CN114718121A - Fixing method for trapezoidal bellmouth steel edge rubber water stop belt of underground pipe gallery structure deformation joint - Google Patents
Fixing method for trapezoidal bellmouth steel edge rubber water stop belt of underground pipe gallery structure deformation joint Download PDFInfo
- Publication number
- CN114718121A CN114718121A CN202210207852.2A CN202210207852A CN114718121A CN 114718121 A CN114718121 A CN 114718121A CN 202210207852 A CN202210207852 A CN 202210207852A CN 114718121 A CN114718121 A CN 114718121A
- Authority
- CN
- China
- Prior art keywords
- die box
- steel
- water stop
- rubber water
- elastic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 108
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 56
- 239000010959 steel Substances 0.000 title claims abstract description 56
- 238000000034 method Methods 0.000 title claims abstract description 40
- 230000002787 reinforcement Effects 0.000 claims abstract description 40
- 230000006835 compression Effects 0.000 claims abstract description 11
- 238000007906 compression Methods 0.000 claims abstract description 11
- 238000004519 manufacturing process Methods 0.000 claims abstract description 5
- 238000009434 installation Methods 0.000 claims description 71
- 238000002788 crimping Methods 0.000 claims description 69
- 230000007246 mechanism Effects 0.000 claims description 49
- 239000002775 capsule Substances 0.000 claims description 27
- 238000005452 bending Methods 0.000 claims description 12
- 238000005192 partition Methods 0.000 claims description 7
- 238000003466 welding Methods 0.000 claims description 3
- 230000002146 bilateral effect Effects 0.000 claims description 2
- 230000009286 beneficial effect Effects 0.000 description 13
- 238000001514 detection method Methods 0.000 description 7
- 230000009471 action Effects 0.000 description 6
- 238000010276 construction Methods 0.000 description 6
- 238000003384 imaging method Methods 0.000 description 6
- 230000001960 triggered effect Effects 0.000 description 5
- 238000004873 anchoring Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 230000003287 optical effect Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 230000036316 preload Effects 0.000 description 2
- 125000006850 spacer group Chemical group 0.000 description 2
- 241000239290 Araneae Species 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000005489 elastic deformation Effects 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 230000008093 supporting effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
- E02D31/025—Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Environmental & Geological Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Sewage (AREA)
Abstract
The invention discloses a method for fixing a trapezoidal bellmouth steel-edged rubber water stop of an underground pipe gallery structure deformation joint, which comprises the following steps: manufacturing a die box, and installing an elastic compression joint device on one side of the upper die box, which is opposite to the lower die box, according to the shape and the size of the steel-edged rubber water stop; determining the position and the size of a deformation joint, marking by taking a perpendicular line at the deformation joint as a critical line, and installing a positioning bracket; according to the marked position, a reinforcement framework is built at the trapezoidal socket of the deformation joint, and a cushion block is bound on the reinforcement framework; an elastic pre-tightening device is arranged in a cushion block on the side face of the reinforcement framework, a prefabricated die box is preliminarily arranged according to the position of the cushion block, and the steel edge rubber water stop is preliminarily fixed through an upper die box and a lower die box; the upper die box and the lower die box are fixed on the reinforcement framework through the fixing assembly, so that the elastic pre-tightening device is extruded between the side surface of the die box and the side surface of the cushion block to form a connection pre-tightening force; triggering the elastic compression joint device to fix the steel edge rubber water stop belt between the upper die box and the lower die box in a compression joint mode.
Description
Technical Field
The invention relates to the technical field of underground pipe gallery structure construction, in particular to a method for fixing a trapezoidal bellmouth steel-edged rubber water stop of an underground pipe gallery structure deformation joint.
Background
The building deformation joint is a joint for vertically separating buildings, which is arranged to avoid deformation, cracking and structural damage of the buildings caused by temperature change, different loads borne by each part of the buildings, difference of structures of adjacent parts of the buildings and influence of earthquake. When the position of the seam is below the low water level line, water seepage is easy to occur, so that technical treatment needs to be carried out on the deformation seam, and a water stop is poured in a common mode at present.
The steel-edged rubber water stop can be classified into a buried steel-edged rubber water stop and a back-attached steel-edged rubber water stop according to the use condition. It is commonly used in underground structures and post-cast strip construction. It utilizes the high elasticity of rubber to produce elastic deformation under various pressure loads, thus playing a firm sealing role, effectively preventing water leakage and water seepage of the building structure and playing a role in shock absorption and buffering. The medium-buried steel-edged rubber water stop is a water stop product which is mainly used for being arranged in concrete such as a concrete deformation joint, an expansion joint and the like, and has the capability of adapting to the concrete expansion deformation by using the elasticity and the structural form of rubber materials.
The city underground comprehensive pipe gallery is a structure and an accessory facility which are built in the city underground and used for accommodating two or more types of city engineering pipelines. By integrating various original overground and underground electric power, communication, gas, heat supply, water supply and drainage and other engineering pipelines of a city into a whole and bringing the integrated engineering pipelines into a corridor, the problems of 'aerial spider web' in the city, reduction in road excavation, avoidance of 'road zippers' and the like can be solved. The underground space release system can be managed intensively, the operation cost is reduced, the pipeline safety is guaranteed, and the underground space is released. The cost of repeated repair of the road surface and the maintenance cost of the engineering pipeline are reduced; the integrity of the pavement and the durability of various pipelines are maintained; the contradiction between the pipeline and urban greening is reduced, the urban environment is beautified, and the method is an infrastructure construction direction which accords with national green and sustainable development.
When the trapezoidal bellmouth movement joint of underground pipe gallery structure is under construction, if only prop up the template of establishing the movement joint side, not consolidate it in the reservation of steel limit rubber waterstop is pre-buried, the fixed positional deviation of steel limit rubber waterstop is big after the structure shaping to cause later stage to handle repeatedly, the finished product protection is not in place, increase construction cost. Therefore, it is necessary to provide a method for fixing a steel-edged rubber water stop for a deformation joint of an underground pipe gallery structure, so as to at least partially solve the problems in the prior art.
Disclosure of Invention
In this summary, concepts in a simplified form are introduced that are further described in the detailed description. The summary of the invention is not intended to identify key features or essential features of the claimed subject matter, nor is it intended to be used as an aid in determining the scope of the claimed subject matter.
In order to at least partially solve the problems, the invention provides a method for fixing a rubber water stop belt with a trapezoidal bellmouth and a steel edge for a deformation joint of an underground pipe gallery structure, which comprises the following steps:
s100, manufacturing a die box, and installing an elastic compression joint device on one side, opposite to the upper die box and the lower die box, of the steel-edged rubber water stop according to the shape and the size of the steel-edged rubber water stop;
s200, determining the position and the size of the deformation joint, marking by taking a perpendicular line at the deformation joint as a critical line, and installing a positioning bracket;
s300, according to the marked positions, a reinforcement framework is built at the deformation joint trapezoid socket, and a cushion block is bound on the reinforcement framework;
s400, an elastic pre-tightening device is installed in a cushion block on the side face of the reinforcement framework, a prefabricated die box is preliminarily installed according to the position of the cushion block, and the steel-edged rubber water stop is preliminarily fixed through an upper die box and a lower die box;
s500, fixing the upper die box and the lower die box on the reinforcement framework through the fixing assembly, and enabling the elastic pre-tightening device to be extruded between the side face of the die box and the side face of the cushion block to form connection pre-tightening force;
s600, triggering the elastic compression joint device, and compressing and fixing the steel edge rubber water stop belt between the upper die box and the lower die box.
Preferably, the fixing assembly includes a split bolt, a steel pipe, and a locking member, and the S500 includes:
s501, enabling the split bolt to penetrate through a through hole formed in the side face of the die box, welding one end of the split bolt with the reinforcement framework, enabling the other end of the split bolt to penetrate through a space between two vertically arranged steel pipes, and enabling the split bolt to be in threaded connection with the locking piece, so that the locking piece extrudes the two steel pipes, and enabling the steel pipes to be abutted against one side, far away from the reinforcement framework, of the die box;
s502, one side, close to the reinforcement framework, of the die box is always abutted to the elastic pre-tightening device, whether the mounting position of the die box is accurate or not is determined according to the marked position in the step S200, if the position is deviated, the distance of the elastic pre-tightening device extending out of the cushion block is adjusted by screwing the locking piece, and then the transverse mounting position of the die box is adjusted.
Preferably, in S400, the steel-edged rubber waterstop is preliminarily fixed by the upper die box and the lower die box, including:
s401, abutting one side of the steel-edged rubber water stop belt against the top working surface of the lower die box, and ensuring that the center line of the steel-edged rubber water stop belt is aligned with the perpendicular line of the deformation joint;
s402, enabling the bottom working face of the upper die box to abut against the other face of the steel-edge rubber water stop belt, ensuring that the center line of the steel-edge rubber water stop belt is aligned with the perpendicular line of the deformation joint, and enabling the side face of the upper die box far away from the reinforcement framework and the side face of the lower die box far away from the reinforcement framework to be on a vertical plane.
Preferably, a plurality of partition plates are arranged inside the upper die box and the lower die box, and the through hole is formed between two adjacent partition plates.
Preferably, the elastic pretensioning device comprises: the installation piece, the inside of installation piece is equipped with elastic component, seted up in the cushion with the mounting hole that the installation piece corresponds, the installation piece is close to one side of diaphragm capsule with the surface parallel and level of cushion, one side of elastic component stretches out the installation piece sets up, and be used for with the side butt of diaphragm capsule.
Preferably, the elastic member includes: the device comprises an arc-shaped elastic piece and pretightening force adjusting mechanisms, wherein at least two movable chambers are arranged in an installation block, a movable opening communicated with the movable chambers is formed in one side, close to a die box, of the installation block, an arc-shaped elastic piece is arranged at the movable opening, the opening of the arc-shaped elastic piece faces the movable chambers, the two pretightening force adjusting mechanisms are symmetrically arranged in the movable chambers, and two end parts on one side of the arc-shaped elastic piece are respectively hinged with the end parts of the two pretightening force adjusting mechanisms;
the pretightening force adjusting mechanism comprises a first sliding block and a second sliding block, the first sliding block and the second sliding block are slidably connected in the movable cavity, one sides of the first sliding block and the second sliding block, which are opposite to each other, are respectively provided with a first threaded hole and a second threaded hole, a first stud and a second stud are respectively arranged in the first threaded hole and the second threaded hole, and the first stud and the second stud are connected through a spring;
a positioning column is arranged at one end, away from the spring, of the first sliding block, a positioning hole corresponding to the positioning column is formed in the movable cavity, a first hinge rod is arranged at one end, away from the spring, of the second sliding block, one end, away from the second sliding block, of the first hinge rod is hinged to one end of the second hinge rod, and one end, away from the first hinge rod, of the second hinge rod is hinged to the end portion of the arc-shaped elastic piece;
the surface of one side of the arc-shaped elastic piece, which is far away from the movable chamber, is provided with a plurality of elastic anti-slip strips, and the cross sections of the elastic anti-slip strips are arranged in a sharp-angled shape.
Preferably, an elastic pad is arranged on one side of the mounting block, which is in contact with the bottom of the mounting hole.
Preferably, in S600, the elastic crimping device includes at least two crimping mechanisms, the two crimping mechanisms are locked by a limiting cover slidably connected with the two crimping mechanisms, and when the limiting cover is slidably removed from the crimping mechanisms, the elastic crimping device is in a triggered state, and the steel-edged rubber water stop is crimped and fixed between the upper die box and the lower die box through the crimping mechanisms.
Preferably, the crimping mechanism includes: the die comprises an upper die box, a lower die box and a mounting groove body, wherein the mounting groove body is fixedly connected with the bottom surface of the upper die box or the top surface of the lower die box, a fixed plate is fixedly arranged at the bottom of an inner groove of the mounting groove body, one end of the fixed plate is connected with a first connecting plate through a first arc plate, one end of the first connecting plate, far away from the first arc plate, is smoothly connected with a second connecting plate through a first bending plate, one end of the second connecting plate, far away from the first connecting plate, is connected with a third connecting plate through a second arc plate, the connection part of the second arc plate and the third connecting plate is smoothly connected through a second bending plate, and one end of the third connecting plate, far away from the second arc plate, is arranged between the fixed plate and the second connecting plate;
the mounting groove is characterized in that limiting sliding plates are convexly arranged on two sides of the mounting groove body, two ends of the limiting cover in the length direction are arranged in a through mode, a sliding opening is formed in one side of the limiting cover, and limiting sliding ways corresponding to the limiting sliding plates are arranged on two opposite sides in the sliding opening;
when the limiting cover is in sliding abutting contact with a limiting sliding plate of the installation groove body through a limiting sliding way, the second arc-shaped plate is abutted against the inner wall of one side, away from the sliding opening, of the limiting cover, and when the limiting cover is detached from the installation groove body in a sliding manner, the second arc-shaped plate extends out of the plane where the notch of the installation groove body is located;
the mounting groove body is provided with a second arc-shaped plate, the mounting groove body is provided with a third connecting plate, the mounting groove body is symmetrically provided with baffles at the positions of notches at one end close to the second arc-shaped plate, limit stops abutted to the baffles are arranged on two sides of one end, far away from the second arc-shaped plate, of the third connecting plate, and sliding chutes for the limit stops to slide are formed between the baffles and the bottom of an inner groove of the mounting groove body.
Preferably, the steel-edged rubber waterstop comprises: the deformation portion, the bilateral symmetry of deformation portion is equipped with anchor portion, anchor portion passes through go up the diaphragm capsule and carry out preliminary fixed with the lower diaphragm capsule, the anchor portion of deformation portion one side passes through elasticity crimping device fixes.
Compared with the prior art, the invention at least comprises the following beneficial effects:
according to the fixing method of the underground pipe gallery structure deformation joint trapezoidal bellmouth steel-edge rubber water stop, the elastic pre-tightening device is arranged, when the pouring operation is carried out to generate vibration, the fixing assembly is used for preventing the fixed connection of the upper die box and the lower die box from loosening, and the elastic compression joint device is used for preventing the position of the steel-edge rubber water stop from being deviated due to the looseness generated by the fixing of the steel-edge rubber water stop under the vibration action; the elastic pre-tightening device is arranged in the cushion block, and can be taken out from the cushion block for reuse after pouring is finished, so that the cost is saved; the elastic crimping device is triggered at last, on one hand, the position of the steel edge rubber water stop is adjusted when position rechecking is conducted in the early period, on the other hand, after the elastic crimping device is triggered, the main crimping component can move towards one side of the steel edge rubber water stop, the moving distance is larger than half of the gap between the two die boxes, and if the elastic crimping device is triggered in advance, the elastic crimping device is not beneficial to installation of the steel edge rubber water stop.
Other advantages, objects, and features of the method for fixing a rubber water stop with a trapezoid bellmouth of a deformation joint of an underground pipe gallery structure according to the present invention will be in part apparent from the following description and in part will be understood by those skilled in the art from a study and practice of the invention.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic flow diagram of a method for fixing a rubber water stop with a trapezoid bellmouth of a deformation joint of an underground pipe gallery structure, disclosed by the invention;
FIG. 2 is a schematic view of the method for fixing the steel-edged rubber water stop at the top socket of the pipe gallery in the deformation joint trapezoidal socket of the underground pipe gallery structure;
FIG. 3 is a schematic view of the installation of the trapezoidal bellmouth steel-edged rubber waterstop of the deformation joint of the underground pipe gallery structure at the bellmouth at the bottom layer of the pipe gallery in the fixing method of the invention;
fig. 4 is a schematic view of the underground pipe gallery structure deformation joint trapezoid bellmouth steel edge rubber waterstop fixing method under installation at the top layer bellmouth of the pipe gallery;
FIG. 5 is a schematic structural view of the elastic crimping device crimping the steel-edged rubber waterstop in the method for fixing the trapezoidal bellmouth steel-edged rubber waterstop of the deformation joint of the underground pipe gallery structure;
FIG. 6 is a schematic structural diagram of an upper die box and a lower die box in the method for fixing the trapezoidal bellmouth steel-edged rubber water stop of the deformation joint of the underground pipe gallery structure;
FIG. 7 is a schematic structural diagram of a cushion block for installing an elastic pre-tightening device in the method for fixing the trapezoidal bellmouth steel-edged rubber water stop of the deformation joint of the underground pipe gallery structure;
FIG. 8 is a schematic structural diagram of an elastic pre-tightening device in the method for fixing the trapezoidal bellmouth steel-edged rubber water stop of the deformation joint of the underground pipe gallery structure;
FIG. 9 is a schematic view of the internal structure of an elastic pre-tightening device in the method for fixing the trapezoidal bellmouth steel-edged rubber water stop of the deformation joint of the underground pipe gallery structure;
FIG. 10 is a schematic structural view of a crimping mechanism mounted on an upper die box and a lower die box in the method for fixing the trapezoidal bellmouth steel-edged rubber water stop of the deformation joint of the underground pipe gallery structure;
fig. 11 is another schematic structural view of the crimping mechanism mounted on the upper die box and the lower die box in the method for fixing the underground pipe gallery structure deformation joint trapezoidal bellmouth steel-edged rubber water stop of the invention;
FIG. 12 is a schematic structural view of a limiting cover in the method for fixing the trapezoidal bellmouth steel-edged rubber water stop of the deformation joint of the underground pipe gallery structure;
FIG. 13 is a schematic structural view of a crimping mechanism in the method for fixing the trapezoidal bellmouth steel-edged rubber water stop of the deformation joint of the underground pipe gallery structure;
FIG. 14 is a schematic structural view of a crimping mechanism in the method for fixing the trapezoidal bellmouth steel-edged rubber water stop of the deformation joint of the underground pipe gallery structure;
FIG. 15 is a schematic structural view of a crimping mechanism in the method for fixing the underground pipe gallery structure deformation joint trapezoid bellmouth steel-edged rubber waterstop according to the invention;
FIG. 16 is a schematic structural view of a crimping mechanism in the method for fixing the trapezoidal bellmouth steel-edged rubber water stop of the deformation joint of the underground pipe gallery structure;
fig. 17 is a schematic structural view of a steel-edged rubber water stop in the method for fixing the trapezoidal bellmouth steel-edged rubber water stop of the deformation joint of the underground pipe gallery structure.
Detailed Description
The present invention is further described in detail below with reference to the drawings and examples so that those skilled in the art can practice the invention with reference to the description.
It will be understood that terms such as "having," "including," and "comprising," as used herein, do not preclude the presence or addition of one or more other elements or groups thereof.
As shown in fig. 1-17, the invention provides a method for fixing a trapezoidal steel-edged rubber water stop with an underground pipe gallery structure deformation joint, which comprises the following steps:
s100, manufacturing a die box, and installing an elastic compression joint device 4 on one side, opposite to the upper die box 2 and the lower die box 3, of the steel-edged rubber water stop 1 according to the shape and the size of the steel-edged rubber water stop;
s200, determining the position and the size of the deformation joint, marking by taking a perpendicular line at the deformation joint as a critical line, and installing a positioning bracket 5;
s300, building a reinforcement framework 6 at the deformation joint trapezoid socket according to the marked positions, and binding a cushion block 7 on the reinforcement framework 6;
s400, installing an elastic pre-tightening device 8 in a cushion block 7 on the side face of a reinforcement framework 6, preliminarily installing a prefabricated die box according to the position of the cushion block 7, and preliminarily fixing the steel-edged rubber water stop 1 through an upper die box 2 and a lower die box 3;
s500, fixing the upper die box 2 and the lower die box 3 on the reinforcement framework 6 through the fixing assembly 9, and enabling the elastic pre-tightening device 8 to be extruded between the side face of the die box and the side face of the cushion block 7 to form connection pre-tightening force;
s600, triggering the elastic compression joint device 4, and compressing and fixing the steel edge rubber water stop belt 1 between the upper die box 2 and the lower die box 3.
The working principle of the technical scheme is as follows: the die box is manufactured according to the pre-designed size, the die box comprises an upper die box 2 and a lower die box 3 and is used for fixing the steel-edge rubber water stop belt 1, after the die box is manufactured, the position of an elastic crimping device 4 is set and installed according to the size and the shape of the steel-edge rubber water stop belt 1 so as to be convenient for fixing the steel-edge rubber water stop belt 1 through the elastic crimping device 4 subsequently, the installation positions of the elastic crimping devices 4 of the upper die box 2 and the lower die box 3 are symmetrical so as to keep the stress balance of the fixed crimping of the steel-edge rubber water stop belt 1, then a positioning bracket 5 is installed according to the position and the size of a deformation joint and a reinforcement framework 6 is erected, according to the different installation positions, the positioning bracket can also be a part of a building, such as a water-facing slope surface of a pipe gallery bell mouth, a concrete ground, a platform and the like, a cushion block 7 is required to be arranged at the position where the reinforcement framework 6 is in installation contact with the die box, the device is used for primarily positioning a die box, before the die box is installed, an elastic pre-tightening device 8 is installed in a cushion block 7 on one side, close to the pre-installed die box, of a reinforcement framework 6, then an upper die box 2 and a lower die box 3 are installed according to the position of the cushion block 7, a steel-edged rubber water stop belt 1 is primarily fixed between the upper die box 2 and the lower die box 3, after the position is determined, the upper die box 2 and the lower die box 3 are transversely locked and fixed through a fixing assembly 9, the upper die box 2 and the lower die box 3 are locked along with the fixing assembly 9 in the locking and fixing process, so that the elastic pre-tightening device 8 is compressed and increases the abutting force with the side surfaces of the upper die box 2 and the lower die box 3, after the upper die box 2 and the lower die box 3 are locked to the side surfaces of the cushion block 7, the elastic pre-tightening device 8 forms an elastic pre-tightening force which pushes the upper die box 2 and the lower die box 3 outwards, and when the pouring operation generates vibration, the fixing component 9 is used for preventing the fixed connection between the upper die box 2 and the lower die box 3 from loosening, and further ensuring that the steel-edged rubber water stop 1 is more firmly fixed; after fixing the completion to the diaphragm capsule, follow and be exactly the further crimping process of the steel limit rubber waterstop 1 of preliminary fixed completion, elastic crimping device 4 on diaphragm capsule 2 and the lower diaphragm capsule 3 is gone up through triggering simultaneously, make the elastic crimping device 4 of upper and lower both sides take place to remove to one side of steel limit rubber waterstop 1 simultaneously, and produce the elasticity crimping power to steel limit rubber waterstop 1, it is fixed to carry out the crimping to steel limit rubber waterstop 1, when pouring the operation and producing the vibration, be used for preventing that the fixed production that the vibration effect made steel limit rubber waterstop 1 is not hard up and lead to its position to take place the skew, influence the construction effect.
The beneficial effects of the above technical scheme are that: the elastic pre-tightening device 8 is used for preventing the fixed connection of the fixing assembly 9 to the upper die box 2 and the lower die box 3 from loosening when pouring operation is carried out to generate vibration, and the elastic compression joint device 4 is used for preventing the steel edge rubber water stop 1 from being fixed to loosen under the vibration action to cause the position deviation of the steel edge rubber water stop 1; by arranging the elastic pre-tightening device 8 in the cushion block 7, after pouring is finished, the elastic pre-tightening device 8 can be taken out from the cushion block 7 for reuse, so that the cost is saved; the setting just triggers elastic crimping device 4 at last, is convenient for carry out position adjustment to steel limit rubber waterstop 1 when position rechecking in the earlier stage on the one hand, and on the other hand is elastic crimping device 4 triggers the back, and its main crimping part can produce to steel limit rubber waterstop 1 one side and remove, and moving distance is greater than half of clearance between two die boxes, if trigger in advance, then be unfavorable for the installation of steel limit rubber waterstop 1.
In one embodiment, the fixing assembly 9 includes a split bolt 910, a steel pipe 920, and a locking member 930, and the S500 includes:
s501, enabling the split bolt 910 to penetrate through a through hole 10 formed in the side face of the die box, welding one end of the split bolt 910 with the reinforcement framework 6, enabling the other end of the split bolt 910 to penetrate through two vertically arranged steel pipes 920, and enabling the split bolt 910 to be in threaded connection with the locking piece 930, so that the locking piece 930 extrudes the two steel pipes 920, and enabling the steel pipes 920 to be abutted against one side, far away from the reinforcement framework 6, of the die box;
s502, one side of the die box, which is close to the reinforcing rib framework 6, is always abutted against the elastic pre-tightening device 8, whether the mounting position of the die box is accurate or not is determined according to the marked position in the step S200, and if the position is deviated, the distance of the elastic pre-tightening device 8 extending out of the cushion block 7 is adjusted by screwing the locking piece 930, so that the transverse mounting position of the die box is adjusted.
The working principle and the beneficial effects of the technical scheme are as follows: the elastic pre-tightening device 8 can also be used for adjusting the transverse installation position of the die box during position rechecking to ensure that the position of the central line of the steel-edge rubber water stop 1 is superposed with the perpendicular line of the deformation joint, generally, when the central line of the steel-edge rubber water stop is deviated to one side of a reinforcement framework, the abutting force of the die box and the elastic pre-tightening device 8 is reduced by screwing the locking piece 930, so that one part of the elastic pre-tightening device 8 extends out of the cushion block 7 to abut against the side surface of the die box, under the condition that the position rechecking does not deviate, the side surface of the die box is always abutted against the elastic pre-tightening device 8, and simultaneously the side surface of the die box is also contacted with the side surface of the cushion block 7, thereby ensuring that the elastic pre-tightening device 8 can increase the pre-tightening force of the connection between the locking piece 930 and the counter-tightening bolt 910 when the counter-tightening bolts 910, the steel pipes 920 and 930 are locked, and ensuring the stability of the connection between the locking piece 920 and the counter-tightening bolt 910, play the role of anti-loosening; and in pouring the operation, the vibrating transmission when the diaphragm capsule and elasticity preloading device 8's elasticity butt can also slow down pouring is to the diaphragm capsule on, further guarantees to go up diaphragm capsule 2 and lower diaphragm capsule 3 to the fixed stability of steel limit rubber waterstop 1, prevents that its position deviation from appearing, promotes the construction effect.
In one embodiment, the preliminary fixing of the steel-edged rubber water stop 1 by the upper mold box 2 and the lower mold box 3 in S400 includes:
s401, one side of the steel-edged rubber water stop 1 is abutted to the top working surface of the lower die box 3, and the alignment of the center line of the steel-edged rubber water stop 1 and the perpendicular line of the deformation joint is ensured;
s402, enabling the bottom working face of the upper die box 2 to abut against the other face of the steel-edged rubber water stop 1, ensuring that the center line of the steel-edged rubber water stop 1 is aligned with the perpendicular line of the deformation joint, and enabling the side face, far away from the reinforcement framework 6, of the upper die box 2 and the side face, far away from the reinforcement framework 6, of the lower die box 3 to be on the same vertical plane.
The working principle and the beneficial effects of the technical scheme are as follows: when going on tentatively fixing steel limit rubber waterstop 1 at last diaphragm capsule 2 and lower diaphragm capsule 3, elasticity crimping device is locking state, not trigger, thereby also can not carry out any contact with steel limit rubber waterstop 1, and steel limit rubber waterstop 1 only carries out tentatively fixing through last diaphragm capsule 2 and lower diaphragm capsule 3 this moment, be convenient for adjust the position of steel limit rubber waterstop 1's central line when tentatively fixing, guarantee that its central line aligns with the perpendicular line of movement joint department, go up diaphragm capsule 2 and keep away from the side of arrangement of reinforcement skeleton 6 and keep away from with lower diaphragm capsule 3 on the equal vertical plane in side of arrangement of reinforcement skeleton 6, one side that the deformation portion 110 of steel limit rubber waterstop 1 kept away from the diaphragm capsule aligns with the side of anchor portion (120) junction at the straight line with the diaphragm capsule, in order to guarantee the accuracy of its tentatively fixed position.
In one embodiment, a plurality of partition plates 11 are disposed inside each of the upper mold box 2 and the lower mold box 3, and the through hole 10 is disposed between two adjacent partition plates 11.
The working principle and the beneficial effects of the technical scheme are as follows: the partition 11 serves to increase the strength of the upper and lower cases 2 and 3, and the through-hole 10 serves to pass the split bolt 910, facilitating the fixing of the upper and lower cases 2 and 3.
In one embodiment, the elastic pretensioning device 8 comprises: the installation piece 810, the inside of installation piece 810 is equipped with elastic component, seted up in the cushion 7 with the mounting hole that the installation piece 810 corresponds, the installation piece 810 is close to one side of diaphragm capsule with the surface parallel and level of cushion 7, one side of elastic component stretches out the setting of installation piece 810, and be used for with the side butt of diaphragm capsule.
The working principle and the beneficial effects of the technical scheme are as follows: the installation block 810 is used for being inserted into the installation hole of the cushion block 7, the installation hole is formed in advance according to the size of the installation block 810, the elastic assembly can also be detached from the installation block 810, the installation is flexible, the elastic assembly and the installation block 810 are assembled firstly when the installation is carried out, then the installation block 810 is inserted into the installation hole, the exposed surface of the installation block 810 is flush with the surface of the cushion block 7, part of the elastic assembly protrudes out of the cushion block 7, the mold box is convenient to extrude the elastic assembly when the installation is carried out, and the elastic abutting is realized to form the pre-tightening force for connecting the split bolt 910 with the locking piece 930.
In one embodiment, the elastic assembly includes: the die box comprises an arc-shaped elastic piece 820 and pretightening force adjusting mechanisms 830, wherein at least two movable cavities 811 are arranged in an installation block 810, a movable opening 812 communicated with the movable cavities 811 is arranged at one side, close to the die box, of the installation block 810, the arc-shaped elastic piece 820 is arranged at the movable opening 812, the opening of the arc-shaped elastic piece 820 faces the movable cavities 811, the two pretightening force adjusting mechanisms 830 are symmetrically arranged in the movable cavities 811, and two end parts of one side of the arc-shaped elastic piece 820 are respectively hinged to end parts of the two pretightening force adjusting mechanisms 830;
the pretightening force adjusting mechanism 830 comprises a first sliding block 831 and a second sliding block 832, the first sliding block 831 and the second sliding block 832 are slidably connected in the movable chamber 811, one sides of the first sliding block 831 opposite to the second sliding block 832 are respectively provided with a first threaded hole and a second threaded hole, a first stud 833 and a second stud 834 are respectively arranged in the first threaded hole and the second threaded hole, and the first stud 833 and the second stud 834 are connected through a spring 835;
a positioning column 836 is arranged at one end of the first sliding block 831 away from the spring 835, a positioning hole corresponding to the positioning column 836 is arranged in the movable chamber 811, a first hinge rod 837 is arranged at one end of the second sliding block 832 away from the spring 835, one end of the first hinge rod 837 away from the second sliding block 832 is hinged to one end of the second hinge rod 838, and one end of the second hinge rod 838 away from the first hinge rod 837 is hinged to the end of the arc-shaped elastic member 820;
the surface of the arc-shaped elastic member 820 far away from the movable chamber 811 is provided with a plurality of elastic anti-slip strips 821, and the cross section of each elastic anti-slip strip 821 is in a sharp-angled arrangement.
The working principle of the technical scheme is as follows: before the installation block 810 and the elastic component are assembled, the elasticity of the preload adjusting mechanism 830 can be adjusted, specifically, by adjusting the length of the first stud 833 screwed in the first slider 831 and the length of the second stud 834 screwed in the second slider 832, thereby adjusting the distance between the two sliders, the shorter the length of the screw bolt screwed in the slider, the larger the distance between the first slider 831 and the second slider 832 in the state that the spring is naturally stretched, such that, upon installation of the preload adjustment mechanism into movable chamber 811, the closer second block 832 is to movable port 812, so that, under the driving action of the first and second hinge rods 837 and 838, the length of the arc-shaped elastic member 820 protruding out of the mounting block 810 is increased, the acting force for elastically abutting the die box and the arc-shaped elastic part 820 is increased, so that the pretightening force for connecting the split bolt 910 and the locking part 930 is increased; when the pretightening force adjusting mechanism is installed, the two first sliding blocks 831 are firstly inserted into two ends of the movable cavity 811 from the movable opening 812 respectively, all the components sequentially connected with the first sliding blocks 831 are inserted into the movable cavity in the same manner, and then the arc-shaped elastic element 820 is forcibly extruded, so that the positioning columns 836 on the first sliding blocks 831 are extruded and inserted into the positioning holes, and the installation is completed; then the mounting block 810 is mounted in the mounting hole; when the upper mold box 2 and the lower mold box 3 are locked and fastened, the side surfaces of the upper mold box 2 and the lower mold box 3 abut against and extrude the arc-shaped elastic member 820, so that the two ends of the arc-shaped elastic member 820 extrude the second hinge rod 838, the second hinge rod 838 extrudes the first hinge rod 837, the first hinge rod 837 extrudes the second slide block 832 towards the two ends of the movable cavity 811, so that the spring 835 is extruded between the first slide block 831 and the second slide block 832, when the mold box continues to move towards one side of the cushion block 7, the arc-shaped elastic member 820 is extruded to be flush with the movable port 812, and under the combined action of the spring 835 and the arc-shaped elastic member 820, an urging force is given to the mold box, so that the steel pipe 920 and the locking member 930 abutting against the other side surfaces of the mold box receive the urging force, so that the connection pre-tightening force of the locking member 930 and the counter bolt 910 is increased; after the pouring is finished, the poured structure is flush with the side face, close to the reinforcement frame 6, of the mold box, so that the arc-shaped elastic part 820 can be detached from the cushion block 7 under the condition that the arc-shaped elastic part is not blocked by the pouring structure, and the continuous use is facilitated next time.
The beneficial effects of the above technical scheme are that: through the matching of the two studs and the two sliding blocks, the distance between the two sliding blocks can be adjusted, so that the distance that the arc-shaped elastic part 820 extends out of the movable opening 812 is increased, the connection pretightening force is further increased, and the pretightening force can be conveniently adjusted according to the requirement; when the mounting block 810 is mounted in the mounting hole, if the exposed surface of the mounting block 810 is lower than the mounting hole, the distance that the arc-shaped elastic piece 820 extends out of the movable opening 812 can be increased through the pretightening force adjusting mechanism 830, so that the connection pretightening force of the split bolt 910 can meet the requirement; the plurality of elastic anti-slip strips 821 are arranged on the surface of the arc-shaped elastic piece 820, so that the friction force between the anti-slip strips and the mould box is increased, and the position of the mould box is prevented from being deviated; meanwhile, during pouring operation, the arc-shaped elastic piece 820 is always abutted against the side face of the die box, so that vibration transmitted to the die box in the pouring process can be reduced, the fixing stability of the die box is further ensured, and the fixing stability of the steel-edged rubber water stop 1 is further ensured; when the position is rechecked, if the center line position of the steel-edge rubber water stop 1 deviates, the direct acting force between the mold box and the arc-shaped elastic part 820 is reduced by unscrewing the locking part 930, so that the arc-shaped elastic part 820 extends out of the movable opening 812 for a certain distance to compensate the position deviation of the steel-edge rubber water stop 1.
In one embodiment, the side of the mounting block 810 contacting the bottom of the mounting hole is provided with an elastic pad 813.
The working principle and the beneficial effects of the technical scheme are as follows: when installing the installation piece 810 to the mounting hole in, cushion 813 is used for the bottom surface butt with the mounting hole, prevents that the degree of depth preparation of mounting hole from appearing the deviation and making the exposed surface of installation piece 810 stretch out the mounting hole, when the diaphragm capsule extrudes it, cushion 813 can compensate this degree of depth deviation to make the exposed surface of installation piece 810 and the surperficial parallel and level of cushion 7 under the effort, further guarantee the accuracy of diaphragm capsule mounted position.
In one embodiment, in S600, the elastic crimping device 4 includes at least two crimping mechanisms 410, two crimping mechanisms 410 are locked by a limiting cover 420 connected with the two crimping mechanisms 410 in a sliding manner, when the limiting cover 420 is detached from the crimping mechanisms 410 in a sliding manner, the elastic crimping device 4 is in a triggered state, and the steel-edged rubber water stop 1 is crimped and fixed between the upper die box 2 and the lower die box 3 through the crimping mechanisms 410.
The working principle and the beneficial effects of the technical scheme are as follows: the elastic crimping device 4 can be provided with a plurality of groups in the length direction of the upper die box 2 or the lower die box 3 according to requirements, when the steel edge rubber water stop 1 is preliminarily fixed, the limiting cover 420 limits the crimping mechanism 410 to prevent the crimping mechanism from contacting with the steel edge rubber water stop 1, after the upper die box 2 and the lower die box 3 are fixed and the position of the steel edge rubber water stop 1 is adjusted, the limiting cover 420 is slid and detached from the crimping mechanism 410, so that the crimping mechanism 410 is in a triggering state and can perform crimping action on the steel edge rubber water stop 1; the two crimping mechanisms 410 are locked and limited through a limiting cover 420, and disassembly is facilitated.
In one embodiment, the crimping mechanism 410 includes: a mounting slot 411, wherein the mounting slot 411 is fixedly connected with the bottom surface of the upper mold box 2 or the top surface of the lower mold box 3, a fixing plate 412 is fixedly arranged at the bottom of an inner groove of the mounting slot 411, one end of the fixing plate 412 is connected with a first connecting plate 414 through a first arc-shaped plate 413, one end of the first connecting plate 414 away from the first arc-shaped plate 413 is smoothly connected with a second connecting plate 415 through a first bending plate 416, one end of the second connecting plate 415 away from the first connecting plate 414 is connected with a third connecting plate 418 through a second arc-shaped plate 417, the connection between the second arc-shaped plate 417 and the third connecting plate 418 is smoothly connected through a second bending plate 419, and one end of the third connecting plate 418 away from the second arc-shaped plate 417 is arranged between the fixing plate 412 and the second connecting plate 415;
two sides of the installation groove body 411 are convexly provided with limiting sliding plates 4111, two ends of the limiting cover 420 in the length direction are arranged in a penetrating manner, one side of the limiting cover 420 is provided with a sliding opening 421, and two opposite sides inside the sliding opening 421 are provided with limiting sliding ways 422 corresponding to the limiting sliding plates 4111;
when the limiting cover 420 is in sliding abutment with the limiting sliding plate 4111 of the installation groove body 411 through the limiting sliding way 422, the second arc-shaped plate 417 is in sliding abutment with the inner wall of the limiting cover 420 on the side away from the sliding opening 421, and when the limiting cover 420 is removed from the installation groove body 411 in a sliding manner, the second arc-shaped plate 417 extends out of the plane where the notch of the installation groove body 411 is located;
The working principle and the beneficial effects of the technical scheme are as follows: the installation groove body 411 is used for fixedly connecting the bottom surface of the upper die box 2 or the top surface of the lower die box 3, and can be selectively connected through bolts, and the specific installation position is determined according to the size of the steel-edged rubber water stop 1; the first bending plate 416 and the second bending plate 419 have certain elasticity, so that the first connecting plate 414 and the second connecting plate 415 are elastically connected, and the second arc-shaped plate 417 and the third connecting plate 418 are elastically connected; when the limit cover 420 does not limit the crimping mechanism 410, under the elastic action of the first bending plate 416 and the second bending plate 419, the second connecting plate 415 drives the second arc-shaped plate 417 to extend out of the notch of the installation groove 411, meanwhile, the limit stop 4181 is always kept inside the installation groove 411, the second bending plate 419 and the third connecting plate 418 keep the elastic supporting action on the second arc-shaped plate 417 and the second connecting plate 415, and the elastic acting force of the second arc-shaped plate 417 on the steel-edged rubber water stop 1 is enhanced; when the limiting cover 420 slides to be connected with the limiting sliding plate 4111, under the limitation of the limiting cover 420, the second arc-shaped plate 417 is pressed, and the third connecting plate 418 is retracted into the installation groove body 411; the number of the crimping mechanisms 410 on the same mounting surface is even, and the two crimping mechanisms 410 are symmetrically arranged, that is, the second arc-shaped plates 417 of the two crimping mechanisms 410 are oppositely arranged or arranged in an opposite way, so that the transverse stress of the steel-edged rubber water stop 1 on the same side is kept balanced; the second arc-shaped plate 417 is in contact with the steel-edge rubber water stop 1 and is in point-contact type compression joint, so that the bulge on the anchoring part 120 of the steel-edge rubber water stop 1 can be avoided, and the steel-edge rubber water stop 1 can be better fixed; when pouring is carried out, the second arc-shaped plate 417 is elastically pressed and connected with the steel plate rubber water stop 1 under the elastic acting force provided by the first bending plate 416 and the second bending plate 419, so that the steel edge rubber water stop 1 is effectively fixed, the position of the steel edge rubber water stop 1 is prevented from being deviated, the vibration effect directly transmitted to the steel edge rubber water stop 1 during a mold box and pouring can be reduced in a vibrating environment, and the situation that the steel edge rubber water stop 1 is deviated or falls off during pouring is further prevented; after the pouring is completed, the elastic crimping device 4 can be detached from the die box and can be used repeatedly, and the use cost is saved.
In one embodiment, the steel-edged rubber waterstop 1 comprises: the deformation part 110 is provided with anchoring parts 120 symmetrically on two sides of the deformation part 110, the anchoring parts 120 are primarily fixed through the upper die box 2 and the lower die box 3, and the anchoring part 120 on one side of the deformation part 110 is fixed through the elastic crimping device 4.
The working principle and the beneficial effects of the technical scheme are as follows: anchor 120 is used for when tentatively fixing, carries out the crimping to it fixedly through last diaphragm capsule 2 and lower diaphragm capsule 3, and anchor 120 of one side is fixed it after elastic crimping device 4 triggers to guarantee the fixed stability of steel limit rubber waterstop 1, anchor 120 of opposite side can be connected stably in pouring the structure of accomplishing.
In one embodiment, the reinforcement cage positioning device further comprises a levelness detection device, the levelness detection device is used for detecting whether the plurality of cushion blocks 7 arranged on the top surface or the bottom surface of the positioning bracket 5 are located on the same horizontal plane, and detecting whether the plurality of cushion blocks 7 arranged on the side surface of the reinforcement cage 6 are located on the same horizontal plane, and the detection method specifically comprises the following steps:
Di=(L1*Δd*sinβ)/[L2*sinα+Δd*sin(α+β)]
wherein D isiIs the distance between the detection plane of the ith pad 7 and the reference plane, L1Is equivalent object distance on the optical axis of the imaging lens, Δ d is the moving distance of the laser spot image point on the imaging plane, L2The equivalent image distance on the optical axis of the imaging lens is beta, the included angle between an imaging plane and the optical axis of the imaging lens is alpha, the included angle between the axial line of the laser beam and the optical axis of the imaging lens is alpha, and sin is the sine value of a trigonometric function;
Wherein n is the total number of the plurality of cushion blocks 7 mounted on the same surface;
The working principle and the beneficial effects of the technical scheme are as follows: because the plurality of cushion blocks 7 arranged on the top surface or the bottom surface of the positioning bracket 5 or the plurality of cushion blocks 7 arranged on the side surface of the reinforcement framework 6 are all used for positioning the upper die box 2 or the lower die box 3 to ensure the accuracy of the installation position of the upper die box or the lower die box 3, the upper die box 2 or the lower die box 3 needs to be ensured to be in full contact with the plurality of cushion blocks 7 as much as possible to ensure the stability of the fixation of the upper die box 2 and the lower die box 3, if the coplanarity of the plurality of cushion blocks 7 on the same installation surface is poor, the die box can not be in uniform contact with the plurality of cushion blocks 7 at the installation position, and when the die box is fixed subsequently, the risk of unstable installation caused by uneven stress of the die box also exists; therefore, the coplanarity of the cushion blocks 7 is measured more accurately by adopting the laser, the contact surfaces of the cushion blocks 7 and the die box are further ensured to be positioned on the same plane as much as possible, and the mounting stability of the die box is improved.
In the description of the present invention, it is to be understood that the terms "central," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," "circumferential," and the like are used in the orientations and positional relationships indicated in the drawings for convenience in describing the invention and to simplify the description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are therefore not to be considered limiting of the invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; may be mechanically coupled, may be electrically coupled or may be in communication with each other; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
While embodiments of the invention have been disclosed above, it is not limited to the applications set forth in the description and the embodiments, which are fully applicable in various fields of endeavor to which the invention pertains, and further modifications may readily be made by those skilled in the art, it being understood that the invention is not limited to the details shown and described herein without departing from the general concept defined by the appended claims and their equivalents.
Claims (10)
1. The utility model provides a trapezoidal bellmouth steel limit rubber waterstop fixed method of underground pipe gallery structure movement joint which characterized in that includes:
s100, manufacturing a die box, and installing an elastic compression joint device (4) on one side, opposite to the upper die box (2) and the lower die box (3), of the upper die box according to the shape and the size of the steel-edged rubber water stop (1);
s200, determining the position and the size of the deformation joint, marking by taking a perpendicular line at the deformation joint as a critical line, and installing a positioning bracket (5);
s300, according to the marked positions, a reinforcement framework (6) is built at the deformation joint trapezoid socket, and a cushion block (7) is bound on the reinforcement framework (6);
s400, an elastic pre-tightening device (8) is installed in a cushion block (7) on the side face of a reinforcement framework (6), a prefabricated mold box is preliminarily installed according to the position of the cushion block (7), and the steel-edged rubber water stop (1) is preliminarily fixed through an upper mold box (2) and a lower mold box (3);
s500, fixing the upper die box (2) and the lower die box (3) on a reinforcement framework (6) through a fixing assembly (9), and enabling an elastic pre-tightening device (8) to be extruded between the side face of the die box and the side face of a cushion block (7) to form a connection pre-tightening force;
s600, triggering the elastic crimping device (4) to crimp and fix the steel edge rubber water stop (1) between the upper die box (2) and the lower die box (3).
2. The method for fixing the rubber water stop with the trapezoid bellmouth of the deformation joint of the underground pipe gallery structure according to claim 1, wherein the fixing assembly (9) comprises a split bolt (910), a steel pipe (920) and a locking member (930), and the S500 comprises:
s501, enabling the split bolt (910) to penetrate through a through hole (10) formed in the side face of the die box, welding one end of the split bolt (910) with a reinforcement framework (6), enabling the other end of the split bolt to penetrate through two vertically arranged steel pipes (920), and enabling the split bolt (910) to be in threaded connection through a locking piece (930), so that the locking piece (930) extrudes the two steel pipes (920), and enabling the steel pipes (920) to be abutted against one side, far away from the reinforcement framework (6), of the die box;
s502, one side, close to the reinforcement framework (6), of the die box is always abutted against the elastic pre-tightening device (8), whether the installation position of the die box is accurate or not is determined according to the marked position in the step S200, and if deviation occurs in the position, the distance that the elastic pre-tightening device (8) extends out of the cushion block (7) is adjusted by screwing the locking piece (930), so that the transverse installation position of the die box is adjusted.
3. The method for fixing the steel-edged rubber water stop of the trapezoidal socket of the deformation joint of the underground pipe gallery structure according to claim 1, wherein the steel-edged rubber water stop (1) is preliminarily fixed in the S400 through an upper die box (2) and a lower die box (3), and comprises the following steps:
s401, abutting one surface of the steel-edged rubber water stop (1) against the top working surface of the lower die box (3) to ensure that the center line of the steel-edged rubber water stop (1) is aligned with the perpendicular line of the deformation joint;
s402, enabling the bottom working face of the upper die box (2) to abut against the other face of the steel-edge rubber water stop (1), ensuring that the center line of the steel-edge rubber water stop (1) is aligned with the perpendicular line of the deformation joint, and enabling the side face of the upper die box (2) far away from the reinforcement frame (6) and the side face of the lower die box (3) far away from the reinforcement frame (6) to be on a vertical plane.
4. The method for fixing the rubber water stop belt with the trapezoid bellmouth and the steel edge of the deformation joint of the underground pipe gallery structure as claimed in claim 2, wherein a plurality of partition plates (11) are arranged inside the upper die box (2) and the lower die box (3), and the through hole (10) is formed between two adjacent partition plates (11).
5. The method for fixing the rubber water stop with the trapezoid bellmouth and the steel edge of the deformation joint of the underground pipe gallery structure according to claim 2, wherein the elastic pre-tightening device (8) comprises: the installation piece (810), the inside of installation piece (810) is equipped with elastic component, set up in cushion (7) with the mounting hole that installation piece (810) correspond, installation piece (810) are close to one side of diaphragm capsule with the surface parallel and level of cushion (7), one side of elastic component stretches out installation piece (810) set up, and be used for with the side butt of diaphragm capsule.
6. The method for fixing the trapezoid bellmouth steel-edged rubber water stop of the underground pipe gallery structure deformation joint according to claim 5, characterized in that the elastic component comprises: the die box comprises an arc-shaped elastic piece (820) and pretightening force adjusting mechanisms (830), wherein at least two movable cavities (811) are arranged in a mounting block (810), a movable port (812) communicated with the movable cavities (811) is arranged on one side, close to the die box, of the mounting block (810), the arc-shaped elastic piece (820) is arranged at the movable port (812), an opening of the arc-shaped elastic piece (820) faces the movable cavities (811), the two pretightening force adjusting mechanisms (830) are symmetrically arranged in the movable cavities (811), and two end parts of one side of the arc-shaped elastic piece (820) are respectively hinged to end parts of the two pretightening force adjusting mechanisms (830);
the pretightening force adjusting mechanism (830) comprises a first sliding block (831) and a second sliding block (832), the first sliding block (831) and the second sliding block (832) are slidably connected into the movable chamber (811), one sides of the first sliding block (831) and the second sliding block (832) opposite to each other are respectively provided with a first threaded hole and a second threaded hole, the first threaded hole and the second threaded hole are respectively provided with a first stud (833) and a second stud (834), and the first stud (833) and the second stud (834) are connected through a spring (835);
a positioning column (836) is arranged at one end, away from the spring (835), of the first sliding block (831), a positioning hole corresponding to the positioning column (836) is arranged in the movable chamber (811), a first hinge rod (837) is arranged at one end, away from the spring (835), of the second sliding block (832), one end, away from the second sliding block (832), of the first hinge rod (837) is hinged to one end of the second hinge rod (838), and one end, away from the first hinge rod (837), of the second hinge rod (838) is hinged to the end of the arc-shaped elastic piece (820);
the surface of one side, away from the movable cavity (811), of the arc-shaped elastic piece (820) is provided with a plurality of elastic anti-slip strips (821), and the cross sections of the elastic anti-slip strips (821) are arranged in a pointed shape.
7. The method for fixing the rubber water stop band with the trapezoid bellmouth of the deformation joint of the underground pipe gallery structure according to claim 6, wherein an elastic cushion (813) is arranged on one side, in contact with the bottom of the mounting hole, of the mounting block (810).
8. The method for fixing the trapezoid bellmouth steel-edged rubber water stop of the underground pipe gallery structure deformation joint according to claim 1, characterized in that in the step S600, the elastic crimping device (4) comprises at least two crimping mechanisms (410), the two crimping mechanisms (410) are locked through a limiting cover (420) in sliding connection with the two crimping mechanisms, when the limiting cover (420) is detached from the crimping mechanisms (410) in a sliding mode, the elastic crimping device (4) is in a triggering state, and the steel-edged rubber water stop (1) is fixed between the upper die box (2) and the lower die box (3) in a crimping mode through the crimping mechanisms (410).
9. The method for fixing the trapezoid bellmouth steel-edged rubber water stop of the underground pipe gallery structure deformation joint according to claim 8, wherein the crimping mechanism (410) comprises: an installation groove body (411), the installation groove body (411) is fixedly connected with the bottom surface of the upper die box (2) or the top surface of the lower die box (3), a fixing plate (412) is fixedly arranged at the bottom of the inner groove of the mounting groove body (411), one end of the fixing plate (412) is connected with a first connecting plate (414) through a first arc-shaped plate (413), one end of the first connecting plate (414) far away from the first arc-shaped plate (413) is smoothly connected with a second connecting plate (415) through a first bent plate (416), the end of the second connecting plate (415) far away from the first connecting plate (414) is connected with a third connecting plate (418) through a second arc-shaped plate (417), the joint of the second arc-shaped plate (417) and the third connecting plate (418) is smoothly connected through a second bending plate (419), one end of the third connecting plate (418) far away from the second arc-shaped plate (417) is arranged between the fixing plate (412) and the second connecting plate (415);
two sides of the installation groove body (411) are convexly provided with limiting sliding plates (4111), two ends of the limiting cover (420) in the length direction are arranged in a through mode, one side of the limiting cover (420) is provided with a sliding port (421), and two opposite sides inside the sliding port (421) are provided with limiting sliding ways (422) corresponding to the limiting sliding plates (4111);
when the limiting cover (420) is in sliding abutting joint with a limiting sliding plate (4111) of the installation groove body (411) through a limiting sliding way (422), the second arc-shaped plate (417) is in abutting joint with the inner wall of one side, away from a sliding opening (421), of the limiting cover (420), and when the limiting cover (420) is detached from the installation groove body (411) in a sliding way, the second arc-shaped plate (417) extends out of a plane where a notch of the installation groove body (411) is located;
baffle plates (4112) are symmetrically arranged at the positions, close to the notches, of one ends of the second arc-shaped plates (417) of the installation groove bodies (411), limit stops (4181) abutted to the baffle plates (4112) are arranged on two sides of one ends, far away from the second arc-shaped plates (417), of the third connecting plates (418), and sliding grooves for the limit stops (4181) to slide are formed between the baffle plates (4112) and the inner groove bottoms of the installation groove bodies (411).
10. The method for fixing the trapezoid bellmouth steel-edged rubber water stop of the deformation joint of the underground pipe gallery structure according to claim 1, wherein the steel-edged rubber water stop (1) comprises: deformation portion (110), the bilateral symmetry of deformation portion (110) is equipped with anchor portion (120), anchor portion (120) pass through go up die box (2) and die box (3) carry out preliminary fixed down, anchor portion (120) of deformation portion (110) one side pass through elasticity crimping device (4) are fixed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210207852.2A CN114718121B (en) | 2022-03-04 | 2022-03-04 | Method for fixing trapezoid bell mouth steel edge rubber water stop belt of deformation joint of underground pipe gallery structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210207852.2A CN114718121B (en) | 2022-03-04 | 2022-03-04 | Method for fixing trapezoid bell mouth steel edge rubber water stop belt of deformation joint of underground pipe gallery structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114718121A true CN114718121A (en) | 2022-07-08 |
CN114718121B CN114718121B (en) | 2024-02-13 |
Family
ID=82236556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210207852.2A Active CN114718121B (en) | 2022-03-04 | 2022-03-04 | Method for fixing trapezoid bell mouth steel edge rubber water stop belt of deformation joint of underground pipe gallery structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114718121B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN207419543U (en) * | 2017-10-18 | 2018-05-29 | 中国二十冶集团有限公司 | A kind of pipe gallery corridor body deformation joint waterproof reinforced node |
CN207700222U (en) * | 2017-12-28 | 2018-08-07 | 谷建廷 | A kind of municipal underground pipeline lane |
CN111173043A (en) * | 2020-01-20 | 2020-05-19 | 陈金铭 | Underground structure deformation joint waterproof structure and construction method thereof |
CN111271096A (en) * | 2020-03-26 | 2020-06-12 | 中国电建集团华东勘测设计研究院有限公司 | Tunnel induced seam steel edge rubber water stop mounting structure and method |
JP2020133346A (en) * | 2019-02-25 | 2020-08-31 | 早川ゴム株式会社 | Fixing structure and fixing method of flexible joint |
CN111764430A (en) * | 2020-06-10 | 2020-10-13 | 北京万兴建筑集团有限公司 | Steel-edged rubber water stop for trapezoidal bellmouth of underground pipe gallery and construction method of steel-edged rubber water stop |
CN211849262U (en) * | 2020-03-25 | 2020-11-03 | 广东荣潮拓展建设有限公司 | Basement waterproof structure |
CN211973571U (en) * | 2020-03-30 | 2020-11-20 | 平湖市新信交通工程有限公司 | Bearing mechanism of adjacent tube coupling of prefabricated utility tunnel |
CN214246135U (en) * | 2020-10-12 | 2021-09-21 | 江苏永益铸管股份有限公司 | Cast steel node convenient to fixed connection |
-
2022
- 2022-03-04 CN CN202210207852.2A patent/CN114718121B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN207419543U (en) * | 2017-10-18 | 2018-05-29 | 中国二十冶集团有限公司 | A kind of pipe gallery corridor body deformation joint waterproof reinforced node |
CN207700222U (en) * | 2017-12-28 | 2018-08-07 | 谷建廷 | A kind of municipal underground pipeline lane |
JP2020133346A (en) * | 2019-02-25 | 2020-08-31 | 早川ゴム株式会社 | Fixing structure and fixing method of flexible joint |
CN111173043A (en) * | 2020-01-20 | 2020-05-19 | 陈金铭 | Underground structure deformation joint waterproof structure and construction method thereof |
CN211849262U (en) * | 2020-03-25 | 2020-11-03 | 广东荣潮拓展建设有限公司 | Basement waterproof structure |
CN111271096A (en) * | 2020-03-26 | 2020-06-12 | 中国电建集团华东勘测设计研究院有限公司 | Tunnel induced seam steel edge rubber water stop mounting structure and method |
CN211973571U (en) * | 2020-03-30 | 2020-11-20 | 平湖市新信交通工程有限公司 | Bearing mechanism of adjacent tube coupling of prefabricated utility tunnel |
CN111764430A (en) * | 2020-06-10 | 2020-10-13 | 北京万兴建筑集团有限公司 | Steel-edged rubber water stop for trapezoidal bellmouth of underground pipe gallery and construction method of steel-edged rubber water stop |
CN214246135U (en) * | 2020-10-12 | 2021-09-21 | 江苏永益铸管股份有限公司 | Cast steel node convenient to fixed connection |
Non-Patent Citations (1)
Title |
---|
陆亚华;: "地下结构伸缩缝处橡胶止水带施工工艺", 建筑技术开发, no. 05 * |
Also Published As
Publication number | Publication date |
---|---|
CN114718121B (en) | 2024-02-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6460214B1 (en) | Vibration resistive instant responding roadway or bridge expansion joint and construction method of the same | |
KR101506782B1 (en) | In-Site Molding Apparatus for manufacturing In-site Concrete Culverts with assembled Partial Precast Concrete | |
KR101433654B1 (en) | Sleeve Lib Joint usable with precast concrete, Manufacturing method for precast concrete having the same, and Installing method for precast concreat structure having the same | |
CN102648318B (en) | Transverse junction comprising two facing transverse ends of two successive pre-fabricated carriageway elements, and connecting system therefor | |
KR101161332B1 (en) | Construction method of the underground tunnel | |
JP2020533507A (en) | Improved curtain wall mullion anchor system | |
JPH06272495A (en) | Construction method of tunnel | |
CN114718121A (en) | Fixing method for trapezoidal bellmouth steel edge rubber water stop belt of underground pipe gallery structure deformation joint | |
KR101526461B1 (en) | Functional precast concrete culvert | |
KR20130081932A (en) | Fastening device for segments | |
CN115772908A (en) | Construction method for post-cast strip of submarine immersed tube tunnel | |
CN110284705B (en) | Sectional type formwork system for reinforcing concrete cylinder | |
CN109518809B (en) | Three-hinged arch | |
JP4753185B2 (en) | Waterway joint structure | |
CN113366178A (en) | Improved connector | |
JP6694852B2 (en) | Concrete block connecting device and connecting method | |
JP2704943B2 (en) | Method and apparatus for installing pre-shear deformation of rubber bearing for structures | |
CN215443114U (en) | Sealing plate structure of reinforced concrete column mould | |
CN113585749B (en) | Method for reinforcing internal and external corners of building shaping template | |
JP7429131B2 (en) | Formwork for manufacturing hexagonal segments | |
CN114606980B (en) | Fixing method for steel edge water stop belt of deformation joint socket of underground pipe gallery structure | |
CN215718838U (en) | Bury formula waterstop fixing device in two lining ends in tunnel | |
CN214819471U (en) | End post ring beam member moulded die | |
CN218757592U (en) | Pre-assembled electric power gallery structure | |
CN221546969U (en) | Assembled rectangular tunnel structure and standard block pipe joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |