CN114314056B - Adjustable building site steel pipe quick loading device - Google Patents
Adjustable building site steel pipe quick loading device Download PDFInfo
- Publication number
- CN114314056B CN114314056B CN202210063626.1A CN202210063626A CN114314056B CN 114314056 B CN114314056 B CN 114314056B CN 202210063626 A CN202210063626 A CN 202210063626A CN 114314056 B CN114314056 B CN 114314056B
- Authority
- CN
- China
- Prior art keywords
- plate
- plates
- mounting
- steel pipe
- loading device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Handcart (AREA)
Abstract
The invention relates to a quick loading device, in particular to an adjustable quick loading device for a steel pipe on a construction site. The invention aims to provide an adjustable type quick loading device for a steel pipe on a construction site, which can adjust the height. The invention provides an adjustable type quick loading device for a steel pipe on a construction site, which comprises a support frame, hinge plates, a mounting plate, a conveying mechanism, an adjusting mechanism and a power mechanism, wherein the hinge plates are respectively arranged at the upper parts of the right sides of the front side and the rear side of the support frame in a rotating mode, the mounting plate is respectively arranged at the upper parts of the hinge plates, the conveying mechanism for conveying the steel pipe is arranged on the mounting plate, the adjusting mechanism for adjusting the height is arranged on the support frame, and the power mechanism for providing power is arranged at the inner side of the support frame. According to the invention, the second double-shaft motor is started to enable the gear-lack and the spur gear to be meshed, so that the mounting plate and the hinged plate can be rotated, the height of the mounting plate can be adjusted, and the device can be suitable for vehicle types with different container heights, and is wide in application range.
Description
Technical Field
The invention relates to a quick loading device, in particular to an adjustable quick loading device for a steel pipe on a construction site.
Background
When the steel pipe is loaded onto the trailer by people, the steel pipe is usually transported to the trailer by manpower, and the truck and the ground are in a height difference, so that the labor is wasted and the efficiency is not high.
Patent application CN206634779U, grant bulletin day 20171114, discloses a steel pipe loading auxiliary conveying device, which comprises a bracket, wherein the bracket comprises two supporting legs and two vertical frameworks respectively fixed on the two supporting legs; the two vertical frameworks are connected through a first roller arranged horizontally, and the lower parts of the two vertical frameworks are connected through a transverse framework; the roller is sleeved on the outer wall of the first roller between the two vertical frameworks, the device is simple and practical, the operation is convenient, a person can load the steel pipe at a high position, the efficiency of loading the steel pipe can be effectively improved, and the labor is saved. Although the steel pipe loading device can facilitate people to load steel pipes, the height of the steel pipe loading device is difficult to adjust, so that people can only singly load steel pipes into the steel pipe loading device according to the vehicle type, and the steel pipe loading device is difficult to load steel pipes into different vehicle types with different container heights, and the application range is narrow.
Therefore, in order to overcome the defects, the adjustable type quick loading device for the steel pipes in the construction site is provided.
Disclosure of Invention
In order to overcome the defect that the height of the device is difficult to adjust when people use most of the existing steel pipe loading auxiliary conveying devices, the invention provides an adjustable type steel pipe rapid loading device for a construction site, which can adjust the height.
The invention is realized by the following technical approaches:
the utility model provides an adjustable building site steel pipe quick loading device, includes support frame, articulated slab, mounting panel, conveying mechanism, adjustment mechanism and power unit, and the right side upper portion of both sides all rotates around the support frame is equipped with the articulated slab, and articulated slab upper portion all is equipped with the mounting panel, is equipped with the conveying mechanism who is used for conveying the steel pipe on the mounting panel, is equipped with the adjustment mechanism who is used for height-adjusting on the support frame, and the support frame inboard is equipped with the power unit who is used for providing power.
In one embodiment, conveying mechanism is including first biax motor, the transmission wheel, the conveyer belt, first connecting plate, first arm-tie, transfer line and second fixed plate, be equipped with the second fixed plate between the inboard left part of mounting panel, second fixed plate left side middle part is equipped with first biax motor, the output shaft of both sides all is connected with the mounting panel rotation of homonymy around the first biax motor, the rotation is equipped with the transfer line between the inboard right part of mounting panel, all be equipped with the transmission wheel with the both sides around the transmission rod on the output shaft of both sides around the first biax motor, all around the conveyer belt between the transmission wheel of horizontal homonymy, even interval is equipped with first connecting plate between the conveyer belt, the equal interval in first connecting plate outside is equipped with three first arm-tie.
In one embodiment, the adjusting mechanism comprises a supporting plate, first clamping blocks and second pulling plates, wherein the supporting plate is arranged on the upper left side of the front side and the rear side of the supporting frame in a rotary mode, six first clamping blocks are arranged at the bottom of the mounting plate at intervals, the supporting plate is in contact with the first clamping blocks on the same side and the rightmost side, and the second pulling plates are arranged on the left side of the lower left side of the inner side of the supporting plate.
In one embodiment, the power mechanism comprises a second double-shaft motor, a gear missing, a mounting block, a spur gear and a pull rope, wherein the second double-shaft motor is arranged in the middle of the inner side of the support frame, the gear missing is arranged on the output shafts of the front side and the rear side of the second double-shaft motor, the mounting block is arranged on the front side and the rear side of the right side of the top of the support frame, the spur gear is arranged on the upper portion of the mounting block in a rotary mode, the gear missing is meshed with the spur gear on the same side, the pull rope is connected to the inner side of the spur gear, and the other end of the pull rope is connected with the second pull plate on the same side.
In one embodiment, still including the mobile mechanism who is used for being convenient for remove, mobile mechanism is including removing the wheel, the connecting block, the slide bar, the second connecting plate, the clamp plate, first fixed plate and first reset spring, support frame top left and right sides all the front and back symmetry is equipped with first fixed plate, all the slidingtype is equipped with the slide bar in the middle of the first fixed plate upper portion, slide bar bottom all the rotation is equipped with the connecting block, the connecting block lower part all the rotation is equipped with and removes the wheel, all be equipped with the second connecting plate between the slide bar top of horizontal homonymy, backup pad right side upper portion all is equipped with the clamp plate, the clamp plate all contacts with the second connecting plate of homonymy, all be equipped with first reset spring between the second connecting plate of first fixed plate top and homonymy, first reset spring all winds on the slide bar of homonymy.
In one embodiment, the auxiliary mechanism is used for hooking the bottom in the container and comprises a rotating plate, ratchet gears, second clamping blocks, second reset springs and guide blocks, wherein the rotating plate is arranged between the left parts of the outer sides of the mounting plates, the ratchet gears are arranged on the left parts of the outer sides of the mounting plates, the guide blocks are arranged on the upper sides of the right parts of the front side and the rear side of the rotating plate, the second clamping blocks are arranged on the guide blocks in a sliding mode, the ratchet gears on the same side are clamped by the second clamping blocks, and the second reset springs are arranged between the right sides of the guide blocks and the second clamping blocks on the same side.
In one embodiment, the protection mechanism for protecting people is further arranged, the protection mechanism comprises a first protection plate, pull rods and a second protection plate, the first protection plate is arranged between the right sides of the mounting plates, the pull rods are arranged on the front side and the rear side of the upper portion of the right side of the first protection plate, the second protection plate is arranged on the right portion of the outer side of the mounting plates, and the second protection plate is connected with the first protection plate on the same side.
In one embodiment, the pull rods are sleeved with rubber sleeves.
The invention provides an adjustable quick loading device for a steel pipe on a construction site, which has the advantages that:
1. according to the invention, the second double-shaft motor is started to enable the gear-lack and the spur gear to be meshed, so that the mounting plate and the hinged plate can be rotated, the height of the mounting plate can be adjusted, and the device can be suitable for vehicle types with different container heights, and is wide in application range.
2. According to the invention, the first connecting plate and the first pulling plate can be rotated by starting the first double-shaft motor, and after the steel pipes are sequentially placed on the first pulling plate, the first pulling plate can automatically drive the steel pipes to rotate, so that the steel pipes roll into a container of a truck, and then the steel pipes are automatically loaded, and the working efficiency of people is improved.
3. Under the action of the moving wheels, the adjustable steel pipe rapid loading device for the construction site can be conveniently moved to a designated position by people, and time and physical strength of people are saved.
4. The adjustable steel pipe quick loading device can enable the rotating plate to hook the inner bottom of the container of the truck by pulling the rotating plate to rotate, so that the adjustable steel pipe quick loading device is prevented from being disjointed with the inner bottom of the container of the truck.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a schematic perspective view of a first embodiment of a conveying mechanism according to the present invention.
Fig. 3 is a schematic view of a second perspective structure of the conveying mechanism of the present invention.
Fig. 4 is a schematic view of a partial perspective structure of the present invention.
Fig. 5 is a schematic view of a part of the three-dimensional structure of the adjusting mechanism, the power mechanism and the moving mechanism of the present invention.
Fig. 6 is a schematic view of a part of a moving mechanism of the present invention.
Fig. 7 is a schematic perspective view of an auxiliary mechanism of the present invention.
Fig. 8 is an enlarged view at a of the present invention.
Fig. 9 is a schematic perspective view of a first embodiment of a protection mechanism according to the present invention.
Fig. 10 is a schematic view of a second perspective structure of the protection mechanism of the present invention.
Marked in the figure as: 1-supporting frame, 2-hinged plate, 3-mounting plate, 4-conveying mechanism, 41-first double-shaft motor, 42-conveying wheel, 43-conveying belt, 44-first connecting plate, 45-first pulling plate, 46-transmission rod, 47-second fixing plate, 5-adjusting mechanism, 51-supporting plate, 52-first clamping block, 53-second pulling plate, 6-power mechanism, 61-second double-shaft motor, 62-gear lack, 63-mounting block, 64-spur gear, 65-stay cord, 7-moving mechanism, 71-moving wheel, 72-connecting block, 73-sliding rod, 74-second connecting plate, 75-pressing plate, 76-first fixing plate, 77-first return spring, 8-auxiliary mechanism, 81-rotating plate, 82-ratchet gear, 83-second clamping block, 84-second return spring, 85-guide block, 9-protecting mechanism, 91-first protecting plate, 92-pulling rod, 93-second protecting plate.
Detailed Description
The invention is further elucidated below in conjunction with the drawings of the specification, and embodiments of the invention are given in conjunction with the drawings of the specification.
Example 1
The utility model provides an adjustable building site steel pipe quick loading device, including support frame 1, articulated slab 2, mounting panel 3, conveying mechanism 4, adjustment mechanism 5 and power unit 6, refer to and show in 1-5, the right side upper portion of both sides all articulates around support frame 1 has articulated slab 2, and the mounting panel 3 has all been welded on articulated slab 2 upper portion, is equipped with conveying mechanism 4 on the mounting panel 3, is equipped with adjustment mechanism 5 on the support frame 1, and support frame 1 inboard is equipped with power unit 6.
The conveying mechanism 4 comprises a first double-shaft motor 41, transmission wheels 42, a conveying belt 43, a first connecting plate 44, a first pulling plate 45, a transmission rod 46 and a second fixing plate 47, the second fixing plate 47 is arranged between the left parts of the inner sides of the mounting plates 3, the first double-shaft motor 41 is bolted to the middle parts of the left sides of the second fixing plate 47, output shafts of the front side and the rear side of the first double-shaft motor 41 are rotatably connected with the mounting plates 3 on the same side, the transmission rods 46 are rotatably arranged between the right parts of the inner sides of the mounting plates 3, the transmission wheels 42 are arranged on the output shafts of the front side and the rear side of the first double-shaft motor 41 and the front side and the rear side of the transmission rods 46, the conveying belt 43 is wound between the transmission wheels 42 on the same side in the transverse direction, the first connecting plates 44 are uniformly arranged at intervals between the conveying belts 43, three first pulling plates 45 are arranged at intervals on the outer sides of the first connecting plates 44, and the first pulling plates 45 are rotatably arranged through the first pulling plates 45, so that when people put steel pipes on the first pulling plates 45, the steel pipes can be automatically loaded by the first pulling plates 45.
The adjustment mechanism 5 is including backup pad 51, first fixture block 52 and second arm-tie 53, see the fig. 4 and 5 and show, the equal rotation in left side upper portion of both sides is equipped with backup pad 51 around the support frame 1, the equal interval in mounting panel 3 bottom is equipped with six first fixture blocks 52, after the first fixture block 52 rotates, can drive mounting panel 3 and rotate to adjust the height of mounting panel 3, backup pad 51 all contacts with the first fixture block 52 of homonymy and rightmost, the inboard lower part left side of backup pad 51 has all welded second arm-tie 53.
The power mechanism 6 comprises a second double-shaft motor 61, a gear-missing 62, a mounting block 63, a spur gear 64 and a pull rope 65, the middle part of the inner side of the support frame 1 is connected with the second double-shaft motor 61 in a bolt manner, the second double-shaft motor 61 can provide power to adjust the height of the mounting plate 3 after being opened, the gear-missing 62 is arranged on the output shafts of the front side and the rear side of the second double-shaft motor 61, the mounting block 63 is arranged on the front side and the rear side of the right side of the top of the support frame 1, the spur gear 64 is arranged on the upper part of the mounting block 63 in a rotary manner, the gear-missing 62 is meshed with the spur gear 64 on the same side, the inner side of the spur gear 64 is connected with the pull rope 65, and the other end of the pull rope 65 is connected with the second pull plate 53 on the same side.
When people need to use the adjustable steel pipe quick loading device for the construction site, the adjustable steel pipe quick loading device for the construction site is firstly placed at a designated position, then the second double-shaft motor 61 is started, the output shaft of the second double-shaft motor 61 rotates, so that the gear deficiency 62 is driven to rotate, when the gear deficiency 62 is meshed with the gear deficiency 64, the gear deficiency 62 drives the gear deficiency 64 to rotate, the gear deficiency 64 drives the second pulling plate 53 to rotate through the pulling rope 65, so that the supporting plate 51 is driven to rotate, the supporting plate 51 presses the first clamping block 52 to rotate, the mounting plate 3 and the hinged plate 2 are driven to rotate, the height of the mounting plate 3 is further adjusted, the mounting plate 3 and the inner bottom of a container of a truck are positioned at the same height, when the supporting plate 51 passes over the first clamping block 52 at the rightmost side, the first clamping block 52 at the rightmost side clamps the supporting plate 51, and when the supporting plate 51 continues to rotate, the supporting plate 51 is separated from the first clamping block 52 at the rightmost side and then is contacted with the rest first clamping blocks 52 from right to left in turn, so that the rest first clamping blocks 52 are sequentially clamped with the supporting plate 51, when the gear-lack 62 is separated from the spur gear 64, the second pulling plate 53 and the supporting plate 51 stop rotating, after the height of the mounting plate 3 is adjusted by people, the second biaxial motor 61 is closed, the first biaxial motor 41 is started, the output shaft of the first biaxial motor 41 drives the transmission rod 46 to rotate through the transmission wheel 42 and the conveying belt 43, thereby driving the first connecting plate 44 and the first pulling plate 45 to rotate, then people can sequentially place steel pipes on the first pulling plate 45, the first pulling plate 45 drives the steel pipes to rotate, so that the steel pipes are downwards and upwards conveyed, the conveyed steel pipes roll into a container of the truck, the steel pipes are loaded, and the steel pipes are circulated in this way, when people put all the steel pipes into the cargo box of the truck, the first double-shaft motor 41 is turned off, the transmission rod 46, the first connecting plate 44 and the first pull plate 45 stop rotating, then the mounting plate 3 is pulled to rotate, so that the hinge plate 2 and the first clamping block 52 are driven to rotate, the first clamping block 52 is separated from the supporting plate 51, the supporting plate 51 is loosened by the first clamping block 52, at the moment, under the action of gravity, the supporting plate 51 and the second pull plate 53 are reversely reset, the second pull plate 53 drives the spur gear 64 to reversely reset through the pull rope 65, then the mounting plate 3 is reversely reset, so that the hinge plate 2 and the first clamping block 52 are driven to reversely reset, the first clamping block 52 on the rightmost side is contacted with the supporting plate 51, and then the mounting plate 3 is loosened.
Example 2
On the basis of embodiment 1, the steel pipe quick loading device further comprises a moving mechanism 7, the moving mechanism 7 comprises a moving wheel 71, a connecting block 72, sliding rods 73, a second connecting plate 74, a pressing plate 75, a first fixing plate 76 and a first reset spring 77, as shown in fig. 1, fig. 2, fig. 4, fig. 5 and fig. 6, the first fixing plate 76 is symmetrically welded on the left side and the right side of the top of the supporting frame 1, the sliding rods 73 are arranged in the middle of the upper portion of the first fixing plate 76 in a sliding mode, the connecting blocks 72 are arranged at the bottoms of the sliding rods 73 in a rotating mode, the moving wheel 71 is arranged at the lower portions of the connecting blocks 72 in a rotating mode, people can conveniently move the adjustable steel pipe quick loading device under the action of the moving wheel 71, the second connecting plate 74 is arranged between the tops of the sliding rods 73 on the same side in a transverse direction, the pressing plate 75 is welded on the upper portion of the right side of the supporting plate 51, the first reset spring 77 is arranged between the tops of the first fixing plate 76 and the second connecting plate 74 on the same side, and the first reset spring 77 is wound on the sliding rod 73 on the same side.
In the initial state, the first return spring 77 is in a compressed state, when people need to place the adjustable type construction site steel pipe quick loading device at a designated position, the mounting plate 3 can be pushed to move, under the action of the moving wheel 71, the adjustable type construction site steel pipe quick loading device is driven to move to the designated position, when the supporting plate 51 rotates, the supporting plate 51 drives the pressing plate 75 to rotate, when the pressing plate 75 is separated from the second connecting plate 74, the first return spring 77 returns to the original state, the first return spring 77 drives the second connecting plate 74 to move upwards, so that the sliding rod 73, the connecting block 72 and the moving wheel 71 are driven to move upwards, the moving wheel 71 is separated from the ground, so that the supporting frame 1 is contacted with the ground, when the supporting plate 51 is reversely reset, the supporting plate 51 drives the pressing plate 75 to reversely reset, when the pressing plate 75 is contacted with the second connecting plate 74, the pressing plate 75 is extruded to move downwards to reset, the first return spring 77 is compressed, so that the pressing plate 73, the connecting block 72 and the moving wheel 71 are driven to move downwards to reset, so that the supporting frame 1 is separated from the ground, and people can conveniently move the adjustable type construction site quick loading device.
The auxiliary mechanism 8 comprises a rotating plate 81, ratchet gears 82, second clamping blocks 83, second return springs 84 and guide blocks 85, the rotating plate 81 is arranged between the left parts of the outer sides of the mounting plates 3, people can rotate the rotating plate 81, the rotating plate 81 hooks the bottom in a cargo box of a truck, ratchet gears 82 are arranged on the left parts of the outer sides of the mounting plates 3, the ratchet gears 82 are located the outer sides of the rotating plate 81, the guide blocks 85 are welded on the upper sides of the right parts of the front side and the rear side of the rotating plate 81, the second clamping blocks 83 are arranged on the guide blocks 85 in a sliding mode, the ratchet gears 82 on the same side are clamped by the second clamping blocks 83, and the second return springs 84 are arranged between the right sides of the guide blocks 85 and the second clamping blocks 83 on the same side.
When people adjust to the condition that the mounting plate 3 is at the same height with the bottom in the container of the truck, the rotating plate 81 can be pulled to rotate, so that the rotating plate 81 hooks the bottom in the container of the truck, and accordingly, after people put all steel pipes into the container of the truck, the second clamping block 83 is pulled to move leftwards, the rotating plate 81 drives the guide block 85 and the second clamping block 83 to rotate, the ratchet gear 82 is extruded to move leftwards, the second clamping block 83 is enabled to release the ratchet gear 82, the second reset spring 84 is compressed, when the second clamping block 83 is separated from the ratchet gear 82, the second reset spring 84 drives the second clamping block 83 to move rightwards, the second clamping block 83 is enabled to clamp the ratchet gear 82 again, then the rotating plate 81 is released, after all steel pipes are put into the container of the truck, the second clamping block 83 is pulled to move leftwards, the second clamping block 83 is enabled to release the ratchet gear 82, the second reset spring 84 is then pulled to be compressed, the rotating plate 81 is enabled to press the second clamping block 83 to release the inner bottom of the truck, and the second clamping block 83 is enabled to reversely rotate, and the second reset spring 84 is enabled to reversely rotate, and then the second reset spring 84 is enabled to reversely rotate, and the second clamping block 83 is enabled to reversely move rightwards, so that the second clamping block 83 is enabled to reversely move the second clamping block 83 is enabled to reversely, and the second reset spring 83 is enabled to reversely, and the second clamping block 83 is enabled to move to reversely.
Still including protection machanism 9, protection machanism 9 is including first guard plate 91, pull rod 92 and second guard plate 93, see that the welding has first guard plate 91 between the mounting panel 3 right side, first guard plate 91 right side upper portion around both sides all are equipped with pull rod 92, all overlap the rubber leather sheath on the pull rod 92, the equal welding of mounting panel 3 outside right part has second guard plate 93, when people place the steel pipe on first guard plate 45 in proper order, first guard plate 91 and second guard plate 93 can protect people, second guard plate 93 all is connected with the first guard plate 91 of homonymy.
When people need to move the adjustable type construction site steel pipe quick loading device to the designated position, the pull rod 92 can be pushed to move, at the moment, the rubber leather sleeve on the pull rod 92 can prevent the hand from slipping, when the adjustable type construction site steel pipe quick loading device moves to the designated position, the pull rod 92 is loosened, and when people place the steel pipes on the first pull plate 45 in sequence, the first protection plate 91 and the second protection plate 93 can protect people, so that the first pull plate 45 is prevented from hooking clothes of people.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made hereto without departing from the spirit and principles of the present invention.
Claims (4)
1. The utility model provides an adjustable building site steel pipe quick loading device, including support frame (1), articulated slab (2) and mounting panel (3), right side upper portion of both sides all rotates around support frame (1) is equipped with articulated slab (2), articulated slab (2) upper portion all is equipped with mounting panel (3), characterized by, still include conveying mechanism (4), adjustment mechanism (5) and power unit (6), be equipped with conveying mechanism (4) that are used for conveying the steel pipe on mounting panel (3), be equipped with on support frame (1) and be used for adjusting high adjustment mechanism (5), support frame (1) inboard is equipped with power unit (6) that are used for providing power;
the conveying mechanism (4) comprises a first double-shaft motor (41), a transmission wheel (42), a conveying belt (43), a first connecting plate (44), a first pull plate (45), a transmission rod (46) and a second fixing plate (47), wherein the second fixing plate (47) is arranged between the left parts of the inner sides of the mounting plates (3), the first double-shaft motor (41) is arranged in the middle of the left sides of the second fixing plate (47), output shafts on the front side and the rear side of the first double-shaft motor (41) are all rotationally connected with the mounting plates (3) on the same side, the transmission rod (46) is rotationally arranged between the right parts of the inner sides of the mounting plates (3), the transmission wheel (42) is arranged on the output shafts on the front side and the rear side of the first double-shaft motor (41) and the front side and the rear side of the transmission rod (46), the conveying belt (43) is wound between the transmission wheels (42) on the same side in the transverse direction, the first connecting plates (44) are uniformly arranged at intervals, and three first pull plates (45) are arranged on the outer sides of the first connecting plate (44) at intervals;
the adjusting mechanism (5) comprises a supporting plate (51), first clamping blocks (52) and second pulling plates (53), wherein the supporting plate (51) is arranged at the upper part of the left side of the front side and the rear side of the supporting frame (1) in a rotating mode, six first clamping blocks (52) are arranged at intervals at the bottom of the mounting plate (3), the supporting plate (51) is contacted with the first clamping blocks (52) on the same side and the rightmost side, and the second pulling plates (53) are arranged at the left side of the lower part of the inner side of the supporting plate (51);
the power mechanism (6) comprises a second double-shaft motor (61), a gear-missing (62), a mounting block (63), a spur gear (64) and a pull rope (65), wherein the second double-shaft motor (61) is arranged in the middle of the inner side of the support frame (1), the gear-missing (62) is arranged on the output shafts of the front side and the rear side of the second double-shaft motor (61), the mounting block (63) is arranged on the front side and the rear side of the right side of the top of the support frame (1), the spur gear (64) is arranged on the upper portion of the mounting block (63) in a rotary mode, the gear-missing (62) is meshed with the spur gear (64) on the same side, the pull rope (65) is connected to the inner side of the spur gear (64), and the other end of the pull rope (65) is connected with the second pull plate (53) on the same side;
the movable type automatic lifting device is characterized by further comprising a moving mechanism (7) which is used for being convenient to move, the moving mechanism (7) comprises moving wheels (71), connecting blocks (72), sliding rods (73), second connecting plates (74), pressing plates (75), first fixing plates (76) and first reset springs (77), the first fixing plates (76) are symmetrically arranged on the left side and the right side of the top of the supporting frame (1), sliding rods (73) are arranged in the middle of the upper portion of the first fixing plates (76), the bottoms of the sliding rods (73) are all rotatably provided with connecting blocks (72), the lower portions of the connecting blocks (72) are all rotatably provided with the moving wheels (71), second connecting plates (74) are all arranged between the tops of the sliding rods (73) on the same side in the transverse direction, pressing plates (75) are all arranged on the upper portion of the right side of the supporting plate (51) and are in contact with the second connecting plates (74) on the same side, the first reset springs (77) are all arranged between the tops of the first fixing plates (76) and the second connecting plates (74) on the same side.
2. The quick loading device for the steel pipes on the construction site is characterized by further comprising an auxiliary mechanism (8) used for hooking the inner bottom of a container, wherein the auxiliary mechanism (8) comprises a rotating plate (81), ratchet gears (82), second clamping blocks (83), second return springs (84) and guide blocks (85), the rotating plate (81) is rotatably arranged between the left parts on the outer sides of the mounting plates (3), the ratchet gears (82) are arranged on the left parts on the outer sides of the mounting plates (3), the ratchet gears (82) are located on the outer sides of the rotating plate (81), the upper sides of the right parts on the front side and the rear side of the rotating plate (81) are respectively provided with the guide blocks (85), the second clamping blocks (83) are respectively provided with the second clamping blocks (83), and the ratchet gears (82) on the same sides are respectively clamped by the second return springs (84) between the right sides of the guide blocks (85) and the second clamping blocks (83) on the same sides.
3. The adjustable rapid loading device for the steel pipes on the construction site of claim 2, further comprising a protection mechanism (9) for protecting people, wherein the protection mechanism (9) comprises a first protection plate (91), a pull rod (92) and a second protection plate (93), the first protection plate (91) is arranged between the right sides of the mounting plates (3), the pull rods (92) are arranged on the front side and the rear side of the upper right side of the first protection plate (91), the second protection plate (93) is arranged on the right side of the outer side of the mounting plates (3), and the second protection plates (93) are connected with the first protection plates (91) on the same side.
4. An adjustable worksite steel pipe quick loading device as set forth in claim 3, wherein the tie rods (92) are each covered with rubber sleeves.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210063626.1A CN114314056B (en) | 2022-01-20 | 2022-01-20 | Adjustable building site steel pipe quick loading device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210063626.1A CN114314056B (en) | 2022-01-20 | 2022-01-20 | Adjustable building site steel pipe quick loading device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114314056A CN114314056A (en) | 2022-04-12 |
CN114314056B true CN114314056B (en) | 2023-10-13 |
Family
ID=81029283
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210063626.1A Active CN114314056B (en) | 2022-01-20 | 2022-01-20 | Adjustable building site steel pipe quick loading device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114314056B (en) |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2470706A1 (en) * | 1979-11-30 | 1981-06-12 | Blatchford Ralph Co Ltd | APPARATUS FOR HANDLING LOADS, IN PARTICULAR CONTAINERS |
JPH07300042A (en) * | 1994-03-07 | 1995-11-14 | Kimio Higuchi | Pallet device for motor-truck |
KR101637134B1 (en) * | 2015-12-01 | 2016-07-06 | 서경산업주식회사 | Salt collecting and stacking apparatus |
CN107985955A (en) * | 2017-12-27 | 2018-05-04 | 成都市旭泰仓储设备有限公司 | Double-vane conveyer |
WO2018228217A1 (en) * | 2017-06-16 | 2018-12-20 | 廊坊景隆重工机械有限公司 | Complementary transportation and support system used after rapid excavation |
CN109849761A (en) * | 2019-03-14 | 2019-06-07 | 万仕鑫 | A kind of lorry wagon box facilitating unloading |
CN110065829A (en) * | 2019-04-15 | 2019-07-30 | 万仕鑫 | Inclined plate is used in a kind of unloading of fork truck |
CN110626826A (en) * | 2019-10-08 | 2019-12-31 | 杭州筱趣贸易有限公司 | Steel pipe quick loading device that construction was used |
JP6726827B1 (en) * | 2019-06-17 | 2020-07-22 | 广州思天汽車用品有限公司 | A mobile vehicle that handles large stones and debris used on sandy beaches |
CN211380431U (en) * | 2020-01-13 | 2020-09-01 | 浙江康德意休闲椅有限公司 | Adjusting device for angle of backrest of leisure chair |
CN112339085A (en) * | 2020-10-20 | 2021-02-09 | 广州好未来科技研究有限公司 | Energy-concerving and environment-protective ceramic plate production facility |
CN213201600U (en) * | 2020-09-07 | 2021-05-14 | 河北昊蕴天成木业有限公司 | Special transfer machine for wood |
CN213294094U (en) * | 2020-09-30 | 2021-05-28 | 荆州市保平环保科技有限公司 | A conveyer for fertilizer loading |
CN213833300U (en) * | 2020-12-04 | 2021-07-30 | 刘晓峰 | Auxiliary conveying device for coal mine production loading |
CN214030956U (en) * | 2020-12-26 | 2021-08-24 | 济南市基仁建安有限公司 | Steel pipe quick loading device that construction was used |
CN113424669A (en) * | 2021-06-30 | 2021-09-24 | 翁丽彤 | Portable soil turning equipment for saline and alkaline land oat planting |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7909153B2 (en) * | 2004-06-18 | 2011-03-22 | Pogue Richard W | Extendible conveyor system |
US20100008750A1 (en) * | 2008-07-08 | 2010-01-14 | Dan Jones, Inc. | Trailers,systems and methods for transferring material |
US8944239B2 (en) * | 2010-10-26 | 2015-02-03 | Engineered Lifting Systems & Equipment Inc. | Conveyor apparatus for loading or unloading packages from shipping containers |
-
2022
- 2022-01-20 CN CN202210063626.1A patent/CN114314056B/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2470706A1 (en) * | 1979-11-30 | 1981-06-12 | Blatchford Ralph Co Ltd | APPARATUS FOR HANDLING LOADS, IN PARTICULAR CONTAINERS |
JPH07300042A (en) * | 1994-03-07 | 1995-11-14 | Kimio Higuchi | Pallet device for motor-truck |
KR101637134B1 (en) * | 2015-12-01 | 2016-07-06 | 서경산업주식회사 | Salt collecting and stacking apparatus |
WO2018228217A1 (en) * | 2017-06-16 | 2018-12-20 | 廊坊景隆重工机械有限公司 | Complementary transportation and support system used after rapid excavation |
CN107985955A (en) * | 2017-12-27 | 2018-05-04 | 成都市旭泰仓储设备有限公司 | Double-vane conveyer |
CN109849761A (en) * | 2019-03-14 | 2019-06-07 | 万仕鑫 | A kind of lorry wagon box facilitating unloading |
CN110065829A (en) * | 2019-04-15 | 2019-07-30 | 万仕鑫 | Inclined plate is used in a kind of unloading of fork truck |
JP6726827B1 (en) * | 2019-06-17 | 2020-07-22 | 广州思天汽車用品有限公司 | A mobile vehicle that handles large stones and debris used on sandy beaches |
CN110626826A (en) * | 2019-10-08 | 2019-12-31 | 杭州筱趣贸易有限公司 | Steel pipe quick loading device that construction was used |
CN211380431U (en) * | 2020-01-13 | 2020-09-01 | 浙江康德意休闲椅有限公司 | Adjusting device for angle of backrest of leisure chair |
CN213201600U (en) * | 2020-09-07 | 2021-05-14 | 河北昊蕴天成木业有限公司 | Special transfer machine for wood |
CN213294094U (en) * | 2020-09-30 | 2021-05-28 | 荆州市保平环保科技有限公司 | A conveyer for fertilizer loading |
CN112339085A (en) * | 2020-10-20 | 2021-02-09 | 广州好未来科技研究有限公司 | Energy-concerving and environment-protective ceramic plate production facility |
CN213833300U (en) * | 2020-12-04 | 2021-07-30 | 刘晓峰 | Auxiliary conveying device for coal mine production loading |
CN214030956U (en) * | 2020-12-26 | 2021-08-24 | 济南市基仁建安有限公司 | Steel pipe quick loading device that construction was used |
CN113424669A (en) * | 2021-06-30 | 2021-09-24 | 翁丽彤 | Portable soil turning equipment for saline and alkaline land oat planting |
Also Published As
Publication number | Publication date |
---|---|
CN114314056A (en) | 2022-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114314056B (en) | Adjustable building site steel pipe quick loading device | |
CN108100693B (en) | Cargo loading and unloading vehicle for large logistics truck | |
CN114275691A (en) | Hoisting accessory for assembly type building construction | |
WO1998011008A1 (en) | Apparatus for inverting container means | |
CN210391731U (en) | Pig feed partial shipment is with wrapping bag straining device | |
EP0679449B1 (en) | Device for scrapping cars | |
US2816675A (en) | Lifting mechanism | |
CN109178952B (en) | Automatic stacking equipment for polyurethane sandwich boards | |
CN109050621B (en) | Material transporting vehicle convenient for discharging for building construction | |
CN216336228U (en) | A hoisting accessory for factory building goods removes | |
CN211970666U (en) | Automatic feeding equipment for rinsing steel pipe joints | |
CN115321431A (en) | Storage handling equipment with clamping device | |
JP2900016B2 (en) | Electric pole transport truck | |
CN114802391A (en) | Shallow is transported to building site steel pipe | |
US2842274A (en) | Motor hoist | |
CN210310086U (en) | Vehicle-mounted automatic glass loading and unloading device | |
CN211997926U (en) | Electric automatic discharge device | |
CN216971447U (en) | KPA membrane transportation loading attachment | |
US4015820A (en) | Work lifting and supporting device | |
CN112617518A (en) | Sales display device for office machinery equipment and use method thereof | |
CN220907728U (en) | Crystal lifting vehicle for photovoltaic single crystal manufacturing industry | |
CN116513933B (en) | Loading and unloading device for road and bridge construction and application method | |
CN115075581B (en) | Anti withstand voltage construction equipment of wall body integrated into one piece | |
CN214140161U (en) | Scaffold frame conveyer convenient to loading and unloading | |
CN220181833U (en) | Automatic lifting and conveying device for trays |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20230913 Address after: 318050, Zhejiang, Taizhou province Luqiao district on the town of clouds on the side of the village Applicant after: TAIZHOU CITY FENLIDA CAR MOTORCYCLE ACCESSORIES Ltd. Address before: 518102 room 703, 7 / F, building 4, Taoyuanju District 1, Xixiang street, Bao'an District, Shenzhen, Guangdong Province Applicant before: Liu Xuan |
|
GR01 | Patent grant | ||
GR01 | Patent grant |