identification code corresponding to the first file based on characters in the first file, obtaining an identification code corresponding to the second file based on characters in the second file, and obtaining an identification code corresponding to the third file based on characters in the third file; and constructing an object library according to all the identification codes to complete the construction of the coal preparation plant management platform. The invention realizes the comprehensive objectification of equipment facilities of the coal preparation plant, associates the documents, drawings, models and attributes by taking the objects as the center, manages the association relationship by using the association list, can effectively manage the objects without three-dimensional models, and can verify the objects in the documents, drawings, models and attributes with each other for the missing objects, thereby realizing the high-efficiency management of management data and equipment facilities.

Description

Method, device and equipment for building management platform of coal preparation plant and readable storage medium
Technical Field
The invention relates to the field of data management, in particular to a method, a device, equipment and a readable storage medium for building a coal preparation plant management platform.
Background
At present, aiming at the project of a coal preparation plant, a large amount of file data is often transferred after the construction of the coal preparation plant is completed, and the related data mainly refers to pdf of a scanned version, so that the file data cannot be efficiently managed, and further equipment and facilities in the coal preparation plant cannot be efficiently managed; when a certain equipment facility in the coal selection plant fails, a large amount of time is wasted by inquiring relevant data of the equipment facility in a large amount of paper documents and then entering a maintenance stage, so that a digital management platform is urgently needed to manage a large amount of document data and equipment facilities, and efficient management of the document data and the equipment facilities is realized.
Disclosure of Invention
The invention aims to provide a method, a device and equipment for building a coal preparation plant management platform and a readable storage medium, so as to solve the problems.
In order to achieve the above object, the embodiments of the present application provide the following technical solutions:
on one hand, the embodiment of the application provides a method for building a coal preparation plant management platform, and the method comprises the following steps:
acquiring a management file of a coal preparation plant, wherein the management file comprises a first file, a second file and a third file, the first file comprises a design drawing file of the coal preparation plant in a dwg format, the second file comprises a three-dimensional model file of the coal preparation plant in an i.dgn format, and the third file comprises files in other formats except the dwg format and the i.dgn format;
obtaining an identification code corresponding to a first file based on characters in the first file, obtaining an identification code corresponding to a second file based on characters in the second file, and obtaining an identification code corresponding to a third file based on characters in the third file;
and constructing an object library according to all the identification codes to complete the construction of a management platform of the coal preparation plant, wherein the object library comprises at least one object, the content of each object comprises the identification code and the attribute content corresponding to the object, and one object is an equipment facility in the coal preparation plant.
Optionally, obtaining an identifier code corresponding to a first file based on the characters in the first file, obtaining an identifier code corresponding to a second file based on the characters in the second file, and obtaining an identifier code corresponding to a third file based on the characters in the third file includes:
extracting characters in the first file to obtain a first character library, extracting characters in the second file to obtain a second character library, and extracting characters in the third file to obtain a third character library;
and acquiring a regular expression, and respectively mining identification codes in a first character library, a second character library and a third character library according to the regular expression to obtain an identification code corresponding to the first file, an identification code corresponding to the second file and an identification code corresponding to the third file.
Optionally, an object library is constructed according to the mined identification codes, and the construction of the coal preparation plant management platform is completed, including:
defining an equipment facility in the coal preparation plant as an object, and constructing a coal preparation plant class library, wherein the coal preparation plant class library comprises the class number and the attribute of each object, and one class number represents one class;
matching the equipment identification contained in the identification code with the category code to obtain the category corresponding to the identification code;
generating an object library according to the coal preparation plant library, wherein the object library comprises the category code and the attribute of each object;
and adding objects in the object library to complete the construction of a coal preparation plant management platform, wherein when each object is added, the identification codes are added under the corresponding class codes according to the classes corresponding to the identification codes, then the design information of the equipment facilities corresponding to the identification codes is acquired, and the content in the design information is respectively added to the corresponding attributes to complete the addition.
Optionally, after obtaining the management file of the coal preparation plant, the method further includes:
identifying keywords in the first character library to obtain a first keyword library; identifying keywords in the second character library to obtain a second keyword library; identifying keywords in the third character library to obtain a third key character library, and collecting the first keyword library, the second keyword library and the third key character library to obtain a keyword library;
acquiring keywords input by a user, and inquiring in the keyword library according to the keywords input by the user to obtain a file case table containing the keywords input by the user;
acquiring input information, wherein the input information comprises click operation information of any file in the file case table;
and responding to the input information, and jumping to the position of the keyword input by the user in the file.
In a second aspect, the embodiment of the application provides a device for building a management platform of a coal preparation plant, and the device comprises a first obtaining module, a calculating module and a building module.
The system comprises a first obtaining module, a second obtaining module and a third obtaining module, wherein the first obtaining module is used for obtaining management files of a coal preparation plant, the management files comprise a first file, a second file and a third file, the first file comprises a design drawing file of the coal preparation plant in a dwg format, the second file comprises a three-dimensional model file of the coal preparation plant in an i.dgn format, and the third file comprises files in other formats except the dwg format and the i.dgn format;
the calculation module is used for obtaining an identification code corresponding to a first file based on characters in the first file, obtaining an identification code corresponding to a second file based on characters in the second file, and obtaining an identification code corresponding to a third file based on characters in the third file;
and the construction module is used for constructing an object library according to all the identification codes and completing construction of a coal preparation plant management platform, wherein the object library comprises at least one object, the content of each object comprises the identification code and the attribute content corresponding to the object, and one object is one equipment facility in the coal preparation plant.
Optionally, the calculation module includes:
the extracting unit is used for extracting characters in the first file to obtain a first character library, extracting characters in the second file to obtain a second character library, and extracting characters in the third file to obtain a third character library;
and the computing unit is used for acquiring a regular expression, and respectively mining identification codes in a first character library, a second character library and a third character library according to the regular expression to obtain an identification code corresponding to the first file, an identification code corresponding to the second file and an identification code corresponding to the third file.
Optionally, the building block includes:
a construction unit, configured to define an equipment facility in the coal preparation plant as an object, and construct a coal preparation plant class library, where the coal preparation plant class library includes a class number and an attribute of each object, and one of the class numbers represents a class;
the matching unit is used for matching the equipment identifier contained in the identifier code with the category code to obtain the category corresponding to the identifier code;
the generating unit is used for generating an object library according to the coal preparation plant library, and the object library comprises the category code and the attribute of each object;
and the adding unit is used for adding objects in the object library and completing the construction of a coal preparation plant management platform, wherein when each object is added, the identification codes are added under the corresponding class codes according to the classes corresponding to the identification codes, then the design information of the equipment facilities corresponding to the identification codes is acquired, and the contents in the design information are respectively added into the corresponding attributes to complete the addition.
Optionally, the apparatus further includes:
the identification module is used for identifying keywords in the first text base to obtain a first keyword base; identifying keywords in the second character library to obtain a second keyword library; identifying keywords in the third character library to obtain a third keyword library, and collecting the first keyword library, the second keyword library and the third keyword library to obtain a keyword library;
the second acquisition module is used for acquiring the keywords input by the user, and inquiring in the keyword library according to the keywords input by the user to obtain a file case table containing the keywords input by the user;
the third acquisition module is used for acquiring input information, wherein the input information comprises click operation information of any file in the file case table;
and the response module is used for responding to the input information and jumping to the position of the keyword input by the user in the file.
In a third aspect, an embodiment of the present application provides a device for building a management platform of a coal preparation plant, where the device includes a memory and a processor. The memory is used for storing a computer program; the processor is used for realizing the steps of the construction method of the coal preparation plant management platform when executing the computer program.
In a fourth aspect, an embodiment of the present application provides a readable storage medium, where a computer program is stored on the readable storage medium, and when the computer program is executed by a processor, the steps of the method for building the coal preparation plant management platform are implemented.
The invention has the beneficial effects that:
1. the invention realizes the comprehensive objectification of equipment facilities of the coal preparation plant, associates the documents, drawings, models and attributes by taking the objects as the center, manages the association relationship by using the association list, can effectively manage the objects without three-dimensional models, and can verify the objects in the documents, drawings, models and attributes with each other for the missing objects, thereby realizing the high-efficiency management of management data and equipment facilities.
2. In the invention, the files related to the keywords can be quickly checked through the keyword searching mode, and the quick searching and positioning of the data are realized.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by the practice of the embodiments of the invention. The objectives and other advantages of the invention will be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and those skilled in the art can also obtain other related drawings based on the drawings without inventive efforts.
FIG. 1 is a schematic flow chart of a construction method of a coal preparation plant management platform in the embodiment of the invention;
FIG. 2 is a schematic structural diagram of a construction device of a coal preparation plant management platform according to an embodiment of the invention;
fig. 3 is a schematic structural diagram of a construction device of the coal preparation plant management platform in the embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that: like reference numbers or letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined or explained in subsequent figures. Meanwhile, in the description of the present invention, the terms "first", "second", and the like are used only for distinguishing the description, and are not to be construed as indicating or implying relative importance.
Example 1
As shown in fig. 1, the present embodiment provides a method for building a coal preparation plant management platform, where the method includes step S1, step S2, and step S3.
Step S1, acquiring management files of the coal preparation plant, wherein the management files comprise a first file, a second file and a third file, the first file comprises a design drawing file of the coal preparation plant in a dwg format, the second file comprises a three-dimensional model file of the coal preparation plant in an i.dgn format, and the third file comprises files in other formats except the dwg format and the i.dgn format;
step S2, obtaining an identification code corresponding to a first file based on the characters in the first file, obtaining an identification code corresponding to a second file based on the characters in the second file, and obtaining an identification code corresponding to a third file based on the characters in the third file;
step S3, constructing an object library according to all the identification codes, and completing the construction of a coal preparation plant management platform, wherein the object library comprises at least one object, the content of each object comprises the identification code and the attribute content corresponding to the object, and one object corresponds to one equipment facility in the coal preparation plant.
In the embodiment, the management files are all files of the coal preparation plant during design, construction and operation and maintenance; the third file comprises files in formats of xls, xlsx, doc, docx, ppt, pptx, pdf, tif, png, jpg and the like;
the embodiment realizes the comprehensive objectification of the equipment and facilities of the coal preparation plant, associates the documents, drawings, models and attributes by taking the objects as centers, manages the association relationship by using the association list, can effectively manage the objects without three-dimensional models, and can verify the objects in the documents, drawings, models and attributes with each other for the missing objects, thereby realizing the efficient management of management data and the equipment and facilities.
In a specific embodiment of the present disclosure, the step S2 may further include a step S21 and a step S22.
Step S21, extracting characters in the first file to obtain a first character library, extracting characters in the second file to obtain a second character library, and extracting characters in the third file to obtain a third character library;
step S22, a regular expression is obtained, and identification codes in a first character library, a second character library and a third character library are respectively mined according to the regular expression to obtain an identification code corresponding to the first file, an identification code corresponding to the second file and an identification code corresponding to the third file.
In step S21, extracting the characters in each file can be performed by using a conventional technical means, and in the present embodiment, when extracting the characters in the pdf, tif, png, and jpg format files, extracting the characters can be performed by using an OCR technology; when extracting characters in doc, docx, xls, xlsx, ppt and pptx format files, a Java POI component can be adopted to extract the characters; when extracting the characters in the pdf format file, a Java pdfbox component can be adopted to extract the characters;
in step S22 of the present embodiment, the regular expression is: ([1-9] {1} [ A-Za-z ] {3} [1-9] {4} [ A-Za-z ] {1} [1-9] {2} [ A-Za-z ] {2 }).
In a specific embodiment of the present disclosure, the step S3 may further include a step S31, a step S32, a step S33, and a step S34.
Step S31, defining an equipment facility in the coal preparation plant as an object, and constructing a coal preparation plant class library, wherein the coal preparation plant class library comprises the class number and the attribute of each object, and one class number represents one class;
step S32, matching the device identification contained in the identification code with the category code to obtain the category corresponding to the identification code;
step S33, generating an object library according to the coal preparation plant library, wherein the object library comprises the category code and the attribute of each object;
and step S34, adding objects in the object library to complete the construction of a coal preparation plant management platform, wherein when each object is added, the identification codes are added under the corresponding class codes according to the classes corresponding to the identification codes, then the design information of the equipment facilities corresponding to the identification codes is acquired, and the contents in the design information are respectively added to the corresponding attributes to complete the addition.
The scheme in this embodiment can be understood as follows: the coal preparation plant library is a table, and the category code and the attribute of a certain equipment facility are described in one row of the table, for example, the category code of the equipment facility, i.e., a pump, is described as CDF890 in the first example of the first row of the table, the power is described in the second example, and the rotational speed is described in the third example, and the specific power and rotational speed are not described herein; when the object library is generated according to the coal preparation plant library, the CDF890 is automatically recorded in the first example of the first row in the object library as the type code of the equipment facility, i.e., the pump, the power is recorded in the second example, and the rotating speed is recorded in the third example, and the specific values of the power and the rotating speed are not recorded in the third example; when a certain identification code is taken, because the equipment identification and the class code contained in the coal preparation plant library have a one-to-one correspondence relationship, the equipment identification and the class code contained in the coal preparation plant library are matched, the class corresponding to the identification code can be obtained according to the method, for example, the class to which the identification code belongs is identified as a pump, then the identification code is placed below the CDF890 column of the object library, then other design data of the equipment facility are obtained according to the identification code, for example, the power of the equipment facility is 22KW and the rotating speed of the equipment facility is 300r/min, 22KW is added below the power of the object library, 300r/min is added below the rotating speed of the object library, and all the identification codes are added to the object library according to the logic;
after the object library is built, the coal preparation plant management platform is built, the object library can be associated with all management files in a mode of building the object library, management and checking of the management files are facilitated, and management of each equipment facility is facilitated.
In a specific embodiment of the present disclosure, the method may further include step S4, step S5, step S6, and step S7.
Step S4, identifying the keywords in the first character library to obtain a first keyword library; identifying keywords in the second character library to obtain a second keyword library; identifying keywords in the third character library to obtain a third key character library, and collecting the first keyword library, the second keyword library and the third key character library to obtain a keyword library;
step S5, acquiring keywords input by a user, and inquiring in the keyword library according to the keywords input by the user to obtain a file case table containing the keywords input by the user;
step S6, acquiring input information, wherein the input information comprises click operation information of any file in the file case table;
and step S7, responding to the input information, and jumping to the position of the keyword input by the user in the file.
In step S4 in this embodiment, a conventional keyword extraction method may be used for extraction, or solr may be used, and an IK Analyzer is used to extract keywords;
in step S5, all files containing the keyword can be obtained after query, and output in the form of a file example table, and when a user clicks a certain file after output, the user jumps to the position where the keyword appears in the file; the method can quickly check the files related to the keywords through the keyword search, and realize quick search and positioning of the data.
When the pipeline contained in the equipment facility needs to be maintained, the files related to the pipeline can be quickly checked through the keyword searching mode, all data related to the pipeline are obtained, the pipeline is conveniently maintained according to the obtained data, and the maintenance efficiency is improved.
Example 2
As shown in fig. 2, the present embodiment provides a device for building a management platform of a coal preparation plant, where the device includes a first obtaining module 701, a calculating module 702, and a building module 703.
A first obtaining module 701, configured to obtain a management file of a coal preparation plant, where the management file includes a first file, a second file, and a third file, the first file includes a design drawing file of the coal preparation plant in a dwg format, the second file includes a three-dimensional model file of the coal preparation plant in an i.dgn format, and the third file includes files in other formats except the dwg format and the i.dgn format;
a calculating module 702, configured to obtain an identifier code corresponding to a first file based on the characters in the first file, obtain an identifier code corresponding to a second file based on the characters in the second file, and obtain an identifier code corresponding to a third file based on the characters in the third file;
the building module 703 is configured to build an object library according to all the identification codes, and complete the building of the management platform of the coal preparation plant, where the object library includes at least one object, the content of each object includes the identification code and the attribute content corresponding to the object, and one object is an equipment facility in the coal preparation plant.
The embodiment realizes the comprehensive objectification of the equipment and facilities of the coal preparation plant, associates the documents, drawings, models and attributes by taking the objects as centers, manages the association relationship by using the association list, can effectively manage the objects without three-dimensional models, and can verify the objects in the documents, drawings, models and attributes with each other for the missing objects, thereby realizing the efficient management of management data and the equipment and facilities.
In a specific embodiment of the present disclosure, the calculating module 702 further includes an extracting unit 7021 and a calculating unit 7022.
An extracting unit 7021, configured to extract the characters in the first file to obtain a first character library, extract the characters in the second file to obtain a second character library, and extract the characters in the third file to obtain a third character library;
a calculating unit 7022, configured to obtain a regular expression, and respectively mine identification codes in a first text library, a second text library, and a third text library according to the regular expression, so as to obtain an identification code corresponding to the first file, an identification code corresponding to the second file, and an identification code corresponding to the third file.
In a specific embodiment of the present disclosure, the building module 703 further includes a building unit 7031, a matching unit 7032, a generating unit 7033, and an adding unit 7034.
A constructing unit 7031, configured to define an equipment facility in the coal preparation plant as an object, and construct a coal preparation plant class library, where the coal preparation plant class library includes a class number and an attribute of each object, and one of the class numbers represents a class;
a matching unit 7032, configured to match the device identifier included in the identifier code with the category code, to obtain a category corresponding to the identifier code;
a generating unit 7033, configured to generate an object library according to the coal preparation plant class library, where the object library includes a category code and an attribute of each object;
an adding unit 7034, configured to add an object to the object library to complete the construction of a coal preparation plant management platform, where when each object is added, the identification code is added to the corresponding category code according to the category corresponding to the identification code, design information of the equipment facility corresponding to the identification code is obtained, and contents in the design information are respectively added to corresponding attributes to complete the addition.
In a specific embodiment of the present disclosure, the apparatus further includes an identification module 704, a second obtaining module 705, a third obtaining module 706, and a response module 707.
An identifying module 704, configured to identify a keyword in the first text library to obtain a first keyword library; identifying keywords in the second character library to obtain a second keyword library; identifying keywords in the third character library to obtain a third key character library, and collecting the first keyword library, the second keyword library and the third key character library to obtain a keyword library;
a second obtaining module 705, configured to obtain a keyword input by a user, and query the keyword in the keyword library according to the keyword input by the user to obtain a file case table including the keyword input by the user;
a third obtaining module 706, configured to obtain input information, where the input information includes click operation information on any file in the file instance table;
and a response module 707, configured to jump to a location in the file where the keyword input by the user is located in response to the input information.
It should be noted that, regarding the apparatus in the above embodiment, the specific manner in which each module performs the operation has been described in detail in the embodiment related to the method, and will not be described in detail here.
Example 3
Corresponding to the above method embodiment, the embodiment of the present disclosure further provides a device for building a management platform of a coal preparation plant, and the device for building a management platform of a coal preparation plant described below and the method for building a management platform of a coal preparation plant described above may be referred to in a corresponding manner.
Fig. 3 is a block diagram illustrating a setup facility 800 for a coal preparation plant management platform according to an exemplary embodiment. As shown in fig. 3, the construction equipment 800 of the coal preparation plant management platform may include: a processor 801, a memory 802. The construction equipment 800 of the coal preparation plant management platform may further include one or more of a multimedia component 803, an input/output (I/O) interface 804, and a communication component 805.
The processor 801 is configured to control the overall operation of the construction equipment 800 of the coal preparation plant management platform, so as to complete all or part of the steps in the construction method of the coal preparation plant management platform. The memory 802 is used to store various types of data to support the operation of the construction apparatus 800 of the coal preparation plant management platform, which data may include, for example, instructions for any application or method operating on the construction apparatus 800 of the coal preparation plant management platform, as well as application-related data, such as contact data, transceived messages, pictures, audio, video, and so forth. The Memory 802 may be implemented by any type of volatile or non-volatile Memory device or combination thereof, such as Static Random Access Memory (SRAM), Electrically Erasable Programmable Read-Only Memory (EEPROM), Erasable Programmable Read-Only Memory (EPROM), Programmable Read-Only Memory (PROM), Read-Only Memory (ROM), magnetic Memory, flash Memory, magnetic disk or optical disk. The multimedia components 803 may include screen and audio components. Wherein the screen may be, for example, a touch screen and the audio component is used for outputting and/or inputting audio signals. For example, the audio component may include a microphone for receiving external audio signals. The received audio signal may further be stored in the memory 802 or transmitted through the communication component 805. The audio assembly also includes at least one speaker for outputting audio signals. The I/O interface 804 provides an interface between the processor 801 and other interface modules, such as a keyboard, mouse, buttons, etc. These buttons may be virtual buttons or physical buttons. The communication component 805 is used for performing wired or wireless communication between the construction equipment 800 of the coal preparation plant management platform and other equipment. Wireless communication, such as Wi-Fi, bluetooth, Near Field Communication (NFC), 2G, 3G, or 4G, or a combination of one or more of them, so that the corresponding communication component 805 may include: Wi-Fi module, bluetooth module, NFC module.
In an exemplary embodiment, the building Device 800 of the coal preparation plant management platform may be implemented by one or more Application Specific Integrated Circuits (ASICs), Digital Signal Processors (DSPs), Digital Signal Processing Devices (DSPDs), Programmable Logic Devices (PLDs), Field Programmable Gate Arrays (FPGAs), controllers, microcontrollers, microprocessors or other electronic elements, and is configured to perform the building method of the coal preparation plant management platform.
In another exemplary embodiment, a computer-readable storage medium is also provided, which includes program instructions, which when executed by a processor, implement the steps of the method of building a coal preparation plant management platform described above. For example, the computer readable storage medium may be the memory 802 comprising program instructions executable by the processor 801 of the construction apparatus 800 of the coal preparation plant management platform to perform the construction method of the coal preparation plant management platform described above.
Example 4
Corresponding to the above method embodiment, the embodiment of the present disclosure further provides a readable storage medium, and the following described readable storage medium and the above described building method of the coal preparation plant management platform may be referred to correspondingly.
A readable storage medium is provided, and a computer program is stored on the readable storage medium, and when being executed by a processor, the computer program realizes the steps of the method for building the coal preparation plant management platform of the embodiment of the method.
The readable storage medium may be a usb disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, an optical disk, or other various readable storage media capable of storing program codes.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The construction method of the coal preparation plant management platform is characterized by comprising the following steps:
acquiring a management file of a coal preparation plant, wherein the management file comprises a first file, a second file and a third file, the first file comprises a design drawing file of the coal preparation plant in a dwg format, the second file comprises a three-dimensional model file of the coal preparation plant in an i.dgn format, and the third file comprises files in other formats except the dwg format and the i.dgn format;
obtaining an identification code corresponding to a first file based on characters in the first file, obtaining an identification code corresponding to a second file based on characters in the second file, and obtaining an identification code corresponding to a third file based on characters in the third file;
and constructing an object library according to all the identification codes to complete the construction of a management platform of the coal preparation plant, wherein the object library comprises at least one object, the content of each object comprises the identification codes and the attribute content corresponding to the object, and one object is an equipment facility in the coal preparation plant.
2. The method for building the coal preparation plant management platform according to claim 1, wherein obtaining an identification code corresponding to a first file based on characters in the first file, obtaining an identification code corresponding to a second file based on characters in the second file, and obtaining an identification code corresponding to a third file based on characters in the third file comprises:
extracting characters in the first file to obtain a first character library, extracting characters in the second file to obtain a second character library, and extracting characters in the third file to obtain a third character library;
and acquiring a regular expression, and respectively mining identification codes in a first character library, a second character library and a third character library according to the regular expression to obtain an identification code corresponding to the first file, an identification code corresponding to the second file and an identification code corresponding to the third file.
3. The method for building the coal preparation plant management platform according to claim 1, wherein the building of the coal preparation plant management platform is completed by building an object library according to the mined identification codes, and comprises the following steps:
defining an equipment facility in the coal preparation plant as an object, and constructing a coal preparation plant class library, wherein the coal preparation plant class library comprises the class number and the attribute of each object, and one class number represents one class;
matching the equipment identification contained in the identification code with the category code to obtain the category corresponding to the identification code;
generating an object library according to the coal preparation plant library, wherein the object library comprises the category code and the attribute of each object;
and adding objects in the object library to complete the construction of a coal preparation plant management platform, wherein when each object is added, the identification codes are added under the corresponding class codes according to the classes corresponding to the identification codes, then the design information of the equipment facilities corresponding to the identification codes is acquired, and the content in the design information is respectively added to the corresponding attributes to complete the addition.
4. The method for building the management platform of the coal preparation plant according to claim 1, wherein after the management file of the coal preparation plant is obtained, the method further comprises the following steps:
identifying keywords in the first character library to obtain a first keyword library; identifying keywords in the second character library to obtain a second keyword library; identifying keywords in the third character library to obtain a third keyword library, and collecting the first keyword library, the second keyword library and the third keyword library to obtain a keyword library;
acquiring keywords input by a user, and inquiring in the keyword library according to the keywords input by the user to obtain a file case table containing the keywords input by the user;
acquiring input information, wherein the input information comprises click operation information of any file in the file case table;
and responding to the input information, and jumping to the position of the keyword input by the user in the file.
5. Coal preparation plant management platform's device of buildding, its characterized in that includes:
the system comprises a first obtaining module, a second obtaining module and a third obtaining module, wherein the first obtaining module is used for obtaining management files of a coal preparation plant, the management files comprise a first file, a second file and a third file, the first file comprises a design drawing file of the coal preparation plant in a dwg format, the second file comprises a three-dimensional model file of the coal preparation plant in an i.dgn format, and the third file comprises files in other formats except the dwg format and the i.dgn format;
the calculation module is used for obtaining an identification code corresponding to a first file based on characters in the first file, obtaining an identification code corresponding to a second file based on characters in the second file, and obtaining an identification code corresponding to a third file based on characters in the third file; and the construction module is used for constructing an object library according to all the identification codes and completing construction of a coal preparation plant management platform, wherein the object library comprises at least one object, the content of each object comprises the identification code and the attribute content corresponding to the object, and one object is one equipment facility in the coal preparation plant.
6. The device for building the management platform of the coal preparation plant according to claim 5, wherein the computing module comprises:
the extracting unit is used for extracting characters in the first file to obtain a first character library, extracting characters in the second file to obtain a second character library, and extracting characters in the third file to obtain a third character library;
and the computing unit is used for acquiring a regular expression, and respectively mining identification codes in a first character library, a second character library and a third character library according to the regular expression to obtain an identification code corresponding to the first file, an identification code corresponding to the second file and an identification code corresponding to the third file.
7. The building device of the coal preparation plant management platform according to claim 5, wherein the building module comprises:
a construction unit, configured to define an equipment facility in the coal preparation plant as an object, and construct a coal preparation plant class library, where the coal preparation plant class library includes a class number and an attribute of each object, and one of the class numbers represents a class;
the matching unit is used for matching the equipment identifier contained in the identifier code with the category code to obtain a category corresponding to the identifier code;
the generating unit is used for generating an object library according to the coal preparation plant library, and the object library comprises the category code and the attribute of each object;
and the adding unit is used for adding objects in the object library and completing the construction of a coal preparation plant management platform, wherein when each object is added, the identification codes are added under the corresponding class codes according to the classes corresponding to the identification codes, then the design information of the equipment facilities corresponding to the identification codes is acquired, and the contents in the design information are respectively added into the corresponding attributes to complete the addition.
8. The building device of the coal preparation plant management platform according to claim 5, further comprising:
the identification module is used for identifying keywords in the first text base to obtain a first keyword base; identifying keywords in the second character library to obtain a second keyword library; identifying keywords in the third character library to obtain a third key character library, and collecting the first keyword library, the second keyword library and the third key character library to obtain a keyword library;
the second acquisition module is used for acquiring keywords input by a user, and inquiring in the keyword library according to the keywords input by the user to obtain a file case table containing the keywords input by the user;
the third acquisition module is used for acquiring input information, wherein the input information comprises click operation information of any file in the file case table;
and the response module is used for responding to the input information and jumping to the position of the keyword input by the user in the file.
9. Coal preparation plant management platform's equipment of buildding, its characterized in that includes:
a memory for storing a computer program;
a processor for implementing the steps of the method of building a coal preparation plant management platform according to any one of claims 1 to 4 when executing the computer program.
10. A readable storage medium, characterized by: the readable storage medium has a computer program stored thereon, and the computer program when executed by a processor realizes the steps of the method for building the coal preparation plant management platform according to any one of claims 1 to 4.
CN202210308782.XA 2022-03-28 2022-03-28 Method, device and equipment for building coal preparation plant management platform and readable storage medium Pending CN114911751A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210308782.XA CN114911751A (en) 2022-03-28 2022-03-28 Method, device and equipment for building coal preparation plant management platform and readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210308782.XA CN114911751A (en) 2022-03-28 2022-03-28 Method, device and equipment for building coal preparation plant management platform and readable storage medium

Publications (1)

Publication Number Publication Date
CN114911751A true CN114911751A (en) 2022-08-16

Family

ID=82762775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210308782.XA Pending CN114911751A (en) 2022-03-28 2022-03-28 Method, device and equipment for building coal preparation plant management platform and readable storage medium

Country Status (1)

Country Link
CN (1) CN114911751A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116010505A (en) * 2023-01-17 2023-04-25 深圳图为技术有限公司 Digital management method and system for factory engineering archival data

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116010505A (en) * 2023-01-17 2023-04-25 深圳图为技术有限公司 Digital management method and system for factory engineering archival data

Similar Documents

Publication Publication Date Title
KR20140009297A (en) Formatting data by example
CN115061721A (en) Report generation method and device, computer equipment and storage medium
CN110399448B (en) Chinese place name address searching and matching method, terminal and computer readable storage medium
CN110941629B (en) Metadata processing method, apparatus, device and computer readable storage medium
CN110688315A (en) Interface code detection report generation method, electronic device, and storage medium
CN114911751A (en) Method, device and equipment for building coal preparation plant management platform and readable storage medium
CN112783482B (en) Visual form generation method, device, equipment and storage medium
CN113656044B (en) Android installation package compression method and device, computer equipment and storage medium
JP2019121164A (en) Document creating apparatus, document creating method, database construction apparatus, database construction method, and program
CN114741077A (en) Page effect preview method, device, equipment and medium based on field granularity
CN114911479A (en) Interface generation method, device, equipment and storage medium based on configuration
KR20120072153A (en) System for generating and searching documents of minutes
CN117891531B (en) System parameter configuration method, system, medium and electronic equipment for SAAS software
Yohannis et al. Towards hybrid model persistence
Firdaus et al. Implementation of Document Management System using Levenshtein Distance Algorithm
JP6703698B1 (en) Information provision system
CN110727897B (en) Geological survey information service rapid publishing method and system supporting multi-terminal operation
CN111967273B (en) Dialog management system, method and rule engine device
CN116483735B (en) Method, device, storage medium and equipment for analyzing influence of code change
CN112860979B (en) Resource searching method, device, equipment and storage medium
CN113760891B (en) Data table generation method, device, equipment and storage medium
CN112445391B (en) Service data generation method, device and computer readable storage medium
CN117493718A (en) Page generation method and device, electronic equipment and medium
CN117815672A (en) Data processing method, apparatus, device, storage medium and computer program product
TWI608415B (en) Electronic data retrieval system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination