CN114493926A - Method and system for line loss lean management and electricity theft prevention based on terminal edge computing - Google Patents
Method and system for line loss lean management and electricity theft prevention based on terminal edge computing Download PDFInfo
- Publication number
- CN114493926A CN114493926A CN202210135891.6A CN202210135891A CN114493926A CN 114493926 A CN114493926 A CN 114493926A CN 202210135891 A CN202210135891 A CN 202210135891A CN 114493926 A CN114493926 A CN 114493926A
- Authority
- CN
- China
- Prior art keywords
- line loss
- power
- loss rate
- cloud server
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 58
- 230000005611 electricity Effects 0.000 title claims abstract description 42
- 230000002265 prevention Effects 0.000 title claims abstract description 15
- 238000007726 management method Methods 0.000 claims abstract description 81
- 238000004458 analytical method Methods 0.000 claims abstract description 20
- 238000012545 processing Methods 0.000 claims abstract description 17
- 238000004364 calculation method Methods 0.000 claims abstract description 16
- 230000002159 abnormal effect Effects 0.000 claims abstract description 5
- 230000008569 process Effects 0.000 claims description 28
- 238000013179 statistical model Methods 0.000 claims description 27
- 230000006399 behavior Effects 0.000 claims description 17
- 230000008014 freezing Effects 0.000 claims description 6
- 238000007710 freezing Methods 0.000 claims description 6
- 230000003993 interaction Effects 0.000 claims 1
- 230000006872 improvement Effects 0.000 description 9
- 238000004891 communication Methods 0.000 description 6
- 230000005540 biological transmission Effects 0.000 description 3
- 230000001965 increasing effect Effects 0.000 description 3
- 238000003672 processing method Methods 0.000 description 3
- 230000001419 dependent effect Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 230000001939 inductive effect Effects 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 241001521797 Scorpaena notata Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000004128 high performance liquid chromatography Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/23—Updating
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/245—Query processing
- G06F16/2458—Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
- G06F16/2462—Approximate or statistical queries
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5061—Partitioning or combining of resources
- G06F9/5072—Grid computing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2209/00—Indexing scheme relating to G06F9/00
- G06F2209/50—Indexing scheme relating to G06F9/50
- G06F2209/502—Proximity
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Health & Medical Sciences (AREA)
- Mathematical Physics (AREA)
- Databases & Information Systems (AREA)
- Probability & Statistics with Applications (AREA)
- Educational Administration (AREA)
- Fuzzy Systems (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Computational Linguistics (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
技术领域technical field
本发明属于电力设备领域,具体涉及一种基于终端边缘计算的线损精益管理与防窃电方法、系统。The invention belongs to the field of power equipment, and in particular relates to a method and system for lean management of line losses and anti-power theft based on terminal edge computing.
背景技术Background technique
在电网中,输配电变压器的不合理配置会导致输配电变压器长期处于空载或轻载等运行状态,致使电能损耗大幅度增加。线路上的电能损耗主要有三个部分的原因:一、电网三相符合不平衡,功率因数较低。二、电网布局不合理,供电线路过长或计量设备准确度差。三、设备管理维护不规范,存在漏电、窃电等行为。In the power grid, the unreasonable configuration of transmission and distribution transformers will cause the transmission and distribution transformers to be in no-load or light-load operation for a long time, resulting in a substantial increase in power loss. There are three main reasons for the power loss on the line: 1. The three-phase grid is unbalanced and the power factor is low. 2. The grid layout is unreasonable, the power supply line is too long or the accuracy of the measuring equipment is poor. 3. The equipment management and maintenance are not standardized, and there are behaviors such as electricity leakage and electricity theft.
其中,在配电线路中常存在三相负荷不平衡现象,当三负荷不平衡度多于20%,则会致使线路中电流大幅升高,导致电能损耗大量增加。例如在工矿企业中,用电设备很多都属于感性用电设备,感性负荷会对系统有功功率加以吸收,同时还需电力系统提供大量无功功率才可正常运行。而系统所提供无功功率在运输及配送过程中,当涉及到的输电线路较多,同时还需经变压器予以转换和输送时,则容易导致无功功率损耗增加,致使电网功率因数降低。Among them, there is often a three-phase load unbalance phenomenon in distribution lines. When the three-phase load unbalance degree is more than 20%, the current in the line will increase significantly, resulting in a large increase in power loss. For example, in industrial and mining enterprises, many electrical equipment are inductive electrical equipment, and the inductive load will absorb the active power of the system, and at the same time, the power system needs to provide a large amount of reactive power to operate normally. In the process of transportation and distribution of reactive power provided by the system, when there are many transmission lines involved, and it needs to be converted and transmitted by transformers, it is easy to lead to an increase in reactive power loss, resulting in a decrease in the power factor of the grid.
在电网建设中,若未对变压器进行合理布点,供电点和负荷中心有较大偏离,采用迂回方式供电或近电远送,或者存在导线截面过小或供电半径较长等问题;都可能引发电能损耗大幅增加。同时,如果节点计量设备在计量时存在准确性差问题,也很容易导致电量流失。在部分电量计量中常存在计量方式不合理、高供低量等问题发生。此外,电能表或互感器倍率存在差错,计量回路的配置不合理等问题,也会导致电能损耗有不同程度的增高。In the construction of power grid, if the transformers are not properly arranged, the power supply point and the load center are greatly deviated, the power supply is supplied in a circuitous way or the power is transmitted near and far, or there are problems such as too small wire cross-section or long power supply radius; Power consumption has increased significantly. At the same time, if the node metering equipment has poor accuracy in metering, it is easy to cause power loss. In some electricity metering, there are often problems such as unreasonable metering methods, high supply and low volume. In addition, there are errors in the magnification of the electric energy meter or transformer, and the unreasonable configuration of the metering circuit will also lead to an increase in electric energy loss to varying degrees.
电网管理不规范是造成线路损耗最重要的人为原因。如未对设备进行妥善维护,则可能会出现漏电、放电等现象;在抄核收时不进行准确统计,存在估抄、少抄和漏抄现象等;都可以造成统计用电量和实际电量误差较大,增大线损统计结果。同时,在各地有各种偷窃电行为,也是线路损耗不断增加的原因之一。Irregular power grid management is the most important man-made cause of line loss. If the equipment is not properly maintained, leakage, discharge and other phenomena may occur; accurate statistics are not carried out when copying and checking, and there are phenomena such as estimated copying, under-copying and omission of copying; all of which can cause statistical power consumption and actual power consumption. If the error is large, the statistical result of line loss will be increased. At the same time, there are various behaviors of stealing electricity in various places, which is also one of the reasons for the increasing line loss.
现有的电力管理系统中,通常需要在云服务器端根据大规模的历史数据对台区中所有用电节点进行分析,进而估算出线路的综合线损分析结果。通过将计算出的理论线损与统计的实际线损相比,可以鉴定供电网络结构和运行的合理性、供电管理的科学性。并及时发现计量装置、设备性能、用电管理、运行方式、理论计算、抄收统计等方面的问题,以便采取降损措施为电力运营企业的电网经济运行提供决策支持。In the existing power management system, it is usually necessary to analyze all power-consuming nodes in the station area on the cloud server side according to large-scale historical data, and then estimate the comprehensive line loss analysis result of the line. By comparing the calculated theoretical line loss with the statistical actual line loss, the rationality of the structure and operation of the power supply network and the scientificity of the power supply management can be identified. And timely find out the problems of metering device, equipment performance, power management, operation mode, theoretical calculation, copying statistics, etc., so as to take loss reduction measures to provide decision support for the economic operation of power grids of power operating enterprises.
但是,常规的线损分析和评估通常都是在云服务器等后台数据中心完成,并且需要在达到结算周期时由云服务器针对海量数据进行综合分析处理完成。这种管理方法的数据处理过程繁复,且高度依赖云端,同时还存在监控滞后的缺陷。However, conventional line loss analysis and evaluation are usually completed in back-end data centers such as cloud servers, and the cloud server needs to comprehensively analyze and process massive amounts of data when the settlement cycle is reached. The data processing process of this management method is cumbersome and highly dependent on the cloud, and it also suffers from monitoring lag.
发明内容SUMMARY OF THE INVENTION
为解决现有电力管理系统中线损分析不及时,线损分析高度依赖云服务器,抗风险能力较弱,线损分析过程的数据量过大,数据处理过程不灵活等问题。本发明提供一种基于终端边缘计算的线损精益管理与防窃电方法、系统。In order to solve the problems that the line loss analysis in the existing power management system is not timely, the line loss analysis is highly dependent on the cloud server, the anti-risk capability is weak, the amount of data in the line loss analysis process is too large, and the data processing process is inflexible. The present invention provides a method and system for line loss lean management and electricity theft prevention based on terminal edge computing.
本发明采用以下技术方案实现:The present invention adopts the following technical solutions to realize:
一种基于终端边缘计算的线损精益管理与防窃电方法,该方法用于在电力设备终端实现用电信息和统计和分析,进而对台区的线损进行精益管理,及时应对线损故障并预防窃电行为发生。该线损精益管理与防窃电方法具体包括如下过程:A method for line loss lean management and electricity theft prevention based on terminal edge computing, the method is used to realize electricity consumption information, statistics and analysis at the terminal of power equipment, and then perform lean management of line loss in the station area, and timely respond to line loss faults and prevent theft of electricity. The line loss lean management and electricity theft prevention method specifically includes the following processes:
S1:按照预设的采集频率,通过集中器采集各个用电节点的电力信息,包括电压、电流、有功功率、无功功率和冻结电量。S1: According to the preset collection frequency, collect the power information of each power-consuming node through the concentrator, including voltage, current, active power, reactive power, and frozen power.
S2:在每个集中器中部署一个边缘计算模块,然后在每次采集完毕后,根据已采集的电力信息在一小时内的历史信息,计算出当前设备节点对应的线损率的小时、日、月,以及年度的统计结果。S2: Deploy an edge computing module in each concentrator, and after each collection is completed, calculate the hourly, daily hourly and daily hours of the line loss rate corresponding to the current equipment node according to the historical information of the collected power information within one hour. , month, and year statistics.
S3:集中器将自身的设备编号以及实时采集的电力信息发送到云服务器进行备份存储,同时每隔一小时将计算出的线损数据统计结果的更新数据发送到云服务器中。S3: The concentrator sends its own device number and power information collected in real time to the cloud server for backup storage, and sends updated data of the calculated line loss data statistics to the cloud server every hour.
S4:云服务器根据获取的各个集中器计算出的线损率统计结果,分析整个用电台区是否存在线损故障,并在出现线损异常状态时再判断台区是否存在窃电行为;S4: The cloud server analyzes whether there is a line loss fault in the entire station area according to the line loss rate statistics calculated by each concentrator obtained, and judges whether there is an electricity stealing behavior in the station area when the line loss abnormal state occurs;
S5:云服务器将分析出的线损故障结果和窃电判断结论以及对应的用电节点信息,发送到相应的台区管理人员,同时发送相应的故障处理建议。S5: The cloud server sends the analyzed line loss fault results, power stealing judgment conclusions, and corresponding power-consuming node information to the corresponding station area management personnel, and sends corresponding fault handling suggestions at the same time.
作为本发明进一步地改进,步骤S1中,采集器采集的电力信息还包括电表的小时冻结数据、电表的日冻结数据、断路器的小时冻结数据、断路器的日冻结数据。As a further improvement of the present invention, in step S1, the power information collected by the collector also includes hourly frozen data of the electric meter, daily frozen data of the electric meter, hourly frozen data of the circuit breaker, and daily frozen data of the circuit breaker.
作为本发明进一步地改进,集中器中还包括一个存储模块。存储模块用于存储一小时内采集到的电力信息的历史信息,以及根据历史信息计算出的当前设备节点的线损率的统计结果。As a further improvement of the present invention, the concentrator also includes a storage module. The storage module is used to store the historical information of the power information collected within one hour, and the statistical result of the line loss rate of the current equipment node calculated according to the historical information.
作为本发明进一步地改进,步骤S1中,存储模块将集中器采集的历史信息和计算出的统计结果分别存储在特定的存储单元中;并每隔一小时对存储的电力信息的历史信息进行覆盖,同时更新线损率的统计结果。As a further improvement of the present invention, in step S1, the storage module stores the historical information collected by the concentrator and the calculated statistical results in a specific storage unit respectively; and covers the historical information of the stored power information every hour , and update the statistical results of the line loss rate at the same time.
作为本发明进一步地改进,步骤S2中,线损率的统计结果中分别包括:设备起始电量、设备结束电量、上一小时线损率、上一日线损率;上一日A相线损率、上一日B相线损率、上一日C相线损率、当月总线损率、当月A相线损率、当月B相线损率、当月C相线损率、当年总线损率、当年A相线损率、当年B相线损率、当年C相线损率。As a further improvement of the present invention, in step S2, the statistical results of the line loss rate respectively include: the starting power of the equipment, the ending power of the equipment, the line loss rate of the last hour, the line loss rate of the last day; the A-phase line of the last day Loss rate, B-phase line loss rate of the previous day, C-phase line loss rate of the previous day, bus loss rate of the current month, A-phase line loss rate of the current month, B-phase line loss rate of the current month, C-phase line loss rate of the current month, and bus loss rate of the current year rate, current year A-phase line loss rate, current year B-phase line loss rate, current year C-phase line loss rate.
作为本发明进一步地改进,采集器中边缘计算模块通过一个统计模型完成线损率统计结果的计算,统计模型与云服务器中的数据中心进行数据交互之前需要先进行模型注册或更新,模型的注册或更新过程如下:As a further improvement of the present invention, the edge computing module in the collector completes the calculation of the statistical results of the line loss rate through a statistical model. Before the statistical model interacts with the data center in the cloud server, the model needs to be registered or updated. Or update process as follows:
S01:云服务器读取统计模型最新的版本号和模型名称。S01: The cloud server reads the latest version number and model name of the statistical model.
S02:云服务器检查对比集中器中当前版本号对应的模型名称和云服务器中的最新版本号对应的模型名称,判断二者是否一致,并做出如下决策:S02: The cloud server checks the model name corresponding to the current version number in the comparison concentrator and the model name corresponding to the latest version number in the cloud server, judges whether the two are consistent, and makes the following decisions:
(1)当二者一致,则判定当前版本号的模型有效,并读取指定的模型内容。(1) When the two are consistent, the model of the current version number is determined to be valid, and the specified model content is read.
(2)当二者不一致,则判定当前版本号的模型无效,并根据云服务器中的最新版本的统计模型对集中器中的统计模型进行更新。(2) When the two are inconsistent, it is determined that the model with the current version number is invalid, and the statistical model in the concentrator is updated according to the latest version of the statistical model in the cloud server.
S03:云服务器读取集中器中的统计模型的注册信息。S03: The cloud server reads the registration information of the statistical model in the concentrator.
S04:云服务器检查统计模型是否完成注册,并作出如下决策:S04: The cloud server checks whether the statistical model is registered, and makes the following decisions:
(1)是则判定注册或更新过程已完成。(1) Yes, it is determined that the registration or update process has been completed.
(2)否则重新完成模型注册过程的设置。(2) Otherwise, complete the setting of the model registration process again.
S05:完成模型注册后,集中器向与服务器请求用于计算线损率统计结果的参数信息。S05: After completing the model registration, the concentrator requests the server for parameter information for calculating the statistical result of the line loss rate.
作为本发明进一步地改进,步骤S2和S3中,统计模型的数据处理过程如下:As a further improvement of the present invention, in steps S2 and S3, the data processing process of the statistical model is as follows:
S001:请求用于计算线损率统计结果的原始数据,并判断数据是否获取成功:S001: Request the raw data used to calculate the statistical result of line loss rate, and judge whether the data is obtained successfully:
(1)是则进入下一步。(1) If yes, go to the next step.
(2)否则中断计算流程,并打印包含数据获取出错原因的出错信息。(2) Otherwise, the calculation process is interrupted, and an error message including the cause of the data acquisition error is printed.
S002:根据上步骤获取的原始数据计算出线损率的统计结果,并判断计算结果是否合法:S002: Calculate the statistical result of the line loss rate according to the original data obtained in the previous step, and judge whether the calculation result is legal:
(1)是则进入下一步。(1) If yes, go to the next step.
(2)否则中断数据上传,并打印包含不合法数据类型的错误信息。(2) Otherwise, the data upload will be interrupted, and an error message containing an illegal data type will be printed.
S003:将上步骤计算出的线损率的统计结果上述到云服务器,并根据云服务器的返回信息判断上传是否成功:S003: Send the statistical result of the line loss rate calculated in the previous step to the cloud server, and judge whether the upload is successful according to the return information of the cloud server:
(1)是则打印数据上传成功的消息。(1) is the message that the print data is uploaded successfully.
(2)否则打印上传失败的原因。(2) Otherwise, print the reason for upload failure.
作为本发明进一步地改进,步骤S4中,云服务器中运行有一个故障分析工具,故障分析工具用于根据每个节点的线损率的历史统计数据,分析出整个台区或供电网络中可能存在的线损故障或窃电行为。并定位到相应的风险节点,针对风险节点下达预警信号。As a further improvement of the present invention, in step S4, there is a fault analysis tool running in the cloud server, and the fault analysis tool is used to analyze the possible existence in the whole station area or power supply network according to the historical statistical data of the line loss rate of each node. line damage or electricity theft. And locate the corresponding risk nodes, and issue early warning signals for the risk nodes.
本发明还包括一种基于终端边缘计算的线损精益管理与防窃电系统,该系统采用如前述的基于终端边缘计算的线损精益管理与防窃电方法,对台区的所有节点的线损进行管理,及时处理线损故障和监控窃电行为。线损精益管理与防窃电系统包括:集中器,边缘计算模块,云服务器。The present invention also includes a line loss lean management and electricity theft prevention system based on terminal edge computing. Manage line damage, deal with line loss faults in a timely manner, and monitor electricity theft. Line loss lean management and anti-theft power system include: concentrator, edge computing module, cloud server.
其中,集中器安装在供电台区中每个用电节点处,集中器用于采集供电台区内各个节点的电力信息,电力信息发送到一个边缘计算模块和云服务器中。The concentrator is installed at each power node in the power supply station area, and the concentrator is used to collect power information of each node in the power supply station area, and the power information is sent to an edge computing module and a cloud server.
边缘计算模块与集中器电连接,边缘计算模块用于接收所述集中器采集到的电力信息,并根据一个预设周期内的电力信息的历史数据计算出当前节点中线损率的统计结果;并将线损率统计结果发送到云服务器。The edge computing module is electrically connected to the concentrator, and the edge computing module is used to receive the power information collected by the concentrator, and calculate the statistical result of the line loss rate in the current node according to the historical data of the power information in a preset period; and Send the line loss rate statistics to the cloud server.
云服务器用于存储各个用电节点的电力信息以及线损率的统计结果。云服务器中还包括一个窃电行为分析工具,其用于根据各个节点的线损率的统计结果判断供电台区或整个供电网络中是否存在线损故障或窃电行为;并定位到相应的风险节点,针对风险节点下达预警信号。The cloud server is used to store the power information of each power node and the statistical results of the line loss rate. The cloud server also includes a power stealing behavior analysis tool, which is used to judge whether there is a line loss fault or power stealing behavior in the power supply station area or the entire power supply network according to the statistical results of the line loss rate of each node; and locate the corresponding risk. node, and issue early warning signals for risk nodes.
作为本发明进一步地改进,线损精益管理与防窃电系统还包括管理终端,管理终端与云服务器通讯连接;每个管理终端的管理区域对应用电台区中的一个或多个用电节点。管理终端配发到相应的管理人员,当云服务器定位到风险节点之后,则向对应的管理终端下发预警信号;管理终端为专用终端,或运行有电力管理APP的通用移动终端;管理终端还用于查询管理区域内的各个节点的历史数据。As a further improvement of the present invention, the line loss lean management and electricity theft prevention system further includes a management terminal, which is connected to the cloud server in communication; the management area of each management terminal corresponds to one or more power consumption nodes in the application radio area. The management terminal is distributed to the corresponding management personnel, and when the cloud server locates the risk node, it sends an early warning signal to the corresponding management terminal; the management terminal is a dedicated terminal, or a general mobile terminal running a power management APP; the management terminal also Used to query the historical data of each node in the management area.
本发明提供的技术方案,具有如下有益效果:The technical scheme provided by the invention has the following beneficial effects:
本发明在自动采集和上传电力信息的集中器中部署了具有边缘计算能力的数据处理模块,并在集中器上传集采数据的同时获取相关数据,并利用相关数据在本地完成当前节点中线损统计结果的计算过程。同时将当前节点的线损数据上传到云服务器。由于本实施在集中器的集采数据生成后即可立刻得到各个节点的线损统计结果;因此这大大提高了限速数据的时效性,为快速处理线损故障,及时发现窃电行为奠定了基础。The present invention deploys a data processing module with edge computing capability in the concentrator that automatically collects and uploads power information, acquires relevant data when the concentrator uploads the collected data, and uses the relevant data to locally complete the current node center line loss statistics The calculation process of the result. At the same time, upload the line loss data of the current node to the cloud server. Because this implementation can obtain the line loss statistics of each node immediately after the collection data of the concentrator is generated; therefore, this greatly improves the timeliness of the speed limit data, which lays a solid foundation for the rapid processing of line loss faults and the timely detection of electricity theft. Base.
本发明的方法将供电网络中评估线路损耗的数据处理方法的集中处理变为基于终端边缘计算能力的分布式处理模式。可以大幅降低后台数据中心的运算压力;同时还可以降低后台服务器宕机等故障对供电网络正常运行带来的影响,提高系统的整体安全性和容错能力。The method of the invention changes the centralized processing of the data processing method for evaluating line loss in the power supply network into a distributed processing mode based on the edge computing capability of the terminal. It can greatly reduce the computing pressure of the back-end data center; at the same time, it can also reduce the impact of failures such as back-end server downtime on the normal operation of the power supply network, and improve the overall security and fault tolerance of the system.
本发明虽然不在后台服务器中完成各个节点的线损数据统计任务,但是基于所有节点数据的供电网络线损故障分析和窃电行为判定行为仍然由后台服务器完成。并由后台服务器将判定结果下方到各个集中器或管理终端,便于管理人员及时处处理故障、消除风险。Although the present invention does not complete the line loss data statistics task of each node in the backend server, the backend server still completes the line loss fault analysis of the power supply network and the determination of electricity stealing behavior based on the data of all nodes. And the backend server sends the judgment results to each concentrator or management terminal, which is convenient for management personnel to deal with faults and eliminate risks in a timely manner.
附图说明Description of drawings
附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the specification, and are used to explain the present invention together with the embodiments of the present invention, and do not constitute a limitation to the present invention. In the attached image:
图1为本发明实施例1中提供的一种基于终端边缘计算的线损精益管理与防窃电方法的步骤流程图;FIG. 1 is a flowchart of steps of a method for lean management of line losses and preventing electricity theft based on terminal edge computing provided in Embodiment 1 of the present invention;
图2为本发明实施例1中统计模型的注册或更新过程的流程图;2 is a flowchart of a registration or update process of a statistical model in Embodiment 1 of the present invention;
图3为本发明实施例1中统计模型的数据处理过程的流程图。FIG. 3 is a flowchart of the data processing process of the statistical model in Embodiment 1 of the present invention.
图4为本发明实施例2中提供的一种基于终端边缘计算的线损精益管理与防窃电系统的系统模块图。FIG. 4 is a system module diagram of a system for lean management of line losses and anti-power theft based on terminal edge computing provided in Embodiment 2 of the present invention.
具体实施方式Detailed ways
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本发明,并不用于限定本发明。In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, but not to limit the present invention.
实施例1Example 1
如图1所示,本实施例提供一种基于终端边缘计算的线损精益管理与防窃电方法,该方法用于在电力设备终端实现用电信息和统计和分析,进而对台区的线损进行精益管理,及时应对线损故障并预防窃电行为发生。As shown in FIG. 1 , this embodiment provides a method for lean management of line losses and anti-power theft based on terminal edge computing. Lean management of damages, timely response to line damage failures and prevention of electricity theft.
本实施例提供的方法可以通过运行在运行在智芯、华为系统平台的基础微应用或软件进行实施。在方法实施过程中,通过配网智能设备升级和采集感知设备如集中的全面覆盖,能够实时监测整个台区内蓑鲉节点的电压、电流、有功、冻结电量等关键数据。同时,基于终端一侧的边缘计算模块的运算能力,本实施例的方法可以就地开展台区分路线损统计分析,及时上送线损超差等异常情况至云与服务器的数据中心。进而为故障分析和窃电排查提供数据基础。通过本实施例提供的处理方式既可以实现对低压线损进行实时监管,有效支撑线损治理、窃电核查等工作开展。还可以降低云服务器的数据处理压力,消除云端的服务器设备宕机或其它故障对电网运行稳定性造成的影响。The method provided in this embodiment may be implemented by running on basic micro-applications or software running on Zhixin and Huawei system platforms. During the implementation of the method, key data such as voltage, current, active power, and frozen power of scorpionfish nodes in the entire station area can be monitored in real time through the upgrading of distribution network intelligent equipment and the acquisition of sensing equipment such as centralized comprehensive coverage. At the same time, based on the computing capability of the edge computing module on the terminal side, the method of this embodiment can perform statistical analysis of line loss by station on the spot, and send abnormal conditions such as line loss out of tolerance to the data center of the cloud and the server in time. In turn, it provides a data basis for fault analysis and power theft investigation. Through the processing method provided in this embodiment, real-time supervision of low-voltage line losses can be realized, and work such as line loss management and power theft verification can be effectively supported. It can also reduce the data processing pressure of the cloud server, and eliminate the impact of the downtime or other failures of the server equipment in the cloud on the stability of the power grid operation.
本实施例提供的线损精益管理与防窃电方法具体包括如下过程:The line loss lean management and electricity theft prevention method provided by this embodiment specifically includes the following processes:
S1:按照预设的采集频率,通过集中器采集各个用电节点的电力信息,包括电压、电流、有功功率、无功功率和冻结电量。S1: According to the preset collection frequency, collect the power information of each power-consuming node through the concentrator, including voltage, current, active power, reactive power, and frozen power.
S2:在每个集中器中部署一个边缘计算模块,然后在每次采集完毕后,根据已采集的电力信息在一小时内的历史信息,计算出当前设备节点对应的线损率的小时、日、月,以及年度的统计结果。S2: Deploy an edge computing module in each concentrator, and after each collection is completed, calculate the hourly, daily hourly and daily hours of the line loss rate corresponding to the current equipment node according to the historical information of the collected power information within one hour. , month, and year statistics.
具体地,线损率的统计结果中分别包括:设备起始电量、设备结束电量、上一小时线损率、上一日线损率;上一日A相线损率、上一日B相线损率、上一日C相线损率、当月总线损率、当月A相线损率、当月B相线损率、当月C相线损率、当年总线损率、当年A相线损率、当年B相线损率、当年C相线损率。Specifically, the statistical results of the line loss rate respectively include: the starting power of the equipment, the ending power of the equipment, the line loss rate of the last hour, and the line loss rate of the previous day; the line loss rate of phase A on the previous day and the phase B of the previous day Line loss rate, last day C-phase line loss rate, current month bus line loss rate, current month A-phase line loss rate, current month B-phase line loss rate, current month C-phase line loss rate, current year bus loss rate, current year A-phase line loss rate , the current year B-phase line loss rate, the current year C-phase line loss rate.
其中,边缘计算模型每隔1h完成一次上一小时线损率的数据更新。每隔24h完成上一日线损率、上一日A相线损率、上一日B相线损率、上一日C相线损率的数据更新;每隔28-31d(由当月日期数确定)完成当月总线损率、当月A相线损率、当月B相线损率、当月C相线损率的数据更新;每隔一年完成当年总线损率、当年A相线损率、当年B相线损率、当年C相线损率的数据更新。Among them, the edge computing model completes the data update of the line loss rate in the previous hour every 1h. Complete the data update of the previous day's line loss rate, the previous day's A-phase line loss rate, the previous day's B-phase line loss rate, and the previous day's C-phase line loss rate; every 28-31d (from the date of the current month) The number is determined) to complete the data update of the current month bus loss rate, the current month A phase line loss rate, the current month B phase line loss rate, and the current month C phase line loss rate; complete the current year bus loss rate, the current year A phase line loss rate, The data of the current year's B-phase line loss rate and the current year's C-phase line loss rate are updated.
S3:集中器将自身的设备编号以及实时采集的电力信息发送到云服务器进行备份存储,同时每隔一小时将计算出的线损数据统计结果的更新数据发送到云服务器中。S3: The concentrator sends its own device number and power information collected in real time to the cloud server for backup storage, and sends updated data of the calculated line loss data statistics to the cloud server every hour.
S4:云服务器根据获取的各个集中器计算出的线损率统计结果,分析整个用电台区是否存在线损故障,并在出现线损异常状态时再判断台区是否存在窃电行为;S4: The cloud server analyzes whether there is a line loss fault in the entire station area according to the line loss rate statistics calculated by each concentrator obtained, and judges whether there is an electricity stealing behavior in the station area when the line loss abnormal state occurs;
云服务器中运行有一个故障分析工具,故障分析工具用于根据每个节点的线损率的历史统计数据,分析出整个台区或供电网络中可能存在的线损故障或窃电行为。并定位到相应的风险节点,针对风险节点下达预警信号。There is a fault analysis tool running in the cloud server. The fault analysis tool is used to analyze the possible line loss faults or electricity stealing behaviors in the entire station area or power supply network according to the historical statistical data of the line loss rate of each node. And locate the corresponding risk nodes, and issue early warning signals for the risk nodes.
S5:云服务器将分析出的线损故障结果和窃电判断结论以及对应的用电节点信息,发送到相应的台区管理人员,同时发送相应的故障处理建议。S5: The cloud server sends the analyzed line loss fault results, power stealing judgment conclusions, and corresponding power-consuming node information to the corresponding station area management personnel, and sends corresponding fault handling suggestions at the same time.
本实施例的边缘计算模块中,通过一个统计模型完成线损率统计结果的计算,统计模型与云服务器中的数据中心进行数据交互之前需要先进行模型注册或更新,如图2所示,统计模型的注册或更新过程如下:In the edge computing module of this embodiment, a statistical model is used to complete the calculation of the statistical results of the line loss rate. Before the statistical model interacts with the data center in the cloud server, it is necessary to register or update the model. As shown in FIG. The process of registering or updating a model is as follows:
S01:云服务器读取统计模型最新的版本号和模型名称。S01: The cloud server reads the latest version number and model name of the statistical model.
S02:云服务器检查对比集中器中当前版本号对应的模型名称和云服务器中的最新版本号对应的模型名称,判断二者是否一致,并做出如下决策:S02: The cloud server checks the model name corresponding to the current version number in the comparison concentrator and the model name corresponding to the latest version number in the cloud server, judges whether the two are consistent, and makes the following decisions:
(1)当二者一致,则判定当前版本号的模型有效,并读取指定的模型内容。(1) When the two are consistent, the model of the current version number is determined to be valid, and the specified model content is read.
(2)当二者不一致,则判定当前版本号的模型无效,并根据云服务器中的最新版本的统计模型对集中器中的统计模型进行更新。(2) When the two are inconsistent, it is determined that the model with the current version number is invalid, and the statistical model in the concentrator is updated according to the latest version of the statistical model in the cloud server.
S03:云服务器读取集中器中的统计模型的注册信息。S03: The cloud server reads the registration information of the statistical model in the concentrator.
S04:云服务器检查统计模型是否完成注册,并作出如下决策:S04: The cloud server checks whether the statistical model is registered, and makes the following decisions:
(1)是则判定注册或更新过程已完成。(1) Yes, it is determined that the registration or update process has been completed.
(2)否则重新完成模型注册过程的设置。(2) Otherwise, complete the setting of the model registration process again.
S05:完成模型注册后,集中器向与服务器请求用于计算线损率统计结果的参数信息。S05: After completing the model registration, the concentrator requests the server for parameter information for calculating the statistical result of the line loss rate.
统计模型完成注册后可以正常开展数据统计和计算任务,计算过程在靠近采集的本地终端上完成。如图3所示,统计模型的数据处理过程大致如下:After the statistical model is registered, data statistics and calculation tasks can be carried out normally, and the calculation process is completed on the local terminal close to the collection. As shown in Figure 3, the data processing process of the statistical model is roughly as follows:
S001:请求用于计算线损率统计结果的原始数据,并判断数据是否获取成功:S001: Request the raw data used to calculate the statistical result of line loss rate, and judge whether the data is obtained successfully:
(1)是则进入下一步。(1) If yes, go to the next step.
(2)否则中断计算流程,并打印包含数据获取出错原因的出错信息。(2) Otherwise, the calculation process is interrupted, and an error message including the cause of the data acquisition error is printed.
S002:根据上步骤获取的原始数据计算出线损率的统计结果,并判断计算结果是否合法:S002: Calculate the statistical result of the line loss rate according to the original data obtained in the previous step, and judge whether the calculation result is legal:
(1)是则进入下一步。(1) If yes, go to the next step.
(2)否则中断数据上传,并打印包含不合法数据类型的错误信息。(2) Otherwise, the data upload will be interrupted, and an error message containing an illegal data type will be printed.
S003:将上步骤计算出的线损率的统计结果上述到云服务器,并根据云服务器的返回信息判断上传是否成功:S003: Send the statistical result of the line loss rate calculated in the previous step to the cloud server, and judge whether the upload is successful according to the return information of the cloud server:
(1)是则打印数据上传成功的消息。(1) is the message that the print data is uploaded successfully.
(2)否则打印上传失败的原因。(2) Otherwise, print the reason for upload failure.
在本实例中,采集器中包括一个数据存储模块。采集器采集的电力信息还包括电表的小时冻结数据、电表的日冻结数据、断路器的小时冻结数据、断路器的日冻结数据。存储模块将集中器采集的历史信息和计算出的统计结果分别存储在特定的存储单元中;并每隔一小时对存储的电力信息的历史信息进行覆盖,同时更新线损率的统计结果。所述存储模块中,存储的数据卡类型如表1所示:In this example, the collector includes a data storage module. The power information collected by the collector also includes hourly freezing data of the electric meter, daily freezing data of the electric meter, hourly freezing data of the circuit breaker, and daily freezing data of the circuit breaker. The storage module stores the historical information collected by the concentrator and the calculated statistical results in specific storage units respectively; and covers the stored historical information of the power information every hour, and simultaneously updates the statistical results of the line loss rate. In the storage module, the stored data card types are shown in Table 1:
表1:采集和计算的线损率的相关数据统计表Table 1: Statistics related to the collected and calculated line loss rate
本实施例在自动采集和上传电力信息的集中器中部署了具有边缘计算能力的数据处理模块,并在集中器上传集采数据的同时获取相关数据,并利用相关数据在本地完成当前节点中线损统计结果的计算过程。同时将当前节点的线损数据上传到云服务器。由于本实施在集中器的集采数据生成后即可立刻得到各个节点的线损统计结果;因此这大大提高了限速数据的时效性,为快速处理线损故障,及时发现窃电行为奠定了基础。In this embodiment, a data processing module with edge computing capability is deployed in the concentrator that automatically collects and uploads power information, and the concentrator acquires relevant data while uploading the collected data, and uses the relevant data to locally complete the line loss of the current node The calculation process of statistical results. At the same time, upload the line loss data of the current node to the cloud server. Because this implementation can obtain the line loss statistics of each node immediately after the collection data of the concentrator is generated; therefore, this greatly improves the timeliness of the speed limit data, which lays a solid foundation for the rapid processing of line loss faults and the timely detection of electricity theft. Base.
本实施例提供的方法将供电网络中评估线路损耗的数据处理方法的集中处理变为基于终端边缘计算能力的分布式处理模式。可以大幅降低后台数据中心的运算压力;同时还可以降低后台服务器宕机等故障对供电网络正常运行带来的影响,提高系统的整体安全性和容错能力。The method provided in this embodiment changes the centralized processing of the data processing method for evaluating line loss in the power supply network into a distributed processing mode based on the edge computing capability of the terminal. It can greatly reduce the computing pressure of the back-end data center; at the same time, it can also reduce the impact of failures such as back-end server downtime on the normal operation of the power supply network, and improve the overall security and fault tolerance of the system.
本实施例虽然不在后台服务器中完成各个节点的线损数据统计任务,但是基于所有节点数据的供电网络线损故障分析和窃电行为判定行为仍然由后台服务器完成。并由后台服务器将判定结果下方到各个集中器或管理终端,便于管理人员及时处处理故障、消除风险。Although this embodiment does not complete the line loss data statistics task of each node in the background server, the power supply network line loss fault analysis and power stealing behavior determination based on all node data are still completed by the background server. And the backend server sends the judgment results to each concentrator or management terminal, which is convenient for management personnel to deal with faults and eliminate risks in a timely manner.
实施例2Example 2
本实施例提供一种基于终端边缘计算的线损精益管理与防窃电系统,该系统采用如实施例1的基于终端边缘计算的线损精益管理与防窃电方法,对台区的所有节点的线损进行管理,及时处理线损故障和监控窃电行为。This embodiment provides a line loss lean management and electricity theft prevention system based on terminal edge computing. The system adopts the line loss lean management and electricity theft prevention method based on terminal edge computing as in Manage the line loss, deal with line loss faults in a timely manner and monitor the behavior of electricity theft.
其中,如图4所示,线损精益管理与防窃电系统包括:集中器,边缘计算模块,云服务器。Among them, as shown in Figure 4, the line loss lean management and electricity theft prevention system includes: a concentrator, an edge computing module, and a cloud server.
集中器安装在供电台区中每个用电节点处,集中器用于采集供电台区内各个节点的电力信息,电力信息发送到一个边缘计算模块和云服务器中。集中器中还包括一个存储模块。存储模块用于存储一小时内采集到的电力信息的历史信息,以及根据历史信息计算出的当前设备节点的线损率的统计结果。The concentrator is installed at each power-consuming node in the power supply station area. The concentrator is used to collect power information of each node in the power supply station area, and the power information is sent to an edge computing module and a cloud server. A storage module is also included in the concentrator. The storage module is used to store the historical information of the power information collected within one hour, and the statistical result of the line loss rate of the current equipment node calculated according to the historical information.
本实施例中的集中器即采用现有的可实现远程抄表的设备。其中,集中器内含有用于存储集采数据的存储器,以及用于后台数据中的云服务器连接的通信系统。集中器和云服务器采用基于宽带电力载波通讯(HPLC)或电运营商的通信网络实现通讯连接。The concentrator in this embodiment adopts the existing equipment that can realize remote meter reading. Among them, the concentrator contains a memory for storing the collected data, and a communication system for connecting the cloud server in the background data. The concentrator and cloud server use the communication network based on broadband power carrier communication (HPLC) or electric operator to realize the communication connection.
边缘计算模块与集中器电连接,边缘计算模块用于接收所述集中器采集到的电力信息,并根据一个预设周期内的电力信息的历史数据计算出当前节点中线损率的统计结果;并将线损率统计结果发送到云服务器。The edge computing module is electrically connected to the concentrator, and the edge computing module is used to receive the power information collected by the concentrator, and calculate the statistical result of the line loss rate in the current node according to the historical data of the power information in a preset period; and Send the line loss rate statistics to the cloud server.
本实施例中的边缘计算模型就是一个小型的处理器,该处理器可以连接在集中器上,直接获取集中器采集的各项集采数据。并完成数据处理和运算。The edge computing model in this embodiment is a small processor, and the processor can be connected to the concentrator to directly acquire various collection data collected by the concentrator. And complete data processing and operation.
云服务器用于存储各个用电节点的电力信息以及线损率的统计结果。云服务器中还包括一个窃电行为分析工具,其用于根据各个节点的线损率的统计结果判断供电台区或整个供电网络中是否存在线损故障或窃电行为;并定位到相应的风险节点,针对风险节点下达预警信号。The cloud server is used to store the power information of each power node and the statistical results of the line loss rate. The cloud server also includes a power stealing behavior analysis tool, which is used to determine whether there is a line loss fault or power stealing behavior in the power supply station area or the entire power supply network according to the statistical results of the line loss rate of each node; and locate the corresponding risk. node, and issue early warning signals for risk nodes.
本实施例中,线损精益管理与防窃电系统还包括管理终端,管理终端与云服务器通讯连接。每个管理终端的管理区域对应用电台区中的一个或多个用电节点。管理终端配发到相应的管理人员,当云服务器定位到风险节点之后,则向对应的管理终端下发预警信号。本实施例提供的管理终端可以为一种专用终端,或是运行有电力管理APP的通用移动终端,如手机、平板电脑等。针对不同的集中器或用电节点。本实施例的电力管理APP中,还可以通过扫码等方式进行节点登录,进而通过管理终端查询管理区域内的各个节点的历史监控数据。In this embodiment, the system for lean management of line loss and anti-electricity theft further includes a management terminal, which is connected to the cloud server in communication. The management area of each management terminal applies to one or more power-consuming nodes in the radio station area. The management terminal is distributed to the corresponding management personnel, and when the cloud server locates the risk node, it sends an early warning signal to the corresponding management terminal. The management terminal provided in this embodiment may be a dedicated terminal, or a general mobile terminal running a power management APP, such as a mobile phone, a tablet computer, and the like. For different concentrators or power consumption nodes. In the power management APP of this embodiment, node login can also be performed by scanning a code or the like, and then the historical monitoring data of each node in the management area can be queried through the management terminal.
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention shall be included in the protection of the present invention. within the range.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210135891.6A CN114493926A (en) | 2022-02-15 | 2022-02-15 | Method and system for line loss lean management and electricity theft prevention based on terminal edge computing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210135891.6A CN114493926A (en) | 2022-02-15 | 2022-02-15 | Method and system for line loss lean management and electricity theft prevention based on terminal edge computing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114493926A true CN114493926A (en) | 2022-05-13 |
Family
ID=81480467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210135891.6A Pending CN114493926A (en) | 2022-02-15 | 2022-02-15 | Method and system for line loss lean management and electricity theft prevention based on terminal edge computing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114493926A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115766398A (en) * | 2022-11-29 | 2023-03-07 | 国网江苏省电力有限公司南通供电分公司 | Fault Analysis System for Power Consumption Information Acquisition in Station Area Based on Edge Computing |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111371185A (en) * | 2020-04-17 | 2020-07-03 | 南京大全自动化科技有限公司 | A line loss monitoring system and method based on distribution transformer terminal |
CN113109656A (en) * | 2021-04-26 | 2021-07-13 | 北京中兆龙芯软件科技有限公司 | Low-voltage transformer area line loss fine analysis system and analysis method |
-
2022
- 2022-02-15 CN CN202210135891.6A patent/CN114493926A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111371185A (en) * | 2020-04-17 | 2020-07-03 | 南京大全自动化科技有限公司 | A line loss monitoring system and method based on distribution transformer terminal |
CN113109656A (en) * | 2021-04-26 | 2021-07-13 | 北京中兆龙芯软件科技有限公司 | Low-voltage transformer area line loss fine analysis system and analysis method |
Non-Patent Citations (1)
Title |
---|
任秋业 等: "泛在电力物联网背景下台区降损策略研究", 科技资讯, no. 34, 3 December 2019 (2019-12-03), pages 1 - 6 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115766398A (en) * | 2022-11-29 | 2023-03-07 | 国网江苏省电力有限公司南通供电分公司 | Fault Analysis System for Power Consumption Information Acquisition in Station Area Based on Edge Computing |
CN115766398B (en) * | 2022-11-29 | 2023-09-22 | 国网江苏省电力有限公司南通供电分公司 | Station area electricity consumption information acquisition fault analysis system based on edge calculation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106253486B (en) | A kind of power supply system intelligent fault Computer Aided Analysis System | |
CN106124935A (en) | Middle and low voltage network Fault Locating Method | |
CN104635198B (en) | Remote monitoring and diagnosing method for electric energy metering device with timely fault finding function | |
CN103852744A (en) | Distributed online monitoring system and method for electric energy metering device | |
CN103941158A (en) | Power distribution network fault diagnosis system and method based on multi-source information | |
CN105160864A (en) | Operating data monitoring system and method for intelligent ammeters | |
CN108983043A (en) | Power distribution network mesolow side operational monitoring main website management system | |
CN110148938A (en) | A kind of method of holographic perception and layering line loss calculation | |
CN105092917A (en) | Electricity theft prevention system | |
CN113890013B (en) | Method and system for automatically identifying low-voltage line topology using network terminal power-off data | |
CN110244163A (en) | A hierarchical intelligent research and judgment method and device for power outage and restoration events in a station area | |
CN210243820U (en) | An on-line monitoring system of gateway electric energy metering device for branch inspection | |
CN106451770B (en) | One kind is based on the low fault-tolerant monitoring information interaction system of distribution system | |
CN104656050B (en) | Manpower-saving remote monitoring and diagnosing method for electric energy metering device | |
CN114493926A (en) | Method and system for line loss lean management and electricity theft prevention based on terminal edge computing | |
CN113189428A (en) | Electric energy quality monitoring management system | |
CN203595760U (en) | Insulator safety status detection system | |
CN104614699A (en) | Higher-efficiency remote monitoring and diagnosis method of electric energy metering device | |
CN105652157B (en) | Method for analyzing health state of power distribution network based on traveling wave electric quantity | |
CN114415062A (en) | A fault judgment method and IoT edge processing unit based on low-voltage platform area | |
CN110460037A (en) | A Line-Transformer-Meter Topology Anomaly Identification Method for Double-shot Cable Distribution Network Wiring | |
CN118300526A (en) | Photovoltaic module fault diagnosis method | |
CN107482767A (en) | A Distributed Equipment and Method for Measuring Line Loss and Monitoring Power Grid | |
CN104104292B (en) | Real-time power generator excitation system state wide area acquisition system | |
CN111638401A (en) | Capacitor online monitoring system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |