CN114838206A - Using method of telescopic finished product support and hanger - Google Patents

Using method of telescopic finished product support and hanger Download PDF

Info

Publication number
CN114838206A
CN114838206A CN202210457854.7A CN202210457854A CN114838206A CN 114838206 A CN114838206 A CN 114838206A CN 202210457854 A CN202210457854 A CN 202210457854A CN 114838206 A CN114838206 A CN 114838206A
Authority
CN
China
Prior art keywords
support
channel steel
layer channel
hanger
transverse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210457854.7A
Other languages
Chinese (zh)
Inventor
祝国梁
林奋彬
陈景镇
马仁刚
吕凯芳
林凤英
刘华长
陈腾飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Engineering Bureau Construction and Development Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Engineering Bureau Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Fourth Engineering Bureau Construction and Development Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202210457854.7A priority Critical patent/CN114838206A/en
Publication of CN114838206A publication Critical patent/CN114838206A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/22Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
    • F16L3/223Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals each support having one transverse base for supporting the pipes
    • F16L3/227Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals each support having one transverse base for supporting the pipes each pipe being supported by a separate element fastened to the base
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0456Ladders or other supports

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a using method of a telescopic finished product support and hanger, which comprises the following steps: a plurality of vertical brackets arranged in parallel and a plurality of transverse brackets arranged in parallel; the joint positions of the vertical bracket and the transverse bracket are connected by adopting a connecting piece; according to the invention, through the structural design of the vertical support and the transverse support, the telescopic adjustment of the finished product support hanger is realized by utilizing the sleeved inner-layer channel steel and the outer-layer channel steel which can move outside, the telescopic adjustment is suitable for various building structure environments of different projects, the deepening time of the finished product support hanger is greatly reduced, and the construction of workers can be simplified during the field actual construction.

Description

Using method of telescopic finished product support and hanger
Technical Field
The invention relates to a using method of a telescopic finished product support hanger, and belongs to the field of bridge and pipeline installation.
Background
The finished product gallows that adopts on the project all processes into fixed size and is used for the site operation, and when a project had multiple specification, the pipe heald volume is big again, just needs the producer to spend a large amount of time on finished product gallows deepening earlier stage.
And (4) manufacturing finished product supports and hangers of various specifications and applying the supports and hangers to different environments. This results in projects that will take up too much time in earlier deepening, affecting the project.
In the field construction, because finished product supporting and hanging frames of various specifications exist, constructors need to number the finished product supporting and hanging frames in the construction process and apply the finished product supporting and hanging frames to different environments in a classified mode, operation processes are increased, and the risk of construction errors is increased.
And the existing finished product supporting and hanging frames have the telescopic function, and the height and the horizontal width can not be adjusted according to the width of the environment.
Disclosure of Invention
The invention provides a using method of a telescopic finished product support hanger, which can effectively solve the problems.
The invention is realized by the following steps:
a method for using a telescopic finished product support and hanger structurally comprises
The scalable finished product gallows includes: a plurality of vertical brackets arranged in parallel and a plurality of transverse brackets arranged in parallel; the joint positions of the vertical support and the transverse support are connected by a connecting piece; the concrete slab is arranged at the topmost end of the vertical support, and the concrete slab and the vertical support are connected and fixed through a structural connecting piece; each of the brackets includes: the first outer hexagonal screw is connected with the first inner layer channel steel; the inner layer channel steel is connected end to end, and the outer layer channel steel is sleeved at the joint of the inner layer channel steel; a plurality of inner layer channel steel round holes which are arranged at intervals along the length direction of the inner layer channel steel are formed in the inner layer channel steel; the outer-layer channel steel is provided with a plurality of outer-layer channel steel round holes which are arranged at intervals along the length direction of the outer-layer channel steel; the third outer hexagonal screw penetrates through the outer layer channel steel round hole and the inner layer channel steel round hole in sequence, so that the vertical support or the transverse support can extend and retract;
the cross section of the outer layer channel steel is larger than that of the inner layer channel steel;
the sectional dimension of the structural connecting piece is consistent with that of the connecting piece and is larger than that of the outer-layer channel steel.
As a further improvement, the connecting piece contains L type connecting piece and first outer hexagonal screw, L type connecting piece horizontal end and vertical end adopt two first outer hexagonal screws respectively with horizontal support, vertical support threaded fixation, its structure still includes the cable testing bridge, the cable testing bridge is located horizontal support.
As a further improvement, the structure of the cable tray comprises a tray, which is positioned on the transverse support;
the horizontal both ends in crane span structure bottom are equipped with L locating part respectively, L locating part horizontal end and vertical end all fix respectively on crane span structure and transverse support through fourth outer hexagonal screw.
As a further improvement, the structure of the water supply device also comprises a drain pipe, wherein the drain pipe comprises a water supply pipe and a drain pipe, and the water supply pipe and the drain pipe are arranged on the transverse bracket.
As a further improvement, the water supply pipe and the water discharge pipe are consistent in structure and are composed of a pipeline, a pipe bundle, a screw rod and a flange nut, one end of the screw rod vertically penetrates through the flange nut and then is fixed on the transverse support, the other end of the screw rod is vertically fixed at the bottom end of the pipe bundle, and the pipeline is arranged in the middle of the pipe bundle.
As a further improvement, the tube bundle is a structure formed by movably connecting two semicircular rods by bolts.
As further improvement, the vertical support and the transverse support are C-shaped channel steel, and arc-shaped round holes are formed in the back faces of the vertical support and the back faces of the transverse support.
As a further improvement, the lengths of the inner layer channel steel and the outer layer channel steel are equal.
As a further improvement, the bottom end of each vertical bracket is provided with a channel steel end cover.
As a further improvement, the third outer hexagonal screw, the expansion bolt, the first outer hexagonal screw and the fourth outer hexagonal screw are all provided with rubber gaskets.
As a further improvement, the angle of the L-shaped connector is 90 ℃.
As a further improvement, the use method of the telescopic finished support hanger comprises
And S1, sleeving every two inner layer channel steel ends to form a through long support rod, and sleeving the through long support rod in different lengths according to the length of the construction environment in a width-adjustable manner to serve as a vertical support and a transverse support.
S2, more than two sections of outer-layer channel steel are sleeved on the outer surface of the sleeved inner-layer channel steel, the outer-layer channel steel in the vertical support structure is adjusted to a required height in a sliding mode on the outer surface of the sleeved inner-layer channel steel, a third outer hexagonal screw penetrates through a circular hole of the outer-layer channel steel and a circular hole of the inner-layer channel steel in sequence and then is locked in a threaded mode, and a transverse support is installed through a connecting piece to form a complete finished product support hanger;
s3, vertically fixing the topmost end of the vertical bracket of the complete finished support hanger on a concrete slab by using a structural connecting piece, and fixing the bottommost end of the vertical bracket by using a channel steel end cover;
s4, mounting more than two groups of cable bridges and drainage pipes on the transverse bracket of the complete finished product support hanger according to requirements, wherein the mounting method of the structural connecting piece and the drainage pipe is as follows,
installing a cable bridge: placing the bridge on a transverse bracket, clamping and fixing two sides of the bridge by adopting a limiting piece, and finally fixing the bridge by using an outer hexagonal screw to finish the assembly of the cable bridge;
and (3) installing a drain pipe: the screw penetrates through the flange nut to be fixed with the transverse support, the pipe bundle is fixed with the screw, finally the pipeline penetrates through the pipe bundle, and the bolts on the two sides of the pipe bundle are screwed down to complete the fixation of the water supply pipe or the water discharge pipe;
and S5, after the telescopic finished product supporting and hanging frame is finally used, reversely disassembling and assembling the telescopic finished product supporting and hanging frame according to the steps.
The invention has the beneficial effects that:
1. according to the invention, through the structural design of the vertical support and the transverse support, the telescopic adjustment of the finished supporting and hanging bracket is realized by utilizing the inner layer channel steel which can be sleeved and the outer layer channel steel which can be moved outside, the telescopic adjustment of the finished supporting and hanging bracket is suitable for various building structure environments of different projects, the deepening time of the finished supporting and hanging bracket is greatly reduced, and the construction of workers can be simplified during the actual construction on site.
2. The vertical support and the transverse support have the same structure and are both C-shaped channel steel, and the lengths of the inner layer channel steel and the outer layer channel steel are equal, so that the vertical support and the transverse support can be alternately used, namely, the transverse support in the dismounting method can also be used as the vertical support, and the bottom of the transverse support is fixed by installing a channel steel end cover, so that the parts of the product support hanger have the same specification, the factory processing is convenient, the parts do not need to be numbered in the construction process, the parts are classified and applied to different environments, and the risk of construction errors is reduced.
3. The cable bridge and the drain pipe are installed by adopting a limiting part and a pipe bundle completely wrapping the pipeline, so that the connection relation between the cable bridge, the drain pipe and the transverse support is enhanced, the stability of the installation of the bridge and the pipeline is improved, and the practicability of the construction of the support and hanger is further embodied.
4. The structural connecting piece and the connecting piece are designed, the support hanger is stably fixed on a concrete slab of a construction project, and the vertical support and the transverse support are strengthened to be mutually vertically fixed, so that the use stability of the concrete support is strengthened under different construction project environments.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings may be obtained based on the drawings without inventive effort.
Fig. 1 is a schematic structural front view of a method of using a collapsible finished support hanger of the present invention.
Fig. 2 is a schematic side view of the construction of a method of using a collapsible finished support hanger of the present invention.
Fig. 3 is a front view of the connector of a method of using a collapsible finished support hanger of the present invention.
Fig. 4 is a side view of the connector of a method of using a collapsible finished support hanger of the present invention.
Fig. 5 is a top view of the connector of a method of using a collapsible finished support hanger of the present invention.
Fig. 6 is an elevation view of a structural connector of a method of using a collapsible finished support hanger of the present invention.
Fig. 7 is a top view of a structural connector of a method of using a collapsible finished support hanger of the present invention.
Fig. 8 is a side view of the structural connector of a method of using a collapsible finished support hanger of the present invention.
Fig. 9 is a schematic cross-sectional view 1-1 of a method of using a collapsible finished support hanger of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings of the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
In the description of the present invention, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implying any number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
Referring to fig. 1-9, a method for using a retractable finished support and hanger includes a method for using a retractable finished support and hanger, which includes
The scalable finished product gallows includes: a plurality of vertical brackets 10 arranged in parallel and a plurality of horizontal brackets 20 arranged in parallel; the joint positions of the vertical bracket 10 and the transverse bracket 20 are connected by a connecting piece 50; the concrete plate 40 is arranged at the topmost end of the vertical support 10, and the concrete plate 40 and the vertical support 10 are fixedly connected through a structural connecting piece 30; each of the brackets includes: a plurality of inner layer channel steels 11, a plurality of outer layer channel steels 13 and a plurality of third outer hexagonal screws 15; the inner layer channel steel 11 is connected end to end, and the outer layer channel steel 13 is sleeved at the joint of the inner layer channel steel 11; a plurality of inner layer channel steel round holes 12 which are arranged at intervals along the length direction of the inner layer channel steel 11 are formed in the inner layer channel steel; the outer-layer channel steel 13 is provided with a plurality of outer-layer channel steel round holes 14 which are arranged at intervals along the length direction; the third outer hexagonal screw 15 sequentially penetrates through the outer layer circular channel steel hole 14 and the inner layer circular channel steel hole 12, so that the vertical support 10 or the transverse support 20 can extend and retract;
the cross section of the outer layer channel steel 13 is larger than that of the inner layer channel steel 11;
the sectional dimension of the structural connecting piece 30 is consistent with that of the connecting piece 50 and is larger than that of the outer layer channel steel 13, so that the structural connecting piece 30 and the connecting piece 50 are conveniently sleeved on the outer surface of the vertical support 10 or the outer surface of the transverse support 20 to play a role in connection and reinforcement.
The connecting piece 50 comprises an L-shaped connecting piece 51 and first outer hexagonal screws 52, and the horizontal end and the vertical end of the L-shaped connecting piece 51 are respectively fixed with the transverse bracket 20 and the vertical bracket 10 by two first outer hexagonal screws 52 in a threaded manner;
the structure further comprises a cable bridge 60, and the cable bridge 60 is positioned on the transverse bracket 20.
The structure of the cable tray 60 comprises a tray 61, the tray 61 is positioned on the transverse support 20;
the horizontal two ends of the bottom of the bridge frame 61 are respectively provided with an L-shaped limiting part 62, and the horizontal end and the vertical end of the L-shaped limiting part 62 are respectively fixed on the bridge frame 61 and the transverse support 20 through a fourth outer hexagonal screw 63.
The structure further includes a drain pipe 70, and the drain pipe 70 includes a feed pipe and a drain pipe, which are installed on the lateral bracket 20.
The structure of the water supply pipe is consistent with that of the water discharge pipe, and the water supply pipe and the water discharge pipe are all composed of a pipeline 71, a pipe bundle 72, a screw 73 and a flange nut 74, wherein one end of the screw 73 vertically penetrates through the flange nut 74 and then is fixed on the transverse support 20, the other end of the screw 73 is vertically fixed at the bottom end of the pipe bundle 72, and the pipeline 71 is arranged in the middle of the pipe bundle 72.
The tube bundle 72 is a structure formed by movably connecting two semicircular rods by bolts.
The vertical support 10 and the transverse support 20 are C-shaped channel steel, and arc-shaped round holes are formed in the back faces of the vertical support and the transverse support.
The lengths of the inner layer channel steel 11 and the outer layer channel steel 13 are equal.
And a channel steel end cover 80 is arranged at the bottommost end of each vertical support 10.
The third outer hexagonal screw 15, the expansion bolt 31, the first outer hexagonal screw 52 and the fourth outer hexagonal screw 63 are all provided with rubber gaskets 90.
The angle of the L-shaped connector is 90 ℃.
The invention relates to a using method and a principle of a telescopic finished product support hanger, which are as follows:
disassembling and assembling method 1
S1, sleeving every two inner layer channel steel 11 end to form a through long support rod, and sleeving the through long support rod in different lengths according to the length of a construction environment to serve as the vertical support 10 and the transverse support 20;
s2, more than two sections of outer channel steel 13 are sleeved on the outer surface of the sleeved inner channel steel 11, the outer channel steel 13 in the vertical support 10 structure is adjusted to a required height by sliding on the outer surface of the sleeved inner channel steel 11, a third outer hexagonal screw 15 sequentially penetrates through an outer channel steel round hole 14 of the outer channel steel 13 and the inner channel steel round hole 12 of the inner channel steel 11 and then is locked in a threaded mode, the transverse support 20 is installed through the connecting piece 50, a complete finished product support hanger is formed, namely the sleeved inner channel steel and the outer channel steel which can be moved outside are utilized, the telescopic adjustment of the finished product support hanger is achieved, the installation configuration of the transverse supports 20 with different heights in different building structure environments is achieved, the deepening time of the finished product support hanger is greatly reduced in field actual construction, the construction of workers can be simplified, the practicability is high, and the applicability is high.
And S3, vertically fixing the topmost end of the vertical support 10 of the complete finished support hanger on the concrete slab 40 by using the structural connecting piece 30, and fixing the bottommost end of the vertical support 10 by using the channel steel end cover 80.
S4, installing more than two sets of cable bridges 60 and drainage pipes 70 on the transverse support 20 of the complete finished product support hanger, and installing the structural connecting members 30 and the drainage pipes 70, as follows:
installation of the cable bridge 60: the cable bridge 60 can be assembled by placing the bridge 61 on the transverse support 20, clamping and fixing the two sides of the bridge by using the limiting parts 62, and finally fixing the bridge by using the outer hexagonal screws 63.
The drain pipe 70 is installed: the screw 73 passes through the flange nut 74 to be fixed with the transverse bracket 20, the pipe bundle 72 is fixed with the screw 73, finally the pipeline 71 passes through the pipe bundle 72, and bolts at two sides of the pipe bundle 72 are screwed down to complete the fixation of the water supply pipe or the water discharge pipe;
at this in-process, the cable testing bridge and the installation of drain pipe adopt locating part and tube bank parcel pipeline design completely, strengthen the relation of connection of cable testing bridge, drain pipe and horizontal support, improve the stability of testing bridge, piping erection, have further embodied the practicality of a gallows construction.
And S5, after the telescopic finished product supporting and hanging frame is finally used, reversely disassembling and assembling the telescopic finished product supporting and hanging frame according to the steps.
Disassembling and assembling method 2
The disassembly and assembly method 2 is different from the disassembly and assembly method 1 in that the vertical support 10 and the transverse support 20 are both made of C-shaped channel steel, and the lengths of the inner layer channel steel 11 and the outer layer channel steel 13 are equal, so that the vertical support 10 and the transverse support 20 can be alternately used, namely, the transverse support 20 in the disassembly and assembly method 1 can also be used as the vertical support 10, and the bottom of the transverse support 20 is provided with the channel steel end cover 80 for fixing, so that the support and hanger of the product are identical in part specification, convenient and fast in factory processing, free of numbering in the construction process, and capable of being applied to different environments in a classified mode, and reducing the risk of construction errors.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes may be made to the present invention by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A method of using a collapsible finished hanger, the collapsible finished hanger comprising: a plurality of vertical brackets (10) arranged in parallel and a plurality of transverse brackets (20) arranged in parallel; the joint positions of the vertical bracket (10) and the transverse bracket (20) are connected by adopting a connecting piece (50); the concrete plate (40) is arranged at the topmost end of the vertical support (10), and the concrete plate (40) and the vertical support (10) are fixedly connected through a structural connecting piece (30); each of the brackets includes: a plurality of inner layer channel steels (11), a plurality of outer layer channel steels (13) and a plurality of third outer hexagonal screws (15); the inner layer channel steel (11) is connected end to end, and the outer layer channel steel (13) is sleeved at the joint of the inner layer channel steel (11); the inner-layer channel steel (11) is provided with a plurality of inner-layer channel steel round holes (12) which are arranged at intervals along the length direction of the inner-layer channel steel; the outer-layer channel steel (13) is provided with a plurality of outer-layer channel steel round holes (14) which are arranged at intervals along the length direction; the third outer hexagonal screw (15) sequentially penetrates through the outer round groove steel hole (14) and the inner round groove steel hole (12) so that the vertical support (10) or the transverse support (20) can stretch.
2. The telescopic finished support and hanger of claim 1, wherein said connecting member (50) comprises an L-shaped connecting member (51) and first outer hexagonal screws (52), and the horizontal end and vertical end of said L-shaped connecting member (51) are respectively screwed with said transverse bracket (20) and said vertical bracket (10) by two first outer hexagonal screws (52);
the structure of the cable bridge further comprises a cable bridge (60), and the cable bridge (60) is located on the transverse support (20).
3. A telescopic finished support and hanger according to claim 2, characterised in that said structure of cable trays (60) comprises trays (61), said trays (61) being positioned on the transversal supports (20);
the horizontal both ends in crane span structure (61) bottom are equipped with L locating part (62) respectively, L locating part (62) horizontal end and vertical end all fix respectively on crane span structure (61) and transverse support (20) through fourth outer hexagonal screw (63).
4. The telescopic finished support and hanger of claim 1, further comprising a drain pipe (70), said drain pipe (70) comprising a water supply pipe and a drain pipe, said water supply pipe and drain pipe being mounted on the transverse support (20).
5. The telescopic finished product support and hanger as claimed in claim 4, wherein the water supply pipe and the water discharge pipe are identical in structure and are composed of a pipeline (71), a pipe bundle (72), a screw rod (73) and a flange nut (74), one end of the screw rod (73) vertically penetrates through the flange nut (74) and then is fixed on the transverse bracket (20), the other end of the screw rod (73) is vertically fixed at the bottom end of the pipe bundle (72), and the pipeline (71) is arranged in the middle of the pipe bundle (72).
6. A telescopic finished support and hanger as claimed in claim 5, characterised in that said tube bundle (72) is a structure of two semi-circular bars movably connected by bolts.
7. A telescopic finished support and hanger as claimed in claim 1, characterised in that said vertical (10) and transverse (20) brackets are C-channel steel, with arc-shaped circular holes on the back of both brackets.
8. A telescopic finished support hanger according to claim 1, characterised in that the inner (11) and outer (13) channels are of equal length.
9. A telescopic finished support and hanger as claimed in claim 1, characterised in that a channel end cap (80) is mounted to the lowermost end of each said vertical support (10).
10. A collapsible finished support and hanger as claimed in any one of claims 1 to 9, in which a method of use of a collapsible finished support and hanger comprises:
s1, sleeving every two inner layer channel steel (11) end to form a through long support rod, and sleeving the through long support rod in different lengths according to the length of a construction environment to serve as a vertical support (10) and a transverse support (20);
s2, more than two sections of outer-layer channel steel (13) are sleeved on the outer surface of the sleeved inner-layer channel steel (11), the outer-layer channel steel (13) in the vertical support (10) structure is adjusted to a required height in a sliding mode on the outer surface of the sleeved inner-layer channel steel (11), a third outer hexagonal screw (15) penetrates through an outer-layer channel steel round hole (14) of the outer-layer channel steel (13) and an inner-layer channel steel round hole (12) of the inner-layer channel steel (11) in sequence and then is locked in a threaded mode, and a transverse support (20) is installed through a connecting piece (50) to form a complete finished product support hanger;
s3, vertically fixing the topmost end of a vertical support (10) of the complete finished support hanger on a concrete slab (40) by using a structural connecting piece (30), and fixing the bottommost end of the vertical support (10) by using a channel steel end cover (80);
s4, installing more than two groups of cable bridges (60) and drainage pipes (70) on the transverse bracket (20) of the complete finished product support hanger according to requirements, and installing the structural connecting piece (30) and the drainage pipe (70) as follows:
installing a cable bridge (60): the cable bridge (60) is assembled by placing the bridge (61) on the transverse bracket (20), clamping and fixing the two sides of the bridge by adopting the limiting pieces (62), and finally fixing the bridge by using the outer hexagonal screws (63);
the drain pipe (70) is installed: the screw (73) penetrates through the flange nut (74) to be fixed with the transverse support (20), the tube bundle (72) is fixed with the screw (73), finally the pipeline (71) penetrates through the tube bundle (72), and bolts on two sides of the tube bundle (72) are screwed down to complete the fixation of the water supply pipe or the water discharge pipe;
and S5, after the telescopic finished product supporting and hanging frame is finally used, reversely disassembling and assembling the telescopic finished product supporting and hanging frame according to the steps.
CN202210457854.7A 2022-04-28 2022-04-28 Using method of telescopic finished product support and hanger Pending CN114838206A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210457854.7A CN114838206A (en) 2022-04-28 2022-04-28 Using method of telescopic finished product support and hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210457854.7A CN114838206A (en) 2022-04-28 2022-04-28 Using method of telescopic finished product support and hanger

Publications (1)

Publication Number Publication Date
CN114838206A true CN114838206A (en) 2022-08-02

Family

ID=82567617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210457854.7A Pending CN114838206A (en) 2022-04-28 2022-04-28 Using method of telescopic finished product support and hanger

Country Status (1)

Country Link
CN (1) CN114838206A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202013105861U1 (en) * 2013-12-20 2015-03-24 Rehau Ag + Co. Adjustable mounting bracket for attaching a cable trunking to a wall
CN205371829U (en) * 2016-02-01 2016-07-06 深圳优力可科技股份有限公司 A multilayer pipeline gallows convenient to equipment
CN208259450U (en) * 2017-07-26 2018-12-21 天津市正一道文化传播有限公司 A kind of Art Design exhibition showing stand
CN111075174A (en) * 2020-02-24 2020-04-28 青岛军英装备科技有限公司 Quick pin connection scaffold system
CN213393893U (en) * 2020-10-20 2021-06-08 泰德阳光(浙江)建筑科技集团有限公司 Safe adjustable assembling support system
CN113217712A (en) * 2021-06-07 2021-08-06 中铁建设集团设备安装有限公司 Three-pipe comprehensive pipeline lateral support
CN214674037U (en) * 2021-01-20 2021-11-09 上海绿政机电工程有限公司 Adjustable cable bridge mounting structure
CN215831308U (en) * 2021-08-05 2022-02-15 陈开猛 Electromechanical engineering screw jib synthesizes support
CN114321117A (en) * 2021-12-31 2022-04-12 三智胜祥集团有限公司 Assembled gravity finished product supporting and hanging frame
CN217234679U (en) * 2022-04-28 2022-08-19 中国建筑第四工程局有限公司 Scalable finished product gallows

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202013105861U1 (en) * 2013-12-20 2015-03-24 Rehau Ag + Co. Adjustable mounting bracket for attaching a cable trunking to a wall
CN205371829U (en) * 2016-02-01 2016-07-06 深圳优力可科技股份有限公司 A multilayer pipeline gallows convenient to equipment
CN208259450U (en) * 2017-07-26 2018-12-21 天津市正一道文化传播有限公司 A kind of Art Design exhibition showing stand
CN111075174A (en) * 2020-02-24 2020-04-28 青岛军英装备科技有限公司 Quick pin connection scaffold system
CN213393893U (en) * 2020-10-20 2021-06-08 泰德阳光(浙江)建筑科技集团有限公司 Safe adjustable assembling support system
CN214674037U (en) * 2021-01-20 2021-11-09 上海绿政机电工程有限公司 Adjustable cable bridge mounting structure
CN113217712A (en) * 2021-06-07 2021-08-06 中铁建设集团设备安装有限公司 Three-pipe comprehensive pipeline lateral support
CN215831308U (en) * 2021-08-05 2022-02-15 陈开猛 Electromechanical engineering screw jib synthesizes support
CN114321117A (en) * 2021-12-31 2022-04-12 三智胜祥集团有限公司 Assembled gravity finished product supporting and hanging frame
CN217234679U (en) * 2022-04-28 2022-08-19 中国建筑第四工程局有限公司 Scalable finished product gallows

Similar Documents

Publication Publication Date Title
CN217234679U (en) Scalable finished product gallows
CN114016383A (en) Pipeline suspension protection device and construction method
CN114838206A (en) Using method of telescopic finished product support and hanger
CN114134934A (en) Assembled pipe gallery support and installation and construction method thereof
CN113216646A (en) Assembling method of pipe truss
CN215721313U (en) Adjustable pipeline support structure
CN217003637U (en) Be applied to a antidetonation gallows of rectangle tuber pipe
CN214834924U (en) Pipe truss assembly jig frame
CN212455784U (en) Pipeline suspension structure
CN210372341U (en) Pipe gallery supporting and hanging frame for urban underground pipeline
CN212247732U (en) Prefabricated high strength concrete floor tile bearing structure of assembled
CN112113035A (en) Network cable pipeline convenient to installation
CN112983487A (en) In-hole inner supporting device
CN112483730A (en) No pre-buried, no crab-bolt arc pipe gallery multi-angle adjustable support
CN210380201U (en) Tunnel crosses rail pipe installation positioner
CN213926684U (en) Simple to operate's combination steel construction
CN213477573U (en) Scaffold for building engineering
CN219827984U (en) Hydropower installation engineering piping lane mount
CN220397054U (en) Prefabricated component for electromechanical equipment assembling synthesis method
CN220980498U (en) Fast-assembling formula pipeline suspended structure
CN207130646U (en) A kind of municipal pipeline construction fence rack
CN220394859U (en) Steel structure upright post with adjustable supporting node
CN107131355B (en) Method and device for replacing large-diameter overhead pipeline
CN215978597U (en) Building crossbeam reinforcing apparatus
CN219274704U (en) Stabilizing device of welding pipeline inner scraping system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination