CN220184830U - Baffle for construction - Google Patents

Baffle for construction Download PDF

Info

Publication number
CN220184830U
CN220184830U CN202321680243.5U CN202321680243U CN220184830U CN 220184830 U CN220184830 U CN 220184830U CN 202321680243 U CN202321680243 U CN 202321680243U CN 220184830 U CN220184830 U CN 220184830U
Authority
CN
China
Prior art keywords
baffle
main body
building construction
baffle main
movable plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321680243.5U
Other languages
Chinese (zh)
Inventor
罗维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Linping Construction Engineering Co ltd
Original Assignee
Xinjiang Hongyu Weiye Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Hongyu Weiye Construction Co ltd filed Critical Xinjiang Hongyu Weiye Construction Co ltd
Priority to CN202321680243.5U priority Critical patent/CN220184830U/en
Application granted granted Critical
Publication of CN220184830U publication Critical patent/CN220184830U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a baffle for building construction, which relates to the field of building construction. According to the utility model, through the arranged baffle main body and the supporting mechanism, the installed telescopic brackets can be rotated and opened through the rotating shaft when the baffle main body is used, different distances can be adjusted through the telescopic brackets after the baffle main body is opened, the stability of the device can be improved when the baffle main body is used, the use strength of the baffle main body is improved through the installed telescopic brackets, the movable plate can be rotated and opened through the installed circular shaft when the device is used, the two baffle main bodies are connected after the baffle main body is opened, meanwhile, the baffle main bodies can be effectively overlapped and spliced through the opened limiting grooves, and the combined use efficiency of the baffle main body can be improved.

Description

一种建筑施工用挡板A kind of baffle for building construction

技术领域Technical field

本实用新型涉及建筑施工领域,具体为一种建筑施工用挡板。The utility model relates to the field of building construction, specifically a baffle for building construction.

背景技术Background technique

建筑施工是指工程建设实施阶段的生产活动,是各类建筑物的建造过程,也可以说是把设计图纸上的各种线条,在指定的地点,变成实物的过程,它包括基础工程施工、主体结构施工、屋面工程施工、装饰工程施工等,在施工时需要对施工场地进行遮挡,需要使用到挡板,因此需要一种建筑施工用挡板。Construction refers to the production activities in the implementation stage of project construction. It is the construction process of various types of buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. It includes basic engineering construction. , main structure construction, roofing engineering construction, decoration engineering construction, etc. During construction, the construction site needs to be shielded, and baffles need to be used, so a baffle for building construction is needed.

现有的技术公开号为CN206815979U的专利文献中提供一种建筑施工用挡板,可以在使用的过程中通过固定杆、连接凹槽、限位板和第二副板,所述固定杆的顶端安装有安装底座,且安装底座的左端镶嵌有连接卡块,所述连接凹槽设置于安装底座的右侧,且安装底座的顶端固定有挡板主体,所述挡板主体的左侧镶嵌有第一副板,且第一副板的外壁安置有荧光条,所述限位板固定于挡板主体的内侧,且挡板主体的底端固定有加强筋,所述第二副板安装于挡板主体的右侧,且第二副板的左端连接有旋转轴,所述安装底座的内侧镶嵌有缓冲弹簧,所述加强筋的底侧安装有防腐层。该建筑施工用挡板结构简单新颖,通过固定杆可将挡板主体便捷的固定在地面上,且固定杆的直径从下至上逐渐增大,能够保证固定时的稳定,但是CN209901482U技术在进行操作时,无法在挡板使用时提高挡板的支撑强度,同时无法在使用便于对挡板进行拼接使用的问题,为此急需一种建筑施工用挡板。The existing patent document with the technical publication number CN206815979U provides a baffle for building construction, which can be used through a fixed rod, a connecting groove, a limiting plate and a second sub-plate. The top of the fixed rod can be A mounting base is installed, and the left end of the mounting base is inlaid with a connecting block. The connecting groove is set on the right side of the mounting base, and the top of the mounting base is fixed with a baffle body. The left side of the baffle body is inlaid with The first auxiliary plate has a fluorescent strip installed on the outer wall of the first auxiliary plate. The limiting plate is fixed on the inside of the baffle main body, and a reinforcing rib is fixed on the bottom end of the baffle main body. The second auxiliary plate is installed on The right side of the main body of the baffle and the left end of the second sub-plate are connected to a rotating shaft. A buffer spring is embedded inside the mounting base, and an anti-corrosion layer is installed on the bottom side of the reinforcing rib. The structure of the baffle for building construction is simple and novel. The main body of the baffle can be conveniently fixed on the ground through a fixed rod, and the diameter of the fixed rod gradually increases from bottom to top, which can ensure stability during fixation. However, the CN209901482U technology is in operation When the baffle is in use, the support strength of the baffle cannot be improved, and at the same time, the baffle cannot be easily spliced and used. Therefore, there is an urgent need for a baffle for building construction.

实用新型内容Utility model content

基于此,本实用新型的目的是提供一种建筑施工用挡板,以解决现有的建筑施工用挡板在使用的时候,无法在挡板使用时提高挡板的支撑强度,同时无法在使用便于对挡板进行拼接使用的问题。Based on this, the purpose of this utility model is to provide a baffle for building construction to solve the problem that the existing baffle for building construction cannot improve the support strength of the baffle when the baffle is in use, and at the same time cannot increase the support strength of the baffle during use. The problem of facilitating the splicing and use of baffles.

为实现上述目的,本实用新型提供如下技术方案:一种建筑施工用挡板,包括挡板主体、支撑机构和固定机构,所述挡板主体内壁安装有支撑机构。In order to achieve the above purpose, the present utility model provides the following technical solution: a baffle for building construction, including a baffle main body, a support mechanism and a fixing mechanism, and a support mechanism is installed on the inner wall of the baffle main body.

所述挡板主体左右两端安装有固定机构,所述挡板主体左右两端均安装有固定机构,所述挡板主体左右两端均开设有引水槽,所述挡板主体上端安装有集水框,所述集水框下端开设有螺纹孔,所述螺纹孔一端安装有连接框,所述连接框内部安装有滤网。Fixing mechanisms are installed at the left and right ends of the baffle main body. Fixing mechanisms are installed at both left and right ends of the baffle main body. Diversion channels are provided at both left and right ends of the baffle main body. A collector is installed at the upper end of the baffle main body. Water frame, a threaded hole is provided at the lower end of the water collecting frame, a connection frame is installed at one end of the threaded hole, and a filter screen is installed inside the connection frame.

所述挡板主体左右两端均开设有限位槽,所述限位槽表面贴合有密封垫,所述挡板主体外壁上端贴合有反光贴。Limiting grooves are provided at both ends of the baffle main body. A sealing gasket is attached to the surface of the limiting groove. A reflective sticker is attached to the upper end of the outer wall of the baffle main body.

优选地,所述支撑机构包括转轴、放置槽、卡扣、伸缩支架、防滑垫,且转轴安装在挡板主体的内壁,所述转轴下端开设有放置槽,且放置槽中部安装有卡扣,所述转轴一端安装有伸缩支架,且伸缩支架一端贴合有防滑垫。Preferably, the support mechanism includes a rotating shaft, a placement slot, a buckle, a telescopic bracket, and an anti-slip pad, and the rotating shaft is installed on the inner wall of the baffle body. A placement slot is provided at the lower end of the rotation shaft, and a buckle is installed in the middle of the placement groove. A telescopic bracket is installed at one end of the rotating shaft, and an anti-slip pad is attached to one end of the telescopic bracket.

优选地,所述伸缩支架通过转轴与挡板主体构成旋转结构,且伸缩支架通过放置槽与挡板主体卡合连接。Preferably, the telescopic bracket forms a rotating structure with the baffle main body through a rotating shaft, and the telescopic bracket is snap-connected to the baffle main body through a placement slot.

优选地,所述固定机构包括圆轴、活动板和固定孔,且圆轴安装在挡板主体的两端,所述圆轴一端安装有活动板,且活动板表面开设有固定孔。Preferably, the fixing mechanism includes a circular shaft, a movable plate and a fixing hole, and the circular shaft is installed at both ends of the baffle body. A movable plate is installed at one end of the circular shaft, and a fixing hole is provided on the surface of the movable plate.

优选地,所述活动板通过圆轴与挡板主体构成旋转结构,且活动板以挡板主体的中轴线为对称设置。Preferably, the movable plate forms a rotating structure with the baffle body through a circular axis, and the movable plate is arranged symmetrically with respect to the central axis of the baffle body.

优选地,所述集水框通过螺纹孔与挡板主体螺纹连接,且集水框与引水槽垂直分布。Preferably, the water collection frame is threadedly connected to the baffle body through a threaded hole, and the water collection frame is vertically distributed with the water diversion channel.

优选地,所述限位槽与密封垫紧密贴合,且限位槽与引水槽平行分布。Preferably, the limiting groove is in close contact with the sealing gasket, and the limiting groove and the water guiding groove are distributed in parallel.

与现有技术相比,本实用新型的有益效果是:Compared with the existing technology, the beneficial effects of this utility model are:

1、本实用新型通过设置的挡板主体和支撑机构,可以在挡板主体进行使用时将安装有的伸缩支架通过转轴转动打开,在打开之后可以通过伸缩支架进行不同的距离的调整,可以对挡板主体进行使用时提高装置的稳定性,通过安装有的伸缩支架支撑,提高挡板主体使用的强度;1. Through the baffle body and support mechanism provided in this utility model, the telescopic bracket installed can be opened by rotating the rotating shaft when the baffle body is in use. After opening, the telescopic bracket can be adjusted to different distances, and the telescopic bracket can be adjusted to different distances. The baffle body improves the stability of the device when in use, and is supported by a telescopic bracket to increase the strength of the baffle body;

2、本实用新型通过设置的挡板主体、固定机构、限位槽和密封垫,在装置进行使用时可以通过安装有的圆轴对活动板进行转动打开,在打开之后将两块挡板主体进行连接,同时可以通过开设有的限位槽对挡板主体进行有效的重叠拼接使用,可以提高挡板主体的组合使用的效率;2. This utility model is equipped with a baffle body, a fixing mechanism, a limiting groove and a sealing gasket. When the device is in use, the movable plate can be rotated and opened through the installed circular shaft. After opening, the two baffle bodies are opened. At the same time, the baffle body can be effectively overlapped and spliced through the provided limit slot, which can improve the efficiency of the combined use of the baffle body;

3、本实用新型通过设置的挡板主体、引水槽、集水框和滤网,在装置进行使用时通过安装的集水框可以将雨水进行收集,同时安装的集水框可以起到遮挡的效果,在使用时可以通过安装有引水槽进行雨水的引导。3. This utility model is equipped with a baffle body, a diversion channel, a water collecting frame and a filter screen. When the device is in use, the rainwater can be collected through the installed water collecting frame, and the installed water collecting frame can also serve as a shield. The effect is that rainwater can be guided by installing a water diversion channel during use.

附图说明Description of drawings

图1为本实用新型的正视剖视图;Figure 1 is a front cross-sectional view of the utility model;

图2为本实用新型支撑机构的结构示意图;Figure 2 is a schematic structural diagram of the support mechanism of the present utility model;

图3为本实用新型固定机构的结构示意图;Figure 3 is a schematic structural diagram of the fixing mechanism of the present utility model;

图4为本实用新型A处的放大结构示意图。Figure 4 is an enlarged structural schematic diagram of point A of the present utility model.

图中:1、挡板主体;2、支撑机构;201、转轴;202、放置槽;203、卡扣;204、伸缩支架;205、防滑垫;3、固定机构;301、圆轴;302、活动板;303、固定孔;4、引水槽;5、集水框;6、螺纹孔;7、连接框;8、滤网;9、限位槽;10、密封垫;11、反光贴。In the picture: 1. Baffle main body; 2. Support mechanism; 201. Rotating shaft; 202. Placement slot; 203. Buckle; 204. Telescopic bracket; 205. Anti-slip pad; 3. Fixed mechanism; 301. Round shaft; 302. Movable plate; 303. Fixed hole; 4. Diversion channel; 5. Water collecting frame; 6. Threaded hole; 7. Connection frame; 8. Filter; 9. Limiting groove; 10. Sealing gasket; 11. Reflective sticker.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述。下面通过参考附图描述的实施例是示例性的,仅用于解释本实用新型,而不能理解为对本实用新型的限制。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. The embodiments described below with reference to the drawings are exemplary and are only used to explain the present invention and cannot be understood as limitations of the present invention.

下面根据本实用新型的整体结构,对其实施例进行说明。The embodiments of the utility model will be described below based on the overall structure of the utility model.

请参阅图1-4,一种建筑施工用挡板,包括挡板主体1、支撑机构2和固定机构3,挡板主体1内壁安装有支撑机构2,支撑机构2包括转轴201、放置槽202、卡扣203、伸缩支架204、防滑垫205,且转轴201安装在挡板主体1的内壁,转轴201下端开设有放置槽202,且放置槽202中部安装有卡扣203,转轴201一端安装有伸缩支架204,且伸缩支架204一端贴合有防滑垫205,伸缩支架204通过转轴201与挡板主体1构成旋转结构,且伸缩支架204通过放置槽202与挡板主体1卡合连接,装置中安装有的伸缩支架204可以通过转轴201进行转动打开,打开之后可以对伸缩支架204进行不同的长度的调整,在调整之后可以将防滑垫205与地面进行接触支撑,可以提高装置中挡板主体1使用时的稳定性。Please refer to Figure 1-4. A baffle for construction includes a baffle body 1, a support mechanism 2 and a fixing mechanism 3. A support mechanism 2 is installed on the inner wall of the baffle body 1. The support mechanism 2 includes a rotating shaft 201 and a placement slot 202. , buckle 203, telescopic bracket 204, anti-slip pad 205, and the rotating shaft 201 is installed on the inner wall of the baffle body 1. A placement slot 202 is provided at the lower end of the rotating shaft 201, and a buckle 203 is installed in the middle of the placing slot 202. One end of the rotating shaft 201 is installed with The telescopic bracket 204 has a non-slip pad 205 attached to one end of the telescopic bracket 204. The telescopic bracket 204 forms a rotating structure with the baffle main body 1 through the rotating shaft 201, and the telescopic bracket 204 is engaged and connected with the baffle main body 1 through the placement slot 202. In the device The installed telescopic bracket 204 can be rotated and opened through the rotating shaft 201. After opening, the telescopic bracket 204 can be adjusted to different lengths. After adjustment, the anti-slip pad 205 can be brought into contact with the ground for support, which can improve the baffle body 1 in the device. stability during use.

请参阅图1-4,一种建筑施工用挡板,挡板主体1左右两端安装有固定机构3,挡板主体1左右两端均安装有固定机构3,固定机构3包括圆轴301、活动板302和固定孔303,且圆轴301安装在挡板主体1的两端,圆轴301一端安装有活动板302,且活动板302表面开设有固定孔303,活动板302通过圆轴301与挡板主体1构成旋转结构,且活动板302以挡板主体1的中轴线为对称设置,装置中安装有的活动板302可以通过圆轴301转动,在转动之后便于进行多个挡板主体1的连接配合使用,通过开设有的固定孔303进行固定,提高装置的使用效率,挡板主体1左右两端均开设有引水槽4,挡板主体1上端安装有集水框5,集水框5下端开设有螺纹孔6,螺纹孔6一端安装有连接框7,连接框7内部安装有滤网8,集水框5通过螺纹孔6与挡板主体1螺纹连接,且集水框5与引水槽4垂直分布,装置中安装有的集水框5可以进行雨水的收集,同时可以起到一定的遮挡效果,将收集的雨水通过引水槽4排出。Please refer to Figure 1-4, a baffle for construction. The baffle body 1 is equipped with fixing mechanisms 3 on both left and right ends. The baffle body 1 is equipped with fixing mechanisms 3 on both left and right ends. The fixing mechanism 3 includes a circular shaft 301, The movable plate 302 and the fixed hole 303, and the circular shaft 301 is installed at both ends of the baffle body 1. The movable plate 302 is installed at one end of the circular shaft 301, and the fixed hole 303 is provided on the surface of the movable plate 302. The movable plate 302 passes through the circular shaft 301 It forms a rotating structure with the baffle body 1, and the movable plate 302 is arranged symmetrically with the central axis of the baffle body 1. The movable plate 302 installed in the device can rotate through the circular shaft 301, and after rotation, it is convenient to carry out multiple baffle bodies. 1 is used in conjunction with the connection, and is fixed through the fixed holes 303 provided to improve the use efficiency of the device. The left and right ends of the baffle body 1 are provided with diversion channels 4, and the upper end of the baffle body 1 is installed with a water collection frame 5 to collect water. A threaded hole 6 is provided at the lower end of the frame 5. A connecting frame 7 is installed at one end of the threaded hole 6. A filter 8 is installed inside the connecting frame 7. The water collecting frame 5 is threadedly connected to the baffle body 1 through the threaded hole 6, and the water collecting frame 5 Distributed perpendicularly to the diversion channel 4, the water collection frame 5 installed in the device can collect rainwater, and at the same time it can have a certain shielding effect, and the collected rainwater can be discharged through the diversion channel 4.

请参阅图1-4,一种建筑施工用挡板,挡板主体1左右两端均开设有限位槽9,限位槽9表面贴合有密封垫10,挡板主体1外壁上端贴合有反光贴11,限位槽9与密封垫10紧密贴合,且限位槽9与引水槽4平行分布,在装置中开设有的限位槽9可以配合装置中安装活动板302进行更好的拼接使用,提高装置拼接时的安装稳定性与密封性。Please refer to Figure 1-4, a kind of baffle for building construction. The left and right ends of the baffle body 1 are provided with limit grooves 9. The surface of the limit groove 9 is fitted with a sealing gasket 10. The upper end of the outer wall of the baffle body 1 is fitted with a gasket 10. The reflective sticker 11, the limit groove 9 and the sealing gasket 10 are closely fitted, and the limit groove 9 is parallel to the water conduit 4. The limit groove 9 provided in the device can cooperate with the installation of the movable plate 302 in the device for better Used in splicing to improve the installation stability and sealing when splicing the device.

工作原理:使用时,将挡板主体1放置在合适的位置之后,通过装置中左右两侧安装有的固定机构3配合开设有的限位槽9对挡板进行拼接使用,将需要拼接的挡板主体1通过开设的限位槽9进行拼接放置,在拼接放置之后通过圆轴301对活动板302进行转动,在转动之后可以通过开设有的固定孔303进行连接与固定,可以便于对挡板主体1进行拼接使用,在拼接完成之后,通过装置中安装的转轴201对安装的伸缩支架204从放置槽202中转动取出,在取出之后可以根据与地面的不同长度对伸缩支架204进行长短的调整,通过防滑垫205与地面接触,以此可以对挡板主体1进行支撑,提高装置中的挡板主体1使用的强度,最后在装置中的挡板主体1上安装的集水框5对雨水进行收集,安装的集水框5可以起到遮挡雨水的效果,当雨水通过集水框5收集之后可以通过开设有的引水槽4进行雨水的引导进入地面,可以提高装置的使用效率,这样就完成了装置的使用过程,本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。Working principle: During use, after placing the baffle body 1 in a suitable position, the baffles are spliced through the fixing mechanisms 3 installed on the left and right sides of the device in conjunction with the existing limit slots 9, and the baffles that need to be spliced are spliced. The plate main body 1 is spliced and placed through the limit slot 9. After the splicing and placement, the movable plate 302 is rotated through the circular shaft 301. After the rotation, it can be connected and fixed through the fixed hole 303, which can facilitate the baffle. The main body 1 is used for splicing. After the splicing is completed, the installed telescopic bracket 204 is rotated and taken out from the placement slot 202 through the rotating shaft 201 installed in the device. After being taken out, the length of the telescopic bracket 204 can be adjusted according to the different lengths with the ground. , the anti-slip pad 205 is in contact with the ground, thereby supporting the baffle body 1 and improving the strength of the baffle body 1 in the device. Finally, the water collecting frame 5 installed on the baffle body 1 in the device can protect the rainwater. For collection, the installed water collecting frame 5 can have the effect of blocking rainwater. After the rainwater is collected through the water collecting frame 5, the rainwater can be guided into the ground through the provided diversion channel 4, which can improve the use efficiency of the device, so that After the use process of the device is completed, the contents not described in detail in this manual belong to the prior art known to those skilled in the art.

术语“中心”、“纵向”、“横向”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为便于描述本实用新型的简化描述,而不是指示或暗指所指的装置或元件必须具有特定的方位、为特定的方位构造和操作,因而不能理解为对本实用新型保护内容的限制。The terms "center", "vertical", "horizontal", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", The orientation or positional relationship indicated by "outside" is based on the orientation or positional relationship shown in the drawings. It is only a simplified description to facilitate the description of the present invention, and does not indicate or imply that the device or component referred to must have specific characteristics. The orientation refers to the specific orientation structure and operation, so it cannot be understood as a limitation on the protection content of the present utility model.

尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions recorded in the foregoing embodiments, or make equivalent substitutions for some of the technical features. Within the spirit and principles of the present utility model, any modifications, equivalent substitutions, improvements, etc. shall be included in the protection scope of the present utility model.

Claims (7)

1.一种建筑施工用挡板,包括挡板主体(1)、支撑机构(2)和固定机构(3),其特征在于:所述挡板主体(1)内壁安装有支撑机构(2);1. A baffle for building construction, including a baffle main body (1), a support mechanism (2) and a fixing mechanism (3), characterized in that: a support mechanism (2) is installed on the inner wall of the baffle main body (1) ; 所述挡板主体(1)左右两端安装有固定机构(3),所述挡板主体(1)左右两端均安装有固定机构(3),所述挡板主体(1)左右两端均开设有引水槽(4),所述挡板主体(1)上端安装有集水框(5),所述集水框(5)下端开设有螺纹孔(6),所述螺纹孔(6)一端安装有连接框(7),所述连接框(7)内部安装有滤网(8);Fixing mechanisms (3) are installed on both left and right ends of the baffle main body (1), and fixing mechanisms (3) are installed on both left and right ends of the baffle main body (1). A water diversion channel (4) is provided in each. A water collection frame (5) is installed at the upper end of the baffle body (1). A threaded hole (6) is provided at the lower end of the water collection frame (5). The threaded hole (6) ) A connection frame (7) is installed at one end, and a filter screen (8) is installed inside the connection frame (7); 所述挡板主体(1)左右两端均开设有限位槽(9),所述限位槽(9)表面贴合有密封垫(10),所述挡板主体(1)外壁上端贴合有反光贴(11)。Limiting grooves (9) are provided at both left and right ends of the baffle body (1), and a sealing gasket (10) is attached to the surface of the limiting groove (9). The upper end of the outer wall of the baffle body (1) is fitted with There are reflective stickers (11). 2.根据权利要求1所述的一种建筑施工用挡板,其特征在于:所述支撑机构(2)包括转轴(201)、放置槽(202)、卡扣(203)、伸缩支架(204)、防滑垫(205),且转轴(201)安装在挡板主体(1)的内壁,所述转轴(201)下端开设有放置槽(202),且放置槽(202)中部安装有卡扣(203),所述转轴(201)一端安装有伸缩支架(204),且伸缩支架(204)一端贴合有防滑垫(205)。2. A baffle for building construction according to claim 1, characterized in that: the support mechanism (2) includes a rotating shaft (201), a placement slot (202), a buckle (203), and a telescopic bracket (204 ), anti-slip pad (205), and the rotating shaft (201) is installed on the inner wall of the baffle body (1). A placement slot (202) is provided at the lower end of the rotating shaft (201), and a buckle is installed in the middle of the placement slot (202) (203), a telescopic bracket (204) is installed at one end of the rotating shaft (201), and an anti-slip pad (205) is attached to one end of the telescopic bracket (204). 3.根据权利要求2所述的一种建筑施工用挡板,其特征在于:所述伸缩支架(204)通过转轴(201)与挡板主体(1)构成旋转结构,且伸缩支架(204)通过放置槽(202)与挡板主体(1)卡合连接。3. A baffle for building construction according to claim 2, characterized in that: the telescopic bracket (204) forms a rotating structure through the rotating shaft (201) and the baffle main body (1), and the telescopic bracket (204) It is snap-connected to the baffle body (1) through the placement groove (202). 4.根据权利要求1所述的一种建筑施工用挡板,其特征在于:所述固定机构(3)包括圆轴(301)、活动板(302)和固定孔(303),且圆轴(301)安装在挡板主体(1)的两端,所述圆轴(301)一端安装有活动板(302),且活动板(302)表面开设有固定孔(303)。4. A baffle for building construction according to claim 1, characterized in that: the fixing mechanism (3) includes a circular shaft (301), a movable plate (302) and a fixed hole (303), and the circular shaft (301) is installed at both ends of the baffle body (1). A movable plate (302) is installed on one end of the circular shaft (301), and a fixing hole (303) is provided on the surface of the movable plate (302). 5.根据权利要求4所述的一种建筑施工用挡板,其特征在于:所述活动板(302)通过圆轴(301)与挡板主体(1)构成旋转结构,且活动板(302)以挡板主体(1)的中轴线为对称设置。5. A baffle for building construction according to claim 4, characterized in that: the movable plate (302) forms a rotating structure with the baffle main body (1) through a circular shaft (301), and the movable plate (302) ) is arranged symmetrically with the central axis of the baffle body (1). 6.根据权利要求1所述的一种建筑施工用挡板,其特征在于:所述集水框(5)通过螺纹孔(6)与挡板主体(1)螺纹连接,且集水框(5)与引水槽(4)垂直分布。6. A baffle for building construction according to claim 1, characterized in that: the water collecting frame (5) is threadedly connected to the baffle main body (1) through the threaded hole (6), and the water collecting frame ( 5) Distributed vertically with the diversion channel (4). 7.根据权利要求1所述的一种建筑施工用挡板,其特征在于:所述限位槽(9)与密封垫(10)紧密贴合,且限位槽(9)与引水槽(4)平行分布。7. A baffle for building construction according to claim 1, characterized in that: the limiting groove (9) is in close contact with the sealing gasket (10), and the limiting groove (9) and the diversion channel (10) are in close contact with each other. 4) Parallel distribution.
CN202321680243.5U 2023-06-29 2023-06-29 Baffle for construction Active CN220184830U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321680243.5U CN220184830U (en) 2023-06-29 2023-06-29 Baffle for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321680243.5U CN220184830U (en) 2023-06-29 2023-06-29 Baffle for construction

Publications (1)

Publication Number Publication Date
CN220184830U true CN220184830U (en) 2023-12-15

Family

ID=89100711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321680243.5U Active CN220184830U (en) 2023-06-29 2023-06-29 Baffle for construction

Country Status (1)

Country Link
CN (1) CN220184830U (en)

Similar Documents

Publication Publication Date Title
CN220184830U (en) Baffle for construction
CN109167322A (en) A kind of telescoping cable operculum colpi plate bracing frame
CN213989987U (en) A multifunctional cable tray
CN211421047U (en) A device for intercepting floating objects on water
CN208986571U (en) A kind of buried cable protective device
CN212231006U (en) A grid bridge connection assembly
CN206041890U (en) Solar cell panel installing support of easily installing
CN212779298U (en) A fixture for an environmental detector
CN211172312U (en) A low-grade highway drainage ditch
CN213449086U (en) A spliced container house roof structure
CN212392650U (en) Municipal works interlude cable special stand
CN211290315U (en) Heating ventilation air conditioner fixing device
CN210219114U (en) High-strength noise reduction screen with day and night warning function for drilling equipment
CN217479907U (en) Tunnel portal warning road surface flatness detection device
CN210577553U (en) Protection device of outdoor electric bridge
CN219909386U (en) Building structure design roof beam reinforced structure
CN221761068U (en) A kind of exposed frame glass curtain wall
CN216978283U (en) Device for quickly positioning leakage points of subway tunnel water supply and drainage pipelines
CN216766850U (en) Rain shielding device for outdoor storage yard building member
CN217537452U (en) Energy-saving waterproof curtain wall
CN211597146U (en) Detachable noise control plate for building construction
CN210430779U (en) A new type of construction pipeline
CN223316213U (en) A shaft top protection device
CN217225197U (en) Novel adjustable frock that shifts of steel pipe tower auxiliary flange plug-in type
CN220284979U (en) Road construction structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250710

Address after: 456550 No. 1 executive street, Guilin Town, Linzhou City, Anyang, Henan.

Patentee after: Henan Linping Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 831100 Floor 16, Tunhe Xintiandi Square, Tunhe Road, Changji City, Changji Hui Autonomous Prefecture, Xinjiang Uygur Autonomous Region (No. 1601, Building 38, Block 3, Community 27)

Patentee before: Xinjiang Hongyu Weiye Construction Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right