CN114444840A - Transformer substation operation and maintenance safety production risk early warning method - Google Patents

Transformer substation operation and maintenance safety production risk early warning method Download PDF

Info

Publication number
CN114444840A
CN114444840A CN202111421223.1A CN202111421223A CN114444840A CN 114444840 A CN114444840 A CN 114444840A CN 202111421223 A CN202111421223 A CN 202111421223A CN 114444840 A CN114444840 A CN 114444840A
Authority
CN
China
Prior art keywords
data
module
monitoring
early warning
transformer substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111421223.1A
Other languages
Chinese (zh)
Inventor
赵金雄
贺洲强
赵博
龚波
刘国亮
赵红
狄磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dingxi Power Supply Co Of State Grid Gansu Electric Power Co
STATE GRID GASU ELECTRIC POWER RESEARCH INSTITUTE
State Grid Gansu Electric Power Co Ltd
Original Assignee
Dingxi Power Supply Co Of State Grid Gansu Electric Power Co
STATE GRID GASU ELECTRIC POWER RESEARCH INSTITUTE
State Grid Gansu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dingxi Power Supply Co Of State Grid Gansu Electric Power Co, STATE GRID GASU ELECTRIC POWER RESEARCH INSTITUTE, State Grid Gansu Electric Power Co Ltd filed Critical Dingxi Power Supply Co Of State Grid Gansu Electric Power Co
Priority to CN202111421223.1A priority Critical patent/CN114444840A/en
Publication of CN114444840A publication Critical patent/CN114444840A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a transformer substation operation and maintenance safety production risk early warning method, which comprises the following steps: processing the original data through a data processing module, and analyzing the data processed by the data processing module through a data analysis module; a preset out-of-limit standard is recorded in the data analysis module, and whether the data exceeds a preset out-of-limit label is judged; analyzing the data through a monitoring analysis module, diagnosing the analyzed data through a monitoring diagnosis module, and transmitting the diagnosed data to a monitoring processing module for processing; the monitoring processing module is internally provided with an alarm out-of-limit standard, and transmits data to the risk evaluation module and the prediction evaluation module to pre-evaluate and predict risks and diagnose fault reasons and fault positions of corresponding equipment; the invention belongs to the technical field of early warning, and particularly relates to a transformer substation operation and maintenance safety production risk early warning method.

Description

Transformer substation operation and maintenance safety production risk early warning method
Technical Field
The invention belongs to the technical field of early warning, and particularly relates to a transformer substation operation and maintenance safety production risk early warning method.
Background
The continuous enlargement of the scale and the increasing importance of the power system make society have higher requirements on the reliable operation of the power system. The power worker needs to solve the problems that have already occurred, and needs to know the possibility of the equipment causing the problems and the severity of the problems through risk assessment. Moreover, the data of risk assessment are often used for operation and maintenance scheduling of the power grid, and can play a guiding role in operation monitoring, maintenance management, fault treatment, field inspection and the like of the power enterprise.
The reliability of the power grid depends on the reliable operation of the power transmission and transformation equipment, and the traditional state maintenance method of the power transmission and transformation equipment cannot meet the requirements of the intelligent power grid. Therefore, it is important and essential to acquire various status information of the equipment by various monitoring means, analyze the occurrence of a fault, identify early signs of the fault, perform status evaluation, analyze the fault status of the equipment, and then use it to guide correct status maintenance to ensure reliable operation of the power supply network.
Disclosure of Invention
In order to solve the problems, the invention provides a transformer substation operation and maintenance safety production risk early warning method.
In order to realize the functions, the technical scheme adopted by the invention is as follows: a transformer substation operation and maintenance safety production risk early warning method comprises the following steps:
(1) the method comprises the steps that original data are obtained from an external system through a data obtaining module, the original data are processed through a data processing module, and the data processed by the data processing module are analyzed through a data analyzing module;
(2) the data analysis module records a preset out-of-limit standard, and if the data exceeds a preset out-of-limit label, the data analysis module transmits the data to the monitoring and early warning module through the wireless transmission module and stores the data in the data storage module for storage; if the data does not exceed the preset out-of-limit mark, the data analysis module stores the data in the data storage module for storage;
(3) analyzing the data through a monitoring analysis module, diagnosing the analyzed data through a monitoring diagnosis module, transmitting the diagnosed data to a monitoring processing module for processing, and storing the data through a monitoring storage module;
(4) the monitoring processing module is internally provided with an alarm out-of-limit standard, if the alarm out-of-limit standard exceeds the standard, an early warning message is sent out, the message is transmitted to the terminal receiving module through the cloud platform, and meanwhile, data are transmitted to the risk assessment module and the prediction assessment module to pre-assess and predict risks, and the fault reason and the fault position existing in corresponding equipment are diagnosed;
(5) the diagnostic data is transmitted to a terminal receiving module through an information transmission module to alarm; and simultaneously, the information transmission module stores the information.
Further, the terminal receiving module comprises a mobile phone and a computer terminal.
The invention adopts the structure to obtain the following beneficial effects: the transformer substation operation and maintenance safety production risk early warning method provided by the invention is simple in operation, compact in structure and reasonable in design, the current health condition of the equipment is evaluated by acquiring and processing characteristic parameters reflecting the health state of the equipment, such as relevant basic data of power transmission and transformation equipment, real-time/historical data of the equipment and the like, the future development trend is predicted, meanwhile, the equipment with state degradation and poor trend timely issues state early warning messages, and effective failure modes and reasons are analyzed.
Drawings
Fig. 1 is a block diagram of a transformer substation operation and maintenance safety production risk early warning method provided by the invention.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings, and it should be understood that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1, the technical solution adopted by the present invention is as follows: a transformer substation operation and maintenance safety production risk early warning method comprises the following steps:
(1) the method comprises the steps that original data are obtained from an external system through a data obtaining module, the original data are processed through a data processing module, and the data processed by the data processing module are analyzed through a data analyzing module;
(2) the data analysis module records a preset out-of-limit standard, and if the data exceeds a preset out-of-limit label, the data analysis module transmits the data to the monitoring and early warning module through the wireless transmission module and stores the data in the data storage module for storage; if the data does not exceed the preset out-of-limit mark, the data analysis module stores the data in the data storage module for storage;
(3) analyzing the data through a monitoring analysis module, diagnosing the analyzed data through a monitoring diagnosis module, transmitting the diagnosed data to a monitoring processing module for processing, and storing the data through a monitoring storage module;
(4) the monitoring processing module is internally provided with an alarm out-of-limit standard, if the alarm out-of-limit standard exceeds the standard, an early warning message is sent out, the message is transmitted to the terminal receiving module through the cloud platform, and meanwhile, data are transmitted to the risk assessment module and the prediction assessment module to pre-assess and predict risks, and the fault reason and the fault position existing in corresponding equipment are diagnosed;
(5) the diagnostic data is transmitted to a terminal receiving module through an information transmission module to alarm; and simultaneously, the information transmission module stores the information.
The terminal receiving module comprises a mobile phone and a computer terminal.
The present invention and its embodiments have been described above, and the description is not intended to be limiting, and the drawings are only one embodiment of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should appreciate that they can readily use the disclosed conception and specific embodiments as a basis for designing or modifying other structures for carrying out the same purposes of the present invention without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (2)

1. A transformer substation operation and maintenance safety production risk early warning method is characterized by comprising the following steps:
(1) the method comprises the steps that original data are obtained from an external system through a data obtaining module, the original data are processed through a data processing module, and the data processed by the data processing module are analyzed through a data analyzing module;
(2) the data analysis module records a preset out-of-limit standard, and if the data exceeds a preset out-of-limit label, the data analysis module transmits the data to the monitoring and early warning module through the wireless transmission module and stores the data in the data storage module for storage; if the data does not exceed the preset out-of-limit mark, the data analysis module stores the data in the data storage module for storage;
(3) analyzing the data through a monitoring analysis module, diagnosing the analyzed data through a monitoring diagnosis module, transmitting the diagnosed data to a monitoring processing module for processing, and storing the data through a monitoring storage module;
(4) the monitoring processing module is internally provided with an alarm out-of-limit standard, if the alarm out-of-limit standard exceeds the standard, an early warning message is sent out, the message is transmitted to the terminal receiving module through the cloud platform, and meanwhile, data are transmitted to the risk assessment module and the prediction assessment module to pre-assess and predict risks, and the fault reason and the fault position existing in corresponding equipment are diagnosed;
(5) the diagnostic data is transmitted to a terminal receiving module through an information transmission module to alarm; and simultaneously, the information transmission module stores the information.
2. The transformer substation operation and maintenance safety production risk early warning method according to claim 1, wherein the terminal receiving module comprises a mobile phone and a computer terminal.
CN202111421223.1A 2021-11-26 2021-11-26 Transformer substation operation and maintenance safety production risk early warning method Pending CN114444840A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111421223.1A CN114444840A (en) 2021-11-26 2021-11-26 Transformer substation operation and maintenance safety production risk early warning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111421223.1A CN114444840A (en) 2021-11-26 2021-11-26 Transformer substation operation and maintenance safety production risk early warning method

Publications (1)

Publication Number Publication Date
CN114444840A true CN114444840A (en) 2022-05-06

Family

ID=81364764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111421223.1A Pending CN114444840A (en) 2021-11-26 2021-11-26 Transformer substation operation and maintenance safety production risk early warning method

Country Status (1)

Country Link
CN (1) CN114444840A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117475590A (en) * 2023-09-28 2024-01-30 杨联富 Security visual alarm system for power transmission and transformation project

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104992270A (en) * 2015-06-19 2015-10-21 国家电网公司 Power transmission and transformation equipment state maintenance aid decision making system and method
CN108388950A (en) * 2018-01-29 2018-08-10 杭州安脉盛智能技术有限公司 Intelligent transformer O&M method and system based on big data

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104992270A (en) * 2015-06-19 2015-10-21 国家电网公司 Power transmission and transformation equipment state maintenance aid decision making system and method
CN108388950A (en) * 2018-01-29 2018-08-10 杭州安脉盛智能技术有限公司 Intelligent transformer O&M method and system based on big data

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117475590A (en) * 2023-09-28 2024-01-30 杨联富 Security visual alarm system for power transmission and transformation project

Similar Documents

Publication Publication Date Title
CN111525694B (en) Intelligent switch cabinet marking device and method based on Internet of things
KR102165530B1 (en) A system for collecting data of railway equipmets with sensor adaptor
CN111983383A (en) Power system fault first-aid repair method and system
KR101094195B1 (en) Power facility management system using two dimensional code and administation server, and method for managing the same
CN212304872U (en) Intelligent power distribution monitoring and operation and maintenance system
CN207096357U (en) A kind of high-tension cable operating state monitoring system
CN111289144A (en) Bus fault monitoring system and method for high-voltage equipment
CN114444840A (en) Transformer substation operation and maintenance safety production risk early warning method
CN109747685A (en) Responder system fault pre-alarming platform
CN116566043A (en) Power distribution terminal monitoring system and monitoring method
CN113654816A (en) Locomotive test device based on CMD and locomotive intelligent debugging system
CN114485796A (en) Online state monitoring self-diagnosis system of box-type substation
CN107991965A (en) Standardization electricity business failure emergency command management method based on intellectual monitoring
CN101567581B (en) Universal intelligent low-voltage monitoring system
CN114362817A (en) Automatic operation and maintenance system for closed-loop automatic optical cable line
CN205622325U (en) Remote intelligent power dispatching automation equipment examine monitoring system
CN112698615A (en) Equipment fault feedback system based on cloud platform
CN111915205A (en) Intelligent scheduling-based automatic complex equipment health inspection method and system
CN204631168U (en) A kind of industrial current transformer remote diagnosis and maintenance system
CN212645787U (en) Computer lab power environmental monitoring system
CN210865046U (en) Test equipment on-line monitoring system with various alarm functions
CN114264982A (en) Transformer inspection system
CN112598869A (en) Electrical fire monitoring method and system
CN116996843A (en) Environment monitoring system and method for electric instrument equipment during nuclear power engineering construction
CN211830799U (en) Automatic comparison and checking device and system for main station alarm data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination