CN220980498U - Fast-assembling formula pipeline suspended structure - Google Patents

Fast-assembling formula pipeline suspended structure Download PDF

Info

Publication number
CN220980498U
CN220980498U CN202322227305.3U CN202322227305U CN220980498U CN 220980498 U CN220980498 U CN 220980498U CN 202322227305 U CN202322227305 U CN 202322227305U CN 220980498 U CN220980498 U CN 220980498U
Authority
CN
China
Prior art keywords
rod
plate
bolt
connecting rod
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322227305.3U
Other languages
Chinese (zh)
Inventor
张海坤
拜瑞
邹炜
沈林杰
章慧
朱亨辉
张淦军
张雷
郑露莎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yaxia Design And Research Institute Co ltd
Original Assignee
Zhejiang Yaxia Design And Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yaxia Design And Research Institute Co ltd filed Critical Zhejiang Yaxia Design And Research Institute Co ltd
Priority to CN202322227305.3U priority Critical patent/CN220980498U/en
Application granted granted Critical
Publication of CN220980498U publication Critical patent/CN220980498U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a quick-assembly type pipeline hanging structure, which relates to the technical field of decoration design and comprises a base, a vertical connecting rod, a horizontal connecting rod and a connecting piece, wherein the base comprises a bottom plate and a vertical rod, the connecting piece comprises a first rod and a second rod, the vertical connecting rod, the horizontal connecting rod, the first rod and the second rod are respectively provided with a first connecting hole, the vertical rod is connected with the vertical connecting rod through a first bolt, the first rod is connected with one end of the vertical connecting rod far away from the vertical rod through a second bolt, the second rod is connected with the horizontal connecting rod through a third bolt, at least one part of the first bolt, the second bolt and the third bolt are positioned in the first connecting holes, and the horizontal connecting rod is provided with a hoop part for connecting with a pipeline. The utility model has simple structure, high assembly type installation efficiency, good stability and wide application range, can adjust the installation position up and down and left and right, can install pipelines with different outer diameters, and can freely install a multi-layer structure in the whole device.

Description

Fast-assembling formula pipeline suspended structure
Technical Field
The utility model relates to the technical field of decoration design, in particular to a quick-assembly type pipeline hanging structure.
Background
The current decoration industry is developing towards industrialized modularized installation, and hoisting and fixing of building pipelines are very important in the building industry, electromechanical installation engineering and indoor wall top decoration engineering.
The existing pipeline hoisting structure mostly adopts a process of cutting and then welding sectional materials such as angle steel or channel steel on site, the process needs to be lofted on site, then cutting and welding are carried out on site, so that the construction process is complicated, the on-site welding increases the fire risk, the requirements on the technology and welding quality of welders are high, and the welding seams need to be subjected to rust prevention on site; so the assembly type installation requirement for the hanging rack is urgent, for example, chinese patent utility model patent CN207569365U discloses an assembly type indoor pipeline supporting hanging rack, which comprises a bracket component, a hanging rack component and a fixing component, wherein the bracket component comprises a pipeline hoop and a hanging frame, the pipeline hoop is fixedly connected with the hanging frame and is positioned at the bottom of the hanging frame, the hanging rack component comprises a threaded column and a fixing plate, the threaded column is rotatably connected with the hanging frame, and the threaded column penetrates through the upper end of the hanging frame and is positioned at the middle position of the hanging frame and is fixedly connected with the fixing plate; the novel assembled indoor pipeline supporting and hanging bracket is provided with fastening screws and pipeline hoops, supports and fixes pipelines, and is convenient to maintain and replace the pipelines when faults occur in the pipelines.
However, the above-mentioned pipeline support and hanger structure still has the following problems: firstly, the device can be only adjusted up and down, and the position adjustment cannot be performed in the left-right direction, so that the requirement on the installation accuracy of the whole device is high; in addition, the installation of the pipelines with different outer diameters cannot be adapted, only a single pipeline can be installed, multi-pipeline supporting and hanging cannot be carried out in a factory building structure, and the application range is small.
Therefore, in order to solve the above problems, it is necessary to design a reasonable and efficient hanging structure for the fast-assembling pipeline.
Disclosure of utility model
The utility model aims to provide a quick-mounting type pipeline hanging structure which is simple in structure, high in assembly type installation efficiency, good in stability and wide in application range, the installation positions can be adjusted up, down, left and right, pipelines with different outer diameters can be installed, and the whole device can be freely additionally provided with a multi-layer structure.
In order to achieve the above purpose, the utility model is realized by adopting the following technical scheme:
The utility model provides a fast-assembling formula pipeline hanging structure, includes base, perpendicular connecting rod, horizontal connecting rod and connecting piece, the base include the bottom plate with set up in montant on the bottom plate, the connecting piece includes first pole and second pole, all be provided with first connecting hole on dead lever, perpendicular connecting rod, horizontal connecting rod, first pole and the second pole, the dead lever pass through first bolt with perpendicular connecting rod connects, first pole pass through the second bolt with perpendicular connecting rod is kept away from the one end of dead lever is connected, the second pole pass through the third bolt with horizontal connecting rod is connected, first bolt, second bolt and third bolt all have some at least to be located in the first connecting hole, be provided with on the horizontal connecting rod and be used for the staple bolt spare with the pipeline connection.
As a preferred aspect of the present utility model, the vertical link includes a first plate, a second plate disposed parallel to the first plate, and a first connection plate for connecting the first plate and the second plate, and the horizontal link includes a third plate, a fourth plate disposed parallel to the third plate, and a second connection plate for connecting the third plate and the fourth plate; the first plate, the second plate, the third plate and the fourth plate are all provided with first connecting holes, and the axial extending direction of the first connecting holes is the same as the extending direction of the pipeline.
Preferably, the present utility model further comprises a reinforcing part including a first flap connected to the bottom bar, a second flap connected to the connector, and a reinforcing link for connecting the first flap and the second flap.
Preferably, the first connecting plate, the second connecting plate, the reinforcing connecting rod, the first folded plate and the second folded plate are all provided with second connecting holes, and at least one part of the hoop member is positioned in the second connecting holes on the second connecting plate.
Preferably, the number of the first connecting holes and the second connecting holes is at least one.
Preferably, the first flap and the second flap are each integrally formed.
The utility model is preferable to be provided with a three-way connecting piece, the three-way connecting piece comprises a vertical rod and a cross rod arranged at the lower end of the vertical rod, the vertical rod is connected with the middle part of the cross rod, the vertical rod is connected with a vertical connecting rod, and both ends of the cross rod are connected with a transverse connecting rod.
Preferably, the connection part of the first rod and the second rod and the connection part of the vertical rod and the horizontal rod are respectively provided with a first connecting hole and a fourth bolt used for penetrating through the first connecting hole.
Preferably, the expansion bolts for connecting with the wall top are arranged on the bottom plate.
Preferably, the base is an integral molding.
The quick-assembly type pipeline hanging structure has the beneficial effects that: simple structure, assembly type installation effectiveness is high, can adjust the mounted position from top to bottom, can install to the pipeline of different external diameters, and its whole device can freely install multilayer structure additional, hangs many pipelines simultaneously, and stability is good, and application scope is wide.
Drawings
FIG. 1 is a schematic view of an embodiment of a quick-assembly pipeline hanging structure according to the present utility model;
FIG. 2 is a schematic view of a base in an embodiment of a quick-assembly pipeline hanging structure according to the present utility model;
FIG. 3 is a schematic view of a vertical link in an embodiment of a quick-assembly pipeline hanging structure according to the present utility model;
FIG. 4 is a schematic view of a transverse link in an embodiment of a quick-assembly pipeline hanging structure according to the present utility model;
FIG. 5 is a schematic view of a connecting member of an embodiment of a quick-assembly pipeline hanging structure according to the present utility model;
FIG. 6 is a schematic structural view of a reinforcement portion in an embodiment of a quick-assembly pipeline hanging structure according to the present utility model;
FIG. 7 is a schematic view of the whole structure of another embodiment of a quick-assembly pipeline hanging structure according to the present utility model;
FIG. 8 is a schematic view of a three-way connection according to another embodiment of a quick-assembly pipeline hanging structure of the present utility model;
In the figure: 1. base, 11, bottom plate, 12, bottom bar, 13, first bolt, 14, expansion bolt, 2, vertical link, 21, first plate, 22, second plate, 23, first connection plate, 3, horizontal link, 31, third plate, 32, fourth plate, 33, second connection plate, 4, connector, 41, first bar, 42, second bar, 43, second bolt, 44, third bolt, 51, first connection hole, 52, second through connection hole, 6, reinforcement, 61, first flap, 62, second flap, 63, reinforcement link, 7, tee connector, 71, vertical bar, 72, cross bar, 8, wall top, 9, pipeline, 91, hoop.
Detailed Description
The following are specific examples of the present utility model, and the technical solutions of the present utility model are further described, but the present utility model is not limited to these examples.
Various exemplary embodiments of the present utility model will now be described in detail with reference to the accompanying drawings. It should be noted that: the relative arrangement of the modules and steps set forth in these embodiments and the steps do not limit the scope of the present utility model unless specifically stated otherwise.
Meanwhile, it should be understood that the flow in the drawings is not merely performed alone, but a plurality of steps are performed to cross each other for convenience of description.
In the description of the present utility model, it should be noted that, directions or positional relationships indicated by terms such as "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., are directions or positional relationships based on those shown in the drawings, or are directions or positional relationships conventionally put in use of the present utility model product, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the apparatus or elements to be referred to must have a specific direction, be configured and operated in a specific direction, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used merely to distinguish between descriptions and should not be construed as indicating or implying relative importance.
The following description of at least one exemplary embodiment is merely exemplary in nature and is in no way intended to limit the utility model, its application, or uses.
Techniques, methods, and systems known to those of ordinary skill in the relevant art may not be discussed in detail, but should be considered part of the authorization specification where appropriate.
Embodiment one: as shown in fig. 1 to 6, which are only embodiments of the present utility model, a quick-assembly type pipe hanging structure comprises a base 1, a vertical connecting rod 2, a horizontal connecting rod 3 and a connecting piece 4, wherein the base 1 comprises a bottom plate 11 and a bottom rod 12 arranged on the bottom plate 11, the connecting piece 4 comprises a first rod 41 and a second rod 42, first connecting holes 51 are formed in the bottom rod 12, the vertical connecting rod 2, the horizontal connecting rod 3, the first rod 41 and the second rod 42, the bottom rod 12 is connected with the vertical connecting rod 2 through a first bolt 13, the first rod 41 is connected with one end, away from the bottom rod 12, of the vertical connecting rod 2 through a second bolt 43, the second rod 42 is connected with the horizontal connecting rod 3 through a third bolt 44, at least one part of the first bolt 13, the second bolt 43 and the third bolt 44 are positioned in the first connecting holes 51, and a hoop 91 for connecting with a pipe 9 is arranged on the horizontal connecting rod 3.
In the utility model, the base 1 is arranged on the ceiling 8, the vertical connecting rod 2 is vertically arranged at the lower end of the base 1, the connecting piece 4 is arranged at the lower end of the vertical connecting rod 2, the number of the base 1, the vertical connecting rod 2 and the connecting piece 4 is at least two, the horizontal connecting rod 3 is horizontally arranged between the two connecting pieces 4, and finally the pipeline 9 is carried on the horizontal connecting rod 3.
Firstly, the base 1 is structured, the base 1 comprises a bottom plate 11 and bottom rods 12 arranged on the bottom plate 11, expansion bolts 14 used for being connected with a wall top are arranged on the bottom plate 11, the bottom plate 11 is horizontally installed on the lower side surface of the wall top 8 ceiling, the bottom rods 12 are vertically arranged on the lower side surface of the bottom plate 11, and after the installation of the bottom plate 11 and the wall top 8 is completed through a plurality of groups of expansion bolts 14, stable suspension of the bottom rods 12 is ensured.
Of course, the base 1 is an integrally formed piece, that is, the bottom plate 11 and the bottom rod 12 are integrally formed when leaving the factory, so that the stability is better; or the bottom plate 11 and the bottom rod 12 are welded, so that the connection stability of the bottom plate 11 and the bottom rod 12 is ensured.
Then, a vertical link 2 and a horizontal link 3, the vertical link 2 including a first plate 21, a second plate 22 disposed in parallel with the first plate 21, and a first connection plate 23 for connecting the first plate 21 and the second plate 22, the horizontal link 3 including a third plate 31, a fourth plate 32 disposed in parallel with the third plate 31, and a second connection plate 33 for connecting the third plate 31 and the fourth plate 32; it can be understood that the vertical connecting rod 2 and the horizontal connecting rod 3 are prepared parts with uniform specifications, and only the vertical connecting rod 2 is vertically arranged, and the horizontal connecting rod 3 is horizontally arranged.
And then the connecting piece 4, wherein the connecting piece 4 comprises a first rod 41 and a second rod 42, the first rod 41 and the second rod 42 are mutually perpendicular to form an L-shaped piece, the first rod 41 is used for being connected with the lower end of the vertical connecting rod 2, and the second rod 42 is used for being connected with the end part of the transverse connecting rod 3.
Here, the bottom rod 12, the vertical link 2, the horizontal link 3, the first rod 41, and the second rod 42 are provided with first connection holes 51, and the first connection holes 51 on each component have the same aperture.
Wherein, the first connecting hole 51 on the vertical connecting rod 2 is arranged on the first plate 21 and the second plate 22; the first connecting holes 51 of the cross links 3 are provided in the third plate 31 and the fourth plate 32.
It should be noted that, here, the axial extension direction of the first connecting hole 51 is the same as the extension direction of the pipeline 9, so that each mounting bolt is horizontally disposed with respect to the pipeline 9, and damage to the pipeline 9 caused by the end portion of the bolt being squeezed and scraped against the side wall of the pipeline 9 can be effectively avoided.
Finally, the assembly type installation of each component is carried out, the bottom rod 12 is connected with the vertical connecting rod 2 through a first bolt 13, the first rod 41 is connected with one end, far away from the bottom rod 12, of the vertical connecting rod 2 through a second bolt 43, the second rod 42 is connected with the transverse connecting rod 3 through a third bolt 44, and at least one part of the first bolt 13, the second bolt 43 and the third bolt 44 are positioned in the first connecting hole 51.
Here, the bottom rod 12 is a hollow member, the cross section of the bottom rod 12 may be C-shaped or square, two opposite sides of the bottom rod 12 are respectively provided with a first connecting hole 51, and a space between two sides of the bottom rod 12 provided with the first connecting holes 51 is just equal to a width of the vertical connecting rod 2, so that the vertical connecting rod 2 may be inserted into the bottom rod 12 until the first connecting holes 51 of the vertical connecting rod 2 and the first connecting holes 51 of the bottom rod 12 are aligned, and then after the first bolts 13 are inserted through nuts for fixing, the fixed connection between the vertical connecting rod 2 and the bottom rod 12 is completed.
Similarly, the upper end of the first rod 41 is hollow, so that the lower end of the vertical connecting rod 2 is convenient to insert, then the first connecting hole 51 of the vertical connecting rod 2 is aligned with the first connecting hole 51 of the first rod 41, and after the second bolt 43 is inserted and fixed by using a nut, the fixed connection between the vertical connecting rod 2 and the first rod 41 is completed; the second rod 42 is a C-shaped member with an opening at the lower side, so that the end of the transverse connecting rod 3 is conveniently inserted, then the first connecting hole 51 of the transverse connecting rod 3 is aligned with the first connecting hole 51 of the second rod 42, and after the third bolt 44 is inserted and fixed by using a nut, the fixed connection of the transverse connecting rod 3 and the second rod 42 is completed.
Of course, the transverse connecting rod 3 is provided with a hoop member 91 for connecting with the pipeline 9, and the hoop member 91 fixes the transverse connecting rod 3 and the pipeline 9.
Because the bottom rod 12, the vertical connecting rod 2, the horizontal connecting rod 3, the first rod 41 and the second rod 42 are all provided with a plurality of uniformly distributed first connecting holes 51, the installation height and the horizontal installation position of the horizontal connecting rod 3 can be adjusted by aligning and fixing different first connecting holes 51 during connection, and pipelines 9 with different specifications can be installed and hung.
In the second embodiment, as shown in fig. 1 to 6, which is only one embodiment of the present utility model, the quick-assembly type pipeline hanging structure of the present utility model further includes a reinforcing portion 6, where the reinforcing portion 6 includes a first folded plate 61 connected to the bottom rod 12, a second folded plate 62 connected to the connecting member 4, and a reinforcing connecting rod 63 for connecting the first folded plate 61 and the second folded plate 62.
Here, the first connecting plate 23, the second connecting plate 33, the reinforcing connecting rod 63, the first folding plate 61 and the second folding plate 62 are all provided with second connecting holes 52, and at least a part of the hoop 91 is located in the second connecting holes 52 on the second connecting plate 33.
That is, in addition to the two bases 1 on which the transverse link 3 is mounted, an additional base 1 is further provided for fixedly mounting the reinforcing portion 6, the reinforcing portion 6 has a main structure including two folded plates 61, 62 and a reinforcing link 63, and the first folded plate 61 and the second folded plate 62 are integrally formed by two plate bodies having an included angle α, respectively denoted as a first plate and a second plate, wherein the first plate of the first folded plate 61 is connected with the additional base 1, the second plate extends obliquely downward, the reinforcing link 63 is mounted along the obliquely downward second plate, and the lower end of the reinforcing link 63 is mounted with the second plate of the second folded plate 62, so that the first plate of the second folded plate 62 extends naturally vertically downward and can be connected with the side wall of the first rod 41 of the connecting member 4.
Of course, the first plate of the first folded plate 61 and the bottom rod 12 of the additional base 1, the second plate of the first folded plate 61 and the reinforcing connecting rod 63, the second plate of the second folded plate 62 and the reinforcing connecting rod 63, and the first plate of the second folded plate 62 and the side wall of the first rod 41 of the connecting piece 4 are all connected by bolts and nuts to limit and fix.
Of course, the number of the second connecting holes 52 is at least one, and the connectors 4 with different heights can be reinforced by aligning different second connecting holes 52, so that the stability of the hanging structure of the whole pipeline is good.
In the above, the first folding plate 61 and the second folding plate 62 are all integrally formed, in fact, the first folding plate 61 and the second folding plate 62 have different types, the included angles α of the different types are different, and the first folding plate 61 and the second folding plate 62 of the different types are selected for use according to actual conditions.
In a third embodiment, as shown in fig. 1 to 8, only one embodiment of the present utility model is provided, and on the basis of any one of the above embodiments, the quick-assembly type pipeline hanging structure of the present utility model further includes a three-way connecting piece 7, where the three-way connecting piece 7 includes a vertical rod 71 and a cross rod 72 disposed at a lower end of the vertical rod 71, the vertical rod 71 is connected with a middle portion of the cross rod 72, the vertical rod 71 is connected with the vertical connecting rod 2, and two ends of the cross rod 72 are connected with the transverse connecting rod 3.
In fact, the three-way connecting piece 7 is the connecting piece 4 of the lengthened type, the difference is that the cross rod 72 of the three-way connecting piece 7 is longer, two ends of the cross rod 72 can be connected with the transverse connecting rods 3, and therefore the transverse connecting rods 3 of two frames can be connected simultaneously, the whole pipeline hanging structure is horizontally prolonged, a plurality of pipeline hanging spaces in the horizontal direction are arranged, and meanwhile a plurality of pipelines are hung.
Further, a first connection hole 51 and a fourth bolt for passing through the first connection hole 51 are provided at both the connection of the first rod 41 and the second rod 42 and the connection of the vertical rod 71 and the horizontal rod 72.
That is, a vertical link 2 can be installed at the connection between the first rod 41 and the second rod 42 and the connection between the vertical rod 71 and the cross rod 72, and the connecting piece 4 and the transverse link 3 are installed at the lower end of the vertical link 2, so that the whole pipeline hanging structure can be vertically prolonged, the multi-layer pipeline hanging space in the vertical direction is provided, and meanwhile, a plurality of pipelines are hung, so that the application range is wide.
The quick-assembly type pipeline hanging structure is simple in structure, high in assembly type installation efficiency, good in stability and wide in application range, the installation positions can be adjusted up, down, left and right, pipelines with different outer diameters can be installed, and the whole device can be freely additionally provided with a multi-layer structure.
The present utility model is not limited to the above-described specific embodiments, and various modifications and variations are possible. Any modification, equivalent replacement, improvement, etc. of the above embodiments according to the technical substance of the present utility model should be included in the protection scope of the present utility model.

Claims (8)

1. A ready-package pipeline hanging structure which is characterized in that: the connecting piece (4) comprises a base (1), a vertical connecting rod (2), a transverse connecting rod (3) and a connecting piece (4), wherein the base (1) comprises a bottom plate (11) and a bottom rod (12) arranged on the bottom plate (11), the connecting piece (4) comprises a first rod (41) and a second rod (42), first connecting holes (51) are formed in the bottom rod (12), the vertical connecting rod (2), the transverse connecting rod (3), the first rod (41) and the second rod (42), the bottom rod (12) is connected with the vertical connecting rod (2) through a first bolt (13), the first rod (41) is connected with one end, far away from the bottom rod (12), of the vertical connecting rod (2) through a second bolt (43), the second rod (42) is connected with the transverse connecting rod (3) through a third bolt (44), at least one part of the first bolt (13), the second bolt (43) and the third bolt (44) is positioned in the first connecting holes (51), and the first bolt (43) is used for being connected with a transverse hoop (91); the vertical connecting rod (2) comprises a first plate (21), a second plate (22) which is arranged in parallel with the first plate (21) and a first connecting plate (23) which is used for connecting the first plate (21) and the second plate (22), and the transverse connecting rod (3) comprises a third plate (31), a fourth plate (32) which is arranged in parallel with the third plate (31) and a second connecting plate (33) which is used for connecting the third plate (31) and the fourth plate (32); the first plate (21), the second plate (22), the third plate (31) and the fourth plate (32) are respectively provided with a first connecting hole (51), and the axial extension direction of the first connecting holes (51) is the same as the extension direction of the pipeline (9);
The folding device further comprises a reinforcing part (6), wherein the reinforcing part (6) comprises a first folded plate (61) connected with the bottom rod (12), a second folded plate (62) connected with the connecting piece (4) and a reinforcing connecting rod (63) used for connecting the first folded plate (61) and the second folded plate (62).
2. The quick-fit pipeline hanging structure according to claim 1, wherein: the first connecting plate (23), the second connecting plate (33), the reinforcing connecting rod (63), the first folding plate (61) and the second folding plate (62) are respectively provided with a second connecting hole (52), and at least one part of the hoop member (91) is positioned in the second connecting hole (52) on the second connecting plate (33).
3. The quick-fit pipeline hanging structure according to claim 2, wherein: the number of the first connecting holes (51) and the second connecting holes (52) is at least one.
4. The quick-fit pipeline hanging structure according to claim 1, wherein: the first folded plate (61) and the second folded plate (62) are all integrally formed pieces.
5. The quick-fit pipeline hanging structure according to claim 1, wherein: still include tee bend connecting piece (7), tee bend connecting piece (7) include montant (71) with set up in horizontal pole (72) of montant (71) lower extreme, montant (71) with the middle part of horizontal pole (72) is connected, montant (71) are connected with perpendicular connecting rod (2), horizontal pole (72) both ends all are connected with horizontal connecting rod (3).
6. The quick-fit pipeline hanging structure according to claim 5, wherein: the connection part of the first rod (41) and the second rod (42) and the connection part of the vertical rod (71) and the cross rod (72) are respectively provided with a first connection hole (51) and a fourth bolt used for penetrating through the first connection hole (51).
7. The quick-fit pipeline hanging structure according to claim 1, wherein: the bottom plate (11) is provided with expansion bolts (14) for connecting with the wall top.
8. The quick-fit pipeline hanging structure according to claim 1, wherein: the base (1) is an integrated part.
CN202322227305.3U 2023-08-18 2023-08-18 Fast-assembling formula pipeline suspended structure Active CN220980498U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322227305.3U CN220980498U (en) 2023-08-18 2023-08-18 Fast-assembling formula pipeline suspended structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322227305.3U CN220980498U (en) 2023-08-18 2023-08-18 Fast-assembling formula pipeline suspended structure

Publications (1)

Publication Number Publication Date
CN220980498U true CN220980498U (en) 2024-05-17

Family

ID=91066115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322227305.3U Active CN220980498U (en) 2023-08-18 2023-08-18 Fast-assembling formula pipeline suspended structure

Country Status (1)

Country Link
CN (1) CN220980498U (en)

Similar Documents

Publication Publication Date Title
JP5777064B2 (en) Suspended ceiling structure and seismic retrofitting method for suspended ceiling structure
CN111946902A (en) Modularization combination assembled antidetonation gallows
CN220980498U (en) Fast-assembling formula pipeline suspended structure
CN211772964U (en) Bridging suspension beam for box culvert first-aid repair
CN210218926U (en) Adjustable electromechanical pipeline installation's a gallows device of synthesizing
CN211118011U (en) Assembled comprehensive support and hanger
CN114043161B (en) Assembling fixing frame and method for reactor core heat exchanger of experimental reactor
CN216112547U (en) Mounting structure for air pipe support and hanger of suspended ceiling
CN215568425U (en) Device of takeing root of electric pipeline gallows in steel construction truss
CN112962856B (en) Suspended ceiling mounting structure
CN220060797U (en) Detachable pipeline supporting and hanging frame
CN213897759U (en) Ceiling device connected with steel beam
CN216788909U (en) Fixing piece and support hanger
CN118009108A (en) Assembled pipeline bracket and pipeline installation method
CN212508995U (en) High-altitude fan saddle plate mounting bracket
CN219827950U (en) Channel steel full-tooth screw rod supporting and hanging frame
CN219366975U (en) Light H-shaped steel purline lower hanging pipeline installation support hanger device
CN218818635U (en) Ready-package antidetonation support
CN221095598U (en) Steel structure beam clamp
CN221300345U (en) Combined type water supply industry plumber labor competition support
CN219974005U (en) Temporary supporting frame for cantilever truss
CN212900147U (en) Accompanying pipeline fixing frame
CN215829991U (en) Support joint for climbing frame at hollow position
CN220842916U (en) Container ship supports bulkhead operation frock
CN220302939U (en) Pipeline connection support fixing clip