Prior art keywords
slope
steel pipe
domatic
scaffold
steel pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210174364.6A
Other languages
English (en)
Inventor
李学斌
张志刚
闫平
徐丽
仵慧广
陈春雷
李林涛
马严
周刚
张�浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 2 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 2 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 2 Engineering Co Ltd filed Critical China Gezhouba Group No 2 Engineering Co Ltd
Priority to CN202210174364.6A priority Critical patent/CN114439212A/zh
Publication of CN114439212A publication Critical patent/CN114439212A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/28Scaffolds primarily resting on the ground designed to provide support only at a low height
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

本发明为适用于高缓边坡支护工程的脚手架搭设方法,解决1:1.5坡度坡面支护脚手架搭设后操作空间受限、整体稳定性差的问题。坡脚设置木板,木板通过锚筋固定,锚筋插入岩石,脚手架搭设自下而上逐步升高,沿坡面设置坡面钢管,其下端位于木板上,坡面钢管沿坡面呈矩形网格状,连墙件将坡面钢管与坡面固定,树立竖向立杆,立杆的下端与构成矩形网格的坡面钢管固定连接,沿坡面横向的立杆的上端之间通过大横杆连接,坡面钢管与立杆上端通过水平设置的小横杆连接,小横杆上边铺踢脚板,坡面钢管与坡面的间距不低于20cm,沿坡面设置的爬梯与坡面钢管通过扣件固定。

Description

适用于高缓边坡支护工程的脚手架搭设方法
技术领域
本发明专利涉及一种高缓边坡支护工程脚手架搭设形式,主要应用于水电水利工程、公路工程边坡1:1.5边坡喷锚支护及TBS支护工程。
背景技术
水电工程中边坡支护一般为挂网喷混或TBS植草护坡、坡比为1:0.75。水电水利工程边坡支护施工中脚手架搭设以传统双排架结构形式为主,搭设形式与支护坡面平行,适用于陡边坡支护施工。在坡比为1:1.5~1:2高缓边坡施工中,传统双排架出现操作空间受限、整体稳定性差的缺点。
发明内容
本发明的目的是提供一种在高缓边坡支护工程中适应性和安全性好,操作空间不受立杆限制、整体稳定性好的适用于高缓边坡支护工程的脚手架搭设方法。
本发明是这样实现的:
适用于高缓边坡支护工程的脚手架搭设方法,坡面开挖清理后,坡顶搭设防护围栏6,坡脚设置木板8,木板8通过锚筋7固定,锚筋7插入岩,锚筋7间隔2.8-3.2m,脚手架搭设自下而上逐步升高,沿坡面设置坡面钢管4,其下端位于木板8上,坡面钢管4沿坡面呈矩形网格状,连墙件5将坡面钢管4与坡面固定,坡面钢管4固定后,树立竖向立杆3,立杆3的下端与构成矩形网格的坡面钢管4固定连接,沿坡面横向的立杆3的上端之间通过大横杆2连接,坡面钢管4与立杆3上端通过水平设置的小横杆1连接,小横杆1上边铺踢脚板14,立杆3超过大横杆2的高度为1.0-1.4m,坡面钢管4与坡面的间距不低于20cm,沿坡面设置的爬梯9与坡面钢管4使用扣件固定。
与大横杆2平行的围栏钢管15与立杆3连接,围栏钢管15上挂设密目网13。
连墙件5包括锚杆12、钢管11,锚杆12插入岩体中并注浆,钢管11一端与锚杆12外露端焊接,焊接长度不小于15cm,另一端通过扣件10与坡面钢管4扣接。
本发明的有益效果如下:
(1)优化了高缓边坡脚手架搭设形式, 适应性和稳定性好。
(2)传统的高缓边坡采用传统双排架搭设时,立杆与支护坡面平行,1:1.5边坡支护施工中,平行坡面立杆阻碍作业平台人员行走,并且立杆容易倾倒滑移。本发明采用新搭设方法的脚手架增加了立杆的受力角度和数量,保证了脚手架的适用性和安全性。
附图说明
图1为脚手架搭设侧视图。
图2为图1的左视图。
图3 为贴坡钢管搭设结构图。
图4为连墙件结构图。
具体实施方式
适用于高缓边坡支护工程的脚手架搭设方法,坡面开挖清理后,坡顶搭设防护围栏6,高度为1.2m,坡脚设置木板8,厚度为5cm,木板8通过锚筋7固定,锚筋7插入岩0.8m,,锚筋7间隔3.0m,脚手架搭设自下而上逐步升高,沿坡面设置坡面钢管4,其下端位于木板8上,坡面钢管4沿坡面呈矩形网格状,连墙件5将坡面钢管4与坡面固定,坡面钢管4固定后,树立竖向立杆3,立杆3的下端与矩形网格固定连接,沿坡面横向的立杆3的上端之间通过大横杆2连接,坡面钢管4与立杆3上端通过水平设置的小横杆1连接,小横杆1上边满铺踢脚板14,立杆3超过大横杆2的高度为1.2m,坡面钢管4与坡面的间距不低于20cm,沿坡面设置的爬梯9与坡面钢管4使用扣件固定。
与大横杆2平行的围栏钢管15与立杆3连接,围栏钢管15上挂设密目网13。
连墙件5包括锚杆12、钢管11,锚杆12插入岩体中0.88m并注浆,钢管11一端与锚杆12外露端焊接,焊接长度不小于15cm,另一端通过扣件10与坡面钢管4扣接。

Claims (3)

1.适用于高缓边坡支护工程的脚手架搭设方法,其特征在于,坡面开挖清理后,坡顶搭设防护围栏(6),坡脚设置木板(8),木板(8)通过锚筋(7)固定,锚筋插入岩石,锚筋之间间隔2.8-3.2m,脚手架搭设自下而上逐步升高,沿坡面设置坡面钢管(4),其下端位于木板(8)上,坡面钢管沿坡面呈矩形网格状,连墙件(5)将坡面钢管与坡面固定,坡面钢管固定后,树立竖向立杆(3),立杆(3)的下端与构成矩形网格的坡面钢管固定连接,沿坡面横向的立杆的上端之间通过大横杆(2)连接,坡面钢管(4)与立杆(3)上端通过水平设置的小横杆(1)连接,小横杆上边铺踢脚板(14),立杆超过大横杆(2)的高度为1.0-1.4m,坡面钢管(4)与坡面的间距不低于20cm,沿坡面设置的爬梯(9)与坡面钢管(4)通过扣件固定。
2.根据权利要求1所述的适用于高缓边坡支护工程脚的手架搭设方法,其特征在于,与大横杆(2)平行的围栏钢管(15)与立杆3连接,围栏钢管上挂设密目网(13)。
3.根据权利要求1或2所述的适用于高缓边坡支护工程的脚手架搭设方法,其特征在于,连墙件(5)包括锚杆(12)、钢管(11),锚杆插入岩体中并注浆,钢管的一端与锚杆外露端焊接,焊接长度不小于15cm,另一端通过扣件(10)与坡面钢管(4)扣接。
CN202210174364.6A 2022-02-25 2022-02-25 适用于高缓边坡支护工程的脚手架搭设方法 Pending CN114439212A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210174364.6A CN114439212A (zh) 2022-02-25 2022-02-25 适用于高缓边坡支护工程的脚手架搭设方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210174364.6A CN114439212A (zh) 2022-02-25 2022-02-25 适用于高缓边坡支护工程的脚手架搭设方法

Publications (1)

Publication Number Publication Date
CN114439212A true CN114439212A (zh) 2022-05-06

Family

ID=81373712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210174364.6A Pending CN114439212A (zh) 2022-02-25 2022-02-25 适用于高缓边坡支护工程的脚手架搭设方法

Country Status (1)

Country Link
CN (1) CN114439212A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116771090A (zh) * 2023-05-29 2023-09-19 上海宝冶集团有限公司 一种超高大斜面碎石边坡的施工脚手架搭设方法

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29706219U1 (de) * 1997-04-08 1997-05-28 Laug, Horst, 49809 Lingen Mehrzweck-Arbeitsdiele
KR100513136B1 (ko) * 2004-03-05 2005-09-07 이호형 암반사면 보강구조 및 이의 시공방법
CN203654708U (zh) * 2013-11-29 2014-06-18 深圳市工勘岩土工程有限公司 边坡脚手架卸荷装置
CN203654709U (zh) * 2013-11-29 2014-06-18 深圳市工勘岩土工程有限公司 边坡脚手架连墙件
CN104032758A (zh) * 2014-05-26 2014-09-10 中国建筑第八工程局有限公司 废弃矿坑内超高边坡加固施工方法
CN204112690U (zh) * 2014-10-09 2015-01-21 宿迁华夏建设(集团)工程有限公司 超高边坡多级放坡综合爬坡脚手架
CN105926651A (zh) * 2016-07-01 2016-09-07 杭州江润科技有限公司 复杂陡峭崖壁深边坡综合支护结构及施工方法
CZ201857A3 (cs) * 2018-02-05 2019-06-05 PPZS s.r.o. Permanentní prefabrikovaná záporová stěna
CN211173043U (zh) * 2019-10-18 2020-08-04 中国建筑第八工程局有限公司 一种斜坡上搭设外架立杆基础装置
CN112252342A (zh) * 2020-10-15 2021-01-22 浙江世润建创科技发展有限公司 岩质边坡破碎岩体钢丝格栅网防护及施工方法
CN113530192A (zh) * 2021-08-16 2021-10-22 中国铁道科学研究院集团有限公司 超高垂直岩质边坡的多支撑悬挑脚手架结构
CN215670918U (zh) * 2021-08-04 2022-01-28 中建八局广西建设有限公司 用于高边坡框格梁的操作架

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29706219U1 (de) * 1997-04-08 1997-05-28 Laug, Horst, 49809 Lingen Mehrzweck-Arbeitsdiele
KR100513136B1 (ko) * 2004-03-05 2005-09-07 이호형 암반사면 보강구조 및 이의 시공방법
CN203654708U (zh) * 2013-11-29 2014-06-18 深圳市工勘岩土工程有限公司 边坡脚手架卸荷装置
CN203654709U (zh) * 2013-11-29 2014-06-18 深圳市工勘岩土工程有限公司 边坡脚手架连墙件
CN104032758A (zh) * 2014-05-26 2014-09-10 中国建筑第八工程局有限公司 废弃矿坑内超高边坡加固施工方法
CN204112690U (zh) * 2014-10-09 2015-01-21 宿迁华夏建设(集团)工程有限公司 超高边坡多级放坡综合爬坡脚手架
CN105926651A (zh) * 2016-07-01 2016-09-07 杭州江润科技有限公司 复杂陡峭崖壁深边坡综合支护结构及施工方法
CZ201857A3 (cs) * 2018-02-05 2019-06-05 PPZS s.r.o. Permanentní prefabrikovaná záporová stěna
CN211173043U (zh) * 2019-10-18 2020-08-04 中国建筑第八工程局有限公司 一种斜坡上搭设外架立杆基础装置
CN112252342A (zh) * 2020-10-15 2021-01-22 浙江世润建创科技发展有限公司 岩质边坡破碎岩体钢丝格栅网防护及施工方法
CN215670918U (zh) * 2021-08-04 2022-01-28 中建八局广西建设有限公司 用于高边坡框格梁的操作架
CN113530192A (zh) * 2021-08-16 2021-10-22 中国铁道科学研究院集团有限公司 超高垂直岩质边坡的多支撑悬挑脚手架结构

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
孙雨轩;: "浅析道路工程边坡处理要点", 信息记录材料, no. 1, 25 December 2017 (2017-12-25) *
汪圣章;张鹏;: "天然边坡支护100m以上高排架设计与施工", 甘肃水利水电技术, no. 07, 25 July 2012 (2012-07-25), pages 60 - 63 *
陈旭东;李正兵;钟声;徐富刚;: "锦屏一级水电站高陡边坡施工脚手架稳定性分析", 施工技术, no. 23, 10 December 2014 (2014-12-10) *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116771090A (zh) * 2023-05-29 2023-09-19 上海宝冶集团有限公司 一种超高大斜面碎石边坡的施工脚手架搭设方法

Similar Documents

Publication Publication Date Title
CN110735525B (zh) 一种预制装配式自立钢管脚手架系统
CN111622126B (zh) 高山岩区高空垂直载人通道的施工方法
CN111779248A (zh) 高支模体系及其施工方法
CN212507296U (zh) 高支模体系
CN114439212A (zh) 适用于高缓边坡支护工程的脚手架搭设方法
CN210507456U (zh) 一种深基坑标准化可周转下挂上下人马道
CN114319809A (zh) 超高作业平台盘扣式作业脚手架体系施工方法
KR100500747B1 (ko) 사면에 도로나 공사용 발판으로서 유용한 구조물을설치하는 방법 및 그에 의해 설치된 도로나 공사용 발판
CN112412002A (zh) 一种跨越式模板支撑系统
CN111005547A (zh) 双向曲扭错层立面的外脚手架的施工方法
CN216042482U (zh) 一种拼接式操作平台
CN110863641A (zh) 一种双曲线冷却塔内超高落地式上人脚手架及其搭设方法
US20150240472A1 (en) Cantilevered structure
CN211229426U (zh) 一种自立式钢管脚手架系统
CN214144681U (zh) 一种跨越式模板支撑系统
CN213204130U (zh) 一种高陡边坡无盖重固结灌浆施工平台
CN213112246U (zh) 一种矩形抗滑桩人工挖孔桩提升门架
CN212714527U (zh) 一种山地桥梁施工便道
CN210598061U (zh) 一种脚手架
CN210686000U (zh) 一种洞室施工作业台车
CN217580216U (zh) 一种用于陡峭边坡施工的栈桥
CN206646830U (zh) 大跨度可周转式混凝土泵管型钢支撑体系
CN216949482U (zh) 用于沉井作业的悬挑式施工作业平台
KR200392074Y1 (ko) 콘크리트구조물의 설치를 용이하게 하기 위하여 협소한작업공간에 설치되는 트러스동바리
CN217232598U (zh) 一种双排脚手架

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination