CN114622453B - Recyclable grouting composite ice and snow melting asphalt pavement and paving method thereof - Google Patents

Recyclable grouting composite ice and snow melting asphalt pavement and paving method thereof Download PDF

Info

Publication number
CN114622453B
CN114622453B CN202210326803.0A CN202210326803A CN114622453B CN 114622453 B CN114622453 B CN 114622453B CN 202210326803 A CN202210326803 A CN 202210326803A CN 114622453 B CN114622453 B CN 114622453B
Authority
CN
China
Prior art keywords
ice
salt
parts
snow
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210326803.0A
Other languages
Chinese (zh)
Other versions
CN114622453A (en
Inventor
蔡广楠
魏唐中
李佩宁
鲁万华
夏新杰
张小强
杜信剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Ninglu New Materials Technology Co ltd
Nanjing Xingyou Traffic Technology Co ltd
Original Assignee
Jiangsu Ninglu New Materials Technology Co ltd
Nanjing Xingyou Traffic Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Ninglu New Materials Technology Co ltd, Nanjing Xingyou Traffic Technology Co ltd filed Critical Jiangsu Ninglu New Materials Technology Co ltd
Priority to CN202210326803.0A priority Critical patent/CN114622453B/en
Publication of CN114622453A publication Critical patent/CN114622453A/en
Application granted granted Critical
Publication of CN114622453B publication Critical patent/CN114622453B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B26/00Compositions of mortars, concrete or artificial stone, containing only organic binders, e.g. polymer or resin concrete
    • C04B26/02Macromolecular compounds
    • C04B26/26Bituminous materials, e.g. tar, pitch
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/06Aluminous cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B38/00Porous mortars, concrete, artificial stone or ceramic ware; Preparation thereof
    • C04B38/0038Porous mortars, concrete, artificial stone or ceramic ware; Preparation thereof by superficial sintering or bonding of particulate matter
    • C04B38/0041Porous mortars, concrete, artificial stone or ceramic ware; Preparation thereof by superficial sintering or bonding of particulate matter the particulate matter having preselected particle sizes
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/24Methods or arrangements for preventing slipperiness or protecting against influences of the weather
    • E01C11/245Methods or arrangements for preventing slipperiness or protecting against influences of the weather for preventing ice formation or for loosening ice, e.g. special additives to the paving material, resilient coatings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • E01C7/182Aggregate or filler materials, except those according to E01C7/26
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • E01C7/26Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • E01C7/26Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre
    • E01C7/265Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre with rubber or synthetic resin, e.g. with rubber aggregate, with synthetic resin binder
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/00612Uses not provided for elsewhere in C04B2111/00 as one or more layers of a layered structure
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/0075Uses not provided for elsewhere in C04B2111/00 for road construction
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/20Resistance against chemical, physical or biological attack
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/70Grouts, e.g. injection mixtures for cables for prestressed concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a recyclable grouting composite ice and snow melting asphalt pavement and a paving method thereof, wherein the asphalt pavement comprises an asphalt concrete framework material, a grouting material which is poured into the asphalt concrete framework material, and a composite salt-storage ice and snow melting filler which is poured into the asphalt concrete framework material and is positioned on the grouting material, wherein the end face of the composite salt-storage ice and snow melting filler is flush with the asphalt concrete framework material; when the pavement is paved, the asphalt concrete framework material is paved on the pavement base layer, then leveling and rolling are carried out, grouting materials are poured on the surface of the pavement base layer, pore channels are reserved, and composite salt-accumulating ice-snow melting filler is poured in the pore channels. After the composite salt-accumulating ice-snow melting filler on the surface layer is completely separated out, saturated salt solution can be sprayed on the road surface in advance, and the saturated salt solution enters the carrier structure for storage, so that the ice-snow melting effect can be continuously exerted in the following ice-snow weather.

Description

Recyclable grouting composite ice and snow melting asphalt pavement and paving method thereof
Technical Field
The invention belongs to the field of ice and snow melting asphalt pavement, and particularly relates to a recyclable grouting composite ice and snow melting asphalt pavement and a paving method thereof.
Background
The problem of high temperature rutting on road surfaces in summer is one of the most important problems affecting road use, especially at structures such as intersections. The grouting road surface technology (also called as semi-flexible road surface) is a novel rigid-flexible road surface structure, and the characteristics of flexible road surfaces and rigid road surfaces can be fully exerted. The current common grouting pavement technology is to mix the rigid material cement mortar or grouting cement mortar into the asphalt mixture matrix, so as to improve the rutting resistance of the asphalt mixture and improve the durability of the asphalt mixture. The pavement structure forms the material strength together with the aggregate and the cement paste by the embedding and extruding principle, and improves the load resistance of the pavement. Meanwhile, the high-temperature stability is greatly superior to that of the common asphalt concrete pavement, and the fatigue resistance and the skid resistance are also superior to those of the common asphalt concrete pavement. The pore channels in the framework also provide play for the compounding of other materials.
Snow ice problem of winter roads is also one of the most important factors affecting the driving safety of roads in winter. Traditional manual salt spraying and mechanical snow removal are time-consuming and labor-consuming, and can pollute the environment and damage roads. In order to solve the problem, the slow-release salt-storage snow-melting technology is increasingly valued by scientific researchers and traffic departments in all countries of the world. The principle is that the snow melting ice inhibiting material replaces part of filler or fine aggregate in asphalt concrete, or is added into emulsified asphalt to be coated on the surface of pavement in the form of a coating. The salt compound on the surface layer of the road surface is released during snowfall, the freezing point of ice and snow at the bonding part of the road surface is reduced, the ice and snow melt and enter the road surface in a solution form, and the salt compound on the deep layer of the road surface is released under the pumping action, osmotic pressure and capillary action of the vehicle load and rises to the road surface, so that the freezing point of the solution is reduced, and the ice of the road surface is delayed. However, the main problem of the development of the slow-release salt-storage snow-melting pavement is that the durability of the slow-release salt-storage filler is the problem, namely, in summer in high-temperature rain, the salt-storage filler on the pavement layer is easy to separate out under the action of running load, so that the filler is wasted on a large scale, and the ice and snow melting life of the slow-release salt-storage asphalt pavement is greatly reduced. Meanwhile, as the pore canal is left in the asphalt mixture after salt is analyzed, rainwater easily enters the asphalt mixture along the pore canal, and water damage of the mixture is accelerated. Research shows that the addition of the slow-release salt-accumulating filler can reduce the water stability by more than three times on average, and the water damage is more obvious along with the increase of the doping amount. These two points are also key factors for limiting the further development and application of the slow-release salt-storage filler.
Disclosure of Invention
The invention aims to: the first object of the invention is to provide a grouting composite ice and snow melting asphalt pavement, which combines grouting materials with composite salt-storage ice and snow melting fillers, so that the cyclic use of the composite salt-storage ice and snow melting fillers is realized while the load resistance of the pavement is improved, and the snow melting efficiency is improved;
a second object of the present invention is to provide a method for paving the above asphalt pavement.
The technical scheme is as follows: the invention relates to a recyclable grouting composite ice and snow melting asphalt pavement, which is characterized in that: the asphalt pavement comprises an asphalt concrete framework material, a grouting material which is poured into the asphalt concrete framework material, and a composite salt-storage ice-snow-melting filler which is poured into the asphalt concrete framework material and positioned on the grouting material, wherein the end face of the composite salt-storage ice-snow-melting filler is flush with the asphalt concrete framework material; wherein, the asphalt concrete framework material is 70-90 parts, the grouting material is 10-15 parts, and the composite salt-accumulating ice-snow-melting filler is 1-5 parts.
According to the asphalt pavement disclosed by the invention, the composite salt-storage ice-snow-melting filler is poured on the grouting material, the composite salt-storage ice-snow-melting filler is added into the grouting material and is added into the surface layer of the grouting pavement in a fluid form, the rapid precipitation of the ice-snow-melting salt is realized by virtue of the large-gap structure of the surface layer, and the ice-snow-melting efficiency is greatly increased; meanwhile, the slow-release salt-storage filler is prevented from being directly added into the pavement structural layer material, so that damage of the salt-storage filler to the pavement structure is reduced, and the pavement performance of the slow-release salt-storage pavement is improved; in addition, based on the composite salt-accumulating ice-snow melting filler, when the filler on the surface layer is completely separated out after the filler is fully acted, saturated salt solution can be sprayed on the road surface in advance, the salt solution can infiltrate downwards in pores in time by means of a road surface dryer, and the salt solution enters a carrier structure for storage, so that the ice-snow melting effect can be continuously exerted in the following ice-snow weather.
Further, the top end of the grouting material is 5-10mm away from the top end of the asphalt concrete framework material, and the composite salt-storage ice-snow melting filler is filled in the 5-10mm gap.
Further, the composite salt-accumulating ice-snow melting filler adopted by the invention comprises, by weight, 60-70 parts of emulsified asphalt, 20-30 parts of inorganic salt, 2-6 parts of a high molecular binder, 0.1-1 part of an active diluent, 25-40 parts of a carrier, 1-3 parts of a surface active treatment agent, 2-5 parts of a high molecular surface polymer coating material, 0.5-2 parts of a wetting cosolvent and 0.1-2 parts of a waterproofing agent.
Further, the carrier adopted by the invention at least comprises one of zeolite, volcanic rock, diatomite, fly ash, floating beads, glass beads, expanded perlite, active carbon, graphene microplates, white carbon black or sepiolite.
Further, the surface active treatment agent adopted by the invention at least comprises one of span-60 polyorganosiloxane, lignin amine, quaternary ammonium salt, sodium dodecyl sulfonate, ammonium diacetate or silane coupling agent.
Further, the polymer coating material used in the invention at least comprises one of polyvinyl alcohol, polyethylene glycol, polyglycerol or polystyrene.
Further, the composite salt-accumulating ice-snow-melting filler adopted by the invention is prepared by the following steps:
(1) Stirring inorganic salt and a carrier for 5-8 hours under the water bath heating condition of 60-70 ℃ to prepare carrier adsorption inorganic salt saturated emulsion;
(2) Drying the inorganic salt saturated solution, adding the inorganic salt saturated solution into an organic solvent doped with a surface active treating agent, a high molecular surface polymer coating material and a waterproof agent, stirring and centrifugally separating to obtain a salt storage filler material adsorbed by a carrier;
(3) Heating emulsified asphalt to 100-200 ℃, adding a high molecular binder to prepare modified asphalt emulsion, mixing and shearing the salt-storage filler material, the reactive diluent and the wetting cosolvent for 30-40min at the speed of 8000-10000r/min, and preparing the composite salt-storage ice-snow melting filler.
Further, the asphalt concrete framework material adopted by the invention comprises 5-10 parts by weight of SBS modified asphalt, 80-90 parts by weight of limestone aggregate and 3-8 parts by weight of limestone mineral powder.
Further, the grouting material adopted by the invention comprises, by weight, 35-65 parts of sulphoaluminate cement, 12-30 parts of silica fume, 15-25 parts of quartz sand, 0.05-0.5 part of nano ettringite early strength agent, 0.1-0.5 part of water reducer, 0.01-0.1 part of defoamer, 0.01-0.05 part of fiber, 0.5-2.5 parts of expanding agent and 19.66-50 parts of water.
The invention relates to a method for paving the recyclable grouting composite ice and snow melting asphalt pavement, which comprises the following steps: paving an asphalt concrete framework material on a pavement base layer, leveling and rolling, pouring grouting material on the surface of the pavement base layer when the pavement base layer is cooled to below 40 ℃, reserving a pore channel from the upper end of the surface of the grouting material to the upper end of the framework material, pouring composite salt-accumulating ice-snow-melting filler into the pore channel after the grouting material is hardened, and drying to obtain the grouting composite ice-snow-melting asphalt pavement; after the inorganic salt in the composite salt-accumulating ice-snow-melting filler is completely separated out, the saturated salt solution is directly sprayed on the pavement, so that the recyclable grouting composite ice-snow-melting asphalt pavement is realized.
The beneficial effects are that: compared with the prior art, the invention has the remarkable advantages that: according to the asphalt pavement, the composite salt-storage ice-snow-melting filler is poured on the surface of the grouting material, so that the composite salt-storage ice-snow-melting filler on the surface layer is easier to separate out under the condition of improving the load resistance of the pavement, and the ice-snow-melting efficiency is improved. And the composite salt-accumulating ice-snow-melting filler is prevented from being directly added into the pavement structural layer material, so that the damage of the composite salt-accumulating ice-snow-melting filler to the pavement structure is reduced, and the pavement performance of the slow-release salt-accumulating pavement is improved. Meanwhile, after the composite salt-accumulating ice-snow melting filler on the surface layer is completely separated out after the composite salt-accumulating ice-snow melting filler plays a role, saturated salt solution can be sprayed on the road surface in advance, the salt solution is timely infiltrated downwards in pores by means of a road surface dryer and enters a carrier structure for storage, the ice-snow melting effect is continuously exerted in the following ice-snow weather, namely, the structure of a grouting channel and a salt-accumulating carrier is utilized, the recyclable supplement of the salt-accumulating filler on the surface layer is realized, the ice-snow melting effect period of the road surface is greatly improved, and the ice-snow removing cost of the road surface is reduced. In addition, the road surface shock absorption effect is improved, and the running stability of the vehicle is improved.
Drawings
FIG. 1 is a schematic view of the structure of an asphalt pavement of the present invention;
FIG. 2 is a schematic diagram of the microstructure of the composite salt-accumulating ice-snow melting filler of the invention;
FIG. 3 is a graph showing the change of the conductivity of the solution after the pavement of the present invention is washed by running water.
Detailed Description
The technical scheme of the invention is further described in detail below with reference to the accompanying drawings and the examples. The raw materials used in the present invention are commercially available.
As shown in fig. 1, the asphalt pavement structure of the invention comprises an asphalt concrete framework material 1, a grouting material 2 poured into the asphalt concrete framework material 1, and a composite salt-storage ice and snow melting filler 3 poured into the asphalt concrete framework material 1 at the upper end of the grouting material 2. The composite salt-accumulating ice-snow melting filler structure is shown in the following figure 2, and is supported by a carrier 4, inorganic salt 5 is adsorbed in the carrier, and the outer surface of the carrier 4 is coated with a polymer coating material 6 on the surface of a polymer.
The pavement material comprises: 70-90 parts of asphalt concrete framework material, 10-15 parts of grouting material and 1-5 parts of composite salt-accumulating ice-snow melting filler. Preferably 86-88 parts of asphalt concrete framework material, 10-11 parts of grouting material and 2-3 parts of composite salt-accumulating ice-snow melting filler.
The asphalt concrete framework material comprises the following components in parts by weight: 5-10 parts of SBS modified asphalt, 80-90 parts of limestone aggregate with the diameter of 0.075-19 mm and 3-8 parts of limestone mineral powder. The preferred method can be as follows: 5-8 parts of SBS modified asphalt, 88.3-89 parts of limestone aggregate with the diameter of 0.075-19 mm and 5.8-7 parts of limestone mineral powder. The raw materials are directly mixed and compounded when the framework material is prepared.
The grouting material comprises the following components in parts by weight: 35-65 parts of sulphoaluminate cement, 12-30 parts of silica fume, 15-25 parts of quartz sand, 0.05-0.5 part of nano ettringite early strength agent, 0.1-0.5 part of water reducer, 0.01-0.1 part of defoamer, 0.01-0.05 part of fiber, 0.5-2.5 parts of swelling agent and 19.66-50 parts of water. The preferred method can be as follows: 45-60 parts of sulphoaluminate cement, 15-20 parts of silica fume, 18-22 parts of quartz sand, 0.15-0.3 part of nano ettringite early strength agent, 0.2-0.3 part of water reducer, 0.05-0.1 part of defoamer, 0.03-0.05 part of fiber, 1.8-2 parts of swelling agent and 19.66-40 parts of water. The grouting preparation method comprises the steps of directly mixing and compounding raw materials.
The water reducer can be a powder water-reducing type polycarboxylate water reducer; the defoamer can be simethicone; the fibrous material may be lignin fibers; the expanding agent may be a mixture of aluminum powder and iron powder.
The composite salt ice and snow melting filler comprises the following components in parts by weight: 60-70 parts of emulsified asphalt, 20-30 parts of inorganic salt, 2-6 parts of polymer binder, 0.1-1 part of reactive diluent, 25-40 parts of carrier, 1-3 parts of surface active treating agent, 2-5 parts of polymer coating material on the surface of the polymer, 0.5-2 parts of wetting cosolvent and 0.1-2 parts of waterproofing agent. The preferred method can be as follows: 63-68 parts of emulsified asphalt, 25-28 parts of inorganic salt, 2.5-4 parts of polymer binder, 0.5-0.8 part of reactive diluent, 30-35 parts of carrier, 1-3 parts of surface active treating agent, 3-4.5 parts of polymer coating material on the surface of the polymer, 0.5-2 parts of wetting cosolvent and 0.1-1.5 parts of waterproofing agent.
Wherein the inorganic salt is sodium chloride and/or calcium chloride; the polymer binder at least comprises one of SBR, SEBS or epoxy resin. The active diluent is polyoxyethylene organic solution with the concentration of 5 percent; the carrier can at least comprise one of zeolite, volcanic rock, diatomite, fly ash, floating beads, glass beads, expanded perlite, activated carbon, graphene microplates, white carbon black or sepiolite; the surface active treating agent at least comprises one of span-60 polyorganosiloxane, lignin amine, quaternary ammonium salt, sodium dodecyl sulfonate, ammonium diacetate or silane coupling agent; the polymer coating material on the surface of the polymer at least comprises one of polyvinyl alcohol, polyethylene glycol, polyglycerol or polystyrene; the wetting co-solvent may be a polyoxyethylene alkylaryl ether and/or a polyoxyethylene polyol ether; the water-proofing agent can be SHP-50 polysiloxane.
Example 1
The materials and contents included in the road surface of example 1 are shown in table 1 below.
Table 1 pavement raw materials and compositions of examples
Sequence number Raw materials Content/part
1 Asphalt concrete framework material 88
2 Grouting material 10
3 Composite salt-storage ice-snow-melting filler 2
The asphalt concrete skeleton material includes the raw materials and the components shown in table 2 below.
TABLE 2 raw materials and Components of asphalt concrete skeleton Material
Sequence number Raw materials Content/part
1 SBS modified asphalt 5
2 Limestone aggregate with diameter of 0.075mm-19mm 89
3 Limestone mineral powder 6
The composite salt-accumulating ice-snow melting filler comprises the following raw materials and components shown in table 3.
TABLE 3 raw materials and compositions of composite salt-accumulating ice-snow melting filler
The composite salt ice and snow melting filler of the embodiment is prepared by the following steps:
(1) Stirring sodium chloride and volcanic rock under the water bath heating condition of 60 ℃, wherein the rotation speed of a stirrer is 300r/min, and the stirring time is 5h, so as to prepare saturated emulsion of the volcanic rock for adsorbing sodium chloride; after the drying treatment, adding cyclohexane organic solution (excessive) doped with poly (organohydrogensiloxane), polyvinyl alcohol and SHP-50 polysiloxane, stirring in a stirrer with the rotating speed of 500r/min, centrifugally separating, and cleaning impurities to obtain a volcanic rock adsorbed salt storage filler finished product;
(2) Heating emulsified asphalt to 150 ℃, then adding SBR and SEBS latex into an emulsifier solution together, and stirring to obtain soap solution; adjusting the PH of the soap solution to 4, and shearing at a high speed of 6000r/min for 2min to obtain modified asphalt emulsion; and mixing and shearing the prepared volcanic rock adsorbed salt storage filler finished product, the polyoxyethylene organic solution and the polyoxyethylene alkylaryl ether, and shearing for 30min at a shearing speed of 8000r/min to prepare the composite salt storage ice and snow melting filler.
The grouting materials of this example include the following raw materials and contents as shown in table 4.
TABLE 4 grouting materials raw materials and Components
The pavement paving method of the embodiment comprises the following steps:
(1) Paving an asphalt concrete framework material with the thickness of 6cm on the base layer, and leveling and rolling; when the temperature of the mixture is cooled to below 40 ℃, grouting material is poured on the surface, and the pouring depth of the grouting material is slightly lower than the depth of an asphalt mixture framework, so that a 5mm gap channel is reserved on the surface layer;
(2) After the grouting material is hardened, the composite salt-accumulating ice-snow melting filler is poured into the gap channel on the surface layer of the pavement, and the recyclable grouting composite ice-snow melting asphalt pavement is obtained after drying for 2 hours.
Example 2
The materials and contents included in the road surface of example 2 are shown in table 5 below.
Table 5 pavement raw materials and compositions of examples
Sequence number Raw materials Content/part
1 Asphalt concrete framework material 86
2 Grouting material 11
3 Composite salt-storage ice-snow-melting filler 3
The asphalt concrete skeletal material includes the raw materials and components shown in table 6 below.
TABLE 6 raw materials and Components of asphalt concrete skeleton Material
Sequence number Raw materials Content-Parts by weight
1 SBS modified asphalt 5.9
2 Limestone aggregate with diameter of 0.075mm-19mm 88.3
3 Limestone mineral powder 5.8
The composite salt-accumulating ice-snow melting filler comprises the following raw materials and components shown in table 7.
TABLE 7 raw materials and compositions of composite salt-accumulating ice and snow melting filler
The salt-accumulating ice-snow melting filler of the embodiment is prepared by the following steps:
(1) Stirring sodium chloride and volcanic rock under the water bath heating condition of 65 ℃ at the rotating speed of 350r/min for 6 hours to prepare saturated emulsion of volcanic rock adsorbed sodium chloride; adding the mixture into cyclohexane organic solvent (excessive) doped with poly (organohydrogensiloxane), polyvinyl alcohol and SHP-50 polysiloxane after drying treatment, stirring in a stirrer with the rotating speed of 700r/min, centrifugally separating, and cleaning impurities to obtain a volcanic rock adsorbed salt storage filler finished product;
(2) Heating emulsified asphalt to 170 ℃, then adding SBR and SEBS latex into an emulsifier solution together, and stirring to obtain soap solution; adjusting the PH of the soap solution to 4.5, and shearing at a high speed of 7000r/min for 2min to obtain modified asphalt emulsion; and mixing and shearing the prepared volcanic rock adsorbed salt storage filler finished product, the polyoxyethylene organic solution and the polyoxyethylene alkylaryl ether, and shearing for 30min at the shearing speed of 9000r/min to prepare the composite salt storage ice and snow melting filler.
The grouting materials of this example include the following raw materials and contents as shown in table 8.
Table 8 raw materials and Components of grouting Material
The pavement paving method of the embodiment comprises the following steps:
(1) Paving an asphalt concrete framework material with the thickness of 8cm on a base layer, and leveling and rolling; when the temperature of the mixture is cooled to below 40 ℃, grouting material is poured on the surface, and the pouring depth of the grouting material is slightly lower than the depth of an asphalt mixture framework, so that 8mm of gap channels are reserved on the surface layer;
(2) After the grouting material is hardened, the composite salt-accumulating ice-snow melting filler is poured into the gap channel on the surface layer of the pavement, and the recyclable grouting composite ice-snow melting asphalt pavement is obtained after drying for 2 hours.
Example 3
The materials and contents included in the road surface of example 3 are shown in table 9 below.
Table 9 pavement raw materials and compositions of examples
Sequence number Raw materials Content/part
1 Asphalt concrete framework material 88
2 Grouting material 10
3 Composite salt-storage ice-snow-melting filler 2
The asphalt concrete skeletal material includes the raw materials and components shown in table 10 below.
TABLE 10 raw materials and Components of asphalt concrete skeleton Material
Sequence number Raw materials Content/part
1 SBS modified asphalt 8
2 Limestone aggregate with diameter of 0.075mm-19mm 85
3 Limestone mineral powder 7
The composite salt-accumulating ice-snow melting filler comprises the following raw materials and components shown in table 11.
Table 11 raw materials and compositions of composite salt-accumulating ice-snow melting filler
The salt-accumulating ice-snow melting filler of the embodiment is prepared by the following steps:
(1) Stirring sodium chloride and volcanic rock under the condition of heating in a water bath at 70 ℃, wherein the rotation speed of a stirrer is 400r/min, and the stirring time is 7h, so as to prepare saturated emulsion of the volcanic rock for adsorbing sodium chloride; adding the mixture into cyclohexane organic solvent (excessive) doped with poly (organohydrogensiloxane), polyvinyl alcohol and SHP-50 polysiloxane after drying treatment, stirring in a stirrer with the rotating speed of 750r/min, centrifugally separating, and cleaning impurities to obtain a volcanic rock adsorbed salt storage filler finished product;
(2) Heating emulsified asphalt to 170 ℃, then adding SBR and SEBS latex into an emulsifier solution together, and stirring to obtain soap solution; adjusting the PH of the soap solution to 5, and shearing at a high speed of 8000r/min for 2min to obtain modified asphalt emulsion; and mixing and shearing the prepared volcanic rock adsorbed salt storage filler finished product, the polyoxyethylene organic solution and the polyoxyethylene alkylaryl ether, and shearing for 40min at a shearing speed of 10000r/min to prepare the composite salt storage ice and snow melting filler.
The grouting materials of this example include the following materials and contents as shown in table 12.
Table 12 raw materials and Components of grouting Material
The pavement paving method of the embodiment comprises the following steps:
(1) Paving an asphalt concrete framework material with the thickness of 10cm on a base layer, and leveling and rolling; when the temperature of the mixture is cooled to below 40 ℃, grouting the grouting material on the surface, wherein the grouting depth is slightly lower than the depth of an asphalt mixture framework, so that a 10mm gap channel is reserved on the surface layer;
(2) After the grouting material is hardened, the composite salt-accumulating ice-snow melting filler is poured into the gap channel on the surface layer of the pavement, and the recyclable grouting composite ice-snow melting asphalt pavement is obtained after drying for 2 hours.
Performance detection
Low temperature rain and fog test
The low-temperature rain and fog ice test aims at evaluating the ice and snow melting effect of the composite salt ice and snow melting filler on the surface of the mixture in a lower-temperature and moist environment. The method is characterized in that a low-temperature environment test box is adopted, a certain temperature (-5 ℃ to 0 ℃) is set, the environment humidity (70%) and the surface water spraying of a test piece are regulated, so that two working conditions of fog and rain of an actual pavement under the low-temperature condition in winter are simulated, and the ice and snow melting effects of the surface of the recyclable grouting composite ice and snow melting asphalt pavement mixture and the common grouting anti-rutting asphalt concrete under different conditions are analyzed. Wherein the condition of mist is set to be at-5 ℃, the humidity is set to be 70%, the condition of rain is set to be at-5 ℃, and water is sprayed on the surface of the test piece.
(1) According to the preparation method in each embodiment, respectively preparing a recyclable grouting composite ice and snow melting asphalt mixture Marshall test piece and a common grouting anti-rutting asphalt concrete Marshall test piece (as a blank group);
(2) Placing the prepared test piece in a low-temperature environment test box, wherein the simulated working condition is rain, the temperature in the box is set to be-5 ℃, and the humidity is set to be 70%; the working condition is rain, the temperature in the box is set to be minus 5 ℃, and water is sprayed on the surface of a test piece;
(3) After 5 hours of freezing in the box, the Marshall test piece was taken out to observe the freezing condition of the surface of the test piece, and the obtained results are shown in Table 13 below.
Table 13 icing condition of test piece in low-temperature rain and fog simulation experiment
Working conditions of Control group Example 1 Example 2 Example 3
Mist spray Surface one-layer white cream The surface is substantially unchanged The surface is substantially unchanged The surface is substantially unchanged
Rain cover Surface icing Low surface icing Unfrozen ice Unfrozen ice
As shown by the results, the recyclable grouting composite ice and snow melting asphalt pavement structure prepared by the invention can effectively reduce the freezing point of the pavement aqueous solution, and the freezing point range is more than or equal to-5 ℃. The grouting composite asphalt concrete test piece with the proper amount of the composite salt-accumulating ice-snow-melting filler is mixed on the surface, so that the grouting composite asphalt concrete test piece has a remarkable ice-melting effect compared with a grouting composite asphalt concrete test piece (blank group) without the composite salt-accumulating ice-snow-melting filler, and the grouting composite asphalt concrete test piece can achieve the effect of melting ice and snow in winter when being mixed in a grouting anti-rutting pavement structure.
(II) Ice interfacial pullout test
Under the condition of medium to large snow, the temperature is low, the ice and snow can not melt, snow or ice layer exists on the road surface of the ice and snow melting road surface, and the ice interface drawing test is just by measuring the binding force of the snow or ice layer and the road surface, and the effect of ice and snow melting of the composite salt ice and snow storage filler is judged. If the composite salt-storage ice-snow melting filler can reduce the binding force of snow or ice layers and the road surface, so that the ice and snow on the road surface are easier to remove, the ice and snow removing operation efficiency is improved, the highway can quickly recover traffic under the condition of medium and large snow, and the interference of snowfall on public travel is reduced. In order to evaluate the bonding performance of the ice interface and the road surface mixture, the ice interface drawing test can be adopted for evaluation, so that the ice and snow melting performance of the composite salt-storage ice and snow melting filler is indirectly reflected, and the specific method is as follows:
(1) Preparing three Marshall test pieces mixed with the composite salt-accumulating ice-snow-melting filler in the embodiment, and demolding for later use;
(2) Different test pieces are placed in drawing equipment, fixed and inspected, watering is carried out in the drawing equipment so that the bottom of the drawing equipment is covered by water surface, the bottom of the test piece is fully ensured to be contacted with the water surface of the drawing equipment, the test pieces are placed in a refrigerator at the temperature of minus 10 ℃ for 24 hours, the test pieces are taken out for quick drawing test, and the obtained results are shown in the following table 14.
TABLE 14 Ice interfacial pull strength
Performance of Control group Example 1 Example 2 Example 3
Drawing strength (MPa) 0.37 0.27 0.25 0.24
It is apparent from table 14 that, after the composite salt-storing and ice-snow-melting filler is mixed, the composite salt-storing and ice-snow-melting filler enters the interface between the ice layer and the mixture, so that the freezing point can be effectively lowered, and the surface adhesion between the ice layer and the mixture is weakened. And the bonding strength of the interface between the ice layer and the mixture can be reduced by about 50% by doping the composite salt-storing ice-snow melting filler. Under the condition of long-term low temperature and large snow in winter, snow accumulated on the pavement and ice layers on the surface of the ice-snow melting asphalt pavement are easier to remove, which is equivalent to the effect of passively spreading the snow-melting agent, the efficiency of manually removing ice and snow on the expressway in winter is improved, and the smoothness and safety of the expressway are ensured.
(III) conductivity Performance detection
The test piece with the grouting composite ice and snow melting pavement structure prepared in the above way is taken and soaked in distilled water, and the DDS-307 conductivity tester is selected to conduct conductivity test on the test piece soaking liquid every other day, and the obtained result is shown in figure 3. From this figure, it was found that the salt still precipitated in the thirty-th soaking, and the initial precipitation amount was large. Has obvious effect of quickly melting road surface snow.
Example 4
The materials and contents included in the road surface of example 4 are shown in table 15 below.
Table 15 pavement materials and compositions of examples
Sequence number Raw materials Content/part
1 Asphalt concrete framework material 70
2 Grouting material 15
3 Composite salt-storage ice-snow-melting filler 5
The asphalt concrete skeletal material included raw materials and components are shown in table 16 below.
Table 16 raw materials and components of asphalt concrete skeleton material
Sequence number Raw materials Content/part
1 SBS modified asphalt 10
2 Limestone aggregate with diameter of 0.075mm-19mm 80
3 Limestone mineral powder 8
The composite salt-accumulating ice-snow melting filler comprises the following raw materials and components shown in table 17.
Table 17 raw materials and compositions of composite salt-accumulating ice-snow melting filler
The composite salt ice and snow melting filler of the embodiment is prepared by the following steps:
(1) Stirring the mixed salt of sodium chloride and calcium chloride and zeolite under the water bath heating condition of 65 ℃, wherein the rotating speed of a stirrer is 300r/min, and the stirring time is 8 hours, so as to prepare saturated emulsion of the zeolite for adsorbing the sodium chloride and the calcium chloride; adding cyclohexane organic solution (excessive) doped with sodium dodecyl sulfate, polyethylene glycol and SHP-50 polysiloxane after drying treatment, stirring in a stirrer with the rotating speed of 500r/min, centrifugally separating, and cleaning impurities to obtain a volcanic rock adsorbed salt storage filler finished product;
(2) Heating emulsified asphalt to 100 ℃, then adding epoxy resin emulsion into the emulsifier solution, and stirring to obtain soap solution; adjusting the PH of the soap solution to 4, and shearing at a high speed of 6000r/min for 2min to obtain modified asphalt emulsion; and mixing and shearing the prepared zeolite-adsorbed salt-accumulating filler finished product, the polyoxyethylene organic solution and the polyoxyethylene polyol ether, and shearing for 30min at the shearing speed of 9000r/min to prepare the composite salt-accumulating ice-snow melting filler.
The grouting materials of this example include the following materials and contents shown in table 18.
Table 18 grouting materials and compositions
/>
The pavement paving method of this example is the same as that of example 1.
Example 5
The materials and contents included in the road surface of example 5 are shown in table 19 below.
Table 19 pavement materials and compositions of examples
Sequence number Raw materials Content/part
1 Asphalt concrete framework material 90
2 Grouting material 10
3 Composite salt-storage ice-snow-melting filler 1
The asphalt concrete skeletal material includes the raw materials and components shown in table 20 below.
Table 20 raw materials and components of asphalt concrete skeleton material
Sequence number Raw materials Content/part
1 SBS modified asphalt 7
2 Limestone aggregate with diameter of 0.075mm-19mm 90
3 Limestone mineral powder 3
The raw materials and components of the composite salt ice and snow melting filler are shown in the following table 21.
Table 21 raw materials and compositions of composite salt-accumulating ice-snow melting filler
The composite salt ice and snow melting filler of the embodiment is prepared by the following steps:
(1) Stirring sodium chloride, diatomite and fly ash under the water bath heating condition of 65 ℃, wherein the rotating speed of a stirrer is 300r/min, and the stirring time is 8 hours, so that saturated emulsion of the diatomite and the fly ash for adsorbing the sodium chloride is prepared; after the drying treatment, adding cyclohexane organic solution (excessive) doped with ammonium diacetate, polypropylene glycol and SHP-50 polysiloxane, stirring in a stirrer with the rotating speed of 500r/min, centrifugally separating, and cleaning impurities to obtain a volcanic rock adsorbed salt storage filler finished product;
(2) Heating emulsified asphalt to 200 ℃, then adding epoxy resin emulsion into the emulsifier solution, and stirring to obtain soap solution; adjusting the PH of the soap solution to 4, and shearing at a high speed of 6000r/min for 2min to obtain modified asphalt emulsion; and mixing and shearing the prepared diatomite and fly ash adsorbed salt storage filler finished product, polyoxyethylene organic solution, polyoxyethylene alkylaryl ether and polyoxyethylene polyol ether, and shearing for 30min at a shearing speed of 9000r/min to obtain the composite salt storage ice and snow melting filler.
The grouting materials of this example include the following materials and contents as shown in table 22.
Table 22 raw materials and compositions of grouting materials
Sequence number Raw materials Specific substances Content/part
1 Sulphoaluminate cement Sulphoaluminate cement 65
2 Silica fume Silica fume 30
3 Quartz sand Quartz sand 25
4 Nano ettringite early strength agent Nano ettringite early strength agent 0.5
5 Water reducing agent Powder water-reducing polycarboxylate water reducer 0.5
6 Defoaming agent Dimethicone 0.1
7 Fiber Lignin fiber 0.05
8 Expanding agent Aluminum powder and iron powder mixture 2.5
9 Water and its preparation method Distilled water 50
The pavement paving method of this example is the same as that of example 1.
The performance of the marshall test pieces of the recyclable grouting compound ice and snow asphalt mixture prepared in examples 4 and 5 was respectively tested, and the results were not much different from those of examples 1 to 3. Therefore, the asphalt pavement disclosed by the invention has the advantages that the composite salt-storage ice-snow-melting filler is poured on the surface of the grouting material, so that the composite salt-storage ice-snow-melting filler on the surface layer is easier to separate out under the condition of improving the load resistance of the pavement, and the ice-snow-melting efficiency is improved. And after the composite salt-accumulating ice-snow melting filler on the surface layer is completely separated out after the composite salt-accumulating ice-snow melting filler plays a role, saturated salt solution can be sprayed on the road surface in advance, the salt solution can infiltrate downwards in pores in time by means of a road surface dryer and enter a carrier structure for storage, the ice-snow melting effect is continuously exerted in the following ice and snow weather, namely, the structure of a grouting channel and a salt-accumulating carrier is utilized, the recyclable supplement of the salt-accumulating filler on the surface layer is realized, the ice-snow melting effect period of the road surface is greatly improved, and the ice-snow removing cost of the road surface is reduced.
In addition to the above embodiments, the carrier in the composite salt-storage ice and snow melting filler used in the recyclable grouting composite ice and snow melting asphalt pavement of the invention can at least comprise one of floating beads, glass beads, expanded perlite, activated carbon, graphene microplates, white carbon black or sepiolite. The surface-active treatment agent may also include at least one of lignin amines, quaternary ammonium salts, or silane coupling agents. The polymer coating material on the surface of the polymer can at least also comprise polypropylene glycol and/or polystyrene.

Claims (8)

1. The method for paving the recyclable grouting composite ice and snow melting asphalt pavement is characterized in that the asphalt pavement related to the paving method comprises an asphalt concrete framework material, grouting materials which are poured into the asphalt concrete framework material, and composite salt-storage ice and snow melting fillers which are poured into the asphalt concrete framework material and are positioned on the grouting materials, wherein the end surfaces of the composite salt-storage ice and snow melting fillers are flush with the asphalt concrete framework material; wherein, 70-90 parts of asphalt concrete framework material, 10-15 parts of grouting material and 1-5 parts of composite salt-accumulating ice-snow melting filler; the composite salt-accumulating ice-snow melting filler comprises, by weight, 60-70 parts of emulsified asphalt, 20-30 parts of inorganic salt, 2-6 parts of a high molecular binder, 0.1-1 part of an active diluent, 25-40 parts of a carrier, 1-3 parts of a surface active treating agent, 2-5 parts of a high molecular surface polymer coating material, 0.5-2 parts of a wetting cosolvent and 0.1-2 parts of a waterproof agent;
the laying method comprises the following steps: paving an asphalt concrete framework material on a pavement base layer, leveling and rolling, pouring grouting material on the surface of the pavement base layer when the pavement base layer is cooled to below 40 ℃, reserving a pore channel from the upper end of the surface of the grouting material to the upper end of the framework material, pouring composite salt-accumulating ice-snow-melting filler into the pore channel after the grouting material is hardened, and drying to obtain the grouting composite ice-snow-melting asphalt pavement; after the composite salt-accumulating ice-snow-melting filler is completely separated out, the saturated salt solution is directly sprayed on the pavement, the salt solution is timely infiltrated downwards in the pores by means of a pavement dryer and enters the carrier structure for storage, the ice-snow-melting effect is continuously exerted in the follow-up ice and snow weather, the recyclable supplement of the surface salt-accumulating filler is realized, and the recyclable grouting composite ice-snow-melting asphalt pavement is realized.
2. The method of paving a recyclable grouting composite ice and snow melting asphalt pavement according to claim 1, wherein: the top end of the grouting material is 5-10mm away from the top end of the asphalt concrete framework material, and the composite salt-accumulating ice-snow melting filler is filled in the 5-10mm gap.
3. The method of paving a recyclable grouting composite ice and snow melting asphalt pavement according to claim 1, wherein: the carrier at least comprises one of zeolite, volcanic rock, diatomite, fly ash, floating beads, glass beads, expanded perlite, activated carbon, graphene microplates, white carbon black or sepiolite.
4. The method of paving a recyclable grouting composite ice and snow melting asphalt pavement according to claim 1, wherein: the surface active treating agent at least comprises one of span-60 polyorganosiloxane, lignin amine, quaternary ammonium salt, sodium dodecyl sulfate, ammonium diacetate or silane coupling agent.
5. The method of paving a recyclable grouting composite ice and snow melting asphalt pavement according to claim 1, wherein: the polymer coating material on the surface of the polymer at least comprises one of polyvinyl alcohol, polyethylene glycol, polyglycerol or polystyrene.
6. The method of paving a recyclable grouting composite ice and snow melting asphalt pavement according to claim 1, wherein: the composite salt-storage ice-snow melting filler is prepared by the following steps:
(1) Stirring inorganic salt and a carrier for 5-8 hours under the water bath heating condition of 60-70 ℃ to prepare carrier adsorption inorganic salt saturated emulsion;
(2) Drying the inorganic salt saturated solution, adding the inorganic salt saturated solution into an organic solvent doped with a surface active treating agent, a high molecular surface polymer coating material and a waterproof agent, stirring and centrifugally separating to obtain a salt storage filler material adsorbed by a carrier;
(3) Heating emulsified asphalt to 100-200 ℃, adding a high molecular binder to prepare modified asphalt emulsion, mixing and shearing the salt-storage filler material, the reactive diluent and the wetting cosolvent for 30-40min at the speed of 8000-10000r/min, and preparing the composite salt-storage ice-snow melting filler.
7. The method of paving a recyclable grouting composite ice and snow melting asphalt pavement according to claim 1, wherein: the asphalt concrete framework material comprises, by weight, 5-10 parts of SBS modified asphalt, 80-90 parts of limestone aggregate and 3-8 parts of limestone mineral powder.
8. The method of paving a recyclable grouting composite ice and snow melting asphalt pavement according to claim 1, wherein: the grouting material comprises, by weight, 35-65 parts of sulphoaluminate cement, 12-30 parts of silica fume, 15-25 parts of quartz sand, 0.05-0.5 part of nano ettringite early strength agent, 0.1-0.5 part of water reducer, 0.01-0.1 part of defoamer, 0.01-0.05 part of fiber, 0.5-2.5 parts of swelling agent and 19.66-50 parts of water.
CN202210326803.0A 2022-03-30 2022-03-30 Recyclable grouting composite ice and snow melting asphalt pavement and paving method thereof Active CN114622453B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210326803.0A CN114622453B (en) 2022-03-30 2022-03-30 Recyclable grouting composite ice and snow melting asphalt pavement and paving method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210326803.0A CN114622453B (en) 2022-03-30 2022-03-30 Recyclable grouting composite ice and snow melting asphalt pavement and paving method thereof

Publications (2)

Publication Number Publication Date
CN114622453A CN114622453A (en) 2022-06-14
CN114622453B true CN114622453B (en) 2024-03-05

Family

ID=81903848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210326803.0A Active CN114622453B (en) 2022-03-30 2022-03-30 Recyclable grouting composite ice and snow melting asphalt pavement and paving method thereof

Country Status (1)

Country Link
CN (1) CN114622453B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005048360A (en) * 2003-07-29 2005-02-24 Fukui Prefecture Injection method for snow melting agent to paving material and the paving material injecting the snow melting agent therein
CN102644225A (en) * 2012-04-24 2012-08-22 唐山市交通运输局 Multifunctional self-snow-melting, anti-skidding, water-drainage and noise-reduction bituminous pavement
CN106149561A (en) * 2016-06-24 2016-11-23 谷建义 The bridge deck pavement structure of complex three-dimensional porous material and construction method thereof
CN215104370U (en) * 2021-04-21 2021-12-10 河南省交通规划设计研究院股份有限公司 Environment-friendly harmless snow-melting asphalt pavement structure
CN114149788A (en) * 2021-12-29 2022-03-08 南京兴佑交通科技有限公司 Slow-release ice and snow melting agent, preparation method thereof and thin-layer cover material containing slow-release ice and snow melting agent

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005048360A (en) * 2003-07-29 2005-02-24 Fukui Prefecture Injection method for snow melting agent to paving material and the paving material injecting the snow melting agent therein
CN102644225A (en) * 2012-04-24 2012-08-22 唐山市交通运输局 Multifunctional self-snow-melting, anti-skidding, water-drainage and noise-reduction bituminous pavement
CN106149561A (en) * 2016-06-24 2016-11-23 谷建义 The bridge deck pavement structure of complex three-dimensional porous material and construction method thereof
CN215104370U (en) * 2021-04-21 2021-12-10 河南省交通规划设计研究院股份有限公司 Environment-friendly harmless snow-melting asphalt pavement structure
CN114149788A (en) * 2021-12-29 2022-03-08 南京兴佑交通科技有限公司 Slow-release ice and snow melting agent, preparation method thereof and thin-layer cover material containing slow-release ice and snow melting agent

Also Published As

Publication number Publication date
CN114622453A (en) 2022-06-14

Similar Documents

Publication Publication Date Title
CN102432230B (en) Preparation method for deicing, antiskid and denoising asphalt pavement material
CN103360000B (en) Pervious concrete and preparation method thereof
CN104018408B (en) Porous pavement and construction method thereof
CN103864374A (en) Semi-flexible pavement base material and preparation method thereof
CN107382358A (en) It is a kind of suitable for permeable alkali-slag concrete of Supporting Load Pavement and preparation method thereof
KR100210163B1 (en) A cold-mix, cold-laid asphalt concrete packaging material for using a repair of road and a method for preparing the same
CN101323516B (en) Rubber modified solidified soil, and preparing and construction method
CN104003661B (en) A kind of permeable reclaimed asphalt mixture pavior brick and preparation method thereof
CN105819783A (en) Salt frost resistant concrete curbstone prepared from waste slurry of concrete mixing station and preparation method thereof
CN114149788A (en) Slow-release ice and snow melting agent, preparation method thereof and thin-layer cover material containing slow-release ice and snow melting agent
CN112211095B (en) Bridge deck waterproof construction suitable for stride sea bridge
CN102745947A (en) Modified asphalt mixture
CN111423846A (en) Waterproof bonding layer material for bridge and tunnel road surface and preparation method and application thereof
CN109160787B (en) Porous water-permeable environment-friendly diluted asphalt cold-patch material and preparation method thereof
CN114622453B (en) Recyclable grouting composite ice and snow melting asphalt pavement and paving method thereof
CN112252108B (en) Road construction method for in-situ cold recycling of asphalt pavement
KR102207012B1 (en) Water-Impermeable Waterproof Asphalt Concrete Compositions Comprising Epoxy Resin and Constructing Methods Using Thereof
CN112160212B (en) Anti-freezing asphalt pavement structure and method for preparing pavement material by using same
CN106996065A (en) A kind of bituminous paving active snow melting material and preparation method thereof
KR200416863Y1 (en) The water permeable block which restraining water
CN114276049B (en) Environment-friendly asphalt-cement composite material, preparation method and construction process
KR102207015B1 (en) Water-Impermeable Waterproof Asphalt Concrete Compositions Comprising Urethane Resin and Constructing Methods Using Thereof
KR102207040B1 (en) Water-Impermeable Waterproof Asphalt Concrete Compositions Comprising Low Density Polyethylene and Constructing Methods Using Thereof
KR102207016B1 (en) Modified-Asphalt Concrete Compositions for Roads Using Latex Resin and Constructing Methods Using Thereof
CN113860799A (en) Curing cold-patch material suitable for low-temperature humid environment and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Country or region after: China

Address after: 211135 floor 12, block g, No. 33, Dongqi Road, Jiangning District, Nanjing City, Jiangsu Province

Applicant after: NANJING XINGYOU TRAFFIC TECHNOLOGY Co.,Ltd.

Applicant after: Jiangsu Ninglu New Materials Technology Co.,Ltd.

Address before: 211135 floor 12, block g, No. 33, Dongqi Road, Jiangning District, Nanjing City, Jiangsu Province

Applicant before: NANJING XINGYOU TRAFFIC TECHNOLOGY Co.,Ltd.

Country or region before: China

Applicant before: Zhenjiang Xingyou New Material Technology Co.,Ltd.

CB02 Change of applicant information