CN114427275B CN202210061423.9A CN202210061423A CN114427275B CN 114427275 B CN114427275 B CN 114427275B CN 202210061423 A CN202210061423 A CN 202210061423A CN 114427275 B CN114427275 B CN 114427275B
Authority
CN
China
Prior art keywords
frame
curtain wall
glass
wedge
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210061423.9A
Other languages
Chinese (zh)
Other versions
CN114427275A (en
Inventor
姚传兰
任初秀
黄文奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Senlan Construction Group Co ltd
Original Assignee
Shenzhen Senlan Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Senlan Construction Group Co ltd filed Critical Shenzhen Senlan Construction Group Co ltd
Priority to CN202210061423.9A priority Critical patent/CN114427275B/en
Publication of CN114427275A publication Critical patent/CN114427275A/en
Application granted granted Critical
Publication of CN114427275B publication Critical patent/CN114427275B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Securing Of Glass Panes Or The Like (AREA)

Abstract

The invention provides a glass curtain wall which comprises a curtain wall outer frame, a curtain wall inner frame, glass plates and limiting pieces, wherein the glass plates are arranged on the outer frame; the curtain wall outer frame is in threaded connection with the wall body, the glass plates are inlaid in the inner frame of the curtain wall, a handle is arranged in the inner frame of the curtain wall and can rotate relatively on the inner frame of the curtain wall, the inner frame of the curtain wall is arranged in the outer frame of the curtain wall, and the limiting piece comprises the wedge-shaped block, the spring and the pull rope; the wedge blocks are in sliding connection with the springs, the wedge blocks are connected through the pull ropes, one ends of the springs are connected with the wedge blocks, and the other ends of the springs are connected with the curtain wall outer frame. The glass plate is directly embedded in the installation mode, the glass plate units are relatively independent, the outer frame body does not need to be disassembled, and the glass plate can be directly taken out from the curtain wall unit after replacement, so that the construction process of the glass plate is accelerated, and the construction efficiency is improved; the invention also provides a construction process of the glass curtain wall, which is used for manufacturing the glass curtain wall.

Description

Glass curtain wall and construction process thereof
Technical Field
The invention relates to the technical field of small glass curtain walls, in particular to a glass curtain wall and a construction process thereof.
Background
The glass plate is a new wall body of contemporary, it gives the building the biggest characteristic to be the building aesthetic, building function, building energy-conservation and building structure factor are unified organically, the building presents different hues from different angles, change with sunshine, moonlight, light gives people the beauty of dynamic. The glass plate has the advantages of light weight, flexible design, systematic construction, modern design and the like, is widely applied to building design, and is an attractive and novel building wall decoration method and is a remarkable feature of modern high-rise building times.
At present, the existing glass plate construction technology is various, but the installation structure of the glass plate is imperfect, the glass plate units are not independent, and an external device such as a sucker is needed for unloading the existing glass curtain wall, so that the glass curtain wall is taken down, but for a broken curtain wall, the sucker is difficult to adsorb on the curtain wall, and the construction process is slow and the efficiency is low.
Disclosure of Invention
The invention provides a glass curtain wall and a construction process thereof, which aim to solve the problem of difficult disassembly when the existing glass plate is damaged.
The invention provides a glass curtain wall and a construction process thereof for solving the technical problems, which are characterized by comprising the following steps: the curtain wall comprises a curtain wall outer frame, a curtain wall inner frame, a glass plate and a limiting piece;
The curtain wall outer frame is in threaded connection with the wall body, the glass plates are inlaid in the inner frame of the curtain wall, a handle is arranged in the inner frame of the curtain wall and can rotate relatively on the inner frame of the curtain wall, the inner frame of the curtain wall is arranged in the outer frame of the curtain wall, and the limiting piece comprises the wedge-shaped block, the spring and the pull rope; the wedge blocks are in sliding connection with the springs, the wedge blocks are connected through the pull ropes, one ends of the springs are connected with the wedge blocks, and the other ends of the springs are connected with the curtain wall outer frame.
Preferably, the curtain frame comprises a first supporting frame, a second supporting frame, a third supporting frame, a fourth supporting frame and a first bolt, wherein a plurality of screw positioning holes are formed in the first supporting frame and the fourth supporting frame, the screw positioning holes are uniformly distributed on the first supporting frame and the fourth supporting frame in a line shape, the first supporting frame is fixed on a wall body through the first bolt, grooves are formed in two sides of the first supporting frame and the fourth supporting frame, protrusions are arranged on two sides of the second supporting frame and the third supporting frame, and the protrusions are matched with the grooves.
Preferably, the limiting piece comprises a wedge block, a spring and a pull rope; the stay cord includes first stay cord, second stay cord, third stay cord and fourth stay cord, the wedge includes first wedge, second wedge, third wedge and fourth wedge, the spring includes first spring, second spring, third spring and fourth spring, first stay cord one end is connected with the second wedge, second stay cord one end is connected first wedge other end is connected the second wedge, third stay cord one end with the third wedge is connected, fourth stay cord one end is connected the third wedge other end is connected the fourth wedge passes through, first spring with first wedge is connected, the second spring with above the second wedge is connected, third spring with third wedge is connected, fourth spring with fourth wedge is connected.
Preferably, the curtain wall inner frame comprises a first transverse frame, a first vertical frame, a second transverse frame, L-shaped cushion blocks, foam plates, second bolts and handles, wherein the first transverse frame, the first vertical frame, the second vertical frame and the second transverse frame are provided with placing grooves, the foam plates are two in number, the foam plates are arranged on two sides of the placing grooves, the L-shaped cushion blocks are arranged between the foam plates, the L-shaped cushion blocks are arranged at two ends of the foam plates, the first transverse frame is connected with the first vertical frame through the second bolts, the second transverse frame is connected with the first vertical frame through the second bolts, the handles are arranged inside the first vertical frame and the second vertical frame, and the handles can rotate relatively on the first vertical frame and the second vertical frame.
Preferably, the device further comprises a fixing assembly, wherein the fixing assembly comprises a rotating shaft, a first winding wheel, a second winding wheel, a buckle and a fifth spring; the rotating shafts are arranged in the second supporting frame and the third supporting frame, the first winding wheel and the second winding wheel are fixedly connected with the rotating shafts, the other end of the first pull rope is connected with the first winding wheel, the other end of the third pull rope is connected with the second winding wheel, one side of the first winding wheel and one side of the second winding wheel are respectively provided with the guide groove, the buckle and the fifth spring are arranged in the guide grooves, and one end of the fifth spring is connected with the guide groove, and the other end of the fifth spring is connected with the buckle.
Preferably, the sealing assembly further comprises a sealing strip and a waterproof adhesive tape, wherein the sealing strip is arranged around the glass plate, one surface of the sealing strip is contacted with the glass plate, and the other surface of the sealing strip is contacted with the inner frame of the curtain wall; the waterproof adhesive tape encircles the curtain inner frame sets up, waterproof adhesive tape one side with the contact of curtain inner frame, the another side with the contact of curtain frame.
The second implementation of the invention also provides a construction process of the glass curtain wall, which is suitable for the glass curtain wall and comprises the following steps: s1, acquiring a glass plate and a curtain wall inner frame, and combining the curtain wall inner frame and the glass plate to obtain the glass plate with the curtain wall inner frame; s2, placing the glass plate with the inner frame of the curtain wall into the outer frame of the curtain wall to obtain the glass plate with the frame body, and S3, obtaining the glass curtain wall with the sealing strips and the waterproof adhesive tapes.
Preferably, S1 is further preceded by: s0, acquiring a curtain wall outer frame, embedding the curtain wall outer frame into a wall body, and filling fillers between the wall body and the curtain wall outer frame to increase the fixing stability of the curtain wall outer frame.
Preferably, S1 comprises the steps of:
S11: respectively attaching the foam board and the L-shaped cushion block in the first transverse frame, the first vertical frame, the second vertical frame and the second transverse frame by using glue to obtain four assemblies;
S12: and then the four assemblies are respectively connected through second bolts to obtain an inner frame of the curtain wall, and the glass plate is combined with the inner frame of the curtain wall to obtain the glass plate with the inner frame of the curtain wall.
Preferably, S2 comprises the steps of:
S21: the first supporting frame is connected with the wall body through a first bolt, then the second supporting frame and the third supporting frame are respectively connected to two sides of the first supporting frame, and finally the fourth supporting frame is covered to form an outer frame of the curtain wall;
S22: combining the glass plate with the inner frame of the curtain wall with the outer frame of the curtain wall to complete the assembly of the curtain wall unit;
Preferably, S3 comprises the steps of:
s31: sealing performance is improved, sealing strips are stuck to contact positions of the glass plates and the inner frame of the curtain wall by using glue, and the glass plates are fixed; s32: installing a waterproof adhesive tape, and adhering the waterproof adhesive tape to the contact position of the inner frame of the curtain wall and the outer frame of the curtain wall by using glue; s33: and finally, cleaning the places with the redundant glue by using neutral cleaning agent and water.
Compared with the prior art, the glass curtain wall and the construction process thereof provided by the invention have the following advantages:
1. The mounting structure of glass board improves, can carry out spacingly to the glass board through mutually supporting of wedge and spring, firm on the curtain frame, the installation is simple, can directly take off when needs change a glass board unit, need not dismantle the frame with wall connection just can take out the glass board, during the change, only need pull the stay cord, make wedge toward the inside shrink of curtain frame, rethread handle is direct takes out the glass board of damage this moment, avoid staff direct contact glass board opponent to cause the fish tail, it is more convenient to dismantle the glass board on the whole, factor of safety is higher, the glass board unit is relatively independent, at the in-process each other of installation and dismantlement does not influence.
2. This glass board has increased fixed subassembly, and the operator uses a style of calligraphy spanner to aim at pivot epaxial opening, then makes the pivot rotate, and the pivot can drive stay cord pulling wedge, can block by the buckle when rotating certain angle, and the wedge is not blocking the glass board this moment, and then people just can take out the glass board through the handle, and it is more convenient just can realize changing just to need one when unloading the glass board to change like this, has saved the manpower.
3. The glass plate construction process adopted by the invention is simple to operate on the whole, is in order to divide work, is reasonable in design on the whole, and improves the mounting structure of the glass plate on the premise of ensuring that the glass plate structure is tight and watertight, so that the glass plate is convenient to mount in the early stage and to replace in the later stage, the mounting and dismounting are faster and more convenient, the construction steps can be effectively accelerated, the curtain wall outer frame is fixed on a wall body, the assembled glass plate is directly put into the curtain wall outer frame, at the moment, the outer part of the curtain wall inner frame can be clamped into the curtain wall outer frame through the inclined plane of the wedge-shaped block, the glass plate mounting can be completed, the time for mounting the glass plate at high altitude is effectively reduced, and the overall construction efficiency is higher and safer.
Drawings
FIG. 1 is a schematic view showing a first perspective structure of a glass curtain wall according to a first embodiment of the present invention;
FIG. 2 is a schematic view of an exploded structure of a glass curtain wall according to a first embodiment of the present invention;
FIG. 3 is a schematic view of a first cross-sectional structure of a curtain wall casing of a glass curtain wall according to a first embodiment of the present invention;
FIG. 4 is an enlarged schematic view of portion A of a glass curtain wall according to a first embodiment of the present invention;
FIG. 5 is a schematic view of a first cross-sectional structure of a curtain wall casing of a glass curtain wall according to a first embodiment of the present invention;
FIG. 6 is an enlarged schematic view of portion B of a glass curtain wall according to a first embodiment of the present invention;
FIG. 7 is an enlarged schematic view of portion C of a glass curtain wall according to a first embodiment of the present invention;
Fig. 8 is a schematic perspective view of an inner frame of a glass curtain wall according to a first embodiment of the present invention;
FIG. 9 is an enlarged schematic view of portion D of a glass curtain wall according to a first embodiment of the present invention;
FIG. 10 is an enlarged schematic view of portion E of a glass curtain wall according to a first embodiment of the present invention;
FIG. 11 is an assembled view of a glass curtain wall according to a first embodiment of the present invention;
FIG. 12 is a flow chart of a glass curtain wall construction process according to a second embodiment of the present invention;
FIG. 13 is a detailed flowchart of step S1 of a glass curtain wall construction process according to a second embodiment of the present invention;
FIG. 14 is a detailed flowchart of step S2 of a glass curtain wall construction process according to a second embodiment of the present invention;
fig. 15 is a detailed flowchart of step S3 of a glass curtain wall construction process according to a second embodiment of the present invention.
Reference numerals illustrate:
100. a kind of glass curtain wall;
110. Curtain wall outer frame; 120. curtain wall inner frames, 130 and glass plates; 140. a limiting piece; 150. a seal assembly; 160. a fixing assembly;
111. A first support frame; 112. a second support frame; 113. a third support frame; 114. a fourth supporting frame; 115. a first bolt; 121. a first cross frame; 122. a first mullion; 123. a second mullion; 124. a second cross frame; 125. an L-shaped cushion block; 126. a foam board; 127. a second bolt; 128. a handle; 129. a cover plate; 141. wedge blocks; 142. a spring, 143, pull cord; 151. sealing strips, 152 and waterproof adhesive tapes; 161. a rotating shaft; 162. a first reel; 163. a second reel; 164. a buckle; 165. a fifth spring;
1411. A first wedge block; 1412. a second wedge block; 1413. a third wedge; 1414. a fourth wedge; 1421. a first spring; 1422. a second spring; 1423. a third spring; 1424. a fourth spring; 1431. a first pull rope; 1432. a second pull rope; 1433. a third pull rope; 1434. and a fourth pull rope.
Detailed Description
For the purpose of making the technical solution and advantages of the present invention more apparent, the present invention will be further described in detail below with reference to the accompanying drawings and examples of implementation. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention.
It will be understood that when an element is referred to as being "fixed to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like are used herein for illustrative purposes only.
At present, the existing glass plate is not convenient and fast enough to install and detach in the construction process, so that the construction progress of the glass plate is slow, and therefore, a glass curtain wall and a construction process thereof are needed to solve the problems.
Referring to fig. 1-11, a first embodiment of the present invention provides a glass curtain wall and a construction process 100 thereof, which solve the problem of slow construction progress caused by insufficient simple and rapid installation and disassembly of glass plates, and are suitable for installation occasions of small glass plates.
The invention provides a glass curtain wall and a construction process 100 thereof, comprising a curtain wall outer frame 110, a curtain wall inner frame 120, glass plates 130 and limiting pieces 140.
The curtain wall outer frame 110 includes a first support frame 111, a second support frame 112, a third support frame 113, a fourth support frame 114, and a first bolt 115.
The first supporting frame 111, the second supporting frame 112, the third supporting frame 113 and the fourth supporting frame 114 are fixedly connected with limiting plates on one sides, screw positioning holes are formed in the limiting plates of the first supporting frame 111 and the fourth supporting frame 114 and uniformly distributed on the limiting plates in a straight shape, first bolts 115 penetrate through the screw positioning holes to fix the first supporting frame 111 and the second supporting frame 112 on a wall, grooves are formed in two sides of the first supporting frame 111 and the fourth supporting frame 114, protrusions are arranged on two sides of the second supporting frame 112 and the third supporting frame 113, the sizes of the protrusions and the grooves are matched, and the first supporting frame, the second supporting frame, the third supporting frame and the fourth supporting frame are made of aluminum alloy materials.
The curtain wall inner frame 120 includes a first cross frame 121, a first mullion 122, a second mullion 123, a second cross frame 124, an L-shaped spacer 125, a foam panel 126, a second bolt 127, a handle 128, and a cover panel 129.
The first transverse frame 121, the first vertical frame 122, the second vertical frame 123 and the second transverse frame 124 are internally provided with placing grooves, two groups of foam boards 126 are arranged in the placing grooves, one surface of each foam board 126 is tightly attached to the inner wall of the mounting groove, the first transverse frame 121 is connected with the first vertical frame 122 and the second vertical frame 123 through second bolts 127, the second transverse frame 124 is connected with the first vertical frame 122 and the second vertical frame 123 through second bolts 127, L-shaped cushion blocks 125 are symmetrically arranged inside the first transverse frame 121 and the second transverse frame 124, the L-shaped cushion blocks 125 are positioned between the two foam boards 126 and are arranged close to two sides of the first transverse frame 121 and the second transverse frame 124, the glass boards 130 are arranged in the placing grooves and are positioned between the two foam boards, and four corners of the edges of the glass boards 130 are tightly attached to the L-shaped cushion blocks. The mounting groove has been seted up to first mullion 122, second mullion 123 one side, and the mounting groove is inside to be provided with handle 128, and handle 128 can rotate relatively in the mounting groove, and apron 129 sets up in first mullion 122, second mullion 123, and apron 129 can slide on first mullion 122, second mullion 123, and there is the damping apron 129 and first mullion 122, second mullion 123 between, and the size of apron 129 and the size of mounting groove size phase-match.
The limiter 140 includes a wedge, a spring, and a pull cord.
The wedge blocks include a first wedge block 1411, a second wedge block 1412, a third wedge block 1413, and a fourth wedge block 1414, the springs include a first spring 1421, a second spring 1422, a third spring 1423, and a fourth spring 1424, and the draw lines include a first draw line 1431, a second draw line 1432, a third draw line 1433, and a fourth draw line 1433; one end of a first spring 1421 is connected with the first wedge-shaped block 1411, the other end of the first spring 1421 is connected with the first supporting frame 111, one end of a second spring 1422 is connected with the second wedge-shaped block 1412, the other end of the second spring 1422 is connected with the inside of the second supporting frame 112, one end of a third spring 1423 is connected with the third wedge-shaped block 1413, the other end of the third spring 1423 is connected with the inside of the third supporting frame 113, one end of a fourth spring 1424 is connected with the fourth wedge-shaped block 1414, the other end of the fourth spring 1424 is connected with the inside of the fourth supporting frame 114, one end of a first pull rope 1431 is connected with the second wedge-shaped block 1412, one end of a second pull rope 1432 is connected with the first wedge-shaped block 1411, the other end of the second wedge-shaped block 1412, one end of the third pull rope 1433 is connected with the third wedge-shaped block 1413, and one end of the fourth pull rope 1434 is connected with the third wedge-shaped block 1413.
During the use, first braced frame 111 passes through first bolt 115 to be fixed on the wall body earlier, then install second braced frame 112, third braced frame 113 on first braced frame 111, then cover fourth braced frame 114, constitute a relatively confined rectangle frame, then install foam board 126 respectively in first horizontal frame 121, first mullion 122, second mullion 123, second horizontal frame 124, install L shape cushion 125 in first horizontal frame 121, in second horizontal frame 124, then assemble the first horizontal frame 121 that will assemble, first mullion 122, second mullion 123 passes through second bolt 127, constitute the three support frame body, then install glass board 130 in three support frame body inside, then be connected with the three support frame body with second horizontal frame 124, move glass board 130 and operating personnel to the assigned position through the lift, handle 129 places the glass board 130 that will assemble directly in curtain frame 110 inside, in the course of placing the in-process curtain wall, the outward flange contact with wedge-shaped block inclined plane, make the wedge-shaped block shrink, the wedge-shaped plate is held to the inside the wedge-shaped block, the wedge-shaped plate is held to the inside is held to the frame 130 when the wedge-shaped plate is held to the wedge-shaped plate 130, the wedge-shaped plate is held completely, the wedge-shaped plate 130 is held completely in the time, the wedge-shaped plate is held to be mounted to the wedge-shaped plate is mounted to the glass frame 130 is held completely, the glass is mounted, the wedge-shaped 130 is held completely, when the wedge-shaped plate is held to be mounted is held to the wedge-shaped plate is held, and the wedge-shaped 130 is held, and the glass is mounted, and the wedge plate is easy, and the glass is used, and the glass is easy, and the glass frame is easy.
When the glass sheet needs to be replaced and removed, the first pull rope 1431 and the third pull rope 1433 need to be pulled manually at the same time, the springs are compressed, and when the wedge block is completely contracted into the curtain wall outer frame 110, the glass sheet 130 can be directly taken out manually through the handle 129.
Further, the fixing assembly 160 is included, and the fixing assembly 160 includes a rotating shaft 161, a first reel 162, a second reel 163, a buckle 164 and a fifth spring 165;
The number of the rotating shafts 161 is two, the rotating shafts 161 are arranged in the second supporting frame 112 and the third supporting frame 113, an opening is formed in one side of each rotating shaft 161, the opening is arranged far away from one end of each buckle, the opening is matched with a standard spanner in size, the first reel 162 and the second reel 163 are fixedly connected with the rotating shafts 161, the other end of each first pull rope 1431 is connected with the first reel 162, the other end of each third pull rope 1433 is connected with the second reel 163, guide grooves are formed in one side of each first reel 162 and one side of each second reel 163, each buckle 164 and each fifth spring 165 are arranged in the corresponding guide groove, one end of each fifth spring 165 is connected with one end of each guide groove, the other ends of the corresponding fifth springs 165 are connected with the corresponding buckles 164, clamping grooves are annularly formed in the second supporting frame 112 and the third supporting frame 113, and the number of the corresponding buckles 124 are multiple, and the corresponding buckles 124 are matched through the clamping grooves to achieve a fixed effect.
When the device is used, an operator rotates the rotating shaft 161 by using the line wrench, at this time, the rotating shaft 161 drives the first reel 162 and the second reel 163 to rotate, the first pull rope 1431 and the third pull rope 1433 connected with the first reel 162 and the second reel 163 are wound, so that the second wedge 1412 and the third wedge 1413 are pulled, the second spring 1422 and the third spring 1423 are compressed, the second wedge 1412 is connected with the first wedge 1411 through the second pull rope, the third wedge 1413 is connected with the fourth wedge 1414 through the fourth pull rope, so that the limiting piece 140 can be contracted inside by rotating the rotating shaft 161, and the limiting piece 140 can be kept contracted inside the curtain wall outer frame 110 after the first reel 162 and the second reel 163 rotate by a certain angle, at this time, the operator can take out the glass plate 130 through the handle 129 and the whole disassembling process can be completed by only one person.
Further, the sealing assembly 150 comprises a sealing strip 151 and a waterproof adhesive tape 152, wherein the sealing strip 151 is symmetrically arranged on the glass plate 130, the sealing strip 151 is arranged around the glass plate 130, one surface of the sealing strip 151 is contacted with the glass plate 130, and the other surface is contacted with the inner frame 120 of the curtain wall; the waterproof adhesive tape 152 is arranged around the inner frame 120 of the curtain wall, the waterproof adhesive tape 152 is arranged on one side of the glass plate 130, one surface of the waterproof adhesive tape 152 is contacted with the waterproof adhesive tape 152, and the other surface is contacted with the outer frame 110 of the curtain wall.
In use, waterproof glue is coated on the contact edge of the inner frame 120 of the curtain wall and the glass plate 130, a sealing strip 151 is coated, then waterproof glue is coated on the contact edge of the inner frame 120 of the curtain wall and the outer frame 110 of the curtain wall, a waterproof adhesive tape 152 is coated, and finally, places with redundant glue are cleaned by neutral cleaning agent and water.
Referring to fig. 12-15, a second embodiment of the present invention provides a glass curtain wall construction process, which is applicable to a glass curtain wall as mentioned in the first embodiment; the construction process of the glass curtain wall is suitable for the field of installation and disassembly of small glass curtain walls.
S1, acquiring a glass plate and a curtain wall inner frame, and combining the curtain wall inner frame and the glass plate to obtain the glass plate with the curtain wall inner frame; s2, placing the glass plate with the inner frame of the curtain wall into the outer frame of the curtain wall to obtain the glass plate with the frame body, and S3, obtaining the glass curtain wall with the sealing strips and the waterproof adhesive tapes.
It can be understood that in order to avoid the direct contact of glass plate and curtain frame, cause the glass plate to take place to break easily, simultaneously in order to be convenient for install, then need be at the external curtain inside casing of glass plate, be connected with the curtain frame through the curtain inside casing, accomplish glass curtain's installation.
S1 further comprises the following steps: s0, acquiring a curtain wall outer frame, embedding the curtain wall outer frame into a wall body, and filling fillers between the wall body and the curtain wall outer frame to increase the fixing stability of the curtain wall outer frame.
It can be understood that the curtain wall outer frame is connected with the wall body, and the filler such as cement is filled, so that the curtain wall outer frame is stably and stably fixed on the wall body, and the curtain wall outer frame is prevented from falling off due to old first bolts after long-time use, so that the danger of high-altitude throwing occurs.
S1 comprises the following steps:
S11: respectively attaching the foam board and the L-shaped cushion block in the first transverse frame, the first vertical frame, the second vertical frame and the second transverse frame by using glue to obtain four assemblies; s12: and then the four assemblies are respectively connected through second bolts to obtain an inner frame of the curtain wall, and the glass plate is combined with the inner frame of the curtain wall to obtain the glass plate with the inner frame of the curtain wall.
It can be understood that through the effect of L type cushion, keep small clearance between glass board and the curtain inside casing, avoid glass board and the inside casing direct contact of glass, the effect of foam board is also protection glass board simultaneously, plays the effect of buffering, combines first horizontal frame, first mullion, the second mullion that will install earlier, then places the glass board along first mullion, second mullion inside groove into, covers the second horizontal frame at last.
S2 comprises the following steps:
S21: the first supporting frame is connected with the wall body through a first bolt, then the second supporting frame and the third supporting frame are respectively connected to two sides of the first supporting frame, and finally the fourth supporting frame is covered to form an outer frame of the curtain wall;
S22: combining the glass plate with the inner frame of the curtain wall with the outer frame of the curtain wall to complete the assembly of the curtain wall unit;
It can be understood that the limiting piece comprises a wedge block and a spring, the wedge block inclined plane can be extruded by the inner frame of the curtain wall in the installation process, the spring is compressed at the moment, the spring is reset when the glass plate with the inner frame of the curtain wall completely passes through the wedge block, the limiting piece acts to limit the movement of the glass plate, the glass plate with the inner frame of the curtain wall is prevented from falling off from the outer frame of the curtain wall,
S3 comprises the following steps:
s31: sealing performance is improved, sealing strips are stuck to contact positions of the glass plates and the inner frame of the curtain wall by using glue, and the glass plates are fixed; s32: installing a waterproof adhesive tape, and adhering the waterproof adhesive tape to the contact position of the inner frame of the curtain wall and the outer frame of the curtain wall by using glue; s33: and finally, cleaning the places with the redundant glue by using neutral cleaning agent and water.
It can be understood that in the installed glass curtain wall, a tiny gap still exists between the glass plate and the inner frame of the curtain wall and between the inner frame of the curtain wall and the outer frame of the curtain wall, in order to avoid the occurrence of air leakage and water leakage, a sealing strip is required to be attached to the joint of the glass plate and the inner frame of the curtain wall, a waterproof adhesive tape is attached to the joint of the inner frame of the curtain wall and the outer frame of the curtain wall, meanwhile, the glass plate is ensured not to move in the inner frame of the curtain wall, the inner frame of the curtain wall does not move in the outer frame of the curtain wall, and finally, the redundant glue is cleaned by neutral cleaning agent and water, so that the whole glass curtain wall is more attractive.
The above description is only of the preferred embodiments of the present invention and is not intended to limit the invention, but any modifications, equivalents, improvements, etc. within the principles of the present invention should be included in the scope of the present invention.

Claims (9)

1. A glass curtain wall, comprising: the curtain wall comprises a curtain wall outer frame, a curtain wall inner frame, a glass plate and a limiting piece;
The curtain wall outer frame is in threaded connection with a wall body, the glass plates are arranged in the curtain wall inner frame, the curtain wall inner frame is arranged inside the curtain wall outer frame, mounting grooves are symmetrically formed in the curtain wall inner frame, handles are arranged in the mounting grooves and can rotate relatively in the mounting grooves, two handles are arranged, limiting pieces are arranged inside the curtain wall outer frame, and the limiting pieces can slide on the curtain wall outer frame in a telescopic manner;
The limiting piece comprises a wedge block, a spring and a pull rope; the stay cord includes first stay cord, second stay cord, third stay cord and fourth stay cord, the wedge includes first wedge, second wedge, third wedge and fourth wedge, the spring includes first spring, second spring, third spring and fourth spring, first stay cord one end with the second wedge is connected, second stay cord one end is connected first wedge other end is connected the second wedge, third stay cord one end with the third wedge is connected, fourth stay cord one end is connected the third wedge other end is connected the fourth wedge passes through, first spring with first wedge is connected, the second spring with the last second wedge is connected, third spring with third wedge is connected, fourth spring with fourth wedge is connected.
2. The glass curtain wall of claim 1, wherein: the curtain frame comprises a first supporting frame, a second supporting frame, a third supporting frame, a fourth supporting frame and a first bolt, wherein a plurality of screw positioning holes are formed in the first supporting frame and the fourth supporting frame, the screw positioning holes are uniformly distributed on the first supporting frame and the fourth supporting frame in a line shape, the first supporting frame is fixed on a wall body through the first bolt, grooves are formed in two sides of the first supporting frame and the fourth supporting frame, protrusions are arranged on two sides of the second supporting frame and the third supporting frame, and the protrusions are matched with the grooves.
3. The glass curtain wall of claim 1, wherein: the curtain wall inner frame comprises a first transverse frame, a first vertical frame, a second transverse frame, L-shaped cushion blocks, foam plates, second bolts and handles, wherein the first transverse frame, the first vertical frame, the second vertical frame and the second transverse frame are provided with placing grooves, the foam plates are two in a group, the foam plates are arranged on two sides of the placing grooves, the L-shaped cushion blocks are arranged between the foam plates, the L-shaped cushion blocks are arranged at two ends of the foam plates, the first transverse frame is connected with the first vertical frame through the second bolts, the second transverse frame is connected with the first vertical frame through the second bolts, the handles are arranged inside the first vertical frame and the second vertical frame, and the handles can rotate relatively on the first vertical frame and the second vertical frame.
4. The glass curtain wall of claim 2, wherein: the device further comprises a fixing component, wherein the fixing component comprises a rotating shaft, a first winding wheel, a second winding wheel, a buckle and a fifth spring; the rotating shafts are arranged in the second supporting frame and the third supporting frame, the first winding wheel and the second winding wheel are fixedly connected with the rotating shafts, the other end of the first pull rope is connected with the first winding wheel, the other end of the third pull rope is connected with the second winding wheel, guide grooves are formed in one sides of the first winding wheel and one side of the second winding wheel, the buckle and the fifth spring are arranged in the guide grooves, and one end of the fifth spring is connected with the other end of the guide groove and the buckle.
5. The glass curtain wall of claim 1, wherein: the sealing assembly comprises a sealing strip and a waterproof adhesive tape, wherein the sealing strip is arranged around the glass plate, one surface of the sealing strip is contacted with the glass plate, and the other surface of the sealing strip is contacted with the inner frame of the curtain wall; the waterproof adhesive tape encircles the curtain inner frame sets up, waterproof adhesive tape one side with the contact of curtain inner frame, the another side with the contact of curtain frame.
6. A glass curtain wall construction process, which is applicable to the glass curtain wall as claimed in claims 1-5, and is characterized in that: the method comprises the following steps:
s1, acquiring a glass plate and a curtain wall inner frame, and combining the curtain wall inner frame and the glass plate to obtain the glass plate with the curtain wall inner frame;
S2, placing the glass plate with the inner frame of the curtain wall into the outer frame of the curtain wall to obtain the glass plate with the frame body.
7. The glass curtain wall construction process according to claim 6, wherein: s1 further comprises the following steps: s0, acquiring a curtain wall outer frame, embedding the curtain wall outer frame into a wall body, and filling fillers between the wall body and the curtain wall outer frame to increase the fixing stability of the curtain wall outer frame.
8. The glass curtain wall construction process according to claim 6, wherein:
S1 comprises the following steps:
S11: acquiring four assemblies, wherein a foam plate and an L-shaped cushion block are respectively arranged in a first transverse frame, a first vertical frame, a second vertical frame and a second transverse frame, and are adhered to the inner walls of the first transverse frame, the first vertical frame, the second vertical frame and the second transverse frame through glue;
S12: and connecting the four assemblies through second bolts to obtain an inner frame of the curtain wall, combining the glass plate with the inner frame of the curtain wall, and obtaining the glass plate with the inner frame of the curtain wall.
9. The glass curtain wall construction process according to claim 6, wherein:
S2 comprises the following steps:
s21: holding the handle, and directly placing the glass plate with the inner frame of the curtain wall into the outer frame of the curtain wall;
S22: the curtain frame is built-in with the locating part, when the glass board that has the curtain inside casing passes through the locating part completely, then accomplish the equipment of curtain unit.
CN202210061423.9A 2022-01-19 2022-01-19 Glass curtain wall and construction process thereof Active CN114427275B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210061423.9A CN114427275B (en) 2022-01-19 2022-01-19 Glass curtain wall and construction process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210061423.9A CN114427275B (en) 2022-01-19 2022-01-19 Glass curtain wall and construction process thereof

Publications (2)

Publication Number Publication Date
CN114427275A CN114427275A (en) 2022-05-03
CN114427275B true CN114427275B (en) 2024-05-10

Family

ID=81314102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210061423.9A Active CN114427275B (en) 2022-01-19 2022-01-19 Glass curtain wall and construction process thereof

Country Status (1)

Country Link
CN (1) CN114427275B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017129042A1 (en) * 2016-01-29 2017-08-03 金粤幕墙装饰工程有限公司 Press-fit unitized curtain wall and sealing member
CN211597309U (en) * 2020-08-18 2020-09-29 佛山市帝澳幕墙有限公司 Building curtain wall convenient to dismouting
CN211774941U (en) * 2020-02-06 2020-10-27 大德惠通建筑工程(北京)有限公司 Hidden frame glass curtain wall structure
CN213597284U (en) * 2020-10-28 2021-07-02 沈阳金维特门窗有限公司 Waterproof construction between aluminum curtain wall and glass curtain wall
CN113089900A (en) * 2021-03-03 2021-07-09 海门市品一铝业有限公司 High-heat-insulation glass curtain wall and processing technology thereof
CN215563633U (en) * 2021-06-21 2022-01-18 河北力尔铝业有限公司 Unit type curtain wall connecting device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017129042A1 (en) * 2016-01-29 2017-08-03 金粤幕墙装饰工程有限公司 Press-fit unitized curtain wall and sealing member
CN211774941U (en) * 2020-02-06 2020-10-27 大德惠通建筑工程(北京)有限公司 Hidden frame glass curtain wall structure
CN211597309U (en) * 2020-08-18 2020-09-29 佛山市帝澳幕墙有限公司 Building curtain wall convenient to dismouting
CN213597284U (en) * 2020-10-28 2021-07-02 沈阳金维特门窗有限公司 Waterproof construction between aluminum curtain wall and glass curtain wall
CN113089900A (en) * 2021-03-03 2021-07-09 海门市品一铝业有限公司 High-heat-insulation glass curtain wall and processing technology thereof
CN215563633U (en) * 2021-06-21 2022-01-18 河北力尔铝业有限公司 Unit type curtain wall connecting device

Also Published As

Publication number Publication date
CN114427275A (en) 2022-05-03

Similar Documents

Publication Publication Date Title
CN114427275B (en) Glass curtain wall and construction process thereof
CN204531106U (en) A kind of sitting posture curtain wall system that can independently change
JP5378853B2 (en) Sash window frame device for repair
CN113333422A (en) Telescopic ventilation system for ventilation based on laboratory
CN110145063B (en) Double-layer glass curtain wall
CN212295183U (en) Novel wall of portable folded cascade of fire prevention gives sound insulation convenient to installation
CN112761508A (en) Detachable curtain wall magnetic control type three-glass two-cavity built-in shutter glass
CN215255706U (en) Durable curtain wall
CN220285105U (en) Aluminum plate curtain wall local damage replacement structure
CN218374619U (en) Single-layer aluminum alloy curtain wall plate structure
CN115405217B (en) Window screening dismounting method for aluminum alloy doors and windows
CN211286195U (en) Concatenation installation formula metal curtain wall
CN215290890U (en) High leakproofness glass curtain wall window node mounting structure
CN214614870U (en) Novel green energy-saving building curtain wall
CN218714182U (en) Waterproof curtain wall structure
CN218456494U (en) Monitoring camera with good protection performance
CN214035276U (en) Energy-saving waterproof fireproof window sleeve
CN215977934U (en) Novel outdoor curtain wall with efficient heat insulation structure
CN220344981U (en) Portable flexible fireproof cover
CN220680629U (en) Aluminum alloy window assembling device
CN110039954A (en) The anti-dust protecting device of panel and mural painting in a kind of ancient building room
CN219828997U (en) Air conditioner convenient to install
CN212534700U (en) Assembled curtain mosaic structure for architectural design
CN211286147U (en) Medical ray separation wall for CT scanning
CN116044077A (en) Aluminum structure top surface glass daylighting roof mounting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant