CN114444840A - Transformer substation operation and maintenance safety production risk early warning method - Google Patents
Transformer substation operation and maintenance safety production risk early warning method Download PDFInfo
- Publication number
- CN114444840A CN114444840A CN202111421223.1A CN202111421223A CN114444840A CN 114444840 A CN114444840 A CN 114444840A CN 202111421223 A CN202111421223 A CN 202111421223A CN 114444840 A CN114444840 A CN 114444840A
- Authority
- CN
- China
- Prior art keywords
- data
- module
- monitoring
- early warning
- transformer substation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 16
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 12
- 238000012544 monitoring process Methods 0.000 claims abstract description 24
- 238000012545 processing Methods 0.000 claims abstract description 22
- 238000007405 data analysis Methods 0.000 claims abstract description 11
- 238000004458 analytical method Methods 0.000 claims abstract description 4
- 238000003745 diagnosis Methods 0.000 claims abstract description 4
- 230000005540 biological transmission Effects 0.000 claims description 12
- 238000013500 data storage Methods 0.000 claims description 6
- 238000012502 risk assessment Methods 0.000 claims description 5
- 238000011156 evaluation Methods 0.000 abstract description 3
- 230000009466 transformation Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses a transformer substation operation and maintenance safety production risk early warning method, which comprises the following steps: processing the original data through a data processing module, and analyzing the data processed by the data processing module through a data analysis module; a preset out-of-limit standard is recorded in the data analysis module, and whether the data exceeds a preset out-of-limit label is judged; analyzing the data through a monitoring analysis module, diagnosing the analyzed data through a monitoring diagnosis module, and transmitting the diagnosed data to a monitoring processing module for processing; the monitoring processing module is internally provided with an alarm out-of-limit standard, and transmits data to the risk evaluation module and the prediction evaluation module to pre-evaluate and predict risks and diagnose fault reasons and fault positions of corresponding equipment; the invention belongs to the technical field of early warning, and particularly relates to a transformer substation operation and maintenance safety production risk early warning method.
Description
Technical Field
The invention belongs to the technical field of early warning, and particularly relates to a transformer substation operation and maintenance safety production risk early warning method.
Background
The continuous enlargement of the scale and the increasing importance of the power system make society have higher requirements on the reliable operation of the power system. The power worker needs to solve the problems that have already occurred, and needs to know the possibility of the equipment causing the problems and the severity of the problems through risk assessment. Moreover, the data of risk assessment are often used for operation and maintenance scheduling of the power grid, and can play a guiding role in operation monitoring, maintenance management, fault treatment, field inspection and the like of the power enterprise.
The reliability of the power grid depends on the reliable operation of the power transmission and transformation equipment, and the traditional state maintenance method of the power transmission and transformation equipment cannot meet the requirements of the intelligent power grid. Therefore, it is important and essential to acquire various status information of the equipment by various monitoring means, analyze the occurrence of a fault, identify early signs of the fault, perform status evaluation, analyze the fault status of the equipment, and then use it to guide correct status maintenance to ensure reliable operation of the power supply network.
Disclosure of Invention
In order to solve the problems, the invention provides a transformer substation operation and maintenance safety production risk early warning method.
In order to realize the functions, the technical scheme adopted by the invention is as follows: a transformer substation operation and maintenance safety production risk early warning method comprises the following steps:
(1) the method comprises the steps that original data are obtained from an external system through a data obtaining module, the original data are processed through a data processing module, and the data processed by the data processing module are analyzed through a data analyzing module;
(2) the data analysis module records a preset out-of-limit standard, and if the data exceeds a preset out-of-limit label, the data analysis module transmits the data to the monitoring and early warning module through the wireless transmission module and stores the data in the data storage module for storage; if the data does not exceed the preset out-of-limit mark, the data analysis module stores the data in the data storage module for storage;
(3) analyzing the data through a monitoring analysis module, diagnosing the analyzed data through a monitoring diagnosis module, transmitting the diagnosed data to a monitoring processing module for processing, and storing the data through a monitoring storage module;
(4) the monitoring processing module is internally provided with an alarm out-of-limit standard, if the alarm out-of-limit standard exceeds the standard, an early warning message is sent out, the message is transmitted to the terminal receiving module through the cloud platform, and meanwhile, data are transmitted to the risk assessment module and the prediction assessment module to pre-assess and predict risks, and the fault reason and the fault position existing in corresponding equipment are diagnosed;
(5) the diagnostic data is transmitted to a terminal receiving module through an information transmission module to alarm; and simultaneously, the information transmission module stores the information.
Further, the terminal receiving module comprises a mobile phone and a computer terminal.
The invention adopts the structure to obtain the following beneficial effects: the transformer substation operation and maintenance safety production risk early warning method provided by the invention is simple in operation, compact in structure and reasonable in design, the current health condition of the equipment is evaluated by acquiring and processing characteristic parameters reflecting the health state of the equipment, such as relevant basic data of power transmission and transformation equipment, real-time/historical data of the equipment and the like, the future development trend is predicted, meanwhile, the equipment with state degradation and poor trend timely issues state early warning messages, and effective failure modes and reasons are analyzed.
Drawings
Fig. 1 is a block diagram of a transformer substation operation and maintenance safety production risk early warning method provided by the invention.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings, and it should be understood that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1, the technical solution adopted by the present invention is as follows: a transformer substation operation and maintenance safety production risk early warning method comprises the following steps:
(1) the method comprises the steps that original data are obtained from an external system through a data obtaining module, the original data are processed through a data processing module, and the data processed by the data processing module are analyzed through a data analyzing module;
(2) the data analysis module records a preset out-of-limit standard, and if the data exceeds a preset out-of-limit label, the data analysis module transmits the data to the monitoring and early warning module through the wireless transmission module and stores the data in the data storage module for storage; if the data does not exceed the preset out-of-limit mark, the data analysis module stores the data in the data storage module for storage;
(3) analyzing the data through a monitoring analysis module, diagnosing the analyzed data through a monitoring diagnosis module, transmitting the diagnosed data to a monitoring processing module for processing, and storing the data through a monitoring storage module;
(4) the monitoring processing module is internally provided with an alarm out-of-limit standard, if the alarm out-of-limit standard exceeds the standard, an early warning message is sent out, the message is transmitted to the terminal receiving module through the cloud platform, and meanwhile, data are transmitted to the risk assessment module and the prediction assessment module to pre-assess and predict risks, and the fault reason and the fault position existing in corresponding equipment are diagnosed;
(5) the diagnostic data is transmitted to a terminal receiving module through an information transmission module to alarm; and simultaneously, the information transmission module stores the information.
The terminal receiving module comprises a mobile phone and a computer terminal.
The present invention and its embodiments have been described above, and the description is not intended to be limiting, and the drawings are only one embodiment of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should appreciate that they can readily use the disclosed conception and specific embodiments as a basis for designing or modifying other structures for carrying out the same purposes of the present invention without departing from the spirit and scope of the invention as defined by the appended claims.
Claims (2)
1. A transformer substation operation and maintenance safety production risk early warning method is characterized by comprising the following steps:
(1) the method comprises the steps that original data are obtained from an external system through a data obtaining module, the original data are processed through a data processing module, and the data processed by the data processing module are analyzed through a data analyzing module;
(2) the data analysis module records a preset out-of-limit standard, and if the data exceeds a preset out-of-limit label, the data analysis module transmits the data to the monitoring and early warning module through the wireless transmission module and stores the data in the data storage module for storage; if the data does not exceed the preset out-of-limit mark, the data analysis module stores the data in the data storage module for storage;
(3) analyzing the data through a monitoring analysis module, diagnosing the analyzed data through a monitoring diagnosis module, transmitting the diagnosed data to a monitoring processing module for processing, and storing the data through a monitoring storage module;
(4) the monitoring processing module is internally provided with an alarm out-of-limit standard, if the alarm out-of-limit standard exceeds the standard, an early warning message is sent out, the message is transmitted to the terminal receiving module through the cloud platform, and meanwhile, data are transmitted to the risk assessment module and the prediction assessment module to pre-assess and predict risks, and the fault reason and the fault position existing in corresponding equipment are diagnosed;
(5) the diagnostic data is transmitted to a terminal receiving module through an information transmission module to alarm; and simultaneously, the information transmission module stores the information.
2. The transformer substation operation and maintenance safety production risk early warning method according to claim 1, wherein the terminal receiving module comprises a mobile phone and a computer terminal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111421223.1A CN114444840A (en) | 2021-11-26 | 2021-11-26 | Transformer substation operation and maintenance safety production risk early warning method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111421223.1A CN114444840A (en) | 2021-11-26 | 2021-11-26 | Transformer substation operation and maintenance safety production risk early warning method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114444840A true CN114444840A (en) | 2022-05-06 |
Family
ID=81364764
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111421223.1A Pending CN114444840A (en) | 2021-11-26 | 2021-11-26 | Transformer substation operation and maintenance safety production risk early warning method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114444840A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117475590A (en) * | 2023-09-28 | 2024-01-30 | 杨联富 | Security visual alarm system for power transmission and transformation project |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104992270A (en) * | 2015-06-19 | 2015-10-21 | 国家电网公司 | Power transmission and transformation equipment state maintenance aid decision making system and method |
CN108388950A (en) * | 2018-01-29 | 2018-08-10 | 杭州安脉盛智能技术有限公司 | Intelligent transformer O&M method and system based on big data |
-
2021
- 2021-11-26 CN CN202111421223.1A patent/CN114444840A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104992270A (en) * | 2015-06-19 | 2015-10-21 | 国家电网公司 | Power transmission and transformation equipment state maintenance aid decision making system and method |
CN108388950A (en) * | 2018-01-29 | 2018-08-10 | 杭州安脉盛智能技术有限公司 | Intelligent transformer O&M method and system based on big data |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117475590A (en) * | 2023-09-28 | 2024-01-30 | 杨联富 | Security visual alarm system for power transmission and transformation project |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111525694B (en) | Intelligent switch cabinet marking device and method based on Internet of things | |
KR102165530B1 (en) | A system for collecting data of railway equipmets with sensor adaptor | |
CN111983383A (en) | Power system fault first-aid repair method and system | |
KR101094195B1 (en) | Power facility management system using two dimensional code and administation server, and method for managing the same | |
CN212304872U (en) | Intelligent power distribution monitoring and operation and maintenance system | |
CN207096357U (en) | A kind of high-tension cable operating state monitoring system | |
CN111289144A (en) | Bus fault monitoring system and method for high-voltage equipment | |
CN114444840A (en) | Transformer substation operation and maintenance safety production risk early warning method | |
CN109747685A (en) | Responder system fault pre-alarming platform | |
CN116566043A (en) | Power distribution terminal monitoring system and monitoring method | |
CN113654816A (en) | Locomotive test device based on CMD and locomotive intelligent debugging system | |
CN114485796A (en) | Online state monitoring self-diagnosis system of box-type substation | |
CN107991965A (en) | Standardization electricity business failure emergency command management method based on intellectual monitoring | |
CN101567581B (en) | Universal intelligent low-voltage monitoring system | |
CN114362817A (en) | Automatic operation and maintenance system for closed-loop automatic optical cable line | |
CN205622325U (en) | Remote intelligent power dispatching automation equipment examine monitoring system | |
CN112698615A (en) | Equipment fault feedback system based on cloud platform | |
CN111915205A (en) | Intelligent scheduling-based automatic complex equipment health inspection method and system | |
CN204631168U (en) | A kind of industrial current transformer remote diagnosis and maintenance system | |
CN212645787U (en) | Computer lab power environmental monitoring system | |
CN210865046U (en) | Test equipment on-line monitoring system with various alarm functions | |
CN114264982A (en) | Transformer inspection system | |
CN112598869A (en) | Electrical fire monitoring method and system | |
CN116996843A (en) | Environment monitoring system and method for electric instrument equipment during nuclear power engineering construction | |
CN211830799U (en) | Automatic comparison and checking device and system for main station alarm data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |