CN114614916B - Communication equipment production and test system with PoE function and production and test method - Google Patents

Communication equipment production and test system with PoE function and production and test method Download PDF

Info

Publication number
CN114614916B
CN114614916B CN202210257840.0A CN202210257840A CN114614916B CN 114614916 B CN114614916 B CN 114614916B CN 202210257840 A CN202210257840 A CN 202210257840A CN 114614916 B CN114614916 B CN 114614916B
Authority
CN
China
Prior art keywords
poe
power receiving
module
test
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210257840.0A
Other languages
Chinese (zh)
Other versions
CN114614916A (en
Inventor
汪玲彦
詹习生
吴杰
高红亮
朱军
黄贞辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Normal University
Original Assignee
Hubei Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Normal University filed Critical Hubei Normal University
Priority to CN202210257840.0A priority Critical patent/CN114614916B/en
Publication of CN114614916A publication Critical patent/CN114614916A/en
Application granted granted Critical
Publication of CN114614916B publication Critical patent/CN114614916B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B17/00Monitoring; Testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/40Testing power supplies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/02Details
    • H04L12/10Current supply arrangements

Abstract

The invention discloses a communication equipment production test system with a PoE function and a production test method, wherein the system comprises power receiving modules, each power receiving module comprises a plurality of first switches, and PoE equipment to be tested is connected in parallel at two ends of a power receiving load through the first switches; a first network port module electrically connected with each power receiving electronic module through a second switch and configured to be electrically connected with the instrument signal generator through a data interface; after a plurality of PoE devices are accessed, the first switch is switched from an off state to an on state, if all PoE devices to be tested successfully supply power to the power receiving load, each PoE device is electrically connected with the instrument signal generator through the second switch and the first network port module, and if the PoE device passes the test of receiving and/or sending data relative to the instrument signal generator, the PoE device passes the performance test. The invention adopts a point-to-multipoint testing method, effectively improves the automatic testing efficiency of the PoE equipment and reduces the production cost.

Description

Communication equipment production and test system with PoE function and production and test method
Technical Field
The invention relates to the field of communication test, in particular to a communication equipment production test system with a PoE function and a production test method.
Background
The Power Over Ethernet (PoE) technology utilizes the existing Ethernet cat.5 wiring infrastructure, and can ensure data transmission for some IP-based terminal devices without any modification, and can also provide a direct-current Power supply for the terminal devices. The PoE technology utilizes a universal ethernet cable to simultaneously transmit data signals and dc power signals, integrating power and data in the same cable system. The current ethernet cable interface has 4 pairs of cables, two pairs of cables are used for transmitting data, and the other two pairs are in an idle state. If the network cable can be effectively utilized to transmit data and the direct current power supply at the same time, the layout of the network terminal can be free from the constraint of the power supply, and the system design is more economical and simple.
At present, communication equipment with a PoE function is in high demand, and each manufacturer has high requirements on production capacity, wherein one of important links in a mass production process is production testing, so that the production testing efficiency of PoE equipment influences the overall production efficiency of PoE equipment.
The existing PoE equipment production test method mainly comprises point-to-point test and different test sites for testing different functions, namely, one PoE equipment is connected with a Powered Device (PD) for power supply test, and the other test site is used for carrying out data test on the PoE equipment, so that not only are manpower and test instruments wasted, but also the test efficiency in unit time is low, the test output efficiency of the whole product is greatly influenced, and the whole output cost is increased.
Disclosure of Invention
The invention aims to provide a production test system and a production test method which can carry out power supply test and data test on communication equipment with a PoE function, can integrate the test, reduce test wiring and improve test efficiency.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows:
a PoE-enabled communications device productivity test system, comprising:
the power receiving module is configured to comprise one or more power receiving sub-modules, each power receiving sub-module comprises a plurality of first switches, one end of each first switch is electrically connected with a power receiving load, and the other end of each first switch is configured to be electrically connected with a PoE device to be tested;
a first network interface module electrically connected to the respective power receiving electronic modules through a second switch and configured to be electrically connectable to a meter signal generator through a data interface;
responding to the one-to-one corresponding connection of a plurality of PoE devices to be tested and the first switches, converting the first switches from an off state to a closed state, if all PoE devices to be tested successfully supply power to the power receiving load, enabling each PoE device to be electrically connected with the instrument signal generator through the second switches and the first network interface module, and if the PoE devices pass the test of receiving and/or sending data relative to the instrument signal generator, enabling the PoE devices to pass the production performance test.
Further, the production testing system of the communication device with the PoE function further includes a second portal module electrically connected to each power receiving module through a third switch, and configured to be electrically connected to the Ping tester through a data interface;
if not all PoE equipment to be tested successfully supplies power to the power receiving load, the Ping test machine is used for carrying out Ping test on the IP address of the PoE equipment, if the IP address Ping of the PoE equipment is up, the PoE equipment successfully supplies power, otherwise, the PoE equipment is a power supply failure fault point.
Further, the power receiving electronic modules at least comprise a first power receiving electronic module and a second power receiving electronic module; the production testing system further comprises a master control module configured to control the first portal module and the second portal module according to the following procedures:
if all the PoE devices to be tested successfully supply power to the power receiving load, the main control module controls the second net port module to send the data of the Ping test machine to each PoE device corresponding to the first power receiving sub-module, and if the IP address Ping of each PoE device corresponding to the first power receiving sub-module is up, the main control module controls the second net port module to send the data of the Ping test machine to each PoE device corresponding to the second power receiving sub-module and controls the first net port module to send the data of the instrument signal generator to each PoE device corresponding to the first power receiving sub-module.
Further, the first switch is an electronically controllable switch, and the master control module is configured to control the first switch to be turned on or turned off;
the main control module controls one first switch of the first power receiving electronic module to be turned on and other first switches of the first power receiving electronic module to be turned off in sequence, and then sequentially performs Ping test on each PoE device corresponding to the first power receiving electronic module.
Further, if all the IP addresses of the PoE devices corresponding to the first powered electronic module are not Ping-enabled, the main control module controls the second port module to send the data of the Ping test machine to the PoE devices corresponding to the next powered electronic module, so as to screen out all Ping-enabled powered electronic modules;
and the master control module controls the first network port module to sequentially send the data of the instrument signal generator to all the selected PoE equipment corresponding to all the Ping-through power receiving modules, and performs a Ping test again after replacing all the PoE equipment at the power failure fault points in the power receiving modules which are not all Ping-through until all the PoE equipment of the power receiving modules are all Ping-through.
Further, the power receiving module of the power receiving module adopts a building block building mode, and the power receiving modules of different specifications are configured to be connected with different numbers of PoE devices, including: if the currently measured non-Ping pass rate of the PoE equipment is larger than a preset first proportional value, the current power receiving sub-module is replaced by a power receiving sub-module with a smaller specification so as to receive a smaller number of PoE equipment; if the current measured non-Ping pass rate of the PoE equipment is smaller than a preset second proportional value, the current powered sub-module is replaced by a larger-size powered sub-module so as to receive a larger number of PoE equipment.
Further, all the PoE devices to be tested are arranged at two ends of the powered load in parallel, each first switch is arranged on a corresponding branch, and whether all the PoE devices to be tested successfully supply power to the powered load is judged in any one of the following manners:
a current sensor is arranged on a main circuit where the power receiving load is located, if the current value detected by the current sensor reaches a preset threshold value, all PoE equipment to be detected successfully supplies power to the power receiving load, otherwise, all PoE equipment to be detected successfully supplies power to the power receiving load; and/or the presence of a gas in the gas,
and an electrical signal detector is arranged on each branch, if the electrical signal detector on each branch detects an electrical signal, all the PoE equipment to be tested successfully supplies power to the powered load, otherwise, not all the PoE equipment to be tested successfully supplies power to the powered load.
Furthermore, all the PoE equipment to be tested are arranged at two ends of the power receiving load in parallel, each first switch is arranged on a corresponding branch, a prompter is arranged on each branch, and if the PoE equipment on the branch is successfully powered, the prompter on the branch sends out a prompt signal;
and taking the PoE equipment on the branch where the prompter which does not send out the prompt signal in the test process as a power failure fault point.
Further, determining PoE equipment except a power failure fault point as PoE equipment to be tested, and sequentially testing the PoE equipment to receive and/or send data relative to the instrument signal generator; alternatively, the first and second electrodes may be,
and replacing the PoE equipment at the power supply failure fault point with new PoE equipment, performing power supply test on the new PoE equipment until the new PoE equipment replacing the power supply failure fault point is successfully powered, and sequentially performing data receiving and/or data sending tests on all the current PoE equipment relative to the instrument signal generator.
Further, the testing of the PoE device to receive and/or transmit data with respect to the meter signal generator comprises the steps of:
sending a data packet to PoE equipment through the instrument signal generator, wherein the data packet comprises a VLAN field;
the PoE equipment receives and analyzes the data packet, and if the VLAN ID value in the VLAN field obtained by analysis meets the parameter range of the PoE equipment, a signal is returned to the instrument signal generator;
if the instrument signal generator receives the return signal of the PoE equipment, the data test of the PoE equipment passes, otherwise, the data test of the PoE equipment fails.
According to another aspect of the present invention, there is provided a production test method based on the above mentioned communication device production test system with PoE function, including the following steps:
s1, respectively connecting a plurality of PoE equipment to be tested to a power receiving module interface of a production testing system;
s2, according to the sequence of the plurality of power receiving modules, a PoE device corresponding to a first power receiving module and a power receiving load in the power receiving module form a test circuit by controlling the switch to be closed;
s3, if the power supply of the test lines of the power receiving module is successful, executing S4, otherwise executing S5;
s4, sequentially testing each PoE device corresponding to the current successfully-powered-on sub-module, enabling the PoE device corresponding to the next powered-on sub-module and a powered load in the powered-on module to form a test line by closing the control switch until the next powered-on sub-module is not available, and returning to execute S3;
and S5, identifying PoE equipment with power supply failure in the power receiving module, replacing the PoE equipment with new PoE equipment, and executing S4 after power supply is successful.
The technical scheme provided by the invention has the following beneficial effects:
a. connecting a plurality of PoE equipment to a PD system device and integrating data test functions together, and connecting a data test line after power supply test is finished without disconnecting the line, so that wiring work is reduced, and the efficiency of PoE equipment production test is improved;
b. the PoE equipment with faults can be positioned through the on-off and ping operation of the relay, the automation degree is high, and the test efficiency is high;
c. by adopting a power supply test-data test double-track system, data test is carried out on the former test unit at the same time, power supply test is carried out on the latter test unit, the unit with successful power supply test is shifted to a data test track, the waiting time for replacing PoE equipment with unsuccessful power supply and carrying out power supply test on new equipment is greatly reduced, and the test efficiency is improved.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the description below are only some embodiments described in the present application, and other drawings can be obtained by those skilled in the art without creative efforts.
Fig. 1 is a schematic diagram of a communication device production test system with PoE function according to an exemplary embodiment of the present disclosure.
Detailed Description
In order to make the technical solutions of the present invention better understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that the terms "first," "second," and the like in the description and claims of the present invention and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used is interchangeable under appropriate circumstances such that the embodiments of the invention described herein are capable of operation in sequences other than those illustrated or described herein. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, apparatus, article, or device that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or device.
In an embodiment of the present invention, a system for testing a communication device with PoE function is provided, as shown in fig. 1, where the system is configured to perform a performance test on a communication device with PoE function (hereinafter referred to as PoE device), and the system includes:
the power receiving module is configured to comprise one or more power receiving sub-modules, each power receiving sub-module comprises a plurality of first switches, one end of each first switch is electrically connected with a power receiving load, and the other end of each first switch is configured to be electrically connected with a PoE device to be tested; taking fig. 1 as an example, the power receiving module includes i power receiving modules, each power receiving module may include j first switches, where i is greater than or equal to 2, j is greater than or equal to 2, and different power receiving modules may be provided with different numbers of first switches.
And a first network interface module electrically connected with the power receiving electronic modules through a second switch (a switch N1 in fig. 1) and configured to be electrically connected with a meter signal generator through a data interface, wherein the meter signal generator may be integrated inside the production and test system or may be disposed outside the system. The meter signal generator is used for data testing of the PoE device, for example, the procedure for verifying the data VLAN function of the PoE device includes: sending a data packet to PoE equipment through the instrument signal generator, wherein the data packet comprises a VLAN field; the PoE equipment receives and analyzes the data packet, if the VLAN ID value in the VLAN field obtained by analysis meets the parameter range of the PoE equipment, a signal TRUE is returned to the instrument signal generator, if the ID value meets the parameter range of the PoE equipment, a signal FAULT is returned to the instrument signal generator, and the signal FAULT indicates that the data VLAN function of the PoE equipment is normal, namely the data test is passed; if the return signal of the PoE equipment is not received within a certain time, the data test failure (abnormal VLAN function) of the PoE equipment is judged.
Responding to the one-to-one corresponding connection of a plurality of PoE devices to be tested and the first switches, converting the first switches from an off state to a closed state, if all PoE devices to be tested successfully supply power to the power receiving load, enabling each PoE device to be electrically connected with the instrument signal generator through the second switches and the first network interface module, and if the PoE devices pass the test of receiving and/or sending data relative to the instrument signal generator, enabling the PoE devices to pass the production performance test.
With the production test system, various tests can be performed in various configurations, and various test modes are described below:
example 1
All PoE equipment to be tested is arranged at two ends of a power receiving load in parallel, each first switch is arranged on a corresponding branch, a prompter, such as an indicator light, is arranged on each branch, and if the PoE equipment on the branch is successfully powered, the prompter light on the branch is turned on, so that the PoE equipment on the branch where the prompter which does not send a prompting signal in the test process is positioned is used as a power supply failure fault point.
After determining that there is PoE equipment with power supply failure, one way is to replace the PoE equipment with new PoE equipment with power supply failure fault point, and perform power supply test on the new PoE equipment until the new PoE equipment with power supply failure fault point is replaced with power supply success, and then sequentially perform test on all current PoE equipment relative to the instrument signal generator for receiving and/or sending data;
the other mode is that the PoE equipment except the power supply failure fault point is determined as the PoE equipment to be tested, the PoE equipment is sequentially tested for receiving and/or sending data relative to the instrument signal generator, meanwhile, the PoE equipment except the power supply failure fault point is replaced by new PoE equipment, then the PoE equipment is tested for supplying power, and after the power supply test is successful and the PoE equipment except the power supply failure fault point finishes the data test, the new PoE equipment which passes the power supply test is tested for data.
Example 2
Different from embodiment 1, in this embodiment, a mode of observing an indicator light with naked eyes is not used to identify PoE devices with power supply failure, in this embodiment, all PoE devices to be tested are arranged at two ends of a power receiving load in parallel, each first switch is arranged on a corresponding branch, and a mode of determining whether all PoE devices to be tested successfully supply power to the power receiving load is, for example:
a current sensor is arranged on a trunk circuit where the power receiving load is located, if the current value detected by the current sensor reaches a preset threshold value, all the PoE equipment to be detected successfully supplies power to the power receiving load, otherwise, all the PoE equipment to be detected successfully supplies power to the power receiving load; or the like, or a combination thereof,
and an electrical signal detector is arranged on each branch, if the electrical signal detector on each branch detects an electrical signal, all PoE equipment to be tested successfully supplies power to the powered load, otherwise, all PoE equipment to be tested successfully supplies power to the powered load. In this embodiment, in order to indicate the orientation of the PoE device that was not successfully powered, the production testing system further includes a second portal module electrically connected to each power receiving module through a third switch (switch N2 in fig. 1) and configured to be electrically connected to a Ping tester (the Ping tester may be replaced by another instrument signal generator) through a data interface; and carrying out Ping test on the IP address of the PoE equipment by using the Ping test machine, if the IP address Ping of the PoE equipment is on, the PoE equipment is successfully powered, otherwise, the PoE equipment is a power failure fault point. Generally, the PoE device itself has an indicator lamp indicating the Ping connected state, thereby identifying whether the power supply of the PoE device is successful or not.
In less than all PoE devices under test (e.g. PoE device N in fig. 1) 11 To N ij ) If the power supply to the power receiving load is successful, the main control module controls the second port module to send the data of the Ping test machine to each PoE device (namely PoE device N) corresponding to the first power receiving module 11 To N 1j ) If PoE device N 11 To N 1j If the IP addresses of the first network port module are all Ping, the second network port module is controlled to send the data of the Ping test machine to the PoE devices (namely, poE device N) corresponding to the second power receiving module 21 To N 2j ) Meanwhile, the first network port module is controlled to send the data of the instrument signal generator to each PoE device (namely PoE device N) corresponding to the first power receiving module 11 To N 1j ). In order to realize that the main control module controls different data to be sent to different power receiving electronic modules, a unit switch (not shown) is also arranged to be connected with the first internet access module except the second switch N1 to be respectively connected with different power receiving electronic modules, and the main control module controls the circulation condition of the data of the instrument signal generator to each power receiving electronic module through the control unit switch; similarly, a unit switch (not shown) is further provided in addition to the third switch N2 for connecting to the second portal module to connect to different power receiving modules, and the main control module controls the flow of the data of the Ping test machine to each power receiving module through the control unit switch.
The method for testing whether the PoE equipment is successfully powered one by utilizing the Ping testing machine comprises the following steps: the first switch is an electronic controllable switch, and the main control module is configured to control the first switch to be switched on or switched off; taking the first power receiving module in fig. 1 as an example, the switch N1 is first controlled to be closed, and then the switch K is controlled 11 Closed, other switch K 12 -K 1j Disconnection, if PoE equipment N 11 Ping is on, the power supply is judged to be successful, otherwise, the power supply is failed; then, the switch K is controlled 11 、K 13 -K 1j Switch off, control switch K 12 And closing, and circulating until all PoE equipment connected with the first power receiving electronic module is traversed.
If the PoE device is not Ping-enabled, the PoE device is replaced with a new PoE device until all the PoE devices of the power receiving electronic unit are Ping-enabled, and then as in embodiment 1, the power receiving electronic unit is connected to the first port module for data testing, and simultaneously the next power receiving electronic unit is connected to the second port module for Ping testing.
Example 3
The difference from embodiment 2 is that, if the IP addresses of all PoE devices corresponding to a first power receiving module are not all Ping-pass, the main control module controls the second port module to send data of the Ping test machine to all PoE devices corresponding to a next power receiving module, so as to screen out all Ping-pass power receiving modules; and the master control module controls the first network port module to sequentially send the data of the instrument signal generator to all the PoE equipment corresponding to all the screened Ping-through power receiving electronic modules, and performs a Ping test again after replacing all the PoE equipment at the power failure fault points in the power receiving electronic modules which are not all Ping-through until all the PoE equipment of the power receiving electronic modules are all Ping-through.
Compared with embodiment 2, in this embodiment, it is not necessary to sequentially update the power receiving electronic modules one by one until all power supply succeeds, but all power receiving electronic modules in Ping are screened out (not taking the power receiving electronic modules as a unit), and the cross-submodule selects the PoE device with unsuccessful power supply, such as the PoE device N 13 、N 22 、N 35 、N 41 And then, performing power supply test on the updated new equipment, and after the success, performing data test on all power receiving electronic modules which are not all Ping powered on when the primary screening is completed.
Example 4
Unlike the previous embodiments, in the initial stage of the test, the power receiving module is used as the test unit in the present embodiment, for example, the switch K is closed first 11 、K 12 To K 1j And connecting the PoE device with the Ping test machine, and if the PoE device N is connected with the PoE device N 11 、N 12 To N 1j When Ping is on, the circuit between the pin and the testing machine is cut off, the pin and the instrument signal generator are connected, and the switch K is closed 21 、K 22 To K 2j And the testing device is connected with the Ping testing machine, namely the next testing unit performs power supply testing, and the previous testing unit performs data testing, so that the testing efficiency is improved.
If, for example, K 24 If not, replacing the PoE equipment with new PoE equipment and communicating the PoE equipment with a Ping test machine until the newly replaced PoE equipment is Ping communicated;
or, mixing K 24 Recording the data to a list which is not Ping passed, then directly carrying out Ping test on the next test unit until all test units are Ping tested, screening all Ping passed test units to enter a data test stage, screening PoE equipment which is not Ping passed to update, carrying out Ping test on the PoE equipment, and preferentially carrying out data test on all Ping passed test units.
Example 5
In one embodiment of the invention, the power receiving modules of the production and measurement system are configured in a building block type building mode, wherein the power receiving modules of the production and measurement system can be built by different power receiving modules, and the different power receiving modules are provided with different numbers of first switches, namely can be connected with different numbers of PoE equipment; if the failure rate of the performance test of the PoE equipment obtained by the test is greater than a preset first proportional value, the small-specification power receiving sub-module (receiving a smaller number of PoE equipment) can be replaced to reduce the probability that all PoEs (power over Ethernet) received by the power receiving sub-module are not successfully powered; if the fault rate of the PoE device performance test obtained through the test is smaller than the preset second ratio value, large-size power receiving sub-modules (connected with a larger number of PoE devices) can be replaced to increase the number of PoE devices synchronously used for power supply test and data test at a time, wherein the first ratio value is larger than or equal to the second ratio value, and the fault rate of the PoE device performance test can be the ratio of the number of PoE devices which do not pass the Ping test to the total number of the PoE devices which do the Ping test, or the ratio of the number of the PoE devices which do not pass the whole production performance test to the total number of the PoE devices which do the production test.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrases "comprising a," "8230," "8230," or "comprising" does not exclude the presence of additional like elements in a process, method, article, or apparatus that comprises the element.
The foregoing is illustrative of the present disclosure and it will be appreciated by those skilled in the art that changes may be made in this embodiment without departing from the principles of the disclosure, the scope of which is defined by the appended claims.

Claims (10)

1. A communications device productivity test system with PoE functionality, comprising:
the power receiving module is configured to comprise one or more power receiving sub-modules, each power receiving sub-module comprises a plurality of first switches, one end of each first switch is electrically connected with a power receiving load, and the other end of each first switch is configured to be electrically connected with a PoE device to be tested;
a first network interface module electrically connected to the respective power receiving electronic modules through a second switch and configured to be electrically connectable to a meter signal generator through a data interface;
responding to the one-to-one corresponding connection of a plurality of PoE devices to be tested and the first switches, converting the first switches from an off state to a closed state, if all PoE devices to be tested successfully supply power to the power receiving load, enabling each PoE device to be electrically connected with the instrument signal generator through the second switches and the first network interface module, and if the PoE devices pass the test of receiving and/or sending data relative to the instrument signal generator, enabling the PoE devices to pass the production performance test.
2. The PoE enabled communications device productivity test system of claim 1, further comprising a second portal module electrically connected to each power receiving module through a third switch and configured to be electrically connectable to a Ping tester through a data interface;
if not all PoE equipment to be tested successfully supplies power to the power receiving load, the Ping test machine is used for carrying out Ping test on the IP address of the PoE equipment, if the IP address Ping of the PoE equipment is up, the PoE equipment successfully supplies power, otherwise, the PoE equipment is a power supply failure fault point.
3. The PoE-enabled communications device production test system of claim 2, wherein said powered electronic modules comprise at least a first powered electronic module and a second powered electronic module; the production testing system further comprises a main control module configured to control the first network port module and the second network port module according to the following procedures:
if not all PoE equipment to be tested successfully supplies power to the power receiving load, the main control module controls the second network port module to send the data of the Ping test machine to each PoE equipment corresponding to the first power receiving module, and if the IP address Ping of each PoE equipment corresponding to the first power receiving module is up, the main control module controls the second network port module to send the data of the Ping test machine to each PoE equipment corresponding to the second power receiving module and controls the first network port module to send the data of the instrument signal generator to each PoE equipment corresponding to the first power receiving module.
4. A PoE-enabled communications device productivity test system as recited in claim 3, wherein said first switch is an electronically controllable switch, said master control module being configured to control said first switch to close or open; the main control module controls a first switch of the first power receiving electronic module to be switched on and other first switches of the first power receiving electronic module to be switched off in sequence, and then each PoE device corresponding to the first power receiving electronic module is subjected to Ping test in sequence;
if all IP addresses of the PoE equipment corresponding to the first power receiving module are not Ping-through, the main control module controls the second network port module to send the data of the Ping test machine to all PoE equipment corresponding to the next power receiving module so as to screen out all Ping-through power receiving modules;
and the master control module controls the first network port module to sequentially send the data of the instrument signal generator to all the PoE equipment corresponding to all the screened Ping-through power receiving electronic modules, and performs a Ping test again after replacing all the PoE equipment at the power failure fault points in the power receiving electronic modules which are not all Ping-through until all the PoE equipment of the power receiving electronic modules are all Ping-through.
5. A system as claimed in any one of claims 2 to 4, wherein the powered modules of the powered modules are in a building block building mode, and the powered modules of different sizes are configured to receive different numbers of PoE devices, including: if the current measured non-Ping pass rate of the PoE equipment is larger than a preset first proportional value, the current power receiving sub-module is replaced by a power receiving sub-module with a smaller specification so as to receive a smaller number of PoE equipment; if the current measured non-Ping pass rate of the PoE equipment is smaller than a preset second proportion value, the current power receiving electronic module is replaced by a power receiving electronic module with a larger size than the current power receiving electronic module so as to receive a larger number of PoE equipment.
6. The system according to any one of claims 1 to 4, wherein all the PoE devices under test are disposed in parallel at two ends of a powered load, each first switch is disposed on the corresponding branch, and whether all the PoE devices under test successfully supply power to the powered load is determined by any one of the following methods:
a current sensor is arranged on a main circuit where the power receiving load is located, if the current value detected by the current sensor reaches a preset threshold value, all PoE equipment to be detected successfully supplies power to the power receiving load, otherwise, all PoE equipment to be detected successfully supplies power to the power receiving load;
and/or the presence of a gas in the gas,
and an electrical signal detector is arranged on each branch, if the electrical signal detector on each branch detects an electrical signal, all PoE equipment to be tested successfully supplies power to the powered load, otherwise, all PoE equipment to be tested successfully supplies power to the powered load.
7. A PoE-enabled communications device production test system as claimed in claim 1, wherein all PoE devices to be tested are connected in parallel to two ends of the power-receiving load, each first switch is disposed on a corresponding branch, each branch is provided with a prompter, and if the PoE devices on the branch are successfully powered, the prompter on the branch sends out a prompt signal;
and taking the PoE equipment on the branch where the prompter which does not send out a prompt signal in the test process is positioned as a power failure fault point.
8. A PoE-enabled communications device production test system as claimed in claim 2 or claim 7, wherein PoE devices other than the point of power failure are determined as PoE devices to be data tested and tested in turn for receiving and/or transmitting data with respect to said meter signal generator; alternatively, the first and second liquid crystal display panels may be,
and replacing the PoE equipment at the power failure fault point with new PoE equipment, performing power supply test on the new PoE equipment until the new PoE equipment replacing the power failure fault point is successfully powered, and sequentially performing data receiving and/or data sending tests on all the current PoE equipment relative to the instrument signal generator.
9. A PoE-enabled communications device production test system as recited in claim 8, wherein the testing of the PoE device to receive and/or transmit data with respect to said meter signal generator comprises the steps of:
sending a data packet to PoE equipment through the instrument signal generator, wherein the data packet comprises a VLAN field;
the PoE equipment receives and analyzes the data packet, and if the VLAN ID value in the VLAN field obtained by analysis meets the parameter range of the PoE equipment, a signal is returned to the instrument signal generator;
if the instrument signal generator receives the return signal of the PoE equipment, the data test of the PoE equipment passes, otherwise, the data test of the PoE equipment fails.
10. A production test method based on the PoE enabled communication device production test system of claim 1, comprising the steps of:
s1, respectively connecting a plurality of PoE equipment to be tested to a power receiving module interface of a production testing system;
s2, according to the sequence of the plurality of power receiving modules, a PoE device corresponding to a first power receiving module and a power receiving load in the power receiving module form a test circuit by controlling the switch to be closed;
s3, if the test lines of the power receiving module are successfully supplied with power, executing S4, otherwise executing S5;
s4, sequentially testing each PoE device corresponding to the current successfully-powered-on sub-module, enabling the PoE device corresponding to the next powered-on sub-module and a powered load in the powered-on module to form a test line by closing the control switch until the next powered-on sub-module is not available, and returning to execute S3;
and S5, identifying PoE equipment with power supply failure in the power receiving module, replacing the PoE equipment with new PoE equipment, and executing S4 after power supply is successful.
CN202210257840.0A 2022-03-16 2022-03-16 Communication equipment production and test system with PoE function and production and test method Active CN114614916B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210257840.0A CN114614916B (en) 2022-03-16 2022-03-16 Communication equipment production and test system with PoE function and production and test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210257840.0A CN114614916B (en) 2022-03-16 2022-03-16 Communication equipment production and test system with PoE function and production and test method

Publications (2)

Publication Number Publication Date
CN114614916A CN114614916A (en) 2022-06-10
CN114614916B true CN114614916B (en) 2023-02-28

Family

ID=81862628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210257840.0A Active CN114614916B (en) 2022-03-16 2022-03-16 Communication equipment production and test system with PoE function and production and test method

Country Status (1)

Country Link
CN (1) CN114614916B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7627398B1 (en) * 2005-02-17 2009-12-01 Sifos Technologies, Inc. Apparatus providing power-over-ethernet test instrument
CN105141480A (en) * 2015-09-21 2015-12-09 上海斐讯数据通信技术有限公司 Power over ethernet (PoE) switch test device, system and method
CN110417559A (en) * 2018-04-28 2019-11-05 华为技术有限公司 Power over Ethernet device and detection method
CN113890845A (en) * 2021-09-14 2022-01-04 博为科技有限公司 PSE (Power supply Enable) test method and device, storage medium and electronic equipment

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201319606Y (en) * 2008-09-19 2009-09-30 鸿富锦精密工业(深圳)有限公司 Testing treatment tool
CN104378213B (en) * 2014-11-06 2017-08-25 深圳市共进电子股份有限公司 The method of testing and device of a kind of POE network communication equipments
CN105681050A (en) * 2016-04-06 2016-06-15 深圳市百维技术有限公司 Multifunctional POE detector and network detection method and POE detection method thereof
US10481216B1 (en) * 2018-04-30 2019-11-19 Fluke Corporation Device for field verification of multi-device power over ethernet

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7627398B1 (en) * 2005-02-17 2009-12-01 Sifos Technologies, Inc. Apparatus providing power-over-ethernet test instrument
CN105141480A (en) * 2015-09-21 2015-12-09 上海斐讯数据通信技术有限公司 Power over ethernet (PoE) switch test device, system and method
CN110417559A (en) * 2018-04-28 2019-11-05 华为技术有限公司 Power over Ethernet device and detection method
CN113890845A (en) * 2021-09-14 2022-01-04 博为科技有限公司 PSE (Power supply Enable) test method and device, storage medium and electronic equipment

Also Published As

Publication number Publication date
CN114614916A (en) 2022-06-10

Similar Documents

Publication Publication Date Title
WO2011143855A1 (en) Method and system for testing mobile terminal
CN106656654A (en) Network fault diagnosis methods and network fault diagnosis device
CN109490763A (en) A kind of relay single-board universal device and test method
CN101793937B (en) Wire automatic control system for electric control cabinet and detection method thereof
CN115856588A (en) Chip test board and test method
CN113514726B (en) Complete machine cable detection system and method
CN113567796B (en) Compatibility performance testing method
CN214591478U (en) Vehicle-mounted Ethernet physical layer testing device
CN114614916B (en) Communication equipment production and test system with PoE function and production and test method
CN101769962A (en) Electric energy meter detecting system and device for detecting contact resistance and method thereof
CN113595835B (en) Ground equipment performance test system
CN105577392A (en) Test device and method for testing remote transmission reliability of POE (Power Over Ethernet) switch
EP3729576A2 (en) Automatic multi-channel electronic test and measurement device
RU2436108C2 (en) Complex of board cable networks monitoring
CN112415253A (en) Circuit and system for testing working current of circuit board
CN105044552A (en) Fault diagnosis method, system and device for distribution network automation system
CN111751716B (en) Circuit breaker test equipment
CN219105350U (en) Fault signal simulation device
CN214845716U (en) Detection apparatus for nuclear power station containment leakage rate measurement return circuit
CN219039626U (en) Ethernet-based vehicle-mounted controller test system
CN215932102U (en) Line testing device
CN113567797B (en) Design method and system suitable for track circuit product performance test case
CN216622550U (en) Power-on and power-off testing device
CN215494583U (en) Test switching circuit
CN110943891A (en) Detection apparatus for be used for switch port broadcast storm

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant