CN114351986A - Plastering unit is used in decoration and finishing engineering construction convenient to remove - Google Patents

Plastering unit is used in decoration and finishing engineering construction convenient to remove Download PDF

Info

Publication number
CN114351986A
CN114351986A CN202210064490.6A CN202210064490A CN114351986A CN 114351986 A CN114351986 A CN 114351986A CN 202210064490 A CN202210064490 A CN 202210064490A CN 114351986 A CN114351986 A CN 114351986A
Authority
CN
China
Prior art keywords
conveying
frame
bottom plate
frame structure
transverse bottom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210064490.6A
Other languages
Chinese (zh)
Inventor
张琴琴
王建中
刘丙强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Nanfang Decoration Technology Co ltd
Original Assignee
Shandong Nanfang Decoration Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Nanfang Decoration Technology Co ltd filed Critical Shandong Nanfang Decoration Technology Co ltd
Priority to CN202210064490.6A priority Critical patent/CN114351986A/en
Publication of CN114351986A publication Critical patent/CN114351986A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Abstract

The invention provides a plastering device convenient to move for decoration engineering construction, which comprises a transverse bottom plate, direction-adjusting wheels, supporting wheels, push rods, an adjustable fixed support structure, a storage hopper, a conveying pump, a conveying hose, a lower side positioning bearing, a rotating motor, a lifting screw, an upper side positioning bearing, a positioning plate, a longitudinal threaded pipe, a buffering jacking scraping frame structure, a material conveying frame structure and an adjustable auxiliary ejection frame structure, wherein the direction-adjusting wheels are arranged on the front side and the rear side of the left lower part of the transverse bottom plate through bolts; the supporting wheel bolts are arranged on the front side and the rear side of the right lower side of the transverse bottom plate. The left-handed conveying blade and the right-handed conveying blade are respectively contacted with the bottom of the inner side of the receiving hopper, so that the left-handed conveying blade and the right-handed conveying blade can be driven to rotate by the conveying motor through the conveying rod when in use, and materials can be conveniently conveyed to two sides, so that the materials can be uniformly and downwards guided out from the delivery pipe.

Description

Plastering unit is used in decoration and finishing engineering construction convenient to remove
Technical Field
The invention belongs to the technical field of plastering equipment, and particularly relates to a plastering device convenient to move and used for decoration engineering construction.
Background
The plastering engineering is a decoration engineering of a traditional method of plastering mortar on walls, floors, ceilings and surfaces of house buildings, and some areas of China are also called as 'plastering' or 'plastering'.
But current plastering unit for decoration and finishing engineering construction has not had the waste material to falling the material and collects, and inconvenient plays the supporting role to the device and inconvenient even problem of carrying the material thing.
Therefore, the plastering device for decoration engineering construction is very necessary to be convenient to move.
Disclosure of Invention
In order to solve the technical problems, the invention provides a plastering device for decoration engineering construction, which is convenient to move and aims to solve the problems that the existing plastering device for decoration engineering construction does not collect fallen waste materials, is inconvenient to support the device and is inconvenient to uniformly convey the materials. A plastering device convenient to move for decoration engineering construction comprises a transverse bottom plate, a direction-adjusting wheel, a supporting wheel, a push rod, an adjustable fixed support structure, a storage hopper, a conveying pump, a conveying hose, a lower side positioning bearing, a rotating motor, a lifting screw, an upper side positioning bearing, a positioning plate, a longitudinal threaded pipe, a buffering and jacking scraping frame structure, a material conveying frame structure and an adjustable auxiliary ejection frame structure, wherein the direction-adjusting wheel is mounted on the front side and the rear side of the left lower part of the transverse bottom plate through bolts; the supporting wheel bolts are arranged on the front side and the rear side of the right lower side of the transverse bottom plate; the push rod bolt is arranged on the left side of the upper part of the transverse bottom plate; the adjustable fixed support structure is arranged at the front part and the rear part of the left side of the transverse bottom plate; the storage hopper is arranged at the upper part of the transverse bottom plate through bolts; the conveying pump is arranged at the right lower side of the storage hopper; the conveying hose is arranged at the upper part of the conveying pump; the lower side positioning bearing is arranged on the right side of the upper part of the transverse bottom plate; the rotating motor is arranged at the front part and the rear part on the right side of the transverse bottom plate; the lifting screw is inserted into the inner side of the lower side positioning bearing and is in transmission connection with an output shaft of the rotating motor; the upper side positioning bearing is sleeved on the upper part of the lifting screw rod; the positioning plate is arranged on the outer side of the upper positioning bearing; the longitudinal threaded pipe is in threaded connection with the outer side of the lifting screw; the buffer jacking scraping frame structure is arranged on one side of the longitudinal threaded pipe; the material conveying frame structure is arranged at the upper part of the buffering and jacking scraping frame structure; the adjustable auxiliary ejection frame structure is arranged on the right side of the transverse bottom plate; the material conveying frame structure comprises a receiving hopper, a discharge pipe, a conveying motor, a conveying rod, a left-handed conveying blade and a right-handed conveying blade, wherein the discharge pipe is respectively inserted into the lower part of the receiving hopper; a conveying motor is installed on the left side of the receiving hopper through a screw; a conveying rod is arranged on an output shaft of the conveying motor; the left-handed conveying leaves and the right-handed conveying leaves are welded to the left side and the right side of the outer portion of the conveying rod respectively.
Preferably, the adjustable auxiliary ejection frame structure comprises a storage frame, a storage bucket, a storage inserting frame, a T-shaped ejector rod, a return spring, an L-shaped groove and an adjusting handle, wherein the storage bucket is inserted in the right side of the interior of the storage frame; the left side of the containing frame is provided with a storage inserting frame; a T-shaped ejector rod is inserted into the right side inside the storage inserting frame; a return spring is sleeved on the outer side of the T-shaped ejector rod; an L-shaped groove is formed in the front side of the storage inserting frame; the inner side of the L-shaped groove is inserted with an adjusting handle.
Preferably, the buffering and jacking scraping frame structure comprises a positioning pipe, a T-shaped movable rod, a limiting ring, a scraping plate, a jacking spring and a connecting frame, wherein the positioning pipe is welded on one side of the longitudinal threaded pipe; the inner side of the positioning tube is inserted with a T-shaped movable rod; a limiting ring is welded on the right side of the outer part of the positioning pipe; a scraping plate is arranged on a bolt on the right side of the T-shaped movable rod; a jacking spring is sleeved on the right side of the outside of the T-shaped movable rod; and the upper part of the scraping plate is provided with a connecting frame through bolts.
Preferably, the adjustable fixing support structure comprises a mounting sleeve frame, a fixing bolt, a supporting cylinder, a supporting frame and an anti-skidding supporting leg, wherein the mounting sleeve frame is arranged at the front part and the rear part of the left side of the transverse bottom plate; a supporting cylinder is arranged on the inner side of the mounting sleeve frame through a bolt; and a support frame is mounted on a bolt at the lower part of the support cylinder.
Preferably, the left-handed conveying blade and the right-handed conveying blade are respectively contacted with the bottom of the inner side of the receiving hopper.
Preferably, the receiving frame is embedded in the right side of the transverse bottom plate.
Preferably, the return spring is disposed inside the housing frame.
Preferably, the adjusting handle is connected with a screw at the left side of the front part of the T-shaped ejector rod.
Preferably, the jacking spring is arranged between the limiting ring and the scraper plate.
Preferably, the mounting sleeve frame is mounted on the transverse bottom plate through a fixing bolt.
Preferably, the lower part of the support frame is provided with an anti-skid supporting leg through a screw.
Preferably, the upper end of the conveying hose is connected with the middle position of the upper part of the receiving hopper.
Preferably, the material receiving hopper is mounted on the upper part of the connecting frame through bolts.
Compared with the prior art, the invention has the beneficial effects that:
1. in the invention, the left-handed conveying blade and the right-handed conveying blade are respectively contacted with the bottom of the inner side of the receiving hopper, so that the left-handed conveying blade and the right-handed conveying blade can be driven to rotate by a conveying motor through the conveying rod when in use, and the material can be conveyed to two sides conveniently, so that the material can be uniformly led out downwards from the delivery pipe.
2. In the invention, the storage frame is embedded in the right side of the transverse bottom plate, so that the storage bucket can be conveniently stored and stored by using the storage frame when not in use.
3. According to the invention, the return spring is arranged on the inner side of the storage frame, so that the T-shaped ejector rod can be used for tightly ejecting the storage bucket under the action of the return spring, and the storage bucket can be in closer contact with a wall when in use.
4. In the invention, the jacking spring is arranged between the limiting ring and the scraping plate, so that the scraping plate can conveniently play an auxiliary jacking role when in use, further play a certain buffering role when in plastering and scraping, and simultaneously fix the T-shaped movable rod on the inner side of the positioning pipe by using a bolt when in no need of buffering.
5. In the invention, the jacking spring is arranged between the limiting ring and the scraping plate, so that the scraping plate can conveniently play an auxiliary jacking role when in use, further play a certain buffering role when in plastering and scraping, and simultaneously fix the T-shaped movable rod on the inner side of the positioning pipe by using a bolt when in no need of buffering.
6. In the invention, the mounting sleeve frame is mounted on the transverse bottom plate through the fixing bolt, so that the fixing bolt can be conveniently dismounted according to requirements when in use, and the mounting sleeve frame and the supporting cylinder can be conveniently dismounted and maintained.
7. In the invention, the lower part of the support frame is provided with the anti-skidding support legs by the bolts, so that the anti-skidding effect of the device placed on the ground can be improved when the device is used, and the device is prevented from moving towards the rear side when plastering is carried out.
8. In the invention, the upper end of the conveying hose is connected with the middle position of the upper part of the receiving hopper, so that the two raw materials can be conveniently conveyed to the middle position of the receiving hopper when in use.
9. In the invention, the hopper receiving bolt is arranged at the upper part of the connecting frame, so that the bolt on the connecting frame can be conveniently detached according to requirements when in use, and the hopper can be conveniently detached.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Fig. 2 is a schematic structural view of an adjustable fixing bracket structure of the present invention.
Fig. 3 is a schematic structural view of the structure of the buffer tightening scraper frame of the invention.
Fig. 4 is a schematic structural diagram of the material conveying frame structure of the invention.
Fig. 5 is a schematic structural diagram of an adjustable auxiliary ejection frame structure of the present invention.
In the figure:
1. a transverse floor; 2. a direction adjusting wheel; 3. a support wheel; 4. a push rod; 5. an adjustable fixed support structure; 51. installing a sleeve frame; 52. fixing the bolt; 53. a support cylinder; 54. a support frame; 55. anti-skid support legs; 6. a storage hopper; 7. a delivery pump; 8. a delivery hose; 9. a lower positioning bearing; 10. a rotating electric machine; 11. a lifting screw; 12. an upper positioning bearing; 13. positioning a plate; 14. a longitudinal threaded pipe; 15. the scraping frame structure is supported tightly by the buffer; 151. a positioning tube; 152. a T-shaped movable rod; 153. a limiting ring; 154. a scraping plate; 155. the spring is tightly propped; 156. a connecting frame; 16. a material conveying frame structure; 161. a receiving hopper; 162. a delivery pipe; 163. a conveying motor; 164. a conveying rod; 165. left-handed leaf delivery; 166. conveying leaves by right hand; 17. the structure of the auxiliary ejection frame can be adjusted; 171. a storage frame; 172. a storage hopper; 173. storing the insert frame; 174. a T-shaped ejector rod; 175. a return spring; 176. an L-shaped groove; 177. an adjusting handle.
Detailed Description
The invention is further described below with reference to the accompanying drawings:
example (b):
as shown in fig. 1 and 4, the invention provides a plastering device for decoration engineering construction, which is convenient to move, and comprises a transverse bottom plate 1, a direction-adjusting wheel 2, a supporting wheel 3, a push rod 4, an adjustable fixed support structure 5, a storage hopper 6, a conveying pump 7, a conveying hose 8, a lower side positioning bearing 9, a rotating motor 10, a lifting screw 11, an upper side positioning bearing 12, a positioning plate 13, a longitudinal threaded pipe 14, a buffering and jacking scraping frame structure 15, a material conveying frame structure 16 and an adjustable auxiliary jacking frame structure 17, wherein the direction-adjusting wheel 2 is arranged on the front side and the rear side of the left lower part of the transverse bottom plate 1 through bolts; the supporting wheels 3 are arranged on the front side and the rear side of the right lower side of the transverse bottom plate 1 through bolts; the push rod 4 is mounted on the left side of the upper part of the transverse bottom plate 1 through a bolt; the adjustable fixed bracket structure 5 is arranged at the front part and the rear part of the left side of the transverse bottom plate 1; the storage hopper 6 is arranged at the upper part of the transverse bottom plate 1 through bolts; the delivery pump 7 is arranged at the lower right side of the storage hopper 6; the conveying hose 8 is arranged at the upper part of the conveying pump 7; the lower positioning bearing 9 is arranged on the right side of the upper part of the transverse bottom plate 1; the rotating motor 10 is arranged at the front part and the rear part of the right side of the transverse bottom plate 1; the lifting screw 11 is inserted into the inner side of the lower side positioning bearing 9 and is connected with an output shaft of the rotating motor 10 in a transmission way; the upper positioning bearing 12 is sleeved on the upper part of the lifting screw rod 11; the positioning plate 13 is arranged on the outer side of the upper positioning bearing 12; the longitudinal threaded pipe 14 is in threaded connection with the outer side of the lifting screw rod 11; the buffer jacking scraping frame structure 15 is arranged on one side of the longitudinal threaded pipe 14; the material conveying frame structure 16 is arranged at the upper part of the buffering and jacking scraping frame structure 15; the adjustable auxiliary ejection frame structure 17 is arranged on the right side of the transverse bottom plate 1; the material conveying frame structure 16 comprises a receiving hopper 161, a delivery pipe 162, a conveying motor 163, a conveying rod 164, a left-handed conveying blade 165 and a right-handed conveying blade 166, wherein the upper end of the conveying hose 8 is connected with the middle position of the upper part of the receiving hopper 161, so that two raw materials are conveniently conveyed to the middle position of the receiving hopper 161 when in use; the material receiving hopper 161 is arranged at the upper part of the connecting frame 156 through bolts, so that the bolts on the connecting frame 156 can be conveniently detached according to requirements when in use, and the material receiving hopper 161 can be conveniently detached; the lower part of the receiving hopper 161 is respectively inserted with a delivery pipe 162; a conveying motor 163 is installed on the left side of the receiving hopper 161 through screws; a conveying rod 164 is arranged on an output shaft of the conveying motor 163; the left-handed conveying blade 165 and the right-handed conveying blade 166 are respectively contacted with the bottom of the inner side of the material receiving hopper 161, and when the material receiving hopper is used, the left-handed conveying blade 165 and the right-handed conveying blade 166 are driven to rotate by the conveying motor 163 through the conveying rod 164, so that materials are conveniently conveyed to two sides, and the materials are uniformly and downwards guided out from the guide pipe 162; the left-handed conveying blades 165 and the right-handed conveying blades 166 are welded to the left and right sides of the outer portion of the conveying rod 164.
As shown in fig. 5, in the above embodiment, specifically, the adjustable auxiliary ejection frame structure 17 includes a storage frame 171, a storage bucket 172, a storage insert frame 173, a T-shaped top bar 174, a return spring 175, an L-shaped groove 176 and an adjusting handle 177, the storage frame 171 is embedded in the right side of the transverse bottom plate 1, and the storage bucket 172 is stored and stored by the storage frame 171 when not in use; a storage bucket 172 is inserted into the right side inside the storage frame 171; a storage insertion frame 173 is installed at the left side of the storage frame 171; a T-shaped top rod 174 is inserted into the right side inside the storage inserting frame 173; a return spring 175 is sleeved on the outer side of the T-shaped ejector rod 174; the return spring 175 is arranged on the inner side of the storage frame 171, and the storage bucket 172 can be tightly pushed by the T-shaped ejector rod 174 under the action of the return spring 175, so that the storage bucket 172 can be more tightly contacted with the wall when the storage bucket is still used; an L-shaped groove 176 is formed in the front side of the storage inserting frame 173; an adjusting handle 177 is inserted into the inner side of the L-shaped groove 176.
In the above embodiment, as shown in fig. 3, specifically, the buffer tightening scraping frame structure 15 includes a positioning tube 151, a T-shaped movable rod 152, a limiting ring 153, a scraping plate 154, a tightening spring 155 and a connecting frame 156, the positioning tube 151 is welded on one side of the longitudinal threaded tube 14; a T-shaped movable rod 152 is inserted into the inner side of the positioning tube 151; a limiting ring 153 is welded on the right side of the outer part of the positioning tube 151; a scraping plate 154 is arranged on the right bolt of the T-shaped movable rod 152; a jacking spring 155 is sleeved on the right side of the outside of the T-shaped movable rod 152; the jacking spring 155 is arranged between the limiting ring 153 and the scraping plate 154, so that the scraping plate 154 can conveniently play an auxiliary jacking role when in use, further play a certain buffering role when in plastering and scraping, and simultaneously fix the T-shaped movable rod 152 on the inner side of the positioning pipe 151 by using a bolt when in no need of buffering; the jacking spring 155 is arranged between the limiting ring 153 and the scraping plate 154, so that the scraping plate 154 can conveniently play an auxiliary jacking role when in use, further play a certain buffering role when in plastering and scraping, and simultaneously fix the T-shaped movable rod 152 on the inner side of the positioning pipe 151 by using a bolt when in no need of buffering; the upper portion of the scraper 154 is bolted with a connecting bracket 156.
As shown in fig. 2, in the above embodiment, specifically, the adjustable fixing support structure 5 includes a mounting bracket 51, a fixing bolt 52, a supporting cylinder 53, a supporting frame 54 and an anti-skid foot 55, wherein the mounting bracket 51 is disposed at the front and rear parts of the left side of the transverse bottom plate 1; the mounting sleeve frame 51 is mounted on the transverse bottom plate 1 through the fixing bolt 52, and the fixing bolt 52 is conveniently dismounted according to requirements when the mounting sleeve frame is used, so that the mounting sleeve frame 51 and the supporting cylinder 53 are conveniently dismounted and maintained; a supporting cylinder 53 is installed on the inner side of the mounting sleeve frame 51 through a bolt; a support frame 54 is mounted on the lower bolt of the support cylinder 53; the lower part of the supporting frame 54 is provided with anti-skid supporting feet 55 by screws, so that the anti-skid effect when the device is placed on the ground can be improved when the device is used, and the device is prevented from moving towards the rear side when plastering is carried out.
Principle of operation
During working, the invention moves the direction-adjusting wheel 2 and the supporting wheel 3 to one side close to the wall according to requirements, then drives the supporting frame 54 to support the left lower side of the device by the antiskid supporting leg 55 by the supporting cylinder 53, then pulls the adjusting handle 177 upwards from the longitudinal section of the L-shaped groove 176, and pushes the storage hopper 172 tightly by the reset spring 175 through the T-shaped ejector rod 174 to contact with the wall, then conveys the materials in the storage hopper 6 into the receiving hopper 161 through the conveying hose 8 by the conveying pump 7, simultaneously drives the left-handed conveying blade 165 and the right-handed conveying blade 166 to rotate by the conveying motor 163 through the conveying rod 164, crushes the materials to two sides, then guides the materials downwards onto the scraping plate 154 through the guide pipe 162, and drives the lifting screw 11 to rotate by the rotating motor 10 to lift the longitudinal threaded pipe 14 and the scraping plate 154, therefore, plastering treatment on the wall surface is realized, and the T-shaped movable rod 152 can be fixed on the inner side of the positioning pipe 151 by using the bolt to scrape materials when buffering is not needed.
The technical solutions of the present invention or similar technical solutions designed by those skilled in the art based on the teachings of the technical solutions of the present invention are all within the scope of the present invention.

Claims (8)

1. The plastering device convenient to move for the decoration and finishing engineering construction is characterized by comprising a transverse bottom plate (1), a direction-adjusting wheel (2), a supporting wheel (3), a push rod (4), an adjustable fixed support structure (5), a storage hopper (6), a conveying pump (7), a conveying hose (8), a lower side positioning bearing (9), a rotating motor (10), a lifting screw (11), an upper side positioning bearing (12), a positioning plate (13), a longitudinal threaded pipe (14), a buffering and jacking scraping frame structure (15), a material conveying frame structure (16) and an adjustable auxiliary jacking frame structure (17), wherein the direction-adjusting wheel (2) is arranged on the front side and the rear side of the left lower part of the transverse bottom plate (1) through bolts; the supporting wheels (3) are arranged on the front side and the rear side of the right lower side of the transverse bottom plate (1) through bolts; the push rod (4) is arranged on the left side of the upper part of the transverse bottom plate (1) through a bolt; the adjustable fixed support structure (5) is arranged at the front part and the rear part of the left side of the transverse bottom plate (1); the storage hopper (6) is arranged on the upper part of the transverse bottom plate (1) through bolts; the delivery pump (7) is arranged at the right lower side of the storage hopper (6); the conveying hose (8) is arranged at the upper part of the conveying pump (7); the lower side positioning bearing (9) is arranged on the right side of the upper part of the transverse bottom plate (1); the rotating motor (10) is arranged at the front part and the rear part of the right side of the transverse bottom plate (1); the lifting screw (11) is inserted into the inner side of the lower side positioning bearing (9) and is in transmission connection with an output shaft of the rotating motor (10); the upper side positioning bearing (12) is sleeved on the upper part of the lifting screw rod (11); the positioning plate (13) is arranged on the outer side of the upper positioning bearing (12); the longitudinal threaded pipe (14) is in threaded connection with the outer side of the lifting screw (11); the buffer jacking scraping frame structure (15) is arranged on one side of the longitudinal threaded pipe (14); the material conveying frame structure (16) is arranged at the upper part of the buffering and jacking scraping frame structure (15); the adjustable auxiliary ejection frame structure (17) is arranged on the right side of the transverse bottom plate (1); the material conveying frame structure (16) comprises a material receiving hopper (161), a delivery pipe (162), a conveying motor (163), a conveying rod (164), a left-handed conveying blade (165) and a right-handed conveying blade (166), wherein the delivery pipe (162) is respectively inserted into the lower part of the material receiving hopper (161); a conveying motor (163) is installed on the left side of the receiving hopper (161) through screws; a conveying rod (164) is arranged on an output shaft of the conveying motor (163); the left-handed conveying blades (165) and the right-handed conveying blades (166) are welded to the left side and the right side of the outer portion of the conveying rod (164) respectively.
2. The movable plastering device for finishing work and project work of decoration and finishing as claimed in claim 1, wherein the adjustable auxiliary ejector frame structure (17) comprises a receiving frame (171), a storage bucket (172), a storage inserting frame (173), a T-shaped ejector rod (174), a return spring (175), an L-shaped groove (176) and an adjusting handle (177), the storage bucket (172) is inserted into the right side of the interior of the receiving frame (171); a storage inserting frame (173) is arranged on the left side of the storage frame (171); a T-shaped ejector rod (174) is inserted into the right side inside the storage inserting frame (173); a return spring (175) is sleeved on the outer side of the T-shaped ejector rod (174); an L-shaped groove (176) is formed in the front side of the storage inserting frame (173); an adjusting handle (177) is inserted into the inner side of the L-shaped groove (176).
3. The movable plastering device for finishing work and project work of decoration according to claim 1, wherein the buffering and tightening frame structure (15) comprises a positioning pipe (151), a T-shaped movable rod (152), a stop ring (153), a scraping plate (154), a tightening spring (155) and a connecting frame (156), the positioning pipe (151) is welded to one side of the longitudinal threaded pipe (14); a T-shaped movable rod (152) is inserted into the inner side of the positioning tube (151); a limiting ring (153) is welded on the right side of the outer part of the positioning pipe (151); a scraping plate (154) is arranged on a right bolt of the T-shaped movable rod (152); a jacking spring (155) is sleeved on the right side of the outer part of the T-shaped movable rod (152); the upper part of the scraping plate (154) is provided with a connecting frame (156) by a bolt.
4. The movable plastering device for finishing work and project work convenient for movement according to claim 1, wherein said adjustable fixing bracket structure (5) comprises a mounting bracket (51), a fixing bolt (52), a supporting cylinder (53), a supporting bracket (54) and a non-slip leg (55), said mounting bracket (51) being provided at the left front and rear portions of the transverse floor (1); a supporting cylinder (53) is installed on the inner side of the mounting sleeve frame (51) through a bolt; and a support frame (54) is mounted on a lower bolt of the support cylinder (53).
5. The portable plastering device for finishing work of ornamental work as claimed in claim 1, wherein the left-hand delivering blade (165) and the right-hand delivering blade (166) are respectively in contact with the inside bottom of the hopper (161).
6. The portable plastering device for finishing work of ornamental works according to claim 4, wherein the mounting bracket (51) is mounted on the transversal base plate (1) by means of a fixing bolt (52).
7. The portable plastering device for finishing work of a decorative work as claimed in claim 4, wherein a non-slip leg (55) is screw-mounted to a lower portion of the supporting frame (54).
8. The portable plastering device for finishing work of ornamental work as claimed in claim 1, wherein the upper end of the delivery hose (8) is connected to an intermediate position of the upper part of the hopper (161).
CN202210064490.6A 2022-01-20 2022-01-20 Plastering unit is used in decoration and finishing engineering construction convenient to remove Pending CN114351986A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210064490.6A CN114351986A (en) 2022-01-20 2022-01-20 Plastering unit is used in decoration and finishing engineering construction convenient to remove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210064490.6A CN114351986A (en) 2022-01-20 2022-01-20 Plastering unit is used in decoration and finishing engineering construction convenient to remove

Publications (1)

Publication Number Publication Date
CN114351986A true CN114351986A (en) 2022-04-15

Family

ID=81091699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210064490.6A Pending CN114351986A (en) 2022-01-20 2022-01-20 Plastering unit is used in decoration and finishing engineering construction convenient to remove

Country Status (1)

Country Link
CN (1) CN114351986A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101643551B1 (en) * 2015-05-07 2016-11-23 송우석 The wall auto spread machine and method for spreading wall using this same
CN108360796A (en) * 2018-02-23 2018-08-03 河南伟民装饰工程有限公司 A kind of building decoration and fitment furred ceiling flush coater
CN110924645A (en) * 2019-12-20 2020-03-27 无棣国梁防腐保温工程有限公司 Movable indoor vertical wall plastering machine
CN211850634U (en) * 2019-11-11 2020-11-03 天津市紫浩君诚电子厂 Electromechanical device is with outdoor wall spraying equipment with adjustable
CN213700550U (en) * 2020-05-06 2021-07-16 陕西富丽包装有限公司 Improved full-automatic glue pasting machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101643551B1 (en) * 2015-05-07 2016-11-23 송우석 The wall auto spread machine and method for spreading wall using this same
CN108360796A (en) * 2018-02-23 2018-08-03 河南伟民装饰工程有限公司 A kind of building decoration and fitment furred ceiling flush coater
CN211850634U (en) * 2019-11-11 2020-11-03 天津市紫浩君诚电子厂 Electromechanical device is with outdoor wall spraying equipment with adjustable
CN110924645A (en) * 2019-12-20 2020-03-27 无棣国梁防腐保温工程有限公司 Movable indoor vertical wall plastering machine
CN213700550U (en) * 2020-05-06 2021-07-16 陕西富丽包装有限公司 Improved full-automatic glue pasting machine

Similar Documents

Publication Publication Date Title
CN216539999U (en) Chemical engineering pipeline cleaning device
CN107901207A (en) Fibre reinforced cement base foam thermal insulation board assembly line
CN109201533A (en) A kind of dry-hang stone curtain wall is with building decoration machine people
CN113338633A (en) Installation and construction method of external wall insulation board
CN114351986A (en) Plastering unit is used in decoration and finishing engineering construction convenient to remove
CN209502357U (en) The remove device of cement block on a kind of building construction formwork
CN112482178B (en) Self-service floating mechanism for filling layer
CN220058695U (en) Wall plastering device
CN211643720U (en) Grit conveying system
CN217975535U (en) Gap repairing device for building decoration
CN220521881U (en) Plastering machine for building wall
CN112814337A (en) Wall plastering device for decoration project
CN2358146Y (en) Automatic plastering machine
CN211514655U (en) Anti-blocking nano ceramic grinding machine for graphene
CN220455129U (en) Underground engineering concrete permeation prevention detection device
CN217353413U (en) Be used for subway to decorate and use floor brick laying device
CN219253448U (en) Archaize brick packing is with surface cleaning device
CN212265131U (en) Garbage collection device for civil engineering
CN219170491U (en) Compressed air pipeline rust cleaning device
CN218932812U (en) Highway crack processing apparatus that highway engineering was used
CN220181881U (en) Feeding mechanism for concrete processing
CN220466538U (en) Buried scraper conveyor
CN220882721U (en) Processing piece cleaning equipment
CN219471461U (en) Cement filling device for building floor fitment
CN219362331U (en) Conveyer belt sweeper

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination