CN114908622A - Overhauling method for failed bolt heavy anchor of railway speed-up turnout sleeper - Google Patents

Overhauling method for failed bolt heavy anchor of railway speed-up turnout sleeper Download PDF

Info

Publication number
CN114908622A
CN114908622A CN202210342542.1A CN202210342542A CN114908622A CN 114908622 A CN114908622 A CN 114908622A CN 202210342542 A CN202210342542 A CN 202210342542A CN 114908622 A CN114908622 A CN 114908622A
Authority
CN
China
Prior art keywords
bolt
column
overhauling
failed
speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210342542.1A
Other languages
Chinese (zh)
Inventor
蔡喜凤
蔡红星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Nanke Railway Equipment Co ltd
Original Assignee
Guangzhou Nanke Railway Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Nanke Railway Equipment Co ltd filed Critical Guangzhou Nanke Railway Equipment Co ltd
Priority to CN202210342542.1A priority Critical patent/CN114908622A/en
Publication of CN114908622A publication Critical patent/CN114908622A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/32Installing or removing track components, not covered by the preceding groups, e.g. sole-plates, rail anchors

Abstract

The invention relates to the technical field of railway device maintenance, and discloses a method for maintaining failed bolt heavy anchors of a railway speed-up turnout switch sleeper, which comprises the following steps: s1: heating, namely aligning the pyramid, the slotted bar and the fixing column of the maintenance equipment by using a heating gun, heating the pyramid, the slotted bar and the fixing column to 220-250 ℃; s2: slotting, inserting the heated maintenance equipment into the bolt sleeve, pressing the pressing disc at a constant speed, and then leading the guiding disc to play a guiding role; s3: cooling, namely cooling the bolt sleeve and the maintenance equipment by using water; s4: and (4) taking out for maintenance, inserting the maintenance equipment into the bolt sleeve again, then inserting the rotating rod into the inserting hole, taking out the bolt sleeve, and maintaining. The whole operation process is simple, a good grooving effect can be achieved through the arrangement of the pyramid, repeated grooving is not needed, pressing and taking out are convenient due to the arrangement of the pressing disc, and time and labor are saved.

Description

Overhauling method for failed bolt heavy anchor of railway speed-up turnout sleeper
Technical Field
The invention relates to the technical field of railway device maintenance, in particular to a method for maintaining failed bolt heavy anchors of a railway speed-up turnout switch sleeper.
Background
Railway transportation is a land transportation mode, in which two parallel rails are used to guide trains, railway transportation is one of the most effective known land transportation modes, railway transportation is one of the main modes of modern transportation, and is one of the two basic transportation modes constituting land transportation, which occupies an important position in the whole transportation field and plays an increasingly important role.
Most switch sleepers in the prior railway technology are of a concrete structure, plastic sleeves are embedded in the switch sleepers, the plastic sleeves are screwed by switch sleeper bolts, a switch base plate and a slab lower rubber mat are firm together with the switch sleepers, the firm structure is characterized in that the difficulty in repairing the failed plastic sleeves is very large, but the plastic sleeves need to be overhauled most difficultly, the plastic sleeves need to be integrally taken out for checking during overhauling, but the plastic sleeves can be damaged in the general taking-out process, the plastic sleeves cannot be reused, and resources are wasted, so that the overhauling method for the failed bolt re-anchoring of the railway speed-raising switch sleeper is provided.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a method for overhauling the failed bolt and the heavy anchor of the turnout sleeper of the speed-up turnout, which solves the problems that the plastic sleeve needs to be integrally taken out for checking in the conventional overhauling process, but the plastic sleeve is damaged, cannot be reused, wastes resources and cannot meet the requirements of people in the conventional overhauling process.
(II) technical scheme
In order to achieve the purpose, the invention provides the following technical scheme:
a method for overhauling a bolt heavy anchor for failure of a railway speed-up turnout sleeper comprises the following steps:
s1: heating, namely aligning the pyramid, the slotted bar and the fixing column of the maintenance equipment by using a heating gun, heating the pyramid, the slotted bar and the fixing column to 220-250 ℃;
s2: slotting, inserting the heated maintenance equipment into the bolt sleeve, and pressing the pressing disc at a constant speed, wherein the guiding disc plays a role in guiding;
s3: cooling, namely cooling the bolt sleeve and the maintenance equipment by using water;
s4: taking out the maintenance, inserting the maintenance equipment into the bolt sleeve again, then inserting the dwang into the spliced eye, taking out the bolt sleeve, overhauling.
As a still further aspect of the present invention, in S2, the diameter of the top of the guiding disc is the same as the inner diameter of the bolt sleeve, and the diameter of the fixing column is smaller than the inner diameter of the bolt sleeve.
Furthermore, the maintenance equipment comprises a fixed column, four uniformly distributed slotted bars are fixedly connected to the side wall of the fixed column, a pyramid is integrally formed at the bottom of each slotted bar, a connecting column is fixedly connected to the top of the fixed column, an inserting hole is formed in one side of the connecting column, and a rotating rod is inserted in the inserting hole.
On the basis of the scheme, the bottom of the fixed column is fixedly connected with a telescopic cylinder, a spring is fixedly connected in the telescopic cylinder, the bottom of the spring is fixedly connected with a telescopic column, and the telescopic column is inserted in the telescopic cylinder.
Furthermore, the bottom of flexible post is fixed with the guiding disc through the bolt, and the guiding disc is the inverted round platform structure.
On the basis of the scheme, the top of the connecting column is fixedly provided with a heat insulation column through a bolt, and the top of the heat insulation column is fixedly provided with a pressing disc through a bolt.
According to a further scheme of the invention, a spongy cushion is adhered to the upper surface of the pressing plate.
(III) advantageous effects
Compared with the prior art, the invention provides a method for overhauling the failed bolt heavy anchor of the turnout sleeper of the railway speed-up turnout, which has the following beneficial effects:
1. according to the invention, the whole operation process is simple, a good grooving effect can be achieved through the arrangement of the pyramid, repeated grooving is not needed, the pressing disc is convenient to press and take out, and time and labor are saved.
2. According to the invention, the diameter of the top of the guide disc is designed to be the same as the inner diameter of the bolt sleeve, and the diameter of the fixing column is smaller than the inner diameter of the bolt sleeve, so that the fixing column can be prevented from contacting with the inner diameter of the bolt sleeve when the pyramid and the slotting strip slot the bolt sleeve, thereby avoiding large-range damage to the bolt sleeve and enabling the bolt sleeve to be reused.
3. According to the invention, the slotting effect of the slotting strip can be improved through the pyramid design, the slotting steps are reduced, and the slotting efficiency is improved.
4. According to the invention, the guide disc is arranged to play a role in guiding, the heating fixed column is prevented from directly contacting with the inner wall of the bolt sleeve, so that the bolt sleeve cannot be used continuously, and the telescopic column and the telescopic cylinder are arranged to play a certain heat insulation role to prevent the guide disc from being heated when the fixed column is heated.
5. According to the invention, a good heat insulation effect can be achieved through the arrangement of the heat insulation column, and the pressing plate is prevented from being heated when the fixing column is heated, so that the normal pressing operation is prevented from being influenced.
Drawings
FIG. 1 is a schematic view of a three-dimensional structure of an overhaul device of an overhaul method for a failed bolt heavy anchor of a railway speed-up switch tie, which is provided by the invention;
FIG. 2 is a schematic view of a partial cross-sectional structure of an overhaul device of an overhaul method for a failed bolt heavy anchor of a railway speed-up switch tie provided by the invention
FIG. 3 is a schematic structural view of the maintenance equipment of the maintenance method for failed bolt heavy anchor of the railroad speed-up switch tie according to the present invention
Fig. 4 is a schematic flow structure diagram of a method for overhauling a failed bolt heavy anchor of a railway speed-up turnout sleeper provided by the invention.
In the figure: 1. a guide plate; 2. a telescopic column; 3. a telescopic cylinder; 4. a pyramid; 5. grooving; 6. fixing the column; 7. connecting columns; 8. rotating the rod; 9. inserting holes; 10. pressing the disc; 11. a sponge cushion; 12. a spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, a method for overhauling a failed bolt heavy anchor of a railway speed-up turnout switch tie comprises the following steps:
s1: heating, namely aligning the pyramid 4, the slotted bar 5 and the fixing column 6 of the maintenance equipment by using a heating gun, heating the pyramid 4, the slotted bar 5 and the fixing column 6 to 220-250 ℃;
s2: slotting, inserting heated maintenance equipment into the bolt sleeve, pressing the pressing disc 10 at a constant speed, and then leading the guide disc 1 to play a role in guiding;
s3: cooling, namely cooling the bolt sleeve and the maintenance equipment by using water;
s4: taking out the maintenance, insert the maintenance equipment in the bolt sleeve pipe once more, then insert peg hole 9 with dwang 8 in, take out the bolt sleeve pipe, overhaul, whole operation process is fairly simple, can play fine fluting effect through setting up of pyramid 4 moreover, need not repeated fluting, press down the setting of dish 10 also conveniently to press and take out labour saving and time saving.
In the invention, the diameter of the top of the guide disc 1 in the S2 is the same as the inner diameter of the bolt sleeve, and the diameter of the fixed column 6 is smaller than the inner diameter of the bolt sleeve, so that the fixed column 6 can be prevented from contacting with the inner diameter of the bolt sleeve when the pyramid 4 and the slotting strip 5 slot the bolt sleeve, thereby avoiding the large-range damage to the bolt sleeve and enabling the bolt sleeve to be reused.
Particularly, the maintenance equipment comprises a fixed column 6, four evenly distributed slotting strips 5 are welded on the side wall of the fixed column 6, pyramids 4 are integrally formed at the bottoms of the slotting strips 5, a connecting column 7 is welded at the top of the fixed column 6, an inserting hole 9 is formed in one side of the connecting column 7, a rotating rod 8 is inserted in the inserting hole 9, the slotting effect of the slotting strips 5 can be improved through the design of the pyramids 4, slotting steps are reduced, the slotting efficiency is improved, a telescopic cylinder 3 is welded at the bottom of the fixed column 6, a spring 12 is welded in the telescopic cylinder 3, a telescopic column 2 is welded at the bottom of the spring 12, the telescopic column 2 is inserted in the telescopic cylinder 3, a guide disc 1 is fixed at the bottom of the telescopic column 2 through bolts, the guide disc 1 is of an inverted circular truncated cone structure, the guide function can be achieved through the arrangement of the guide disc 1, the fixed column 6 which generates heat is prevented from directly contacting with the inner wall of a bolt sleeve pipe, make it can not continue to use, and telescopic column 2 and telescopic cylinder 3's setting can play certain thermal-insulated effect, deflector 1 also is heated when preventing to heat fixed column 6, there is thermal-insulated post at the top of spliced pole 7 through the bolt fastening, and the top of thermal-insulated post has press plate 10 through the bolt fastening, can play fine thermal-insulated effect through the setting of thermal-insulated post, prevent to press plate 10 also by the heating when heating fixed column 6, influence normal pressing operation, press plate 10's upper surface bonding has foam-rubber cushion 11.
In the description herein, it is noted that relational terms such as first and second, and the like, may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. A method for overhauling a bolt heavy anchor for failure of a railway speed-up turnout sleeper is characterized by comprising the following steps:
s1: heating, namely aligning the pyramid (4), the slotting strip (5) and the fixing column (6) of the maintenance equipment by using a heating gun, heating the pyramid, the slotting strip and the fixing column to 220-250 ℃;
s2: slotting, inserting heated maintenance equipment into the bolt sleeve, pressing the pressing disc (10) at a constant speed, and guiding the guide disc (1) at the moment;
s3: cooling, namely cooling the bolt sleeve and the maintenance equipment by using water;
s4: and (4) taking out for maintenance, inserting the maintenance equipment into the bolt sleeve again, then inserting the rotating rod (8) into the inserting hole (9), taking out the bolt sleeve, and maintaining.
2. The method for overhauling the failed bolt heavy anchor of the switch tie of the speed-up switch according to the claim 1, wherein the diameter of the top of the guide plate (1) in the S2 is the same as the inner diameter of the bolt sleeve, and the diameter of the fixed column (6) is smaller than the inner diameter of the bolt sleeve.
3. The method for overhauling the failed bolt heavy anchor of the railway speed-up turnout switch tie according to claim 2, wherein the overhauling equipment comprises a fixed column (6), four evenly distributed slotted bars (5) are fixedly connected to the side wall of the fixed column (6), pyramids (4) are integrally formed at the bottoms of the slotted bars (5), a connecting column (7) is fixedly connected to the top of the fixed column (6), an inserting hole (9) is formed in one side of the connecting column (7), and a rotating rod (8) is inserted in the inserting hole (9).
4. The overhauling method of the bolt heavy anchor of the failed switch tie of the railway speed-up turnout according to claim 3, wherein the bottom of the fixed column (6) is fixedly connected with a telescopic cylinder (3), the telescopic cylinder (3) is internally and fixedly connected with a spring (12), the bottom of the spring (12) is fixedly connected with a telescopic column (2), and the telescopic column (2) is inserted in the telescopic cylinder (3).
5. The method for overhauling the failed bolt heavy anchor of the railway speed-up turnout switch tie according to claim 4, wherein the bottom of the telescopic column (2) is fixed with a guide disc (1) through a bolt, and the guide disc (1) is of an inverted frustum structure.
6. The method for overhauling the failed bolt heavy anchor of the switch tie of the speed-up switch according to claim 3, wherein the top of the connecting column (7) is fixed with a heat-insulating column through a bolt, and the top of the heat-insulating column is fixed with a pressing plate (10) through a bolt.
7. The method for overhauling the failed bolt heavy anchor of the switch tie of the speed-up switch of the railway according to claim 6, wherein a sponge pad (11) is bonded on the upper surface of the pressing plate (10).
CN202210342542.1A 2022-03-31 2022-03-31 Overhauling method for failed bolt heavy anchor of railway speed-up turnout sleeper Pending CN114908622A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210342542.1A CN114908622A (en) 2022-03-31 2022-03-31 Overhauling method for failed bolt heavy anchor of railway speed-up turnout sleeper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210342542.1A CN114908622A (en) 2022-03-31 2022-03-31 Overhauling method for failed bolt heavy anchor of railway speed-up turnout sleeper

Publications (1)

Publication Number Publication Date
CN114908622A true CN114908622A (en) 2022-08-16

Family

ID=82763579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210342542.1A Pending CN114908622A (en) 2022-03-31 2022-03-31 Overhauling method for failed bolt heavy anchor of railway speed-up turnout sleeper

Country Status (1)

Country Link
CN (1) CN114908622A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1818452A1 (en) * 2006-01-06 2007-08-15 BWG GmbH & Co. KG Rail fastening system and screw and screw-plug for this system
CN101109164A (en) * 2007-06-13 2008-01-23 杨红瑞 Method for replacing disabled bolt weight anchor at speed improving runway switch crossing sleeper of railway
CN201080581Y (en) * 2007-09-14 2008-07-02 杨红瑞 Railway speed-raising turnout sleeper failure kingbolt heavy anchor heating splined shaft
CN206308565U (en) * 2016-11-22 2017-07-07 中铁株洲桥梁有限公司 One kind changes concrete turnout sleeper embedded sleeve pipe heat melting device
CN209923700U (en) * 2019-04-28 2020-01-10 文盼盼 Anchor changing operation device for bolt of railway switch tie plate

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1818452A1 (en) * 2006-01-06 2007-08-15 BWG GmbH & Co. KG Rail fastening system and screw and screw-plug for this system
CN101109164A (en) * 2007-06-13 2008-01-23 杨红瑞 Method for replacing disabled bolt weight anchor at speed improving runway switch crossing sleeper of railway
CN201080581Y (en) * 2007-09-14 2008-07-02 杨红瑞 Railway speed-raising turnout sleeper failure kingbolt heavy anchor heating splined shaft
CN206308565U (en) * 2016-11-22 2017-07-07 中铁株洲桥梁有限公司 One kind changes concrete turnout sleeper embedded sleeve pipe heat melting device
CN209923700U (en) * 2019-04-28 2020-01-10 文盼盼 Anchor changing operation device for bolt of railway switch tie plate

Similar Documents

Publication Publication Date Title
CN108004855B (en) Pressing limiting device and method for plate-type ballastless track structure
CN203546532U (en) High-speed railway ballast track steel rail fastener system
CN106192620A (en) A kind of railway ballastless track supporting layer and substructure change method
CN217078222U (en) Assembled ballastless track based on dry-type connection
CN114908622A (en) Overhauling method for failed bolt heavy anchor of railway speed-up turnout sleeper
CN208280027U (en) A kind of steel construction pedestal for the automatic dabbing of prefabricated bent cap
JP3829119B2 (en) Method and apparatus for correcting the position of a slab structure composed of precast concrete slabs
CN202830761U (en) Railway steel truss girder bridge ballastless track laying structure
CN108930201B (en) Rail foundation
CN201151858Y (en) Fixing rack of double block type ballastless track construction
CN216156258U (en) Railway track supporting structure
CN102605684B (en) Low assembly type monolithic roadbed with elastic short sleeper and construction method thereof
CN212426699U (en) Corrugated steel leader plate structure capable of absorbing horizontal deformation in full seamless bridge
CN210684339U (en) Bamboo glue combined sleeper
CN210341507U (en) Temporary overhead device for ballastless track line of high-speed rail suitable for high-speed traveling
CN211645786U (en) Fastener system mounting structure
CN207998758U (en) Bracing means for underground cable solid concrete roabed templates for expansion joints
CN111267218A (en) Movable pedestal
CN206368325U (en) A kind of bridge composite seamless expansion joint
CN103266544B (en) Combined construction method of monolithic track bed and track of locomotive washing warehouse
CN206784960U (en) Lower supporting type overhanging unloading platform
CN108643051A (en) A kind of steel construction pedestal for the automatic dabbing of prefabricated bent cap
CN211285229U (en) Full-prefabricated assembled track structure on steel truss girder
CN219794528U (en) Concrete slab expansion joint connecting piece
CN216340281U (en) Cast-in-place concrete wall structure with built-in insulation board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20220816