CN114510767A - 一种基于三维立体建模的钢结构装配效果评估方法及系统 - Google Patents
一种基于三维立体建模的钢结构装配效果评估方法及系统 Download PDFInfo
- Publication number
- CN114510767A CN114510767A CN202210160079.9A CN202210160079A CN114510767A CN 114510767 A CN114510767 A CN 114510767A CN 202210160079 A CN202210160079 A CN 202210160079A CN 114510767 A CN114510767 A CN 114510767A
- Authority
- CN
- China
- Prior art keywords
- evaluation result
- steel structure
- ratio
- obtaining
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/14—Force analysis or force optimisation, e.g. static or dynamic forces
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210160079.9A CN114510767B (zh) | 2022-02-22 | 2022-02-22 | 一种基于三维立体建模的钢结构装配效果评估方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210160079.9A CN114510767B (zh) | 2022-02-22 | 2022-02-22 | 一种基于三维立体建模的钢结构装配效果评估方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114510767A true CN114510767A (zh) | 2022-05-17 |
CN114510767B CN114510767B (zh) | 2022-09-02 |
Family
ID=81554336
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210160079.9A Active CN114510767B (zh) | 2022-02-22 | 2022-02-22 | 一种基于三维立体建模的钢结构装配效果评估方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114510767B (zh) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101673319A (zh) * | 2008-09-12 | 2010-03-17 | 上海宝冶工程技术有限公司 | 火灾后钢结构建筑的评定方法 |
US20180245329A1 (en) * | 2017-02-24 | 2018-08-30 | New World China Land Limited | Fabricated structural system and assembling method thereof |
CN109190309A (zh) * | 2018-10-25 | 2019-01-11 | 长沙理工大学 | 老化钢筋混凝土梁桥抗剪承载力评价方法 |
CN110409606A (zh) * | 2019-08-02 | 2019-11-05 | 中国航空规划设计研究总院有限公司 | 一种摩擦摆连接的装配式钢结构体系及其设计方法 |
CN110940732A (zh) * | 2019-12-30 | 2020-03-31 | 华东交通大学 | 一种钢轨结构腐蚀在线监测与评价方法 |
CN111795978A (zh) * | 2020-09-08 | 2020-10-20 | 湖南大学 | 一种钢桥结构健康状态评估方法、装置、设备及存储介质 |
CN112557504A (zh) * | 2020-11-25 | 2021-03-26 | 福建省长汀瑞祥装配式建筑有限公司 | 一种装配式钢结构桥梁寿命的断裂力学测量方法 |
CN113345558A (zh) * | 2021-06-30 | 2021-09-03 | 南通市第一人民医院 | 一种提高骨科诊断决策效率的辅助系统及方法 |
-
2022
- 2022-02-22 CN CN202210160079.9A patent/CN114510767B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101673319A (zh) * | 2008-09-12 | 2010-03-17 | 上海宝冶工程技术有限公司 | 火灾后钢结构建筑的评定方法 |
US20180245329A1 (en) * | 2017-02-24 | 2018-08-30 | New World China Land Limited | Fabricated structural system and assembling method thereof |
CN109190309A (zh) * | 2018-10-25 | 2019-01-11 | 长沙理工大学 | 老化钢筋混凝土梁桥抗剪承载力评价方法 |
CN110409606A (zh) * | 2019-08-02 | 2019-11-05 | 中国航空规划设计研究总院有限公司 | 一种摩擦摆连接的装配式钢结构体系及其设计方法 |
CN110940732A (zh) * | 2019-12-30 | 2020-03-31 | 华东交通大学 | 一种钢轨结构腐蚀在线监测与评价方法 |
CN111795978A (zh) * | 2020-09-08 | 2020-10-20 | 湖南大学 | 一种钢桥结构健康状态评估方法、装置、设备及存储介质 |
CN112557504A (zh) * | 2020-11-25 | 2021-03-26 | 福建省长汀瑞祥装配式建筑有限公司 | 一种装配式钢结构桥梁寿命的断裂力学测量方法 |
CN113345558A (zh) * | 2021-06-30 | 2021-09-03 | 南通市第一人民医院 | 一种提高骨科诊断决策效率的辅助系统及方法 |
Non-Patent Citations (5)
Title |
---|
HONGHAO LI,ET AL.: "Three-Dimensional Effects and Collapse Resistance Mechanisms in Steel Frame Buildings", 《JOURNAL OF STRUCTURAL ENGINEERING》 * |
JUNG-KYUN KIM,ET AL.: "Seismic Performance Evaluation of Footing-to-Circular RC Pier Connection Reinforced by High-Manganese Steel Bars (HMSBs)", 《ADVANCES IN CIVIL ENGINEERING》 * |
张永慧: "面向虚拟装配的作业仿真及工效分析方法研究", 《中国优秀博硕士学位论文全文数据库(硕士) 工程科技I辑》 * |
荣超 等: "装配式钢混组合结构加固时抗震性能模糊综合评估模型研究", 《地震工程学报》 * |
陈欢: "钢支撑加固医院建筑钢筋混凝土框架结构抗震性能研究", 《中国优秀博硕士学位论文全文数据库(硕士) 工程科技II辑》 * |
Also Published As
Publication number | Publication date |
---|---|
CN114510767B (zh) | 2022-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Vamvatsikos et al. | Performance‐based seismic design via yield frequency spectra | |
de Zea Bermudez et al. | Parameter estimation of the generalized Pareto distribution—Part I | |
Bracchi et al. | Consideration of modelling uncertainties in the seismic assessment of masonry buildings by equivalent-frame approach | |
Tankova et al. | A consistent methodology for the out-of-plane buckling resistance of prismatic steel beam-columns | |
Zhi et al. | Elasto-plastic instability of single-layer reticulated shells under dynamic actions | |
Caspeele et al. | Influence of quality control of concrete on structural reliability: assessment using a Bayesian approach | |
Pintucchi et al. | Effectiveness of nonlinear static procedures for slender masonry towers | |
Arrayago et al. | The Continuous Strength Method for the design of stainless steel hollow section columns | |
Sangiorgio et al. | Structural degradation assessment of RC buildings: Calibration and comparison of semeiotic-based methodology for decision support system | |
Arrayago et al. | Influence of the imperfection direction on the ultimate response of steel frames in advanced analysis | |
CN114969952B (zh) | 建筑物坍塌风险评估方法、装置、计算机设备及存储介质 | |
Smyrou et al. | Sectional response of T-shaped RC walls | |
CN114510767B (zh) | 一种基于三维立体建模的钢结构装配效果评估方法及系统 | |
Jindra et al. | Flexural buckling of stainless steel CHS columns: Reliability analysis utilizing FEM simulations | |
Cirak Karakas et al. | Fragility based evaluation of different code based assessment approaches for the performance estimation of existing buildings | |
Arteta et al. | Hybrid approach for simulating shear–flexure interaction in RC walls with nonlinear truss and fiber models | |
Ferreira et al. | Comparison of the General Method with the Overall Method for the out-of-plane stability of members with lateral restraints | |
CN111539142A (zh) | 一种管道裂纹扩展驱动力计算方法及系统 | |
Arrayago et al. | Simplified expressions for reliability assessments in code calibration | |
Gantes et al. | Strategy for numerical verification of steel structures at the ultimate limit state | |
Okasha et al. | Proposed structural reliability-based approach for the classification of concrete quality | |
CN116522286A (zh) | 一种逻辑回归优化的svr-lstm滑坡位移预测方法及系统 | |
Coimbra et al. | Optimization of rack-section cold-formed profiles columns | |
WO2015037067A1 (ja) | 延性破壊評価システム及び延性破壊評価方法 | |
Hradil et al. | Advanced design and optimization of steel portal frames |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220725 Address after: No.114, Jiaodaokou South Street, Dongcheng District, Beijing, 100007 Applicant after: CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd. Applicant after: CCCC FOURTH HIGHWAY FIRST ENGINEERING FIRMS CO.,LTD. Address before: 100176 unit 1308, 15th floor, building 1, No.3, rongjingdong street, economic and Technological Development Zone, Daxing District, Beijing Applicant before: CCCC FOURTH HIGHWAY FIRST ENGINEERING FIRMS CO.,LTD. |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No.114, Jiaodaokou South Street, Dongcheng District, Beijing, 100007 Patentee after: CCCC Construction Group Co.,Ltd. Patentee after: CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd. Address before: No.114, Jiaodaokou South Street, Dongcheng District, Beijing, 100007 Patentee before: CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd. Patentee before: CCCC FOURTH HIGHWAY FIRST ENGINEERING FIRMS CO.,LTD. |