CN114498654B - 基于变尺度混沌算法的含小水电接入配电网电压优化方法 - Google Patents
基于变尺度混沌算法的含小水电接入配电网电压优化方法 Download PDFInfo
- Publication number
- CN114498654B CN114498654B CN202210403372.3A CN202210403372A CN114498654B CN 114498654 B CN114498654 B CN 114498654B CN 202210403372 A CN202210403372 A CN 202210403372A CN 114498654 B CN114498654 B CN 114498654B
- Authority
- CN
- China
- Prior art keywords
- variable
- node
- voltage
- search
- follows
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005457 optimization Methods 0.000 title claims abstract description 76
- 230000000739 chaotic effect Effects 0.000 title claims abstract description 49
- 238000000034 method Methods 0.000 title claims abstract description 32
- 150000001875 compounds Chemical class 0.000 claims description 31
- 230000009466 transformation Effects 0.000 claims description 22
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 13
- 239000011159 matrix material Substances 0.000 claims description 12
- 230000008859 change Effects 0.000 claims description 6
- 238000006243 chemical reaction Methods 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 6
- 238000013507 mapping Methods 0.000 claims description 6
- 238000010248 power generation Methods 0.000 claims description 4
- 230000005284 excitation Effects 0.000 claims description 3
- 230000007774 longterm Effects 0.000 claims description 3
- 230000008569 process Effects 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims 1
- 239000003990 capacitor Substances 0.000 description 2
- 230000001276 controlling effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 230000002068 genetic effect Effects 0.000 description 1
- 230000035772 mutation Effects 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/004—Generation forecast, e.g. methods or systems for forecasting future energy generation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/466—Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/10—Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Power Engineering (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210403372.3A CN114498654B (zh) | 2022-04-18 | 2022-04-18 | 基于变尺度混沌算法的含小水电接入配电网电压优化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210403372.3A CN114498654B (zh) | 2022-04-18 | 2022-04-18 | 基于变尺度混沌算法的含小水电接入配电网电压优化方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114498654A CN114498654A (zh) | 2022-05-13 |
CN114498654B true CN114498654B (zh) | 2022-08-16 |
Family
ID=81489558
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210403372.3A Active CN114498654B (zh) | 2022-04-18 | 2022-04-18 | 基于变尺度混沌算法的含小水电接入配电网电压优化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114498654B (zh) |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102043905B (zh) * | 2010-12-23 | 2014-06-04 | 广东电网公司江门供电局 | 基于自适应算法的小水电群智能优化错峰调度方法 |
US9312698B2 (en) * | 2012-12-19 | 2016-04-12 | Robert Bosch Gmbh | System and method for energy distribution |
CN109886446B (zh) * | 2018-12-14 | 2023-04-21 | 贵州电网有限责任公司 | 基于改进混沌粒子群算法的电力系统动态经济调度方法 |
CN112994063B (zh) * | 2021-04-29 | 2022-11-01 | 重庆大学 | 基于储能有序充电和智能软开关控制模型的配电网优化运行方法 |
CN113517723A (zh) * | 2021-07-08 | 2021-10-19 | 云南电网有限责任公司电力科学研究院 | 一种含小型水电站的配电网系统的无功电压优化方法 |
-
2022
- 2022-04-18 CN CN202210403372.3A patent/CN114498654B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN114498654A (zh) | 2022-05-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107634518B (zh) | 一种“源-网-荷”相协调的主动配电网经济调度方法 | |
CN109120008A (zh) | 一种应用于风光储能的能源路由器装置及控制方法 | |
CN111049171B (zh) | 一种主动配电网储能配置方法 | |
CN112653154B (zh) | 基于边缘计算的分布式光伏配电网无功优化控制方法 | |
CN107221965B (zh) | 一种基于分布式设计的日前计划计算方法 | |
CN108695840A (zh) | 一种直流配电网电压控制方法及系统 | |
CN111614110B (zh) | 一种基于改进多目标粒子群算法的受端电网储能优化配置方法 | |
CN111952958A (zh) | 一种考虑控制模式转换的配电网柔性软开关优化配置方法 | |
CN114996908B (zh) | 考虑智能软开关接入的主动配电网扩展规划方法及系统 | |
CN116345466A (zh) | 一种考虑配网重构的主动配电网两阶段潮流优化方法 | |
CN114498654B (zh) | 基于变尺度混沌算法的含小水电接入配电网电压优化方法 | |
CN111541257B (zh) | 一种基于高频交流母线的住宅微电网及运行方法 | |
CN108667071A (zh) | 一种主动配电网负荷精准控制计算方法 | |
CN115693687B (zh) | 一种考虑综合调节成本的台区配电网自治调控方法 | |
CN111242389A (zh) | 一种智能储能软开关规划方法、系统、设备及介质 | |
Schonberger | Distributed control of a nanogrid using dc bus signalling | |
CN108493974A (zh) | 一种考虑充电成本的电动汽车参与调压的两级调度方法 | |
CN113937798B (zh) | 一种多站融合场景下考虑新能源消纳的储能系统配置方法 | |
CN116093950A (zh) | 基于双极性直接式ac/ac变换的双母线并供系统 | |
CN110807538A (zh) | 一种考虑居民区电动汽车渗透率的配电网规划方法 | |
CN115860372A (zh) | 一种直流配电网双时间尺度能量管理方法及装置 | |
CN115719973A (zh) | 一种分布式光伏并网电压综合治理方法及系统 | |
CN113629784A (zh) | 一种农村配电网多目标优化调度方法 | |
CN212588095U (zh) | 一种应用于电力传输的电力补偿变电系统 | |
CN114977155A (zh) | 基于运行灵活性价格引导的配电系统运行灵活性提升方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 330096 No. 88, Minqiang Road, private science and Technology Park, Qingshanhu District, Nanchang City, Jiangxi Province Applicant after: STATE GRID JIANGXI ELECTRIC POWER COMPANY LIMITED Research Institute Applicant after: STATE GRID CORPORATION OF CHINA Applicant after: Nanchang University Address before: 330096 No.88 Minqiang Road, private science and Technology Park, high tech Zone, Nanchang City, Jiangxi Province Applicant before: STATE GRID JIANGXI ELECTRIC POWER COMPANY LIMITED Research Institute Applicant before: STATE GRID CORPORATION OF CHINA Applicant before: Nanchang University |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |