CN114872846A - Floating type fan foundation transportation structure and construction method thereof - Google Patents

Floating type fan foundation transportation structure and construction method thereof Download PDF

Info

Publication number
CN114872846A
CN114872846A CN202210441853.3A CN202210441853A CN114872846A CN 114872846 A CN114872846 A CN 114872846A CN 202210441853 A CN202210441853 A CN 202210441853A CN 114872846 A CN114872846 A CN 114872846A
Authority
CN
China
Prior art keywords
column
water
vertical
underwater
water column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210441853.3A
Other languages
Chinese (zh)
Inventor
钮新强
吴司洲
刘海波
喻飞
付文军
姜军倪
刘凯
苏毅
胡超
刘璟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN202210441853.3A priority Critical patent/CN114872846A/en
Publication of CN114872846A publication Critical patent/CN114872846A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B75/00Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B77/00Transporting or installing offshore structures on site using buoyancy forces, e.g. using semi-submersible barges, ballasting the structure or transporting of oil-and-gas platforms
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Civil Engineering (AREA)
  • Wind Motors (AREA)

Abstract

本发明提供了一种浮式风机基础运输结构及其施工方法,属于海上风力发电设备技术领域。该运输结构包括船体、支架组件、水上立柱、水下立柱和两个条形连接段。船体的一端具有安装凹口,位于安装凹口两端的安装面上均设置有滑轨。支架组件包括两个立式扶正支架,两个立式扶正支架分别可滑动地安装于两个滑轨上,立式扶正支架上设置有的抱紧环。两个立式扶正支架上的抱紧环对合并将水上立柱夹持固定于安装凹口中,水上立柱的侧壁上具转轴,两个条形连接段的中部与转轴转动连接,条形连接段的一端与水下立柱固定连接。采用该运输结构和施工方法,在实现减少运输成本的同时,降低浮式风机基础与海上风机在海上对接安装的作业难度,提高施工效率。

Figure 202210441853

The invention provides a floating fan base transport structure and a construction method thereof, belonging to the technical field of offshore wind power generation equipment. The transport structure includes a hull, a bracket assembly, an above-water column, an underwater column and two bar-shaped connecting sections. One end of the hull is provided with a mounting recess, and slide rails are provided on the mounting surfaces at both ends of the mounting recess. The bracket assembly includes two vertical centralizing brackets, which are respectively slidably installed on the two sliding rails, and a holding ring is arranged on the vertical centralizing brackets. The holding rings on the two vertical centralizing brackets are combined to clamp and fix the water column in the installation recess. The side wall of the water column is provided with a rotating shaft. One end is fixedly connected with the underwater column. By adopting the transportation structure and construction method, the operation difficulty of docking and installation of the floating wind turbine foundation and the offshore wind turbine on the sea is reduced while the transportation cost is reduced, and the construction efficiency is improved.

Figure 202210441853

Description

一种浮式风机基础运输结构及其施工方法A kind of floating fan foundation transportation structure and construction method thereof

技术领域technical field

本发明涉及海上风力发电设备技术领域,特别涉及一种浮式风机基础运输结构及其施工方法。The invention relates to the technical field of offshore wind power generation equipment, in particular to a floating fan base transportation structure and a construction method thereof.

背景技术Background technique

海上风电作为一种清洁能源,其资源丰富且靠近城市负荷中心,就地消纳方便,所以发展海上风电已逐渐成为全球能源结构转型的重要支撑。随着能源需求的不断提高,海上风电开发逐步向更深、更远海域发展。深远海域资源丰富,但随着水深的增加,传统固定式基础的建造施工成本急剧增加,其经济效益下降,需要开发浮式基础支撑大型的海上风机。As a kind of clean energy, offshore wind power is rich in resources and close to the urban load center, so it is convenient to consume locally. Therefore, the development of offshore wind power has gradually become an important support for the transformation of the global energy structure. With the continuous improvement of energy demand, the development of offshore wind power has gradually developed to deeper and farther sea areas. The far-reaching sea area is rich in resources, but with the increase of water depth, the construction cost of traditional fixed foundations increases sharply, and its economic benefits decline, so it is necessary to develop floating foundations to support large offshore wind turbines.

在相关技术中,单立柱(Spar)式基础是浮式风机基础的一种,其设计、制造简单,且具有恒稳性。但由于其结构型式特点,与海上风机组合直立于海上时整体长度较长,只适用于百米级别以上的深水海域。单立柱式基础在陆上预制建造完成后,由于浅水海域水深不足无法垂直浮运,目前运输多采用驳船运输或者水平浮运的施工方式。In the related art, a single-column (Spar) type foundation is a type of floating fan foundation, which is simple in design and manufacture, and has constant stability. However, due to its structural characteristics, when combined with the offshore wind turbine, the overall length is long when it is erected at sea, and it is only suitable for deep waters above the level of 100 meters. After the single-column foundation is prefabricated on land, it cannot be floated vertically due to insufficient water depth in shallow waters. At present, the construction methods of barge transportation or horizontal floating are mostly used for transportation.

采用相关技术中的方式,由于采用大型驳船对组装好的浮式风机进行整体运输,会大幅增加运输成本高,浮式风机基础与海上风机往往采用分体式结构呈水平状态进行承载运输或者浮运。在运输到指定地点后,再通过起重船等设施进行浮吊和海上对接安装,整体施工周期长,安装效率低且操作难度高。Using the method in the related art, since large-scale barges are used to transport the assembled floating wind turbines as a whole, the transportation cost will be greatly increased. . After being transported to the designated location, the floating crane and the offshore docking installation are carried out by means of cranes and other facilities. The overall construction period is long, the installation efficiency is low, and the operation is difficult.

发明内容SUMMARY OF THE INVENTION

本发明实施例提供了一种浮式风机基础运输结构及其施工方法,在实现浮式风机基础与海上风机的整体运输成本的同时,有效降低浮式风机基础与海上风机在海上对接安装的作业难度,提高施工效率。技术方案如下:The embodiments of the present invention provide a floating fan foundation transportation structure and a construction method thereof, which can effectively reduce the operation of docking and installing the floating fan foundation and the offshore fan at sea while realizing the overall transportation cost of the floating fan base and the offshore fan. difficulty and improve construction efficiency. The technical solution is as follows:

第一方面,本发明实施例提供了一种浮式风机基础运输结构,该浮式风机基础运输结构包括:船体、支架组件、水上立柱、水下立柱和两个条形连接段,In a first aspect, an embodiment of the present invention provides a basic transportation structure for a floating wind turbine. The basic transportation structure for a floating wind turbine includes: a hull, a bracket assembly, a water column, an underwater column, and two bar-shaped connecting sections,

所述船体上具有安装面,所述船体的一端具有沿所述船体的中轴线方向设置的安装凹口,位于所述安装凹口两端的所述安装面上均设置有滑轨,所述滑轨与所述船体的中轴线垂直,两个所述滑轨相对于所述安装凹口对称布置;The hull has a mounting surface, one end of the hull has a mounting notch along the direction of the central axis of the hull, and slide rails are provided on the mounting surfaces at both ends of the mounting notch, and the sliding The rail is perpendicular to the central axis of the hull, and the two sliding rails are arranged symmetrically with respect to the installation recess;

所述支架组件包括两个立式扶正支架,所述两个立式扶正支架分别可滑动地安装于两个所述滑轨上,所述立式扶正支架面向所述安装凹口一侧的端面上设置有呈半圆弧状的抱紧环,所述水上立柱沿竖直方向布置,所述两个立式扶正支架被配置为能够沿所述滑轨相向移动,以使两个所述立式扶正支架上的所述抱紧环对合并将所述水上立柱夹持固定于所述安装凹口中;The bracket assembly includes two vertical centralizing brackets, the two vertical centralizing brackets are respectively slidably installed on the two sliding rails, and the vertical centralizing brackets face the end face on the side of the installation recess. A semi-circular arc-shaped holding ring is arranged on the upper part, the water uprights are arranged in a vertical direction, and the two vertical righting supports are configured to be able to move toward each other along the sliding rails, so that the two vertical righting brackets can be moved toward each other. The holding rings on the bracket are combined to clamp and fix the water column in the installation recess;

所述水上立柱的一端具有用于与海上风机连接的连接口,所述水上立柱的侧壁上具有两个沿径向设置的转轴,两个所述转轴相对于所述水上立柱对称布置,所述两个条形连接段的中部分别可转动的连接于两个所述转轴上,所述两个条形连接段的一端与所述水下立柱固定连接,所述水下立柱与所述两个条形连接段平行,所述水下立柱内部具有压载舱。One end of the water column has a connection port for connecting with the offshore fan, and the side wall of the water column has two radially arranged rotating shafts, and the two rotating shafts are arranged symmetrically with respect to the water column, so The middle parts of the two bar-shaped connecting sections are respectively rotatably connected to the two rotating shafts, and one end of the two bar-shaped connecting sections is fixedly connected to the underwater upright column, and the underwater upright column is connected to the two shafts. Each of the bar-shaped connecting sections is parallel, and the underwater column is provided with a ballast tank.

可选地,所述条形连接段的另一端具有第一螺栓孔,所述水上立柱的侧壁上具有与所述第一螺栓孔相匹配的第二螺栓孔,所述第二螺栓孔位于所述转轴和所述连接口之间。Optionally, the other end of the bar-shaped connecting section has a first bolt hole, the side wall of the water column has a second bolt hole matching the first bolt hole, and the second bolt hole is located in the between the rotating shaft and the connecting port.

可选地,所述水上立柱的侧壁上具有沿径向凸出设置的装配凸缘,所述装配凸缘位于所述第二螺栓孔与所述连接口之间,所述水上立柱被配置为当通过两个所述立式扶正支架上的所述抱紧环夹持固定于所述安装凹口中时,所述装配凸缘面向所述转轴一侧的端面与所述抱紧环相抵接。Optionally, the side wall of the water column has a radially protruding assembly flange, the assembly flange is located between the second bolt hole and the connection port, and the water column is configured When the clamping rings on the two vertical centralizing brackets are clamped and fixed in the installation recesses, the end face of the assembling flange facing the side of the rotating shaft abuts the clamping rings .

可选地,所述立式扶正支架上具有多个所述抱紧环,多个所述抱紧环沿所述立式扶正支架的延伸方向间隔布置,所述水上立柱具有与多个所述抱紧环一一对应的多个所述装配凸缘。Optionally, the vertical centralizing support is provided with a plurality of the holding rings, and the plurality of the holding rings are arranged at intervals along the extending direction of the vertical centralizing support, and the water column has a plurality of the holding rings. The holding rings correspond to a plurality of the assembling flanges one by one.

可选地,立式扶正支架与所述滑轨滑动连接的一端具有固定耳,所述固定耳上具有第三螺栓孔,位于所述滑轨旁侧的所述安装面上具有多个与所述第三螺栓孔相匹配的第四螺栓孔,多个所述第四螺栓孔沿所述滑轨的长度方向均匀间隔布置。Optionally, one end of the vertical centralizing bracket slidably connected to the sliding rail has a fixing ear, the fixing ear has a third bolt hole, and the mounting surface on the side of the sliding rail has a plurality of bolt holes corresponding to the sliding rail. The fourth bolt holes are matched with the third bolt holes, and a plurality of the fourth bolt holes are evenly spaced along the length direction of the slide rail.

可选地,所述抱紧环的内圈端面设置有弹性垫片。Optionally, an elastic gasket is provided on the inner ring end face of the holding ring.

可选地,所述船体的另一端具有两个导水面,所述导水面与所述船体的中轴线所在的数值平面呈锐角布置,所述两个导水面相对于所述船体的中轴线对称布置。Optionally, the other end of the hull has two water guiding surfaces, the water guiding surfaces are arranged at an acute angle with the numerical plane where the central axis of the hull is located, and the two water guiding surfaces are symmetrical with respect to the central axis of the hull. layout.

可选地,所述立式扶正支架为多层桁架结构。Optionally, the vertical centralizer is a multi-layer truss structure.

可选地,所述抱紧环与所述立式扶正支架通过焊接连接。Optionally, the clasping ring and the vertical centralizer are connected by welding.

第二方面,本发明实施例提供了一种施工方法,用于对前述第一方面所述的浮式风机基础运输结构进行施工,该施工方法包括:In a second aspect, an embodiment of the present invention provides a construction method for constructing the floating fan base transport structure described in the first aspect, the construction method comprising:

利用所述两个条形连接段连接所述水上立柱和所述水下立柱;Connect the above-water column and the underwater column by using the two bar-shaped connecting sections;

利用两个所述立式扶正支架上的所述抱紧环对合以将所述水上立柱沿竖直方向夹持固定于所述安装凹口中,并使所述水下立柱呈自然悬浮于水面的水平浮运状态,通过拖带船体以进行所述水上立柱和所述水下立柱的水上运输;Utilize the holding rings on the two vertical centralizing brackets to fit together to clamp and fix the above-water column in the installation recess in the vertical direction, and make the underwater column naturally suspend on the water surface The horizontal floating state is carried out by towing the hull to carry out the water transportation of the above-water column and the underwater column;

待所述船体到达指定位置后,调整所述压载舱的重量,使所述水下立柱的另一端下沉并带动所述两个条形连接段绕所述转轴旋转,直到所述水下立柱呈整体与所述水上立柱同轴的竖直浮运状态;After the hull reaches the designated position, adjust the weight of the ballast tank to sink the other end of the underwater column and drive the two bar-shaped connecting sections to rotate around the rotating shaft until the underwater The column is in a vertical floating state that is coaxial with the water column as a whole;

对所述水下立柱的一端与所述水上立柱的另一端进行固定连接,调整所述水上立柱和所述水下立柱的吃水深度,与海床进行锚固并张拉系泊线;One end of the underwater column is fixedly connected to the other end of the above-water column, the draught of the above-water column and the underwater column is adjusted, and the seabed is anchored and the mooring line is tensioned;

沿所述滑轨调整所述两个立式扶正支架的相对位置,解除所述抱紧环对所述水上立柱的夹持固定。The relative positions of the two vertical righting brackets are adjusted along the sliding rail, and the clamping and fixing of the water column by the holding ring is released.

本发明实施例提供的技术方案带来的有益效果至少包括:The beneficial effects brought by the technical solutions provided by the embodiments of the present invention include at least:

通过将浮式风机基础设置为分体的水上立柱和水下立柱,并利用两个条形连接段与转轴组成的连接结构进行转动连接。用于拖运的船体仅需要通过支架组件夹持固定需要设置在水上的水上立柱,而让水下立柱保持漂浮在水面上跟随浮运,即可实现浮式风机基础的整体运输,减少大型驳船的使用。而在拖运到位后,通过调整水下立柱上压载舱的重量,即可使水下立柱在两个条形连接段的导向下下沉并转动到与水上立柱同轴的位置。在水下立柱转动到位后,两个条形连接段则可以继续起到对水下立柱与水上立柱之间相对位置的约束作用,方便工作人员直接对水上立柱与水下立柱进行水上对接,而水上立柱和海上风机的连接在岸上即可完成,无需通过起重船等设施进行浮吊等水上吊装施工,有效降低浮式风机基础与海上风机在海上对接安装的作业难度,提高施工效率。By setting the foundation of the floating fan into a separate water column and an underwater column, and using a connection structure composed of two bar-shaped connecting sections and a rotating shaft for rotational connection. The hull used for hauling only needs to be clamped and fixed on the water column that needs to be set on the water through the bracket assembly, and the underwater column can be kept floating on the water surface to follow the floating, the overall transportation of the floating fan foundation can be realized, and the large barges can be reduced. usage of. After the hauling is in place, by adjusting the weight of the ballast tank on the underwater column, the underwater column can sink under the guidance of the two bar-shaped connecting sections and rotate to a position coaxial with the water column. After the underwater column is rotated in place, the two bar-shaped connecting sections can continue to constrain the relative position between the underwater column and the water column, which is convenient for the staff to directly connect the water column and the underwater column. The connection between the water column and the offshore wind turbine can be completed on the shore, and there is no need for floating cranes and other water hoisting construction through cranes and other facilities, which effectively reduces the difficulty of docking and installation of the floating wind turbine foundation and the offshore wind turbine and improves the construction efficiency.

附图说明Description of drawings

为了更清楚地说明本发明实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.

图1是本发明实施例提供的一种浮式风机基础运输结构处于浮运状态的结构示意图;1 is a schematic structural diagram of a basic transport structure of a floating fan provided in an embodiment of the present invention in a floating state;

图2是本发明实施例提供的一种式风机基础运输结构处于浮运状态的侧视结构示意图;2 is a schematic side view of the basic transport structure for a wind turbine provided in an embodiment of the present invention in a floating state;

图3是本发明实施例提供的支架组件的局部结构示意图;3 is a schematic diagram of a partial structure of a stent assembly provided by an embodiment of the present invention;

图4是本发明实施例提供的抱紧环的俯视结构示意图;Fig. 4 is the top-view structure schematic diagram of the clasping ring provided by the embodiment of the present invention;

图5是本发明实施例提供的水上立柱的结构示意图;5 is a schematic structural diagram of a water column provided by an embodiment of the present invention;

图6是本发明实施例提供的水下立柱的剖视结构示意图;6 is a schematic cross-sectional structural diagram of an underwater column provided by an embodiment of the present invention;

图7是本发明实施例提供的一种浮式风机基础运输结构处于组装状态的结构示意图;7 is a schematic structural diagram of a basic transportation structure for a floating fan provided in an embodiment of the present invention in an assembled state;

图8是本发明实施例提供的另一种浮式风机基础运输结构处于浮运状态的俯视结构示意图;8 is a schematic top-view structural diagram of another floating fan base transport structure provided in an embodiment of the present invention in a floating state;

图9是本发明实施例提供的一种浮式风机基础组装完成的姿态结构示意图;9 is a schematic diagram of the posture structure of a floating fan base assembly provided by an embodiment of the present invention;

图10是本发明实施例提供的一种施工方法的流程图。FIG. 10 is a flowchart of a construction method provided by an embodiment of the present invention.

具体实施方式Detailed ways

为使本发明的目的、技术方案和优点更加清楚,下面将结合附图对本发明实施方式作进一步地详细描述。In order to make the objectives, technical solutions and advantages of the present invention clearer, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

在相关技术中,单立柱(Spar)式基础是浮式风机基础的一种,其设计、制造简单,且具有恒稳性。但由于其结构型式特点,与海上风机组合直立于海上时整体长度较长,只适用于百米级别以上的深水海域。单立柱式基础在陆上预制建造完成后,由于浅水海域水深不足无法垂直浮运,目前运输多采用驳船运输或者水平浮运的施工方式。In the related art, a single-column (Spar) type foundation is a type of floating fan foundation, which is simple in design and manufacture, and has constant stability. However, due to its structural characteristics, when combined with the offshore wind turbine, the overall length is long when it is erected at sea, and it is only suitable for deep waters above the level of 100 meters. After the single-column foundation is prefabricated on land, it cannot be floated vertically due to insufficient water depth in shallow waters. At present, the construction methods of barge transportation or horizontal floating are mostly used for transportation.

采用相关技术中的方式,由于采用大型驳船对组装好的浮式风机进行整体运输,会大幅增加运输成本高,浮式风机基础与海上风机往往采用分体式结构呈水平状态进行承载运输或者浮运。在运输到指定地点后,再通过起重船等设施进行浮吊和海上对接安装,整体施工周期长,安装效率低且操作难度高。Using the method in the related art, since large-scale barges are used to transport the assembled floating wind turbines as a whole, the transportation cost will be greatly increased. . After being transported to the designated location, the floating crane and the offshore docking installation are carried out by means of cranes and other facilities. The overall construction period is long, the installation efficiency is low, and the operation is difficult.

图1是本发明实施例提供的一种浮式风机基础运输结构处于浮运状态的结构示意图。图2是本发明实施例提供的一种式风机基础运输结构处于浮运状态的侧视结构示意图。图3是本发明实施例提供的支架组件的局部结构示意图。图4是本发明实施例提供的抱紧环的俯视结构示意图。图5是本发明实施例提供的水上立柱的结构示意图。图6是本发明实施例提供的水下立柱的剖视结构示意图。图7是本发明实施例提供的一种浮式风机基础运输结构处于组装状态的结构示意图。图8是本发明实施例提供的另一种浮式风机基础运输结构处于浮运状态的俯视结构示意图。图9是本发明实施例提供的一种浮式风机基础组装完成的姿态结构示意图。如图1至图9所示,通过实践,本申请人提供了一种浮式风机基础运输结构,包括船体1、支架组件2、水上立柱3、水下立柱4和两个条形连接段5。FIG. 1 is a schematic structural diagram of a basic transportation structure of a floating fan provided in an embodiment of the present invention in a floating state. FIG. 2 is a schematic side view of the basic transportation structure of a type of wind turbine provided in an embodiment of the present invention in a floating state. FIG. 3 is a partial structural schematic diagram of a stent assembly provided by an embodiment of the present invention. FIG. 4 is a schematic top-view structural diagram of a holding ring provided by an embodiment of the present invention. FIG. 5 is a schematic structural diagram of a water column provided by an embodiment of the present invention. 6 is a schematic cross-sectional structural diagram of an underwater column provided by an embodiment of the present invention. FIG. 7 is a schematic structural diagram of a basic transportation structure of a floating fan provided in an embodiment of the present invention in an assembled state. FIG. 8 is a schematic top-view structural diagram of another basic transportation structure of a floating wind turbine provided in an embodiment of the present invention in a floating state. FIG. 9 is a schematic diagram of the attitude structure of a floating fan base assembled according to an embodiment of the present invention. As shown in FIGS. 1 to 9 , through practice, the applicant has provided a basic transportation structure for a floating wind turbine, including a hull 1 , a bracket assembly 2 , a water column 3 , an underwater column 4 and two bar-shaped connecting sections 5 .

其中,船体1上具有安装面1a,船体1的一端具有沿船体1的中轴线方向设置的安装凹口11,位于安装凹口11两端的安装面1a上均设置有滑轨12,滑轨12与船体1的中轴线垂直,两个滑轨12相对于安装凹口11对称布置。The hull 1 has an installation surface 1a, one end of the hull 1 has an installation recess 11 arranged along the direction of the central axis of the hull 1, and the installation surfaces 1a located at both ends of the installation recess 11 are provided with slide rails 12. The slide rails 12 Perpendicular to the central axis of the hull 1 , the two sliding rails 12 are arranged symmetrically with respect to the mounting recess 11 .

支架组件2包括两个立式扶正支架21。两个立式扶正支架21分别可滑动地安装于两个滑轨12上,立式扶正支架21面向安装凹口11一侧的端面上设置有呈半圆弧状的抱紧环211。水上立柱3沿竖直方向布置,两个立式扶正支架21被配置为能够沿滑轨12相向移动,以使两个立式扶正支架21上的抱紧环211对合并将水上立柱3夹持固定于安装凹口11中。The bracket assembly 2 includes two vertical centralizing brackets 21 . The two vertical centralizing brackets 21 are respectively slidably mounted on the two slide rails 12 , and a semi-circular arc-shaped holding ring 211 is provided on the end surface of the vertical centralizing bracket 21 facing the installation recess 11 . The water column 3 is arranged in the vertical direction, and the two vertical centralizing brackets 21 are configured to be able to move toward each other along the slide rails 12, so that the clamping rings 211 on the two vertical centralizing brackets 21 are combined to clamp the water column 3. Fixed in the mounting recess 11 .

水上立柱3的一端具有用于与海上风机连接的连接口31,水上立柱3的侧壁上具有两个沿径向设置的转轴32,两个转轴32相对于水上立柱3对称布置。两个条形连接段5的中部分别可转动的连接于两个转轴32上,两个条形连接段5的一端与水下立柱4固定连接。水下立柱4与两个条形连接段5平行,水下立柱4内部具有压载舱41。One end of the water column 3 is provided with a connection port 31 for connecting with the offshore wind turbine. The side wall of the water column 3 has two radially arranged rotating shafts 32 , and the two rotating shafts 32 are symmetrically arranged relative to the water column 3 . The middle parts of the two bar-shaped connecting sections 5 are respectively rotatably connected to the two rotating shafts 32 , and one end of the two bar-shaped connecting sections 5 is fixedly connected to the underwater column 4 . The underwater column 4 is parallel to the two bar-shaped connecting sections 5 , and the underwater column 4 has a ballast tank 41 inside.

在本发明实施例中,分体设置的水上立柱3和水下立柱4共同组成用于连接海上风机的浮式风机基础,在进行浮运前,水下立柱4可以自由漂浮于水面上,而水上立柱3则可以通过岸边的起吊装置吊起到船体1的安装凹口11处中,并沿竖直方向吊运到两个立式扶正支架21之间。在水上立柱3的位置调整完成后,可以驱动两个立式扶正支架21沿滑轨12相向运动,利用两个立式扶正支架21上的抱紧环211对水上立柱3进行对合夹紧,将水上立柱3夹持固定于安装凹口11中的水面上方。而海上风机的风机塔筒、机头和叶片等上部风机结构即可连接安装在位于水上立柱3顶端的连接口31上。之后即可通过常规拖轮拖带船体1的另一端在水上移动,而水下立柱4则会在两个条形连接段5的连接下呈水平浮云状态跟随水上立柱3以及船体1同时移动。当船体1拖运到指定的浮式风机设置位置后,通过调整压载舱41的重量,使水下立柱4的另一端由漂浮状态向水下下沉,而水下立柱4的一端通过两个条形连接段5与水上立柱3转动连接,水下立柱4在下沉的同时整体绕转轴32相对于水上立柱3转动。水下立柱4在下沉到整体呈竖直的浮运状态后会与同样呈竖直状态设置的水上立柱3同轴,此时通过在水上立柱3和水下立柱4的端部增设法兰等连接部件,即可完成水上立柱3和水下立柱4的同轴固定连接,完成浮式风机基础的水上组装设置。在调节水上立柱3和水下立柱4的整体吃水深度后,安装与水下海床的锚固基础并张拉系泊线,即可完成浮式风机基础的安装。最后解除两个立式扶正支架21对水上立柱3的支撑与夹持固定,即可循环进行下一组浮式风机基础的浮运安装工作。In the embodiment of the present invention, the water column 3 and the underwater column 4 which are arranged separately constitute the floating fan foundation for connecting the offshore wind turbine. Before the floating, the underwater column 4 can float freely on the water surface, and The water column 3 can be hoisted into the installation recess 11 of the hull 1 by the hoisting device on the shore, and hoisted between the two vertical centralizers 21 in the vertical direction. After the position adjustment of the water column 3 is completed, the two vertical righting brackets 21 can be driven to move toward each other along the slide rail 12, and the water column 3 can be butted and clamped by the holding rings 211 on the two vertical righting brackets 21. The water column 3 is clamped and fixed above the water surface in the installation recess 11 . The upper fan structures such as the fan tower, the nose and the blades of the offshore fan can be connected and installed on the connection port 31 located at the top of the water column 3 . Afterwards, the other end of the hull 1 can be towed by a conventional tugboat to move on the water, and the underwater column 4 will move simultaneously with the water column 3 and the hull 1 in a horizontal floating cloud state under the connection of the two bar-shaped connecting sections 5 . After the hull 1 is towed to the designated location where the floating fan is installed, the weight of the ballast tank 41 is adjusted to make the other end of the underwater column 4 sink underwater from the floating state, while one end of the underwater column 4 passes through the two Each bar-shaped connecting section 5 is rotatably connected to the above-water column 3, and the underwater column 4 rotates relative to the above-water column 3 as a whole around the rotating shaft 32 when it sinks. The underwater column 4 will be coaxial with the water column 3 that is also set in a vertical state after sinking to a vertical floating state. At this time, flanges, etc. The connecting parts can complete the coaxial fixed connection of the above-water column 3 and the underwater column 4, and complete the above-water assembly and setting of the floating fan foundation. After adjusting the overall draft depth of the above-water column 3 and the underwater column 4, install the anchoring foundation with the underwater seabed and tension the mooring line, and then the installation of the floating fan foundation can be completed. Finally, the support, clamping and fixing of the water column 3 by the two vertical centralizing brackets 21 are released, and then the floating installation work of the next group of floating fan foundations can be cyclically performed.

采用本发明实施例所提供的浮式风机基础运输结构,通过将浮式风机基础设置为分体的水上立柱3和水下立柱4,并利用两个条形连接段5与转轴32组成的连接结构进行转动连接。用于拖运的船体1仅需要通过支架组件2夹持固定需要设置在水上的水上立柱3,而让水下立柱4保持漂浮在水面上跟随浮运,即可实现浮式风机基础的整体运输,减少大型驳船的使用。而在拖运到位后,通过调整水下立柱4上压载舱41的重量,即可使水下立柱4在两个条形连接段5的导向下下沉并转动到与水上立柱3同轴的位置。在水下立柱4转动到位后,两个条形连接段5则可以继续起到对水下立柱4与水上立柱3之间相对位置的约束作用,方便工作人员直接对水上立柱3与水下立柱4进行水上对接,而水上立柱3和海上风机的连接在岸上即可完成,无需通过起重船等设施进行浮吊等水上吊装施工,有效降低浮式风机基础与海上风机在海上对接安装的作业难度,提高施工效率。By adopting the basic transportation structure of the floating fan provided by the embodiment of the present invention, the floating fan foundation is set as a separate water column 3 and an underwater column 4, and the connection formed by the two bar-shaped connecting sections 5 and the rotating shaft 32 is used. The structure is connected in rotation. The hull 1 for hauling only needs to be clamped and fixed by the bracket assembly 2 to fix the water column 3 that needs to be set on the water, and let the underwater column 4 keep floating on the water surface to follow the floating, so that the overall transportation of the floating fan foundation can be realized. , reducing the use of large barges. After the hauling in place, by adjusting the weight of the ballast tank 41 on the underwater column 4, the underwater column 4 can sink under the guidance of the two bar-shaped connecting sections 5 and rotate to be coaxial with the water column 3 s position. After the underwater column 4 is rotated in place, the two bar-shaped connecting sections 5 can continue to play a role in constraining the relative position between the underwater column 4 and the water column 3, so that the staff can directly control the water column 3 and the underwater column. 4. Connecting on the water, and the connection between the water column 3 and the offshore wind turbine can be completed on the shore, without the need for floating cranes and other water hoisting construction through crane boats and other facilities, effectively reducing the work of docking and installing the floating wind turbine foundation and the offshore wind turbine at sea. difficulty and improve construction efficiency.

示例性地,在本发明实施例中,水上立柱3的长度为30米,水下立柱4的长度为50米,水上立柱3和水下立柱4的直径均为8.5米,整体连接后设计吃水深度大于100米。相应的,为了保证对水上立柱3和水下立柱4的承载,船体1的高度范围为5至6米,空船吃水深度范围为0.5至1米,设计吃水深度为2.5至3米,在滑轨12的延伸方向上,船体1的整体宽度为水上立柱3以及水下立柱4直径的5至6倍。Exemplarily, in the embodiment of the present invention, the length of the water column 3 is 30 meters, the length of the underwater column 4 is 50 meters, the diameters of the water column 3 and the underwater column 4 are both 8.5 meters, and the design draft after the overall connection is Depths greater than 100 meters. Correspondingly, in order to ensure the bearing of the water column 3 and the underwater column 4, the height of the hull 1 is 5 to 6 meters, the empty ship draft is 0.5 to 1 meter, and the design draft is 2.5 to 3 meters. In the extending direction of the rail 12 , the overall width of the hull 1 is 5 to 6 times the diameter of the water column 3 and the underwater column 4 .

可选地,条形连接段5的另一端具有第一螺栓孔51,水上立柱3的侧壁上具有与第一螺栓孔51相匹配的第二螺栓孔33,第二螺栓孔33位于转轴32和连接口31之间。示例性地,在本发明实施例中,在通过调整水下立柱4上压载舱41的重量,使水下立柱4在两个条形连接段5的导向下下沉并转动到与水上立柱3同轴的位置后,位于条形连接段5另一端的第一螺栓孔51即可与水上立柱3侧边上的第二螺栓孔33对齐,此时施工人员可以利用螺栓将两个条形连接段5的另一端与水上立柱3固定连接。此时条形连接段5与水上立柱3两点固定连接后即不会再发生相对转动,可以进一步强化对水下立柱4的约束效果,防止海上施工时因海浪和海风等因素造成水下立柱4与水上立柱3之间发生晃动,方便工作人员进行对接施工,进一步降低浮式风机基础海上对接安装的作业难度,提高施工效率。Optionally, the other end of the bar-shaped connecting section 5 has a first bolt hole 51 , the side wall of the water column 3 has a second bolt hole 33 matching the first bolt hole 51 , and the second bolt hole 33 is located on the rotating shaft 32 . and the connection port 31. Exemplarily, in the embodiment of the present invention, by adjusting the weight of the ballast tank 41 on the underwater column 4, the underwater column 4 is made to sink under the guidance of the two bar-shaped connecting sections 5 and rotate to the same position as the water column. 3 After the coaxial position, the first bolt hole 51 at the other end of the bar-shaped connecting section 5 can be aligned with the second bolt hole 33 on the side of the water column 3. At this time, the construction personnel can use bolts to connect the two bars. The other end of the connecting section 5 is fixedly connected with the water column 3 . At this time, after the bar-shaped connecting section 5 is fixedly connected with the water column 3 at two points, there will be no relative rotation, which can further strengthen the restraint effect on the underwater column 4 and prevent the underwater column from being caused by factors such as waves and sea wind during offshore construction. There is shaking between 4 and the water column 3, which is convenient for the staff to carry out the docking construction, further reduces the operation difficulty of the offshore docking and installation of the floating fan foundation, and improves the construction efficiency.

可选地,水上立柱3的侧壁上具有沿径向凸出设置的装配凸缘34,装配凸缘34位于第二螺栓孔33与连接口31之间,水上立柱3被配置为当通过两个立式扶正支架21上的抱紧环211夹持固定于安装凹口11中时,装配凸缘34面向转轴32一侧的端面与抱紧环211相抵接。示例性地,在本发明实施例中,通过在水上立柱3的侧壁上凸出设置装配凸缘34,当两侧的抱紧环211对合夹紧水上立柱3的同时,两个抱紧环211的上端面会同时与装配凸缘34面向转轴32一侧的端面,也即是下端面相抵接。抱紧环211在实现水平方向的夹持固定的同时,也能够在竖直方向上对水上立柱3进行支撑,提供竖向支撑力。防止因海上恶劣环境造成船体1晃动导致水上立柱3在径向上与抱紧环211发生相对晃动。进一步提高了浮式风机基础运输结构在运输过程中的装配稳定性。Optionally, the side wall of the water column 3 has a radially protruding assembly flange 34, the assembly flange 34 is located between the second bolt hole 33 and the connection port 31, and the water column 3 is configured to pass through the two When the holding rings 211 on the vertical centralizing brackets 21 are clamped and fixed in the installation recesses 11 , the end face of the mounting flange 34 facing the side of the rotating shaft 32 abuts against the holding rings 211 . Exemplarily, in the embodiment of the present invention, by arranging the mounting flange 34 protrudingly on the side wall of the water column 3, when the clamping rings 211 on both sides are abutted and clamped to the water column 3, the two The upper end surface of the ring 211 will simultaneously abut with the end surface of the mounting flange 34 facing the side of the rotating shaft 32 , that is, the lower end surface. While realizing the clamping and fixing in the horizontal direction, the holding ring 211 can also support the water column 3 in the vertical direction and provide a vertical support force. This prevents the water column 3 from shaking relative to the holding ring 211 in the radial direction due to the shaking of the hull 1 caused by the harsh environment at sea. The assembly stability of the basic transportation structure of the floating wind turbine during transportation is further improved.

可选地,立式扶正支架21上具有多个抱紧环211,多个抱紧环211沿立式扶正支架21的延伸方向间隔布置,水上立柱3具有与多个抱紧环211一一对应的多个装配凸缘34。示例性地,在本发明实施例中,每个立式扶正支架21上均间隔设置有两个抱紧环211,通过在立式扶正支架21上间隔设置多个抱紧环211,由水上立柱3的两侧进行多点夹持固定,提高夹持紧固度,进一步提高了浮式风机基础运输结构在运输过程中的装配稳定性。Optionally, the vertical centralizing support 21 is provided with a plurality of holding rings 211, and the plurality of holding rings 211 are arranged at intervals along the extending direction of the vertical centralizing support 21, and the water column 3 has a one-to-one correspondence with the plurality of holding rings 211. The plurality of mounting flanges 34 . Exemplarily, in the embodiment of the present invention, each vertical centralizer 21 is provided with two holding rings 211 at intervals. The two sides of 3 are clamped and fixed at multiple points to improve the clamping tightness and further improve the assembly stability of the basic transportation structure of the floating fan during transportation.

可选地,立式扶正支架21与滑轨12滑动连接的一端具有固定耳212,固定耳212上具有第三螺栓孔2121,位于滑轨12旁侧的安装面1a上具有多个与第三螺栓孔2121相匹配的第四螺栓孔13,多个第四螺栓孔13沿滑轨12的长度方向均匀间隔布置。示例性地,参见图8,在本发明的一种可能实现的实施例中,在沿滑轨12的长度方向调节立式扶正支架21到位实现对水上立柱3的夹持固定后,可以通过固定耳212上的第三螺栓孔2121与船体1上的第四螺栓孔13相对应,并利用插销或者螺栓进行固定连接,以限制立式扶正支架21的滑动。结构简单,固定安装方便,进一步提高了浮式风机基础运输结构在运输过程中的装配稳定性。Optionally, one end of the vertical centralizing bracket 21 slidably connected to the slide rail 12 has a fixing ear 212, the fixing ear 212 has a third bolt hole 2121, and the mounting surface 1a on the side of the slide rail 12 has a plurality of third bolt holes 2121. The bolt holes 2121 are matched with the fourth bolt holes 13 , and the plurality of fourth bolt holes 13 are evenly spaced along the length direction of the slide rail 12 . Exemplarily, referring to FIG. 8 , in a possible embodiment of the present invention, after the vertical centralizing bracket 21 is adjusted in place along the length direction of the slide rail 12 to realize the clamping and fixing of the water column 3 , the water column 3 can be clamped and fixed. The third bolt holes 2121 on the ears 212 correspond to the fourth bolt holes 13 on the hull 1 and are fixedly connected by bolts or bolts to limit the sliding of the vertical centralizer 21 . The structure is simple, the fixed installation is convenient, and the assembly stability of the basic transportation structure of the floating fan during transportation is further improved.

可选地,抱紧环211的内圈端面设置有弹性垫片2111。示例性地,在本发明实施例中,通过在抱紧环211用于与水上立柱3接触的内圈端面上设置弹性垫片2111,例如橡胶垫片。可以提高抱紧环211夹持固定水上立柱3时与水上立柱3外表面之间的静摩擦力,进而调高夹持紧固度。同时减少刚性结构的直接接触,减少剐蹭,提高使用寿命。Optionally, an elastic washer 2111 is provided on the end surface of the inner ring of the holding ring 211 . Exemplarily, in the embodiment of the present invention, an elastic gasket 2111 , such as a rubber gasket, is provided on the end face of the inner ring of the holding ring 211 for contacting with the water column 3 . The static friction force between the holding ring 211 and the outer surface of the water column 3 can be improved when clamping and fixing the water column 3, thereby increasing the clamping tightness. At the same time, the direct contact of the rigid structure is reduced, the scratches are reduced, and the service life is improved.

可选地,船体1的另一端具有两个导水面1b,导水面1b与船体1的中轴线所在的数值平面呈锐角布置,两个导水面1b相对于船体1的中轴线对称布置。示例性地,在本发明实施例中,通过在船体1的另一端,也即是船体1在被拖运时的迎水端面上沿中轴线对称布置两个倾斜的导水面1b,使迎水面整体成等腰梯形结构。能够有效减少船体1在被拖运过程中所受到的阻力,提高拖运速度,进一步提高整体施工效率。Optionally, the other end of the hull 1 has two water guide surfaces 1b, the water guide surfaces 1b are arranged at an acute angle with the numerical plane where the central axis of the hull 1 is located, and the two water guide surfaces 1b are arranged symmetrically with respect to the central axis of the hull 1 . Exemplarily, in the embodiment of the present invention, by symmetrically arranging two inclined water guide surfaces 1b along the central axis on the other end of the hull 1, that is, the water-facing end surface of the hull 1 when being towed, the water-facing surface is The whole is an isosceles trapezoid structure. The resistance that the hull 1 is subjected to in the process of being towed can be effectively reduced, the towing speed can be improved, and the overall construction efficiency can be further improved.

可选地,立式扶正支架21为多层桁架结构。示例性地,在本发明实施例中,通过采用格构化的多层梁式结构作为立式扶正支架21,在保证立式扶正支架21的高度、跨度以及机械强度的基础上,有效减少钢材用量,整体重量轻盈,方便进行移动调整。Optionally, the vertical centralizer 21 is a multi-layer truss structure. Exemplarily, in the embodiment of the present invention, by using a latticed multi-layer beam structure as the vertical centralizing bracket 21, on the basis of ensuring the height, span and mechanical strength of the vertical centralizing bracket 21, the steel material is effectively reduced. The dosage is light, and the overall weight is light, which is convenient for mobile adjustment.

可选地,抱紧环211与立式扶正支架21通过焊接连接。示例性地,在本发明实施例中,抱紧环211呈半圆形的钢制结构,通过焊接连接的方式与立式扶正支架21通过钢构或者连接臂固定连接。可进行切割拆卸,根据不同直径的水上立柱3进行重新焊接,以适用于不同尺寸的浮式风机基础,结构简单,连接紧固且工序简单。Optionally, the holding ring 211 and the vertical centralizer 21 are connected by welding. Exemplarily, in the embodiment of the present invention, the holding ring 211 is a semi-circular steel structure, and is fixedly connected to the vertical centralizing support 21 through a steel structure or a connecting arm by means of welding connection. It can be cut and disassembled, and re-welded according to the water column 3 of different diameters, so as to be suitable for floating fan foundations of different sizes. The structure is simple, the connection is tight and the process is simple.

图10是本发明实施例提供的一种施工方法的流程图。如图10所示,本发明实施例还提供了一种施工方法,用于对如图1至图9所述的浮式风机基础运输结构进行组装施工,该施工方法包括以下步骤:FIG. 10 is a flowchart of a construction method provided by an embodiment of the present invention. As shown in FIG. 10 , an embodiment of the present invention also provides a construction method for assembling and constructing the basic transportation structure of the floating fan as shown in FIG. 1 to FIG. 9 , and the construction method includes the following steps:

S1,利用两个条形连接段5连接水上立柱3和水下立柱4。S1 , using two bar-shaped connecting sections 5 to connect the above-water column 3 and the underwater column 4 .

S2,利用两个立式扶正支架21上的抱紧环211对合以将水上立柱3沿竖直方向夹持固定于安装凹口11中,并使水下立柱4呈自然悬浮于水面的水平浮运状态,通过拖带船体1以进行水上立柱3和水下立柱4的水上运输。S2, using the holding rings 211 on the two vertical righting brackets 21 to align to clamp and fix the water column 3 in the installation recess 11 in the vertical direction, and make the underwater column 4 naturally suspended on the water surface. In the floating state, the water column 3 and the underwater column 4 are transported by towing the hull 1 on the water.

示例性地,在该步骤中,在进行浮运前,水下立柱4可以自由漂浮于水面上,而水上立柱3则可以通过岸边的起吊装置吊起到船体1的安装凹口11处中,并沿竖直方向吊运到两个立式扶正支架21之间。在水上立柱3的位置调整完成后,可以驱动两个立式扶正支架21沿滑轨12相向运动,利用两个立式扶正支架21上的抱紧环211对水上立柱3进行对合夹紧,将水上立柱3夹持固定于安装凹口11中的水面上方。之后即可通过常规拖轮拖带船体1的另一端在水上移动,而水下立柱4则会在两个条形连接段5的连接下呈水平浮云状态跟随水上立柱3以及船体1同时移动。Exemplarily, in this step, before floating, the underwater column 4 can float freely on the water surface, and the water column 3 can be lifted into the installation recess 11 of the hull 1 by the lifting device on the shore. , and hoisted along the vertical direction between the two vertical righting supports 21 . After the position adjustment of the water column 3 is completed, the two vertical righting brackets 21 can be driven to move toward each other along the slide rail 12, and the water column 3 can be butted and clamped by the holding rings 211 on the two vertical righting brackets 21. The water column 3 is clamped and fixed above the water surface in the installation recess 11 . Afterwards, the other end of the hull 1 can be towed by a conventional tugboat to move on the water, and the underwater column 4 will move simultaneously with the water column 3 and the hull 1 in a horizontal floating cloud state under the connection of the two bar-shaped connecting sections 5 .

S3,待船体1到达指定位置后,调整压载舱41的重量,使水下立柱4的另一端下沉并带动两个条形连接段5绕转轴32旋转,直到水下立柱4呈整体与水上立柱3同轴的竖直浮运状态。S3, after the hull 1 reaches the designated position, adjust the weight of the ballast tank 41 so that the other end of the underwater column 4 sinks and drives the two bar-shaped connecting sections 5 to rotate around the rotating shaft 32 until the underwater column 4 is integral with the The vertical floating state in which the water column 3 is coaxial.

示例性地,在该步骤中,当船体1拖运到指定的浮式风机设置位置后,通过调整压载舱41的重量,使水下立柱4的另一端由漂浮状态向水下下沉,而水下立柱4的一端通过两个条形连接段5与水上立柱3转动连接,水下立柱4在下沉的同时整体绕转轴32相对于水上立柱3转动。水下立柱4在下沉到整体呈竖直的浮运状态后会与同样呈竖直状态设置的水上立柱3同轴。Exemplarily, in this step, after the hull 1 is towed to the designated location where the floating fan is installed, the other end of the underwater column 4 is made to sink underwater from a floating state by adjusting the weight of the ballast tank 41, One end of the underwater column 4 is rotatably connected to the above-water column 3 through two bar-shaped connecting sections 5 . The underwater column 4 will be coaxial with the above-water column 3 which is also arranged in a vertical state after sinking to a floating state as a whole.

S4,对水下立柱4的一端与水上立柱3的另一端进行固定连接,调整水上立柱3和水下立柱4的吃水深度,与海床进行锚固并张拉系泊线。S4, one end of the underwater column 4 is fixedly connected to the other end of the above-water column 3, the drafts of the above-water column 3 and the underwater column 4 are adjusted, anchored with the seabed and tensioned the mooring line.

示例性地,在该步骤中,通过在水上立柱3和水下立柱4的端部增设法兰等连接部件,即可完成水上立柱3和水下立柱4的同轴固定连接,完成浮式风机基础的水上组装设置。在调节水上立柱3和水下立柱4的整体吃水深度后,安装与水下海床m的锚固基础n并张拉系泊线o,即可完成浮式风机基础的安装。Exemplarily, in this step, by adding connecting components such as flanges at the ends of the above-water column 3 and the underwater column 4, the coaxial fixed connection of the above-water column 3 and the underwater column 4 can be completed, and the floating fan can be completed. Basic aquatic assembly setup. After adjusting the overall draft depth of the above-water column 3 and the underwater column 4, install the anchoring foundation n with the underwater seabed m and tension the mooring line o, and then the installation of the floating fan foundation can be completed.

S5,沿滑轨12调整两个立式扶正支架21的相对位置,解除抱紧环211对水上立柱3的夹持固定。S5 , adjust the relative positions of the two vertical righting brackets 21 along the slide rail 12 , and release the clamping and fixing of the water column 3 by the holding ring 211 .

示例性地,在该步骤中,通过在滑轨12上反向调整两个立式扶正支架21,解除两个立式扶正支架21对水上立柱3的支撑与夹持固定,即可循环进行下一组浮式风机基础的浮运安装工作。Exemplarily, in this step, by adjusting the two vertical centralizing brackets 21 in the opposite direction on the slide rail 12 to release the support, clamping and fixing of the two vertical centralizing brackets 21 to the water column 3, the downward movement can be carried out cyclically. Floating installation work for a set of floating wind turbine foundations.

采用本发明实施例所提供的施工方法,通过将浮式风机基础设置为分体的水上立柱3和水下立柱4,并利用两个条形连接段5与转轴32组成的连接结构进行转动连接。用于拖运的船体1仅需要通过支架组件2夹持固定需要设置在水上的水上立柱3,而让水下立柱4保持漂浮在水面上跟随浮运,即可实现浮式风机基础的整体运输,减少大型驳船的使用。而在拖运到位后,通过调整水下立柱4上压载舱41的重量,即可使水下立柱4在两个条形连接段5的导向下下沉并转动到与水上立柱3同轴的位置。在水下立柱4转动到位后,两个条形连接段5则可以继续起到对水下立柱4与水上立柱3之间相对位置的约束作用,方便工作人员直接对水上立柱3与水下立柱4进行水上对接,而水上立柱3和海上风机的连接在岸上即可完成,无需通过起重船等设施进行浮吊等水上吊装施工,有效降低浮式风机基础与海上风机在海上对接安装的作业难度,提高施工效率。By adopting the construction method provided by the embodiment of the present invention, the floating fan foundation is set as a separate water column 3 and an underwater column 4, and the connection structure composed of two bar-shaped connecting sections 5 and the rotating shaft 32 is used for rotational connection . The hull 1 for hauling only needs to be clamped and fixed by the bracket assembly 2 to fix the water column 3 that needs to be set on the water, and let the underwater column 4 keep floating on the water surface to follow the floating, so that the overall transportation of the floating fan foundation can be realized. , reducing the use of large barges. After the hauling in place, by adjusting the weight of the ballast tank 41 on the underwater column 4, the underwater column 4 can sink under the guidance of the two bar-shaped connecting sections 5 and rotate to be coaxial with the water column 3 s position. After the underwater column 4 is rotated in place, the two bar-shaped connecting sections 5 can continue to play a role in constraining the relative position between the underwater column 4 and the water column 3, so that the staff can directly control the water column 3 and the underwater column. 4. Connecting on the water, and the connection between the water column 3 and the offshore wind turbine can be completed on the shore, without the need for floating cranes and other water hoisting construction through crane boats and other facilities, effectively reducing the work of docking and installing the floating wind turbine foundation and the offshore wind turbine at sea. difficulty and improve construction efficiency.

除非另作定义,此处使用的技术术语或者科学术语应当为本发明所属领域内具有一般技能的人士所理解的通常意义。本发明专利申请说明书以及权利要求书中使用的“第一”、“第二”以及类似的词语并不表示任何顺序、数量或者重要性,而只是用来区分不同的组成部分。同样,“一个”或者“一”等类似词语也不表示数量限制,而是表示存在至少一个。“包括”或者“包含”等类似的词语意指出现在“包括”或者“包含”前面的元件或者物件涵盖出现在“包括”或者“包含”后面列举的元件或者物件极其等同,并不排除其他元件或者物件。“连接”或者“相连”等类似的词语并非限定于物理的或者机械的连接,而是可以包括电性的连接,不管是直接的还是间接的。“上”、“下”、“左”、“右”等仅用于表示相对位置关系,当被描述对象的绝对位置改变后,则所述相对位置关系也可能相应地改变。Unless otherwise defined, technical or scientific terms used herein should have the ordinary meaning as understood by one of ordinary skill in the art to which this invention belongs. The terms "first", "second" and similar terms used in the description of the patent application and the claims of the present invention do not denote any order, quantity or importance, but are only used to distinguish different components. Likewise, "a" or "an" and the like do not denote a quantitative limitation, but rather denote the presence of at least one. Words like "including" or "comprising" mean that the elements or items appearing before "including" or "including" cover the elements or items listed after "including" or "including" to the full extent of equivalents, and do not exclude other elements or object. Words like "connected" or "connected" are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "Down", "Left", "Right", etc. are only used to indicate the relative positional relationship, and when the absolute position of the described object changes, the relative positional relationship may also change accordingly.

以上所述仅为本发明的可选实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only optional embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection of the present invention. within the range.

Claims (10)

1.一种浮式风机基础运输结构,其特征在于,包括:船体(1)、支架组件(2)、水上立柱(3)、水下立柱(4)和两个条形连接段(5),1. A basic transport structure for a floating fan, characterized in that it comprises: a hull (1), a bracket assembly (2), a water column (3), an underwater column (4) and two bar-shaped connecting sections (5) , 所述船体(1)上具有安装面(1a),所述船体(1)的一端具有沿所述船体(1)的中轴线方向设置的安装凹口(11),位于所述安装凹口(11)两端的所述安装面(1a)上均设置有滑轨(12),所述滑轨(12)与所述船体(1)的中轴线垂直,两个所述滑轨(12)相对于所述安装凹口(11)对称布置;The hull (1) is provided with a mounting surface (1a), and one end of the hull (1) is provided with a mounting notch (11) arranged along the direction of the central axis of the hull (1), located in the mounting notch ( 11) Slide rails (12) are provided on the mounting surfaces (1a) at both ends, the slide rails (12) are perpendicular to the central axis of the hull (1), and the two slide rails (12) are opposite to each other symmetrically arranged in the installation recess (11); 所述支架组件(2)包括两个立式扶正支架(21),所述两个立式扶正支架(21)分别可滑动地安装于两个所述滑轨(12)上,所述立式扶正支架(21)面向所述安装凹口(11)一侧的端面上设置有呈半圆弧状的抱紧环(211),所述水上立柱(3)沿竖直方向布置,所述两个立式扶正支架(21)被配置为能够沿所述滑轨(12)相向移动,以使两个所述立式扶正支架(21)上的所述抱紧环(211)对合并将所述水上立柱(3)夹持固定于所述安装凹口(11)中;The bracket assembly (2) includes two vertical centralizing brackets (21), the two vertical centralizing brackets (21) are respectively slidably mounted on the two sliding rails (12), and the vertical centralizing brackets (21) are respectively slidably mounted on the two sliding rails (12). The end surface of the centralizing bracket (21) facing the side of the installation recess (11) is provided with a holding ring (211) in the shape of a semi-circular arc, the water uprights (3) are arranged in the vertical direction, and the two vertical The vertical centralizing brackets (21) are configured to be able to move toward each other along the sliding rails (12), so that the pair of the holding rings (211) on the two vertical centralizing brackets (21) are combined to move the water The upright column (3) is clamped and fixed in the installation recess (11); 所述水上立柱(3)的一端具有用于与海上风机连接的连接口(31),所述水上立柱(3)的侧壁上具有两个沿径向设置的转轴(32),两个所述转轴(32)相对于所述水上立柱(3)对称布置,所述两个条形连接段(5)的中部分别可转动的连接于两个所述转轴(32)上,所述两个条形连接段(5)的一端与所述水下立柱(4)固定连接,所述水下立柱(4)与所述两个条形连接段(5)平行,所述水下立柱(4)内部具有压载舱(41)。One end of the above-water column (3) is provided with a connection port (31) for connecting with the offshore fan, and the side wall of the above-water column (3) is provided with two rotating shafts (32) arranged in the radial direction. The rotating shaft (32) is symmetrically arranged with respect to the water column (3), and the middle parts of the two bar-shaped connecting sections (5) are respectively rotatably connected to the two rotating shafts (32), and the two One end of the bar-shaped connecting section (5) is fixedly connected to the underwater column (4), the underwater column (4) is parallel to the two bar-shaped connecting sections (5), and the underwater column (4) is parallel to the two bar-shaped connecting sections (5). ) has a ballast tank (41) inside. 2.根据权利要求1所述的浮式风机基础运输结构,其特征在于,所述条形连接段(5)的另一端具有第一螺栓孔(51),所述水上立柱(3)的侧壁上具有与所述第一螺栓孔(51)相匹配的第二螺栓孔(33),所述第二螺栓孔(33)位于所述转轴(32)和所述连接口(31)之间。2. The basic transportation structure for a floating fan according to claim 1, wherein the other end of the bar-shaped connecting section (5) has a first bolt hole (51), and the side of the water column (3) is provided with a first bolt hole (51). The wall has a second bolt hole (33) matching the first bolt hole (51), the second bolt hole (33) is located between the rotating shaft (32) and the connection port (31) . 3.根据权利要求2所述的浮式风机基础运输结构,其特征在于,所述水上立柱(3)的侧壁上具有沿径向凸出设置的装配凸缘(34),所述装配凸缘(34)位于所述第二螺栓孔(33)与所述连接口(31)之间,所述水上立柱(3)被配置为当通过两个所述立式扶正支架(21)上的所述抱紧环(211)夹持固定于所述安装凹口(11)中时,所述装配凸缘(34)面向所述转轴(32)一侧的端面与所述抱紧环(211)相抵接。3. The basic transportation structure for a floating fan according to claim 2, characterized in that the side wall of the water upright column (3) has a radially protruding assembly flange (34), and the assembly convex The edge (34) is located between the second bolt hole (33) and the connection port (31), and the water column (3) is configured to pass through the two vertical centralizing brackets (21). When the clamping ring (211) is clamped and fixed in the installation recess (11), the end face of the assembling flange (34) facing the side of the rotating shaft (32) and the clamping ring (211) ) are in contact with each other. 4.根据权利要求3所述的浮式风机基础运输结构,其特征在于,所述立式扶正支架(21)上具有多个所述抱紧环(211),多个所述抱紧环(211)沿所述立式扶正支架(21)的延伸方向间隔布置,所述水上立柱(3)具有与多个所述抱紧环(211)一一对应的多个所述装配凸缘(34)。4 . The basic transportation structure for a floating wind turbine according to claim 3 , wherein the vertical centralizing support ( 21 ) is provided with a plurality of the holding rings ( 211 ), and a plurality of the holding rings ( 4 . 211) The vertical centralizers (21) are arranged at intervals along the extending direction, and the water uprights (3) are provided with a plurality of the assembling flanges (34) corresponding to the plurality of the holding rings (211) one-to-one ). 5.根据权利要求1所述的浮式风机基础运输结构,其特征在于,立式扶正支架(21)与所述滑轨(12)滑动连接的一端具有固定耳(212),所述固定耳(212)上具有第三螺栓孔(2121),位于所述滑轨(12)旁侧的所述安装面(1a)上具有多个与所述第三螺栓孔(2121)相匹配的第四螺栓孔(13),多个所述第四螺栓孔(13)沿所述滑轨(12)的长度方向均匀间隔布置。5. The basic transportation structure for a floating fan according to claim 1, characterized in that, one end of the vertical centralizing bracket (21) slidably connected to the sliding rail (12) has a fixing ear (212), and the fixing ear There are third bolt holes (2121) on (212), and a plurality of fourth bolt holes (2121) matching the third bolt holes (2121) are formed on the mounting surface (1a) on the side of the slide rail (12). Bolt holes (13), a plurality of the fourth bolt holes (13) are evenly spaced along the length direction of the slide rail (12). 6.根据权利要求1所述的浮式风机基础运输结构,其特征在于,所述抱紧环(211)的内圈端面设置有弹性垫片(2111)。6 . The basic transportation structure for a floating fan according to claim 1 , wherein an elastic gasket ( 2111 ) is provided on the end surface of the inner ring of the holding ring ( 211 ). 7 . 7.根据权利要求1至6任一项所述的浮式风机基础运输结构,其特征在于,所述船体(1)的另一端具有两个导水面(1b),所述导水面(1b)与所述船体(1)的中轴线所在的数值平面呈锐角布置,所述两个导水面(1b)相对于所述船体(1)的中轴线对称布置。7. The basic transportation structure for a floating wind turbine according to any one of claims 1 to 6, wherein the other end of the hull (1) has two water guide surfaces (1b), and the water guide surfaces (1b) The two water guiding surfaces (1b) are arranged symmetrically with respect to the central axis of the hull (1) and are arranged at an acute angle to the numerical plane on which the central axis of the hull (1). 8.根据权利要求1至6任一项所述的浮式风机基础运输结构,其特征在于,所述立式扶正支架(21)为多层桁架结构。8. The basic transportation structure for a floating wind turbine according to any one of claims 1 to 6, wherein the vertical centralizing support (21) is a multi-layer truss structure. 9.根据权利要求8所述的浮式风机基础运输结构,其特征在于,所述抱紧环(211)与所述立式扶正支架(21)通过焊接连接。9 . The basic transportation structure for a floating wind turbine according to claim 8 , wherein the holding ring ( 211 ) and the vertical centralizing support ( 21 ) are connected by welding. 10 . 10.一种施工方法,其特征在于,所述施工方法基于权利要求1至9任一项所述的浮式风机基础运输结构实现,所述施工方法包括:10. A construction method, characterized in that, the construction method is realized based on the floating fan base transportation structure according to any one of claims 1 to 9, and the construction method comprises: 利用所述两个条形连接段(5)连接所述水上立柱(3)和所述水下立柱(4);The above-water column (3) and the underwater column (4) are connected by the two bar-shaped connecting sections (5); 利用两个所述立式扶正支架(21)上的所述抱紧环(211)对合以将所述水上立柱(3)沿竖直方向夹持固定于所述安装凹口(11)中,并使所述水下立柱(4)呈自然悬浮于水面的水平浮运状态,通过拖带船体(1)以进行所述水上立柱(3)和所述水下立柱(4)的水上运输;The holding rings (211) on the two vertical centralizing brackets (21) are combined to clamp and fix the water column (3) in the installation recess (11) in the vertical direction. , and make the underwater column (4) be in a horizontal floating state that is naturally suspended on the water surface, and carry out the water transportation of the above-water column (3) and the underwater column (4) by towing the hull (1); 待所述船体(1)到达指定位置后,调整所述压载舱(41)的重量,使所述水下立柱(4)的另一端下沉并带动所述两个条形连接段(5)绕所述转轴(32)旋转,直到所述水下立柱(4)呈整体与所述水上立柱(3)同轴的竖直浮运状态;After the hull (1) reaches the designated position, adjust the weight of the ballast tank (41) so that the other end of the underwater column (4) sinks and drives the two bar-shaped connecting sections (5). ) rotate around the shaft (32) until the underwater column (4) is in a vertical floating state in which the whole is coaxial with the above-water column (3); 对所述水下立柱(4)的一端与所述水上立柱(3)的另一端进行固定连接,调整所述水上立柱(3)和所述水下立柱(4)的吃水深度,与海床进行锚固并张拉系泊线;One end of the underwater column (4) is fixedly connected to the other end of the above-water column (3), and the draught of the above-water column (3) and the underwater column (4) is adjusted to be consistent with the seabed. Anchoring and tensioning of mooring lines; 沿所述滑轨(12)调整所述两个立式扶正支架(21)的相对位置,解除所述抱紧环(211)对所述水上立柱(3)的夹持固定。The relative positions of the two vertical centralizing brackets (21) are adjusted along the sliding rail (12), and the clamping and fixing of the water column (3) by the holding ring (211) is released.
CN202210441853.3A 2022-04-25 2022-04-25 Floating type fan foundation transportation structure and construction method thereof Pending CN114872846A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210441853.3A CN114872846A (en) 2022-04-25 2022-04-25 Floating type fan foundation transportation structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210441853.3A CN114872846A (en) 2022-04-25 2022-04-25 Floating type fan foundation transportation structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN114872846A true CN114872846A (en) 2022-08-09

Family

ID=82672560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210441853.3A Pending CN114872846A (en) 2022-04-25 2022-04-25 Floating type fan foundation transportation structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN114872846A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000078604A1 (en) * 1999-06-07 2000-12-28 Mpu Enterprise As Lifting vessel and method for positioning, lifting and handling a platform deck and a jacket
WO2012011601A1 (en) * 2010-07-23 2012-01-26 株式会社アイ・エイチ・アイ マリンユナイテッド Working system for floating structure, floating structure, working ship, and working method for floating structure
CN206071798U (en) * 2016-08-31 2017-04-05 中核机械工程有限公司 Wind turbines marine transportation installation ship
CN112283043A (en) * 2020-09-04 2021-01-29 中交第三航务工程局有限公司 Construction method of deep open sea Spar column type platform fan
KR20210035874A (en) * 2018-07-26 2021-04-01 디이엠이 오프쇼어 비이 엔.브이. Device and method for flipping tubular elements longitudinally on the supporting surface at the outer end
CN113184117A (en) * 2021-05-01 2021-07-30 天津大学 Novel Spar type fan whole machine floating transportation method
CN113581395A (en) * 2020-04-30 2021-11-02 Bassoe科技公司 Semi-submersible floating fan with T-shaped floating body

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000078604A1 (en) * 1999-06-07 2000-12-28 Mpu Enterprise As Lifting vessel and method for positioning, lifting and handling a platform deck and a jacket
WO2012011601A1 (en) * 2010-07-23 2012-01-26 株式会社アイ・エイチ・アイ マリンユナイテッド Working system for floating structure, floating structure, working ship, and working method for floating structure
CN206071798U (en) * 2016-08-31 2017-04-05 中核机械工程有限公司 Wind turbines marine transportation installation ship
KR20210035874A (en) * 2018-07-26 2021-04-01 디이엠이 오프쇼어 비이 엔.브이. Device and method for flipping tubular elements longitudinally on the supporting surface at the outer end
US20210310270A1 (en) * 2018-07-26 2021-10-07 Deme Offshore Be Nv Device and Method for Upending a Tubular Element with a Longitudinal Direction from a Support Surface at an Outer End
CN113581395A (en) * 2020-04-30 2021-11-02 Bassoe科技公司 Semi-submersible floating fan with T-shaped floating body
CN112283043A (en) * 2020-09-04 2021-01-29 中交第三航务工程局有限公司 Construction method of deep open sea Spar column type platform fan
CN113184117A (en) * 2021-05-01 2021-07-30 天津大学 Novel Spar type fan whole machine floating transportation method

Similar Documents

Publication Publication Date Title
CN110450917B (en) Floating type offshore photovoltaic power generation platform
CN109506044B (en) Submarine oil pipeline construction process
KR20160023660A (en) Submersible active support structure for turbine towers and substations or similar elements, in offshore facilities
CN113846665B (en) Combined type offshore wind turbine foundation suitable for deepwater conditions and installation method thereof
JP2011042257A (en) Link-type self-elevating platform and installation method for wind power generation facility in open sea
CN105339651A (en) Platform for tidal turbines
CN109720512A (en) It ocean platform and its steps on and multiplies gangway ladder
CN115743441A (en) Self-rotation-preventing single-point anchoring system of marine floating type photovoltaic structure
JP2012112370A (en) Ship for installing offshore wind turbine and method for installing offshore wind turbine using the same
CN203095441U (en) Combined floating crane for mud flats
CN114872846A (en) Floating type fan foundation transportation structure and construction method thereof
CN116605366B (en) Transportation, positioning and dismantling method for large-scale offshore facilities
CN209816899U (en) Floating pile-stabilizing platform for construction of steel pipe piles of offshore jacket type fan foundation
CN103758096B (en) A kind of offshore exploration platform and construction method thereof
CN107119687B (en) Inter-tidal zone pile sinking limit frame capable of rotating greatly and construction method thereof
CN217870596U (en) Tensioning type fan foundation anchored on foundation seabed
JPH1096241A (en) Jacket structure
CN206511082U (en) Ship helps only pillar offshore exploration platform
CN212715000U (en) Steel cofferdam positioning system in deep water
CN115892384A (en) A semi-submersible installation platform and installation method for a cylindrical foundation wind turbine
NO348117B1 (en) Spar-type offshore wind turbine assembly and methods relating thereto
CN111764418B (en) Steel cofferdam positioning system in deep water
CN113914783A (en) A dual-purpose engineering survey water drilling platform and its use method
CN109295919B (en) A breakwater for emergency rescue and taking into account the energy supply of waves and its arrangement method
CN206971221U (en) A kind of marine intertidal wind power generating basis pile sinking position-limited rack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220809