CN114482821A - Rapid installation device and installation method for steel structure film shutter - Google Patents

Rapid installation device and installation method for steel structure film shutter Download PDF

Info

Publication number
CN114482821A
CN114482821A CN202210087668.9A CN202210087668A CN114482821A CN 114482821 A CN114482821 A CN 114482821A CN 202210087668 A CN202210087668 A CN 202210087668A CN 114482821 A CN114482821 A CN 114482821A
Authority
CN
China
Prior art keywords
sleeve
connecting seat
shutter
membrane
screw body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210087668.9A
Other languages
Chinese (zh)
Other versions
CN114482821B (en
Inventor
朱茂茂
林超
赵常杰
王鹏辉
潘宁
张世阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202210087668.9A priority Critical patent/CN114482821B/en
Publication of CN114482821A publication Critical patent/CN114482821A/en
Application granted granted Critical
Publication of CN114482821B publication Critical patent/CN114482821B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B7/00Special arrangements or measures in connection with doors or windows
    • E06B7/02Special arrangements or measures in connection with doors or windows for providing ventilation, e.g. through double windows; Arrangement of ventilation roses
    • E06B7/08Louvre doors, windows or grilles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/0007Implements for finishing work on buildings for mounting doors, windows or frames; their fitting
    • E04F21/0023Implements for finishing work on buildings for mounting doors, windows or frames; their fitting for mounting door leaves, window sashes or the like
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B7/00Special arrangements or measures in connection with doors or windows
    • E06B7/28Other arrangements on doors or windows, e.g. door-plates, windows adapted to carry plants, hooks for window cleaners
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B9/24Screens or other constructions affording protection against light, especially against sunshine; Similar screens for privacy or appearance; Slat blinds
    • E06B9/26Lamellar or like blinds, e.g. venetian blinds
    • E06B9/28Lamellar or like blinds, e.g. venetian blinds with horizontal lamellae, e.g. non-liftable

Abstract

The invention relates to a steel structure film shutter quick installation device and an installation method, wherein the installation device comprises a first connecting seat and a second connecting seat, the first connecting seat is vertically connected to the position of a steel structure where a film shutter to be installed in advance, the second connecting seat is connected to the film shutter in advance, and the second connecting seat comprises: the first end of the sleeve is vertically fixed on the membrane shutter, an inclined hole is reserved at the second end of the sleeve, and an included angle consistent with the installation angle of the membrane shutter is formed between the axis of the inclined hole and the axis of the sleeve; the rotary bolt is inserted into the sleeve, a nut of the rotary bolt is clamped and embedded in the inclined hole, and a screw body of the rotary bolt penetrates through the inclined hole and is detachably connected to the first connecting seat. The invention has simple structure and convenient construction, adopts a modular installation system, obviously improves the positioning precision, reduces the construction difficulty, saves the construction period and reduces the construction cost.

Description

Rapid installation device and installation method for steel structure film shutter
Technical Field
The invention relates to the technical field of building construction, in particular to a device and a method for quickly mounting steel structure film shutters.
Background
Because the steel structure membrane tripe has intensity height, difficult ageing, can level or vertical installation advantage such as so widely used in complicated steel structure design and work progress, but in the actual installation in-situ, there are the accurate positioning of difficult, installation effectiveness low and installation quality difficult to guarantee scheduling problem.
Disclosure of Invention
In order to solve the problems, the invention provides a steel structure film shutter quick mounting device and a mounting method.
The invention is realized by the following scheme: the utility model provides a quick installation device of steel construction membrane tripe, includes in advance the perpendicular connection wait to install the first connecting seat of membrane tripe position department and the second connecting seat that is connected to the membrane tripe in advance on the steel construction, wherein, the second connecting seat includes:
the first end of the sleeve is vertically fixed on the membrane shutter, an inclined hole is reserved at the second end of the sleeve, and an included angle consistent with the installation angle of the membrane shutter is formed between the axis of the inclined hole and the axis of the sleeve;
the rotary bolt is inserted into the sleeve, a nut of the rotary bolt is clamped and embedded in the inclined hole, and a screw body of the rotary bolt penetrates through the inclined hole and is detachably connected to the first connecting seat.
The invention further improves the steel structure film shutter quick installation device, wherein the inclined hole comprises a small hole area which is close to the second end of the sleeve and through which the screw body penetrates, and a large hole area which is far away from the second end of the sleeve and is matched with the screw cap, the first end of the sleeve is provided with an insertion hole which is communicated with the large hole area and into which the screw cap is inserted, and the screw body penetrates through the small hole area and is screwed and connected to the first connecting seat.
The invention further improves the steel structure film shutter quick installation device, and the screw body is provided with a positioning line for controlling the screwing depth.
The steel structure film shutter quick installation device is further improved in that the device further comprises an adapter tube with a certain length, the first end of the adapter tube is detachably connected with the first connecting seat, and the second end of the adapter tube is detachably connected with the screw body.
The quick mounting device for the steel structure film shutters is further improved in that the first end of the adapter tube is connected with the first connecting seat through a flange and a bolt.
The invention also provides a method for quickly installing the steel structure film shutter, which comprises the following steps:
positioning the mounting position of a first connecting seat on the steel structure according to the mounting height of the film shutter, and fixing the prefabricated first connecting seat at the corresponding mounting position;
prefabricating a sleeve, and deepening and designing an inclined hole reserved at the second end part of the sleeve according to the installation angle of the film shutter by using software to enable the axis of the inclined hole and the axis of the sleeve to form an included angle consistent with the installation angle;
prefabricating a rotary bolt matched with the sleeve, inserting the rotary bolt into the sleeve, enabling a nut of the rotary bolt to be clamped and embedded in the inclined hole, and enabling a screw body of the rotary bolt to penetrate through the inclined hole;
securing a first end of the sleeve perpendicularly to the membrane louver;
and hoisting the membrane shutter in place, and connecting the screw body with the first connecting seat.
The invention further improves the method for quickly installing the steel structure film shutter, and comprises the following steps:
when the inclined hole is deeply designed, the inclined hole comprises a small hole area close to the second end of the sleeve and a large hole area far away from the second end of the sleeve, and meanwhile, a jack communicated with the large hole area is designed at the first end of the sleeve;
when the rotary bolt is inserted into the sleeve, the screw body is inserted into the insertion hole, sequentially passes through the large hole area and the small hole area and then penetrates out, and the screw cap is clamped and embedded in the large hole area;
after the membrane shutter is hoisted in place, the screw body penetrating out of the small hole area is screwed and connected to the first connecting seat.
The invention further improves the method for quickly installing the steel structure film shutter, and comprises the following steps:
when the rotary bolt is prefabricated, determining the screwing depth of the screw body according to the position to be installed of the membrane louver, and marking a positioning line on the screw body according to the screwing depth;
when the screw body is screwed and connected to the first connecting seat, the screw body is screwed to the positioning line.
The invention further improves the method for quickly installing the steel structure film shutter, and comprises the following steps:
before the membrane shutter is hoisted in place, a transfer pipe with a certain length is prefabricated according to the to-be-installed distance between the membrane shutter and the steel structure, and then the first end of the transfer pipe is connected with the first connecting seat;
after the membrane shutter is hoisted in place, the connection of the screw body and the first connecting seat is realized by connecting the screw body to the second end of the adapter tube.
The present invention includes but is not limited to the following benefits:
1. the first connecting seat and the second connecting seat are fixed in advance according to the position to be installed of the membrane shutter, so that the step of installing the membrane shutter on site is simplified, the installation speed is increased, and the installation efficiency is improved.
2. Through the sectional modular installation system consisting of the first connecting seat, the switching tube, the rotary bolt, the sleeve and the like, each module can be deeply designed in advance according to the installation position of the membrane shutter, a large amount of time for on-site positioning installation is saved, the installation precision is ensured, and the installation quality is improved.
3. Through the setting of switching pipe and location line, can adjust the installation distance of membrane tripe and steel construction in a flexible way, cooperation modularization installing the system for this installation device is applicable to various steel construction membrane tripe installation occasions.
Drawings
Figure 1 shows a partial side view of a membrane louver mounted on a steel structure by the mounting device.
Fig. 2 shows an enlarged schematic view at a in fig. 1.
Fig. 3 is a schematic view illustrating an assembly structure of the second connecting socket of the present invention.
Fig. 4 is a schematic view illustrating a disassembled structure of the second connecting socket of the present invention.
Detailed Description
In order to solve the problems that the film shutter is difficult to accurately position, the installation efficiency is low, the installation quality is difficult to ensure and the like when the film shutter is installed on site, the invention provides a steel structure film shutter quick installation device and an installation method.
As shown in fig. 1, a plurality of film shutters 2 are installed on each steel structure 1, each film shutter 2 is installed on the steel structure 1 through at least two upper and lower installation devices of the present invention, and the following description will further explain the steel structure film shutter quick installation device and installation method by using one installation device as a reference and combining the drawings through specific embodiments.
Referring to fig. 1 to 3, a steel structure film louver fast mounting device includes a first connecting seat 3 connected to a steel structure 1 vertically in advance at a position where a film louver is to be mounted, and a second connecting seat 4 connected to a film louver 2 in advance, wherein the second connecting seat 4 includes:
a sleeve 42, a first end of the sleeve 42 is vertically welded to the film shutter 2, a slant hole is reserved at a second end of the sleeve 42, and an included angle Y consistent with the film shutter installation angle X is formed between an axis M of the slant hole and an axis Y of the sleeve;
the rotating bolt 41 is inserted into the sleeve 42, the nut of the rotating bolt 41 is engaged with the inclined hole, and the body of the rotating bolt 41 passes through the inclined hole and is detachably connected to the first connecting base 3.
According to the invention, the first connecting seat 3 and the second connecting seat 4 are fixed in advance according to the position to be installed of the membrane louver, and only the first connecting seat 3 and the second connecting seat 4 need to be connected on site, so that the step of installing the membrane louver 2 on site is simplified, the installation speed is accelerated, and the installation efficiency is improved. Furthermore, by means of a segmented modular installation system consisting of the first connecting seat 3, the rotary bolt 41, the sleeve 42 and the like, each module can be deeply designed in advance according to the installation position of the membrane shutter, a large amount of time for on-site positioning and installation is saved, the installation precision is ensured, and the installation quality is improved.
For the connection structure of the rotating bolt 41 and the sleeve 42, the present invention provides a preferred embodiment, and as shown in fig. 4, the inclined hole includes a small hole area 421 near the second end of the sleeve for the screw body to pass through and a large hole area 422 far away from the second end of the sleeve and adapted to the screw cap, the first end of the sleeve is provided with an insertion hole 423 communicated with the large hole area 422 and for the screw cap to insert, the screw body passes through the small hole area 421 and is screwed to the first connecting seat 3, the first connecting seat 3 is a threaded cylinder with a standard length, and is welded and fixed on the steel structure 1 in advance. The structure can quickly realize the connection between the rotary bolt 41 and the sleeve 42, and on the premise of ensuring the inclination angle of the rotary bolt 41 (i.e. the installation angle of the membrane shutter), the rotation of the rotary bolt 41 is not affected, so that the second connecting seat 4 still easily realizes the screwing connection between the rotary bolt 41 and the first connecting seat 3 in the state of being fixed on the membrane shutter 2.
As a preferred embodiment, the screw body is provided with a positioning line 411 for controlling the screwing depth. When the rotating bolt 41 is screwed, the rotating bolt 41 is screwed to the positioning line 411 to stop screwing, and the distance between the membrane louver 2 and the steel structure 1 is ensured.
Further, in order to adapt to the application where the distance between the film louver 2 and the steel structure 1 is large, the installation device in the present embodiment further includes an adapter tube 5 having a certain length, a first end of the adapter tube 5 is connected to the first connecting seat 3 by a flange and a bolt (not limited to the connection form, but other detachable connection forms such as direct screwing connection may be adopted), and a second end of the adapter tube 5 is detachably connected to the screw body.
According to the invention, through the arrangement of the adapter tube 5 and the positioning line 411, the installation distance between the film shutter 2 and the steel structure 1 can be flexibly adjusted, and the installation device is suitable for various steel structure film shutter installation occasions by matching with a modularized installation system.
The invention also provides a method for quickly installing the steel structure film shutter, which comprises the following steps:
step 1, after the steel structure 1 is processed, positioning devices such as a total station are utilized to position the mounting position of the first connecting seat 3 on the steel structure 1 according to the mounting height of the film shutter 2 in the steel structure processing factory. The prefabricated first connection socket 3 is welded at the corresponding installation location, and then the steel structure 1 is transported to the working surface.
And 2, prefabricating the sleeve 42, and deepening and designing an inclined hole reserved at the second end part of the sleeve 42 according to the installation angle Y of the film louver by utilizing BIM software to enable an included angle X consistent with the installation angle Y to be formed between the axis M of the inclined hole and the axis N of the sleeve. Specifically, when designing the inclined hole deeply, the inclined hole includes a small hole region 421 near the second end of the sleeve and a large hole region 422 far away from the second end of the sleeve, and meanwhile, a plug hole 423 communicating with the large hole region 422 is designed at the first end of the sleeve.
Step 3, prefabricating a rotating bolt 41 matched with the sleeve 42, inserting the rotating bolt 41 into the sleeve 42, specifically, inserting the screw body through the insertion hole 423, passing through the large hole area 422 and the small hole area 421 in sequence, and then passing out, so that the nut is embedded in the large hole area 422.
Step 4, vertically welding the first end of the sleeve 42 to the membrane louver 2.
And 5, transporting the membrane shutter 2 to a working surface through vertical transportation equipment, hoisting the membrane shutter in place, and screwing the screw body penetrating out of the small hole area 421 to the first connecting seat 3.
Through the sectional modular installation system consisting of the first connecting seat 3, the rotary bolt 41, the sleeve 42 and the like, the BIM software can be used for carrying out advanced design on each module according to the installation position (including the installation height, the installation angle, the installation distance to the steel structure 1 and the like) of the membrane shutter, so that a large amount of time for on-site positioning and installation is saved, the installation precision is ensured, and the installation quality is improved.
As a preferred embodiment:
when the rotary bolt 41 is prefabricated, the screw depth of the screw body is determined by using the BIM software according to the position to be installed of the film louver, and the positioning line 411 is marked on the screw body according to the screw depth.
When the screw body is screwed to the first connecting seat 3, the screw body is screwed to the positioning line 411, that is, the screw body is installed in place.
As a preferred embodiment:
before the film louver 2 is hoisted in place, a certain length of adapter tube 5 is prefabricated according to the distance to be installed between the film louver 2 and the steel structure 1, and then the first end of the adapter tube is connected with the first connecting seat 3, specifically, the connection can be performed through flanges and bolts.
After the membrane louver 2 is hoisted in place, the connection between the screw body and the first connecting seat 3 is realized by connecting the screw body to the second end of the adapter tube, specifically, the connection can also be realized by a screw connection mode, and the screw depth can also be controlled by marking a positioning line 411 on the screw body.
Through the setting of switching pipe 5 and location line 411, can adjust the installation distance of membrane tripe 2 and steel construction 1 in a flexible way, cooperation modularization installing the system for this installation device is applicable to various steel construction membrane tripe installation occasions.
While the present invention has been described in detail and with reference to the embodiments thereof as shown in the accompanying drawings, it will be apparent to one skilled in the art that various changes and modifications can be made therein. Therefore, certain details of the embodiments are not to be interpreted as limiting, and the scope of the invention is to be determined by the appended claims.

Claims (9)

1. The utility model provides a quick installation device of steel construction membrane tripe which characterized in that, includes in advance the perpendicular connection wait to install the first connecting seat of membrane tripe position department and the second connecting seat of being connected to the membrane tripe in advance on the steel construction, wherein, the second connecting seat includes:
the first end of the sleeve is vertically fixed on the membrane shutter, an inclined hole is reserved at the second end of the sleeve, and an included angle consistent with the installation angle of the membrane shutter is formed between the axis of the inclined hole and the axis of the sleeve;
the rotary bolt is inserted into the sleeve, a nut of the rotary bolt is clamped and embedded in the inclined hole, and a screw body of the rotary bolt penetrates through the inclined hole and is detachably connected to the first connecting seat.
2. The steel structure membrane shutter quick installation device as claimed in claim 1, wherein the inclined hole comprises a small hole area which is close to the second end of the sleeve and through which the screw body penetrates, and a large hole area which is far away from the second end of the sleeve and is matched with the screw cap, the first end of the sleeve is provided with a jack which is communicated with the large hole area and through which the screw cap is inserted, and the screw body penetrates through the small hole area and is screwed and connected to the first connecting seat.
3. The steel structural film shutter quick installation device as claimed in claim 2, wherein the screw body is provided with a positioning line for controlling the screwing depth.
4. The steel structural membrane shutter quick installation device as claimed in claim 1, further comprising a length of adapter tube, wherein a first end of the adapter tube is detachably connected with the first connection base, and a second end of the adapter tube is detachably connected with the screw body.
5. The steel structural film shutter quick installation device of claim 4, wherein the first end of the adapter tube is connected with the first connection seat through a flange and a bolt.
6. A method for quickly installing steel structure film shutters is characterized by comprising the following steps:
positioning the mounting position of a first connecting seat on the steel structure according to the mounting height of the film shutter, and fixing the prefabricated first connecting seat at the corresponding mounting position;
prefabricating a sleeve, and deepening and designing an inclined hole reserved at the second end part of the sleeve according to the installation angle of the film shutter by using software to enable the axis of the inclined hole and the axis of the sleeve to form an included angle consistent with the installation angle;
prefabricating a rotary bolt matched with the sleeve, inserting the rotary bolt into the sleeve, enabling a nut of the rotary bolt to be clamped and embedded in the inclined hole, and enabling a screw body of the rotary bolt to penetrate through the inclined hole;
securing a first end of the sleeve perpendicularly to the membrane louver;
and hoisting the membrane shutter in place, and connecting the screw body with the first connecting seat.
7. The method for quickly installing the steel structure film shutter as claimed in claim 6, wherein:
when the inclined hole is deeply designed, the inclined hole comprises a small hole area close to the second end of the sleeve and a large hole area far away from the second end of the sleeve, and meanwhile, a jack communicated with the large hole area is designed at the first end of the sleeve;
when the rotary bolt is inserted into the sleeve, the screw body is inserted into the insertion hole, sequentially passes through the large hole area and the small hole area and then penetrates out, and the screw cap is clamped and embedded in the large hole area;
after the membrane shutter is hoisted in place, the screw body penetrating out of the small hole area is screwed and connected to the first connecting seat.
8. The method for quickly installing the steel structure film shutter as claimed in claim 7, wherein:
when the rotary bolt is prefabricated, determining the screwing depth of the screw body according to the position to be installed of the membrane louver, and marking a positioning line on the screw body according to the screwing depth;
when the screw body is screwed and connected to the first connecting seat, the screw body is screwed to the positioning line.
9. The method for quickly installing the steel structure film shutter as claimed in claim 6, wherein:
before the membrane shutter is hoisted in place, a transfer pipe with a certain length is prefabricated according to the to-be-installed distance between the membrane shutter and the steel structure, and then the first end of the transfer pipe is connected with the first connecting seat;
after the membrane shutter is hoisted in place, the connection of the screw body and the first connecting seat is realized by connecting the screw body to the second end of the adapter tube.
CN202210087668.9A 2022-01-25 2022-01-25 Quick installation device and installation method for steel structure film shutter Active CN114482821B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210087668.9A CN114482821B (en) 2022-01-25 2022-01-25 Quick installation device and installation method for steel structure film shutter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210087668.9A CN114482821B (en) 2022-01-25 2022-01-25 Quick installation device and installation method for steel structure film shutter

Publications (2)

Publication Number Publication Date
CN114482821A true CN114482821A (en) 2022-05-13
CN114482821B CN114482821B (en) 2023-09-01

Family

ID=81474757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210087668.9A Active CN114482821B (en) 2022-01-25 2022-01-25 Quick installation device and installation method for steel structure film shutter

Country Status (1)

Country Link
CN (1) CN114482821B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4497134A (en) * 1982-09-13 1985-02-05 Meyer Bruce E Exterior louver and louver apparatus
US4503900A (en) * 1982-08-16 1985-03-12 Rca Corporation Venetian blind construction
CN107724574A (en) * 2017-09-12 2018-02-23 湖南建工集团装饰工程有限公司 All-transparent louver glass double skin aspiratory curtain wall equivalent space construction technology
JP2018184713A (en) * 2017-04-24 2018-11-22 日新製鋼株式会社 Louver system and manufacturing method thereof
CN214329481U (en) * 2021-01-27 2021-10-01 深圳瑞和建筑装饰股份有限公司 Automatic rotatory energy-conserving tripe mounting structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4503900A (en) * 1982-08-16 1985-03-12 Rca Corporation Venetian blind construction
US4497134A (en) * 1982-09-13 1985-02-05 Meyer Bruce E Exterior louver and louver apparatus
JP2018184713A (en) * 2017-04-24 2018-11-22 日新製鋼株式会社 Louver system and manufacturing method thereof
CN107724574A (en) * 2017-09-12 2018-02-23 湖南建工集团装饰工程有限公司 All-transparent louver glass double skin aspiratory curtain wall equivalent space construction technology
CN214329481U (en) * 2021-01-27 2021-10-01 深圳瑞和建筑装饰股份有限公司 Automatic rotatory energy-conserving tripe mounting structure

Also Published As

Publication number Publication date
CN114482821B (en) 2023-09-01

Similar Documents

Publication Publication Date Title
CN110607907A (en) Quick accurate positioning tool assembly for embedded sleeve
CN114482821A (en) Rapid installation device and installation method for steel structure film shutter
CN210031813U (en) Steel-pipe column straightness correcting unit that hangs down of reverse construction method
CN109116335B (en) Sonar installation device for detecting gate slot of conventional hydropower station tail gate
CN201190699Y (en) Coupling device for sewage submersible pump
CN202187429U (en) Ceiling suspender precast device
CN112523581B (en) Power transmission tower fixing device and method based on unmanned aerial vehicle installation
CN205791363U (en) A kind of electrical engineering positioning installation apparatus
CN210562812U (en) Light partition wall with auxiliary installation positioning device
CN209958389U (en) Foundation bolt positioning device convenient to adjust
KR20030062875A (en) Sealing constructing method for preventing epoxy leakage when attaching steel plates on by anchor bolts and apparatus thereof
CN220870296U (en) PCCP (prestressed concrete cylinder pipe) with inner cladding
CN213704044U (en) Electric hammer punching device for installing water-stopping needle head for building crack leak stoppage
CN110282080B (en) Fastening device
CN211340734U (en) Small offshore rock-socketed platform
CN214783202U (en) Landscape bridge convenient to transport
CN217053789U (en) Electric power ditch built-in fitting mounting tool
CN215237030U (en) Pipeline bending device is used in installation of warm class electromechanical device that leads to
CN110729949A (en) Device convenient for mounting solar panel roof and using method thereof
CN210194979U (en) Glass curtain wall side-hanging system
CN113872514B (en) Photovoltaic support upright post fixing device of T-shaped groove preassembling platform and mounting method
CN220168781U (en) Water supply and drainage through-wall connecting pipe structure
CN210755614U (en) Bearing locating hole deckle edge prosthetic devices
CN220414916U (en) Work embedded sleeve convenient to installation
CN216949590U (en) Embedded sleeve mounting and positioning device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant