CN114510767B - 一种基于三维立体建模的钢结构装配效果评估方法及系统 - Google Patents
一种基于三维立体建模的钢结构装配效果评估方法及系统 Download PDFInfo
- Publication number
- CN114510767B CN114510767B CN202210160079.9A CN202210160079A CN114510767B CN 114510767 B CN114510767 B CN 114510767B CN 202210160079 A CN202210160079 A CN 202210160079A CN 114510767 B CN114510767 B CN 114510767B
- Authority
- CN
- China
- Prior art keywords
- evaluation result
- steel structure
- ratio
- obtaining
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/14—Force analysis or force optimisation, e.g. static or dynamic forces
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- General Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210160079.9A CN114510767B (zh) | 2022-02-22 | 2022-02-22 | 一种基于三维立体建模的钢结构装配效果评估方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210160079.9A CN114510767B (zh) | 2022-02-22 | 2022-02-22 | 一种基于三维立体建模的钢结构装配效果评估方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114510767A CN114510767A (zh) | 2022-05-17 |
CN114510767B true CN114510767B (zh) | 2022-09-02 |
Family
ID=81554336
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210160079.9A Active CN114510767B (zh) | 2022-02-22 | 2022-02-22 | 一种基于三维立体建模的钢结构装配效果评估方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114510767B (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101673319A (zh) * | 2008-09-12 | 2010-03-17 | 上海宝冶工程技术有限公司 | 火灾后钢结构建筑的评定方法 |
CN109190309A (zh) * | 2018-10-25 | 2019-01-11 | 长沙理工大学 | 老化钢筋混凝土梁桥抗剪承载力评价方法 |
CN110409606A (zh) * | 2019-08-02 | 2019-11-05 | 中国航空规划设计研究总院有限公司 | 一种摩擦摆连接的装配式钢结构体系及其设计方法 |
CN110940732A (zh) * | 2019-12-30 | 2020-03-31 | 华东交通大学 | 一种钢轨结构腐蚀在线监测与评价方法 |
CN111795978A (zh) * | 2020-09-08 | 2020-10-20 | 湖南大学 | 一种钢桥结构健康状态评估方法、装置、设备及存储介质 |
CN112557504A (zh) * | 2020-11-25 | 2021-03-26 | 福建省长汀瑞祥装配式建筑有限公司 | 一种装配式钢结构桥梁寿命的断裂力学测量方法 |
CN113345558A (zh) * | 2021-06-30 | 2021-09-03 | 南通市第一人民医院 | 一种提高骨科诊断决策效率的辅助系统及方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3366853B1 (en) * | 2017-02-24 | 2020-04-22 | New World China Land Limited | Prefabricated structural system and assembling method thereof |
-
2022
- 2022-02-22 CN CN202210160079.9A patent/CN114510767B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101673319A (zh) * | 2008-09-12 | 2010-03-17 | 上海宝冶工程技术有限公司 | 火灾后钢结构建筑的评定方法 |
CN109190309A (zh) * | 2018-10-25 | 2019-01-11 | 长沙理工大学 | 老化钢筋混凝土梁桥抗剪承载力评价方法 |
CN110409606A (zh) * | 2019-08-02 | 2019-11-05 | 中国航空规划设计研究总院有限公司 | 一种摩擦摆连接的装配式钢结构体系及其设计方法 |
CN110940732A (zh) * | 2019-12-30 | 2020-03-31 | 华东交通大学 | 一种钢轨结构腐蚀在线监测与评价方法 |
CN111795978A (zh) * | 2020-09-08 | 2020-10-20 | 湖南大学 | 一种钢桥结构健康状态评估方法、装置、设备及存储介质 |
CN112557504A (zh) * | 2020-11-25 | 2021-03-26 | 福建省长汀瑞祥装配式建筑有限公司 | 一种装配式钢结构桥梁寿命的断裂力学测量方法 |
CN113345558A (zh) * | 2021-06-30 | 2021-09-03 | 南通市第一人民医院 | 一种提高骨科诊断决策效率的辅助系统及方法 |
Non-Patent Citations (5)
Title |
---|
Seismic Performance Evaluation of Footing-to-Circular RC Pier Connection Reinforced by High-Manganese Steel Bars (HMSBs);Jung-Kyun Kim,et al.;《Advances in Civil Engineering》;20181004;第1-16页 * |
Three-Dimensional Effects and Collapse Resistance Mechanisms in Steel Frame Buildings;Honghao Li,et al.;《journal of structural engineering》;20130313;第1-11页 * |
装配式钢混组合结构加固时抗震性能模糊综合评估模型研究;荣超 等;《地震工程学报》;20190430;第41卷(第2期);第539-544页 * |
钢支撑加固医院建筑钢筋混凝土框架结构抗震性能研究;陈欢;《中国优秀博硕士学位论文全文数据库(硕士) 工程科技II辑》;20170215;C038-1283 * |
面向虚拟装配的作业仿真及工效分析方法研究;张永慧;《中国优秀博硕士学位论文全文数据库(硕士) 工程科技I辑》;20160215;B022-836 * |
Also Published As
Publication number | Publication date |
---|---|
CN114510767A (zh) | 2022-05-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Glaister et al. | Development of a simplified deformation-based method for seismic vulnerability assessment | |
de Zea Bermudez et al. | Parameter estimation of the generalized Pareto distribution—Part I | |
Vamvatsikos et al. | Performance‐based seismic design via yield frequency spectra | |
Sangiorgio et al. | Structural degradation assessment of RC buildings: Calibration and comparison of semeiotic-based methodology for decision support system | |
Málaga‐Chuquitaype et al. | Inelastic displacement demands in steel structures and their relationship with earthquake frequency content parameters | |
Arrayago et al. | Influence of the imperfection direction on the ultimate response of steel frames in advanced analysis | |
CN114510767B (zh) | 一种基于三维立体建模的钢结构装配效果评估方法及系统 | |
Cirak Karakas et al. | Fragility based evaluation of different code based assessment approaches for the performance estimation of existing buildings | |
Smyrou et al. | Sectional response of T-shaped RC walls | |
CN111539142A (zh) | 一种管道裂纹扩展驱动力计算方法及系统 | |
Ferreira et al. | Comparison of the General Method with the Overall Method for the out-of-plane stability of members with lateral restraints | |
JP6647992B2 (ja) | 設計支援装置 | |
Torquati et al. | Displacement-based seismic assessment for precast concrete frames with non-emulative connections | |
CN114881528A (zh) | 基于bim装配式建筑质量安全管控方法、系统、设备、介质 | |
Baji et al. | Reliability of ductility requirements in concrete design codes | |
Chatzidaki et al. | Mixed probabilistic seismic demand models for fragility assessment | |
Miano et al. | Seismic fragility of circular piers in simply supported RC bridges: A proposal for capacity assessment | |
CN116522286A (zh) | 一种逻辑回归优化的svr-lstm滑坡位移预测方法及系统 | |
Gantes et al. | Strategy for numerical verification of steel structures at the ultimate limit state | |
Okasha et al. | Proposed structural reliability-based approach for the classification of concrete quality | |
CN115186351B (zh) | 坡道侧墙配筋规划方法及装置、计算机设备和存储介质 | |
Grilo et al. | On stochastic aspects of impact modeling of the innovation incentive system and business internationalization: evidence from Portuguese SMEs | |
CN112329108B (zh) | 一种地铁车站优化抗浮验算方法及系统 | |
Yang | Factor price distortion among regions in China and its influence on China’s economic growth | |
CN116541976B (zh) | 一种基于ga-grnn代理模型的核电用塔机结构系统静态优化方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220725 Address after: No.114, Jiaodaokou South Street, Dongcheng District, Beijing, 100007 Applicant after: CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd. Applicant after: CCCC FOURTH HIGHWAY FIRST ENGINEERING FIRMS CO.,LTD. Address before: 100176 unit 1308, 15th floor, building 1, No.3, rongjingdong street, economic and Technological Development Zone, Daxing District, Beijing Applicant before: CCCC FOURTH HIGHWAY FIRST ENGINEERING FIRMS CO.,LTD. |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No.114, Jiaodaokou South Street, Dongcheng District, Beijing, 100007 Patentee after: CCCC Construction Group Co.,Ltd. Patentee after: CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd. Address before: No.114, Jiaodaokou South Street, Dongcheng District, Beijing, 100007 Patentee before: CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd. Patentee before: CCCC FOURTH HIGHWAY FIRST ENGINEERING FIRMS CO.,LTD. |