CN114735567A - Wall-attached arrangement mechanism of construction elevator - Google Patents

Wall-attached arrangement mechanism of construction elevator Download PDF

Info

Publication number
CN114735567A
CN114735567A CN202210396068.0A CN202210396068A CN114735567A CN 114735567 A CN114735567 A CN 114735567A CN 202210396068 A CN202210396068 A CN 202210396068A CN 114735567 A CN114735567 A CN 114735567A
Authority
CN
China
Prior art keywords
guide rail
support rod
rail frame
double
connecting seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210396068.0A
Other languages
Chinese (zh)
Inventor
彭旺
李燕雷
马凤臣
王浩
付宝良
叶松
朱王伟
金鹤翔
韦福英
李雷
宗海迥
李盈盈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Power Transmission And Distribution Engineering Co ltd
Uhv Construction Branch Of State Grid Corp Of China
Zhejiang Construction Engineering Machinery Group Co Ltd
Original Assignee
Shandong Power Transmission And Distribution Engineering Co ltd
Uhv Construction Branch Of State Grid Corp Of China
Zhejiang Construction Engineering Machinery Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Power Transmission And Distribution Engineering Co ltd, Uhv Construction Branch Of State Grid Corp Of China, Zhejiang Construction Engineering Machinery Group Co Ltd filed Critical Shandong Power Transmission And Distribution Engineering Co ltd
Priority to CN202210396068.0A priority Critical patent/CN114735567A/en
Publication of CN114735567A publication Critical patent/CN114735567A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor
    • B66B7/024Lateral supports

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention relates to a wall-attached arrangement mechanism of a construction elevator, and belongs to the field of construction elevators. The double-tube clip comprises a connecting lug plate, a steering connecting seat, a support rod, a double-tube clip and a guide rail frame, wherein the connecting lug plate is connected with a building or is arranged on the building in advance, the steering connecting seat is arranged between the support rod and the connecting lug plate, the steering connecting seat ensures the installation of the support rod in each angle direction, the double-tube clip is arranged between the support rod and the guide rail frame, and the double-tube clip has the 360-degree-angle rotation function and can be respectively connected with a vertical column tube of the support rod and the guide rail frame. The guide rail bracket is reasonable in structural design, safe and reliable, the problem of curved surface adhesion positioning is solved quickly, the verticality of the guide rail bracket is adjusted conveniently, the stability of the guide rail bracket is improved, and the use requirement is met.

Description

Wall-attached arrangement mechanism of construction elevator
Technical Field
The invention relates to a mechanism, in particular to a wall-attached arrangement mechanism of a construction elevator, and belongs to the field of construction elevators.
Background
The wall-attached frame is an important component of the construction elevator, and is mainly used for attaching and connecting the guide rail frame with a building so as to ensure the stability of the guide rail frame, and the stability of the guide rail frame is one of important factors influencing the smooth up-and-down running of the elevator.
The wall-attached frame of a general construction elevator consists of a connecting seat 1-1, a supporting tube 2-1, a diagonal web member 3-1, a large support 4-1, a small support 5-1, a connecting rod 6-1, a wall-attached attachment 7-1, an elevator guide rail frame 10-1 and the like, as shown in figure 1, the attachment point of the sheet wall-attached structure is basically fixed, particularly the opening size B between the two supporting tubes 2-1, the size L from the center of the guide rail frame to the attachment point position is also fixed or changes in a limited range of unidirectional dimensionality, the wall-attached frame is suitable for a vertical guide rail frame or an inclined guide rail frame but the attachment surface is a planar construction environment, in the construction environment of the electric power iron tower group of a power transmission line, the electric power iron tower attached to the guide rail frame is an inclined cylindrical curved surface of a main pipe, and the cross section of the whole main pipe is changed from thick to thin, the method means that the opening size B of each wall attachment point is changed, and meanwhile, the main axis of the attached main pipe of the power iron tower is inclined, and the attachment surface of the attached wall is a curved surface, so that the requirement on the accuracy of the position of the attachment point is high, and the wall attachment structure of the plate type structure cannot meet the use requirement.
If special design is carried out aiming at the installation working condition of each attached wall, field data needs to be continuously collected, so that the waste of manpower and material resources in design and manufacture is caused, and the management is inconvenient.
Besides, the elevator is faced with another embarrassment, namely, under finite element optimization analysis, on the premise of meeting the requirements of strength and rigidity performance, a main steel structure, particularly a guide rail frame structure, achieves the purpose of simplification, so that the cross section area of the guide rail frame is in a miniaturization trend. Because the space requirement, the cage size still remains unchanged, therefore the size ratio of cage to guide rail frame increases, and in the operation process, for the lift of big cross-section guide rail frame, the range of wrench movement of cage to guide rail frame can be some big for passenger's comfort can be some poor, and this has had higher requirement with regard to the stability requirement to guide rail frame.
The applicant discloses a utility model named as an elevator guide rail frame wall attachment device in a Chinese patent with application date of 2018, 05, 24 and publication number of CN 208747416U. The utility model has an upper, middle and lower three-layer space structure, is convenient to disassemble, can be universally adjusted to form an M-shaped wall attachment device, realizes stepless adjustment of front, back, upper, lower, left and right three-dimensional spaces, solves the attachment problem, and is convenient for adjusting the verticality of the guide rail frame. As shown in fig. 2, the connecting lug plate comprises a connecting lug plate 1-2, a connecting seat 2-2, an adjustable stay bar 3-2 and a connecting rod 4-2, wherein the connecting lug plate 1-2 and the connecting seat 2-2, the connecting seat 2-2 and the adjustable stay bar 3-2 and the connecting seat 2-2 and the connecting rod 4-2 are hinged by pin shafts; but is relatively weak in stabilizing the rail frame due to the small size of the B1 distance between the links.
Therefore, the wall-attached attachment mechanism which is light in assembly and disassembly, solves the installation problem and can improve the stability of the guide rail frame is particularly necessary.
Disclosure of Invention
The invention aims to overcome the defects in the prior art and provide the novel multifunctional electric heating cooker with reasonable structural design, safety and reliability. The problem of curved surface adhesion positioning is solved fast, the verticality of the guide rail frame is adjusted conveniently, and meanwhile, the stability of the guide rail frame is improved.
The technical scheme adopted by the invention for solving the problems is as follows: this construction elevator attaches wall and arranges mechanism, includes to link to each other with the building or set up in advance in the architectural connection otic placode, its characterized in that: still including turning to connecting seat, vaulting pole, double-barrelled checkpost and guide rail frame, turn to the connection and install between vaulting pole and engaging lug board, should turn to the connecting seat and ensure the installation of vaulting pole on each angular direction, install double-barrelled checkpost between vaulting pole and the guide rail frame, this double-barrelled checkpost has 360 degrees and revolves to the stand pipe that the function can connect vaulting pole and guide rail frame respectively.
Preferably, the connecting lug plate is movably connected with the steering connecting seat.
Preferably, the stay bar and the steering connecting seat can rotate relatively.
Compared with the prior art, the invention has the following advantages and effects: the whole structure is reasonable in design, safe and reliable, the problem of curved surface adhesion positioning is solved quickly, the verticality of the guide rail frame is convenient to adjust, and meanwhile, the stability of the guide rail frame is improved; the steering connecting seat ensures the installation of the stay bar in each angle direction; a double-tube clamp is arranged between the stay bar and the guide rail frame, and the double-tube clamp has 360-degree rotation function and can be respectively connected with the stay bar and the upright tube of the guide rail frame; under the constraint action of the four support rods, the stability of the rail bracket torsion caused by the fact that the size of the two front connecting rods B1 is too small can be greatly improved.
Drawings
Fig. 1 is a first conventional structural diagram.
Fig. 2 is a schematic diagram of a conventional structure.
In fig. 1-2: the device comprises a connecting seat 1-1, a supporting tube 2-1, an inclined web member 3-1, a large support 4-1, a small support 5-1, a connecting rod 6-1, a wall attachment 7-1 and a lifter guide rail frame 10-1; the connecting ear plate 1-2, the connecting seat 2-2, the adjustable support rod 3-2 and the connecting rod 4-2 are connected;
fig. 3 is a schematic view of the overall structure of the embodiment of the present invention.
In the figure: the device comprises connecting ear plates 1-3, a steering connecting seat 2-3, a support rod 3-3, a double-tube clamp 4-3 and a guide rail frame 5-3.
Detailed Description
The present invention will be described in further detail below by way of examples with reference to the accompanying drawings, which are illustrative of the present invention and are not to be construed as limiting the present invention.
Examples are given.
Referring to fig. 3, the wall-attached arrangement mechanism of the construction elevator of the embodiment includes a connection lug plate 1-3, a steering connection seat 2-3, a support rod 3-3, a double-pipe clip 4-3 and a guide rail frame 5-3, wherein the connection lug plate 1-3 is connected with a building or is pre-arranged on the building, the steering connection seat 2-3 is arranged between the support rod 3-3 and the connection lug plate 1-3, and the double-pipe clip 4-3 is arranged between the support rod 3-3 and the guide rail frame 5-3.
The support rods 3-3 in the embodiment are four groups and are respectively connected with the steering connecting seat 2-3 and the double-pipe clamp 4-3.
The connecting lug plates 1-3 and the steering connecting seats 2-3 are movably connected in the embodiment; the brace rod 3-3 and the steering connecting seat 2-3 can rotate relatively.
The wall-attached arrangement mechanism of the construction elevator not only can quickly solve the problem of curved surface attachment positioning, is convenient for adjusting the verticality of the guide rail frame 5-3, but also can improve the stability of the guide rail frame 5-3. Namely, the hoop type wall attachment devices are arranged at intervals on the basis of the original M-shaped wall attachment device with the adjusting support rods.
Connecting ear plates 1-3 are arranged on the attached building; a steering connecting seat 2-3 is arranged between the support rod 3-3 and the connecting lug plate 1-3, and the steering connecting seat 2-3 ensures the installation of the support rod in each angle direction; a double-tube clip 4-3 is arranged between the support rod 3-3 and the guide rail frame 5-3, and the double-tube clip 4-3 has 360-degree rotation function and can be respectively connected with the support rod 3-3 and the upright tube of the guide rail frame 5-3. Under the constraint action of the four groups of support rods 3-3, the stability of the guide rail bracket 5-3 which is twisted and swayed due to the fact that the size of the two front connecting rods B1 is too small can be greatly improved.
And will be apparent to those skilled in the art from the foregoing description.
In addition, it should be noted that the specific embodiments described in the present specification may be different in the components, the shapes of the components, the names of the components, and the like, and the above description is only an illustration of the structure of the present invention. Equivalent or simple variations of the structures, features and principles described in the present patent application are included in the scope of the present patent. Various modifications, additions and substitutions for the specific embodiments described may be made by those skilled in the art without departing from the scope of the invention as defined in the accompanying claims.

Claims (3)

1. A construction elevator attaches wall and arranges mechanism, includes and links to each other with the building or sets up in advance in the building connection otic placode (1-3), its characterized in that: the steering connecting seat (2-3) is installed between the support rod (3-3) and the connecting lug plate (1-3), the support rod (3-3) is installed on the steering connecting seat (2-3) in all angular directions, the double-tube clamp (4-3) is installed between the support rod (3-3) and the guide rail frame (5-3), and the double-tube clamp (4-3) has 360-degree-angle rotation function and can be respectively connected with the support rod (3-3) and the guide rail frame (5-3).
2. The construction elevator wall attachment arranging mechanism according to claim 1, wherein: the connecting lug plates (1-3) are movably connected with the steering connecting seats (2-3).
3. The construction elevator wall attachment arranging mechanism according to claim 1, wherein: the stay bar (3-3) and the steering connecting seat (2-3) can rotate relatively.
CN202210396068.0A 2022-04-15 2022-04-15 Wall-attached arrangement mechanism of construction elevator Pending CN114735567A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210396068.0A CN114735567A (en) 2022-04-15 2022-04-15 Wall-attached arrangement mechanism of construction elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210396068.0A CN114735567A (en) 2022-04-15 2022-04-15 Wall-attached arrangement mechanism of construction elevator

Publications (1)

Publication Number Publication Date
CN114735567A true CN114735567A (en) 2022-07-12

Family

ID=82280730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210396068.0A Pending CN114735567A (en) 2022-04-15 2022-04-15 Wall-attached arrangement mechanism of construction elevator

Country Status (1)

Country Link
CN (1) CN114735567A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE520839C2 (en) * 1998-03-27 2003-09-02 Alimak Ab Anchor fitting for securing lift mast to building construction
JP2007308297A (en) * 2006-05-22 2007-11-29 Ohbayashi Corp Connecting device, temporary structure support method and temporary structure support structure
JP2008013347A (en) * 2006-07-07 2008-01-24 Sansei Kenki Kk Seismic isolation wall connection device in facility for construction
CN207484944U (en) * 2017-09-30 2018-06-12 上海建工集团股份有限公司 Clamping type wall-attaching equipment
CN208747416U (en) * 2018-05-24 2019-04-16 浙江省建设机械集团有限公司 A kind of elevator guide bracket wall-attaching equipment
CN113247789A (en) * 2021-05-14 2021-08-13 温州市金展建设有限公司 A novel connection structure for tower crane attaches wall
CN215797804U (en) * 2021-07-23 2022-02-11 湖北江汉建筑工程机械有限公司 Construction elevator attaches wall
CN217458357U (en) * 2022-04-15 2022-09-20 国家电网有限公司特高压建设分公司 Wall-attached arrangement mechanism of construction elevator

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE520839C2 (en) * 1998-03-27 2003-09-02 Alimak Ab Anchor fitting for securing lift mast to building construction
JP2007308297A (en) * 2006-05-22 2007-11-29 Ohbayashi Corp Connecting device, temporary structure support method and temporary structure support structure
JP2008013347A (en) * 2006-07-07 2008-01-24 Sansei Kenki Kk Seismic isolation wall connection device in facility for construction
CN207484944U (en) * 2017-09-30 2018-06-12 上海建工集团股份有限公司 Clamping type wall-attaching equipment
CN208747416U (en) * 2018-05-24 2019-04-16 浙江省建设机械集团有限公司 A kind of elevator guide bracket wall-attaching equipment
CN113247789A (en) * 2021-05-14 2021-08-13 温州市金展建设有限公司 A novel connection structure for tower crane attaches wall
CN215797804U (en) * 2021-07-23 2022-02-11 湖北江汉建筑工程机械有限公司 Construction elevator attaches wall
CN217458357U (en) * 2022-04-15 2022-09-20 国家电网有限公司特高压建设分公司 Wall-attached arrangement mechanism of construction elevator

Similar Documents

Publication Publication Date Title
CN101663544A (en) two-axis solar tracker
CN217458357U (en) Wall-attached arrangement mechanism of construction elevator
CN114735567A (en) Wall-attached arrangement mechanism of construction elevator
CN114614751A (en) Photovoltaic flexible support and photovoltaic support group
CN209767436U (en) Photovoltaic girder and photovoltaic supporting structure
CN206041890U (en) Solar cell panel installing support of easily installing
CN209345069U (en) A kind of plane roof distributed photovoltaic supporting structure
CN110677104B (en) Angle-adjustable support and photovoltaic device
CN208632973U (en) A kind of prefabricated box girder hoisting positioning device
CN206958386U (en) A kind of fire water-supply Pipe installing standpipe mounting bracket
CN214298999U (en) Connecting assembly of tower crane and steel structure
CN113235733A (en) Inter-column support and steel column connection node structure and method
CN217789590U (en) Photovoltaic grillage convenient to install photovoltaic panels of different sizes
CN219611643U (en) Steering device, support portal and flexible suspension cable photovoltaic bracket system
CN219937866U (en) Cable bridge support for realizing safe installation of cable bridge
CN212840405U (en) Equipment mounting support with adjustable triangular degree
CN220440297U (en) Cable bridge bracket convenient for angle adjustment
CN220775715U (en) Photovoltaic panel installing support
CN209963996U (en) Photovoltaic support convenient to installation
CN220909114U (en) Balcony anti-bank template structure
CN220451232U (en) Jig frame for space curved surface variable-section pipe truss
CN219412031U (en) Environment-friendly energy-saving steel structure factory building
CN215048210U (en) Adjustable wall-attached frame for construction elevator
CN213268467U (en) Connecting device for building external hanging and building main body
CN218276579U (en) High performance photovoltaic support bearing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination