CN114903261A - Processing method of precious metal ornaments - Google Patents

Processing method of precious metal ornaments Download PDF

Info

Publication number
CN114903261A
CN114903261A CN202210299822.9A CN202210299822A CN114903261A CN 114903261 A CN114903261 A CN 114903261A CN 202210299822 A CN202210299822 A CN 202210299822A CN 114903261 A CN114903261 A CN 114903261A
Authority
CN
China
Prior art keywords
noble metal
ornaments
ornament
size
processing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202210299822.9A
Other languages
Chinese (zh)
Inventor
刘诗豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jin Chuan Culture Development Jiangsu Co ltd
Original Assignee
Jin Chuan Culture Development Jiangsu Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jin Chuan Culture Development Jiangsu Co ltd filed Critical Jin Chuan Culture Development Jiangsu Co ltd
Priority to CN202210299822.9A priority Critical patent/CN114903261A/en
Publication of CN114903261A publication Critical patent/CN114903261A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A44HABERDASHERY; JEWELLERY
    • A44CPERSONAL ADORNMENTS, e.g. JEWELLERY; COINS
    • A44C27/00Making jewellery or other personal adornments
    • AHUMAN NECESSITIES
    • A44HABERDASHERY; JEWELLERY
    • A44CPERSONAL ADORNMENTS, e.g. JEWELLERY; COINS
    • A44C27/00Making jewellery or other personal adornments
    • A44C27/001Materials for manufacturing jewellery
    • A44C27/002Metallic materials
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Adornments (AREA)

Abstract

The invention relates to the technical field of ornaments and discloses a processing method of a noble metal ornament, which comprises the steps of investigating the market style requirements of the noble metal ornament, designing the structure and the size of a product according to the required noble ornament, and producing a mold for the structure and the size of the noble metal ornament; collecting the raw materials of the noble metal ornaments, putting the raw materials of the noble metal ornaments in a melting furnace for melting, and adding the melted noble metal ornaments into a mold for processing; then cooling the die, and taking the blank of the noble metal ornament out of the die; placing the obtained blank of the noble metal ornament on a milling machine for finish machining; and then polishing and deburring the finish-machined metal ornament, packaging and packaging the finish-machined metal ornament, heating the precious metal ornament raw material in a melting furnace to a melting temperature, and cooling the die with water. The processing method of the noble metal ornament has the advantages of convenience in resource saving and the like.

Description

Processing method of precious metal ornaments
Technical Field
The invention relates to the technical field of ornaments, in particular to a processing method of a noble metal ornament.
Background
The ornaments are used for decoration, and are generally used for beautifying personal appearance, decorating rooms, beautifying public environment and decorating automobiles, so that the ornaments can be divided into the following categories, namely household ornaments, clothing ornaments, automobile ornaments and the like, and the industry of wholesale ornaments gradually rises along with the gradual increase of people wearing the ornaments.
At present, ornaments are widely applied, and the raw materials of some precious metal ornaments are directly subjected to numerical control processing, so that the raw materials are wasted, and resources are inconveniently saved, therefore, the processing method of the precious metal ornaments is provided to solve the problems.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides the processing method of the precious metal ornaments, which has the advantages of convenience in resource saving and the like, and solves the problems that the raw materials of some precious metal ornaments are directly subjected to numerical control processing, the raw materials are wasted, and the resources are inconvenient to save.
(II) technical scheme
In order to realize the purpose of conveniently saving resources and the like, the invention provides the following technical scheme: a processing method of a noble metal ornament comprises the following steps:
1) investigating the market style requirements of the noble metal ornaments, designing the structure and the size of a product according to the required noble jewelry, and producing a mold for the structure and the size of the noble metal ornaments;
2) collecting the raw materials of the noble metal ornaments, putting the raw materials of the noble metal ornaments in a melting furnace for melting, and adding the melted noble metal ornaments into a mold for processing;
3) then cooling the die, and taking the blank of the noble metal ornament out of the die;
4) placing the obtained blank of the noble metal ornament on a milling machine for finish machining;
5) and then polishing and deburring the finish-machined metal ornament, and packaging the finish-machined metal ornament.
Furthermore, the structure and the size of the metal ornament are drawn on a drawing sheet, and the metal ornament is marked with the size and the size of a fillet.
Further, the precious metal ornament raw material is placed in a melting furnace to be heated to the melting temperature, and the die is cooled by water.
Further, the milling machine is a full-automatic intelligent numerical control milling machine, and a numerical control operation panel of the milling machine is used for programming the size and the walkway data of the noble metal.
Further, the finely processed precious metal ornaments are polished on a polisher, and waste residues are filtered and recovered.
Further, the packaging machine packages the precious metal ornaments.
(III) advantageous effects
Compared with the prior art, the invention provides a processing method of a noble metal ornament, which has the following beneficial effects:
according to the processing method of the precious metal ornaments, the market style requirements of the precious metal ornaments are investigated, the structures and the sizes of products are designed according to the required precious ornaments, the molds are produced according to the structures and the sizes of the precious metal ornaments, the precious metal ornaments can be conveniently specified in size, the raw materials of the precious metal ornaments are collected, the raw materials of the precious metal ornaments are placed in a melting furnace to be melted, the melted precious metal ornaments are added into the molds to be processed, then the molds are cooled, blanks of the precious metal ornaments are lifted out of the molds, the raw materials of the precious metal ornaments can be directly shaped, then finish machining is carried out through a milling machine, the raw materials with overlarge size are avoided being needed in rough machining, and the raw materials are saved.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The first embodiment is as follows: the processing method of the precious metal ornaments in the implementation is characterized by comprising the following steps of:
1) investigating the market style requirements of the noble metal ornaments, designing the structure and the size of a product according to the required noble jewelry, and producing a mold for the structure and the size of the noble metal ornaments;
2) collecting the raw materials of the noble metal ornaments, placing the raw materials of the noble metal ornaments in a melting furnace for melting, and adding the melted noble metal ornaments into a mold for processing;
3) then cooling the mould, and taking the blank of the noble metal ornament out of the mould;
4) placing the obtained blank of the noble metal ornament on a milling machine for finish machining;
5) and then polishing and deburring the finish-machined metal ornament, and packaging the finish-machined metal ornament.
In this embodiment, the structure and the size of the metal ornament are drawn on a production drawing, and the metal ornament is marked with the size and the size of a fillet.
In this embodiment, the precious metal ornament raw material is placed in a melting furnace and heated to a melting temperature, and the mold is cooled with water.
In this embodiment, the milling machine is a full-automatic intelligent numerical control milling machine, and a numerical control operation panel of the milling machine programs the size and the walkway data of the precious metal.
In this embodiment, the finish-machined precious metal ornaments are polished on a polisher, and waste residues are filtered and recovered.
In this embodiment, the wrapping machine wraps the precious metal ornaments.
The invention has the beneficial effects that:
the method comprises the steps of investigating market style requirements of the precious metal ornaments, designing the structure and the size of a product according to the required precious ornaments, producing a mold for the structure and the size of the precious metal ornaments, conveniently specifying the size of the precious metal ornaments, collecting raw materials of the precious metal ornaments, placing the raw materials of the precious metal ornaments in a melting furnace for melting, adding the melted precious metal ornaments into the mold for processing, cooling the mold, taking blanks of the precious metal ornaments out of the mold, facilitating direct shaping of the raw materials of the metal ornaments, performing fine machining through a milling machine, avoiding the need of oversize raw materials for rough machining, saving the raw materials, and saving the raw materials
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The processing method of the noble metal ornament is characterized by comprising the following steps:
1) investigating the market style requirements of the noble metal ornaments, designing the structure and the size of a product according to the required noble jewelry, and producing a mold for the structure and the size of the noble metal ornaments;
2) collecting the raw materials of the noble metal ornaments, putting the raw materials of the noble metal ornaments in a melting furnace for melting, and adding the melted noble metal ornaments into a mold for processing;
3) then cooling the die, and taking the blank of the noble metal ornament out of the die;
4) placing the obtained blank of the noble metal ornament on a milling machine for finish machining;
5) and then polishing and deburring the finish-machined metal ornament, and packaging the finish-machined metal ornament.
2. The processing method of the noble metal ornament is characterized in that the structure and the size of the noble metal ornament are drawn on a production drawing, and the structure and the size are marked with the size and the size of a fillet.
3. The processing method of the precious metal ornaments is characterized in that the precious metal ornaments are placed in a melting furnace to be heated to a melting temperature, and the mold is cooled by water.
4. The processing method of the precious metal ornaments is characterized in that the milling machine is a full-automatic intelligent numerical control milling machine, and a numerical control operating panel of the milling machine is used for programming the size and the walkway data of the precious metal.
5. The processing method of the precious metal ornaments is characterized in that the finished precious metal ornaments are polished on a polisher, and waste residues are filtered and recovered.
6. The processing method of the noble metal ornaments is characterized in that the precious metal ornaments are packaged by the packaging machine.
CN202210299822.9A 2022-03-25 2022-03-25 Processing method of precious metal ornaments Withdrawn CN114903261A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210299822.9A CN114903261A (en) 2022-03-25 2022-03-25 Processing method of precious metal ornaments

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210299822.9A CN114903261A (en) 2022-03-25 2022-03-25 Processing method of precious metal ornaments

Publications (1)

Publication Number Publication Date
CN114903261A true CN114903261A (en) 2022-08-16

Family

ID=82762776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210299822.9A Withdrawn CN114903261A (en) 2022-03-25 2022-03-25 Processing method of precious metal ornaments

Country Status (1)

Country Link
CN (1) CN114903261A (en)

Similar Documents

Publication Publication Date Title
CN101185954A (en) Aluminum alloy special-shaped member equivalent temperature precision forging technique method
CN104814579A (en) Gold jewelry processing technology
CN110742370A (en) Method for processing jewelry
CN104014116A (en) Method for manufacturing upper cover of golf club head
CN114903261A (en) Processing method of precious metal ornaments
CN105478618B (en) A kind of processing technology of spinning wheel rim
CN1045179C (en) Carved glass ornaments nd their processes
CN106925962A (en) A kind of auto parts and components production method
CN108751691B (en) Production process method of multi-face trimming prism
CN111116020A (en) Hot forging forming processing technology for shell with different thicknesses of electronic device
CN1095004A (en) Method for producing sealing ring
CN109761482A (en) A kind of preparation method of 3D cover board
CN107009098A (en) A kind of preparation method and applications of automobile telecommunication sheet metal component
JP2630510B2 (en) Ring manufacturing method
CN111774818A (en) Manufacturing process of automobile aluminum alloy wheel decorative cover with small diameter of less than 6 inches
CN114728443A (en) Method for producing semi-finished products and articles made of cellulose acetate
CN102172303B (en) Bowl type ornament manufacturing method
CN109227061A (en) A kind of equal diameter dust-proof cover die processing method
CN110712009A (en) Heat treatment high-precision mold core frame machining method
CN116787075A (en) Method for manufacturing imitation drill by gold
CN106425293A (en) Process for molding triangular shiny trim strip
CN108247287A (en) USB joint shell processing method
CN112499980A (en) Processing technology of wired glass artware
CN102189383B (en) Making method of Yuanbao-shaped solid ornament
CN116460532A (en) High-temperature tempering pressing method for mirror product

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20220816